You are on page 1of 1

KAMAL EDLIN +6019 324 5211

HUSIN Kuala Lumpur, Malaysia

Technical Manager | Project Management Team kamaledlin@gmail.com


goo.gl/NucPNy

ABOUT ME
EDUCATION Resourceful technical manager for well stimulation and pumping application in various
oil & gas field; local & global market. 10 years of experience in oilfield industry which
consists of offshore deployment, account managerial & department business unit
BACHELOR OF ENGINEER
resource planner.
Oil & Gas (Hons)
Curtin University Perth, Australia
Currently looking for growth in challenging segment & niche technology development.
Class of 2013
Available immediately.

SKILLS WORK EXPERIENCE


Resource Management DELEUM ASST MANAGER – SALES & TECHNICAL
Outlook & Business Unit Report BERHAD (2021 – Present)
CAPEX & Asset Planning Malaysia ▪ Expand overall budget by 80% thru contract acquisition (Thru
Design of well/reservoir interface (2014 – Present) tubing gravel pack, Equipment support for Managed Pressure
Downhole Sand Control Drilling (13-16ppg mud fluid) etc.)
Sealant Application (control line, ▪ Addition 5 new technologies (Sand control, Water control,
tubing & packer sealant) Downhole inhibition chemical, Subsurface Foam Stick, Inhibit
Production Impact Specialist Chelant/HF Pack)
Artificial Lift Method ▪ Account supervisory for Malaysia, Indonesia & Thailand books
International Well Control Forum:
ACCOUNT MANAGER
(Subsea and BOP stack)
(2018 – 2021)
Production Enhancement for Shallow
▪ Boosted 200% current contract sales thru marketing & project
& Deepwater
management for Specialty Chemical Contract (ie. Petrofac, SEA
Specialty Chemical Technology
Hibiscus, Petronas Carigali)
Thru Tubing Gravel Packing
▪ Elevated 150%+ contract boost thru partnership with
Production Chemical Analytic
Multinational partners (ie. Halliburton, Schlumberger, Baker
Lab Analysis
Inteq)
ISO 14001:2015
ISO 9001:2015 FIELD TRAINEE / TECHNICAL ENGINEER 1
(2014-2018)
▪ Optimized 80% of asset utilization thru contract and call-out
partners
▪ Achieved 100% operation uptime (ie. Zero LTI, Zero NPT)
REFERENCE throughout period

Available upon request AEROCARE AIRLINE SERVICE AGENT


Australia (2013-2014)
(2013 – 2014) ▪ Aircraft marshaller, lead loader, baggage bay

M I L E S TO N E
2019-2022 Contract Provision for Managed Pressure Drilling with
Halliburton for Nangka Saborr & Irama field
Thru Tubing Package deployment for PTTEP (Sabah
& Sarawak)
Sealant Deployment (North Sabah)
Foam Stick Deployment (West Malaysia)
Pipeline Consultancy for Pertamina OSES TITI-KARA pipeline
dewaxing
Global Indonesia - Premier Oil, Pertamina Hulu Rokan
Thailand – PTTEP(S1), Fang Field

2014-2018 Contract Consultancy contract with Petrofac(M) & SEA


Hibiscus
Water Deployment package for Petronas Carigali (Sabah)
Injection
Pipeline Treatment for Terengganu Crude Oil Terminal
14km pipeline
Global Deployment of thermochemical pumping for
Sirikit field, PTTEP Thailand

2013 Research Behaviour of Hydrates for deep water condition


Graduate Bachelor of Chemical Engineer, Curtin
University Perth, W.A.

2012 Publish Thermal in-situ chemical technology for


Paper application in treating micro & macro wax
deposition.
Lab Write up for modified SARA analysis procedure
Analyst ref: IP 143.89 ASTN D3279-90 ASTM D-