You are on page 1of 3

Advanced

Completion Engineering
Advanced
Advanced
Advanced
Completion
Jonathan Bellarby Engineering
Completion Engineering
Completion Engineering
AdvancedPetroleum Engineering and Completions
M.Eng Petroleum Engineering, Herriot Watt

Completion Engineering
17 December 2017A first class degree in geophysics and a m aster degree in Petroleum
Engineering was a prelude to 6 years with BP as a petroleum engi-
Jonathan Bellarby
neer. Jonathan left BP and following a short spell in Camco, jointly

Jonathan Bellarbyfounded
Petroleum ICE Energy.
Engineering After 6 years of com pletions and petroleum engi-
and Completions
Jonathan
neering consultancy, knowledge Bellarby and technical training,
management

Jonathan Bellarby
M.Eng Petroleum Engineering, Herriot Watt
Petroleum Engineering and Completions
ICE Energy
Petroleum Engineering merged with TRACS International (now owned by AGR Pe-
and Completions M.Eng Petroleum Engineering, Herriot Watt
troleum Services), where he continued with petroleum and completion
M.Eng Petroleum Engineering, Herriot Watt
PetroleumAEngineering
first class degree
engineering and in geophysics
studies, leading class and
degreeain
A first integrated
Completions mgeophysics
teamaster
s and degree in Petroleum
developing
and a m aster / deliver-
degree in Petroleum
Engineering wascourses
ing training a prelude a to 6 years
for Engineering
variety awith
of clients
was preludeBP 6as a petroleum
into diverse
years world
with -wide
BP as engi-
loca- engi-
a petroleum
M.Eng Petroleum
neer.tions. Engineering,
Jonathan left BPHerriot
and Watt
neer. Jonathan left BP and following a short spell in Camco, jointly
following a short spellof com
in pletions
Camco, and jointly
A first class degree in geophysics and a m aster degree in Petroleum
founded ICE Energy. After 6 years petroleum engi-
founded ICE Energy. After neering 6 years of com pletions
consultancy, and petroleum
knowledge management engi-training,
and technical
Engineering was a prelude to 6 ICE years
Energy with
merged BP as aInternational
with TRACS petroleum engi-
(now owned by AGR Pe-
neering consultancy, knowledge
Jonathan now works independently management
troleum Services),and providesand technical
impartial training,
adviceand and
neer. Jonathan
A first class left
degree
ICE expertise
Energy BP
merged and
to oil
following
in / with
geophysics
gas TRACS
com
a short
and
International
panies,
engineering
where
service
studies,
spell
leading
in
he continued
a companies
m(now
aster Camco,
owned
integrated
with petroleum
degree
and
team s by
jointly
AGR inPe-
potential
and developing
completion
Petroleum
in-
/ deliver-
founded ICE Energy.
Engineeringvestors.
troleum After
was Waithprelude
Services), 6
whereyears
over 25 years ing of
to of
he com
training
continued pletions
6 experience,
years with
courses
with and
for a variety
petroleum petroleum
BP asskills
of clients
Jonathan’s and a include:engi-
petroleum engi-
in diverse world
completion -wide loca-
tions.
neering consultancy, knowledge
engineering studies, leadingmanagement
integrated teamand s andtechnical
developingtraining, / deliver-
neer. Jonathan
ing training
left
courses
BP forand a
following
variety of clients
a inshort diverse
spell
world
in
-wide
Camco, jointly
ICE Energy merged with and
 Tubing TRACS casingInternational
Jonathan now works
design (technical (nowexpert),
ownedwell
independently and provides AGR loca-
by perform Pe-
impartial advice and
ance
foundedtions.
ICE Energy. After 6 years
expertise to of com
oil / gas completions
panies, service and petroleum
companies and potential in-engi-
troleum Services),and where he continued
artificial lift, m aterial
vestors. with petroleum
selection,
W ith over 25 yearssmart andJonathan’s
completion
completions,
of experience, HPHT,
skills include:
engineering studies, leading integrated team s and developing / deliver- training,
neering consultancy,
stimulation knowledge
(including shale management
oil and gas) and and
sand technical
control.
ICE
ing Energy
training merged
Jonathan
courses now
 SPE for with
works
Technical
a varietyTRACS
Interest
of and International
Group
clients chairm
artificialin
an on (now
lift,diverse
Com
world
m aterial selection,
owned
 Tubing and casing design (technical expert), well perform ance
independently and provides impartialpletionsadvice
-wide
smart
and by
and
loca-W ell
completions,
AGR
HPHT,
Pe-
expertise Interventions.
to oil / gas com panies, service companies and potential in-
troleum
tions. Services), where he continued with petroleum and
stimulation (including shale oil and gas) and sand control.
completion
vestors.
 W ith over
Author of 25 years
“W ell of experience,
Completion Jonathan’s
Design” skills include:
book published by Elsevier.
 SPE Technical Interest Group chairm an on Com pletions and W ell
engineering studies,
Over 8,000leading integrated
copies sold.
Interventions. team s and developing / deliver-
 Author of “W ell Completion Design” book published by Elsevier.
ing training
Jonathan now courses
works
 Tubing and
for a variety
independently
 Teaching of technical
casing and of
training
designOver clients
provides
8,000courses
copies sold.
(technical
in diverse
impartial
(over
expert), 200
wellrun inworld
advice and
40+ ance
perform
-wide loca-
coun-
tions. to oiland
expertise tries).
/ gas com panies,
artificial
 Teaching
service
lift, m aterial
of technical
companies
selection,
tries).
training courses (over
and potential
smart completions,
200 run in
HPHT,
40+ coun-
in-
stimulation
vestors. W ith over (including
25 years shale oil and
of experience, gas) and sand
Jonathan’s control.
skills include:
 SPE Technical Interest Group chairm an on Com pletions and W ell
Jonathan now works independently and provides impartial advice and
Interventions.
 Tubing and casing
expertise toAuthor “Wdesign
oil / ofgas com
ell (technical
panies,
Completion expert),
service
Design” well perform
companies
book published byand ance
potential in-
Elsevier.
and artificial lift, mcopies
aterialsold.
selection, smart completions, HPHT,
vestors. W ith over 25 years of experience, Jonathan’s skills include: WellAuthor
Over 8,000 for the Textbook
stimulation (including
 Teaching shale oil
of technical and gas)
training and(over
courses sand control.
200 run in 40+ coun-
Completion Design
AuthorMarch
for the
2009Textbook
700+ pages
 SPE Technicaltries). Interest Group chairm an on Com pletions and W ell Well Completion
Elsevier Publication.Design
Tubing and casing design (technical expert), well perform ance March 2009
 Interventions.
700+ pages
and of
 Author artificial lift, m aterial
“W ell Completion selection,
Design” smart completions,
book published by Elsevier. HPHT,Elsevier Publication.
stimulation
Over 8,000 copies(including
sold. shale oil and gas) and sand control.
SPE Technical
  Teaching of technicalInterest
trainingGroup
courseschairm
(over an
200onrunCom pletions
in 40+ coun- and W ell
tries).
Interventions.
Author for the Textbook
Author of “W ell Completion Design” book published by Elsevier. Well Completion Design
Over 8,000 copies sold.
Course Location: Dusit Thai Hotel - 5th Settlement
March 2009
For Reservation : 700+ pages
 Teaching of technical training courses (over 200 runChemist
in 40+. Ahmed
coun-Elsevier
YoussefPublication.

Course Price
tries). : $ 2500 (For Egyptians) +2 01000131393
$ 3000 (For Non - Egyptians) +202 26147336
Discounts : 5 % (For nomination > 5 Fax : +202 26147201
Author for the Textbook
participants) Payment (For Egyptians) Email : aelsayed@ogs.com.eg
Well Completion Design
: Should be in EGP equivalent to the March 2009
announced exchange rate for USD Eng. Ibrahim Fatehy 700+ pages
Elsevier Publication.
in the central bank of Egypt at the +2 01011434131
time for invoicing Payment (For Non - Email : ifatehy@ogs.com.eg
Egyptians) : Should be in USD Author for the T
Well Completio
March 20
About
About
Aboutthe
the
the
Course
Course
Course
This
This
This
course
course
course
will
willbewill
beofofbeinterest
interest
of interest
toto to
Engineers
Engineers
Engineers(both
(both(both
Operating
Operating
Operating and
andand
Service
Service
ServiceCompany
Company
Company personnel)
personnel)
personnel)
who
whowhoare
areare
already
already
alreadyfamiliar
familiar
familiar
with
withwith
the
thethe
basic
basic
basic
completion
completion
completion process-
process-
process-
es,
es,es,
but
butbut
have
have
haveaa need
need
a need toto extend
extend
to extend
their
their
their
area
area
area
ofof understanding
of
understanding
understanding toto to
cover
cover
cover
more
more
moreadvanced
advanced
advanced aspects;
aspects;
aspects;
but
butbut
who
whowho
cannot
cannot
cannotjustify
justify
justify
attending
attending
attending
aa number
number
a number ofof separate
separate
of separate courses
courses
courses
which
which
whichare
areareoften
oftenoftentargeted
targeted
targetedatat at
Sub-Surface
Sub-Surface
Sub-Surfacecontrolled
controlled
controlledBOP
BOP
BOP teaching
teaching
teachingspecific
specific
specific software.
software.
software.ItIt It
would
would
would
thus
thus
thus
also
alsoalso
suit
suitsuit
Production
Production
Production
Staff,
Staff,
Staff,
Engineers
Engineers
Engineers from
fromfrom disci-
disci-disci-
Course
Course
CourseTopics
Topics
Topics plines
plines
plines
other
other
otherthan
than than Production
Production
Production
Well
Well
WellPerformance
Performance
Performance Technology
Technology
Technology etc.
etc.etc.
How
How
Howtototrack
track
trackperformance,
performance,
performance,
How
How
Howtotopredict
predict
predictperformance,
performance,
performance,
How
How
Howtotomaintain
maintain
maintainperformance,
performance,
performance,
What
What
Whatarearethethe
thekey
key
keyperformance
performance
performance indicators
indicators
indicators and
and
and Course
Course
CourseObjectives
Objectives
Objectives
What
What
Whatarearethethe
thekey
key
keyperformance
performance
performance controlling
controlling
controlling factors?
factors?
factors?
 How
How
Howtoto
toselect
select
select
completion
completion
completion
Selection
Selection
SelectionofofArtificial
Artificial
ArtificialLift
Lift
LiftTechniques
Techniques
Techniques (ESP,
(ESP,
(ESP, SRSRSR
and
andandPCP)
PCP)
PCP)
What
What
Whatarearethethe
thedecision
decision
decision factors
factors
factors tototo
select
select
selectbetween
between
between different
different
differentAL,
AL,AL,
equipments
equipments
equipments
How
How
Howtototroubleshoot,
troubleshoot,
troubleshoot,
 How
How
How
toto identify
to
identify
identify
and
andand
calculate
calculate
calculate
IsIs
Isthere
thereaastandard
standard
standardprocedure
procedure
procedure totototroubleshoot
troubleshoot
troubleshoot the
thethe
ALALAL
the
thethe
wells’
wells’
wells’
performances
performances
performances
Formation
Formation
FormationDamage
Damage
How
How
Howtotoselect
select
selectthe
the
thecandidate
candidate
candidate remedial
remedial
remedial action,
action,
action,  What
What
What
isis
the
is
thethe
Well
Well
Well
Completion
Completion
Completion
How
How
Howtototrack
track
trackdamage
damage
damage progression
progression
progression
Planning
Planning
Planning
and
andand
Design
Design
Design
Process
Process
Process
What
What
Whatarearethethe
thebest
best
bestpractices
practices
practices forfor
for
damage
damage
damage prevention
prevention
prevention
Matrix
Matrix
MatrixAcidizing
Acidizing
AcidizingTreatments
Treatments
Treatments
Cycle
Cycle
Cycle
How
How
Howtotoselect
select
selectcandidates,
candidates,
candidates,  What
What
What
are
areare
the
thethe
Advanced
Advanced
Advanced
com-
com-
com-
What
What
Whatareareacidizing
acidizing
acidizingtechnologies,
technologies,
technologies,
pletion
pletion
pletion
techniques
techniques
techniques
(e.g.
(e.g.(e.g.
Tubing
Tubing
Tubing
How
How
Howtotoselect
select
selectthe
the
thebest
best
best treatment
treatment
treatment forfor
for
mymy
myproblem
problem
problem
What
What
Whatareareacidizing
acidizing
acidizingbestbest
best practices
practices
practices
less
less
lesscompletion,
completion,
completion, Intelligent
Intelligent
Intelligent
Conformance
Conformance
ConformanceControlControl
Control completion,
completion,
completion, Multilateral
Multilateral
Multilateralcom-
com- com-
What
What
Whatareareconformance
conformance
conformance control
control
control best
bestbest practices
practices
practices pletion,
pletion,
pletion,
Deep
Deep
Deep
water
water
water
comple-
comple-
comple-
How
How
Howtotoselect
select
selectcandidates
candidates
candidates tion,
tion,
tion,
Single
Single
Single
trip
trip trip
multizones
multizones
multizones
Hydraulic
Hydraulic
HydraulicFracturing
Fracturing
Fracturing gravelpack
gravelpack
gravelpacksystem,
system,
system,
……etc)
etc)
… etc)
WeWe
Weare areinterest
interest
interestinin
inthe
the
thelatest
latest
latest technology
technology
technology only
only
only
(Client
(Client
(Clientsaid:
said:
said:
WeWe We
are
areare
the
thethe
best
best
best
inin in
Egypt
Egyptdoing
doing
doinghydraulic
hydraulic
hydraulic fracturing
fracturing
fracturing )) )  What
What
What
are
areare
the
thethe
sand
sand
sand
production
production
production
Unstable
Unstable
UnstableFormations
Formations
Formationsand and
andSandSand
Sand Control
Control
Control completion
completion
completion
techniques
techniques
techniques
What
What
Whatarearethethe
thecause
cause
causeofof of
proppant
proppant
proppant flow
flow
flow
back
back
back and
and
and
how
howhowtotocontrol
to
control
control
it,it, it,
How
How
Howtotopredict
predict
predictsolids
solids
solids production
production
production  How
How
How
totoselect
select
to select
among
among
among
different
different
different
What
What
Whatarearethethe
thebest
best
bestpractices
practices
practices forfor
for
solids
solids
solidscontrol
control
controland
andand
handling
handling
handling Artificial
Artificial
Artificial
Lift
LiftTechniques
Lift
Techniques
Techniques

Advanced
Completion Engineering
Course Topics
Basic Well Completion
design process

Perforating

Horizontal wells
(including open hole com-
pletions)

Stimulation design con-


sideration – matrix and
proppant. Developments
in completion design for
horizontal well stimulation

Sand control including


gravel packing

Flow assurance including


production chemistry and
flow instability

Artificial lift – ESPs, PCPs


and SRP

Completion equipment
and completion installa-
tion

Modern wellhead

Session Day 1 Day 2 Day 3 Day 4 Day 5


Open hole and
09:15 AM Completion objec- Natural tubing flow Flow assurance
horizontal wells
To tives and types of Perforating behavior and un- (production chem-
Smart and multilat-
10:15 AM completion stable flow istry)
eral completions
10:30 AM
Reservoir Well per- Stimulation and Screen only com- Exercise on flow Exercise on pro-
To
formance hydraulic fracturing pletions and ICDs behavior duction chemistry
12:00 PM
12:00 PM
To Lunch Break
01:30 PM
01:30 PM
Gravel packing Artificial lift (ESP, Material selection
To Formation damage Acid treatments
and frac-packing SR and PCP) and stress analysis
02:45 PM
02:45 PM Conclusions and
Exercise on reser- Exercise on stimu- Exercise on sand Exercise on de-
To remarks on the
voir completions lation control signing ESPs
04:00 PM exercises

Advanced
Completion Engineering

You might also like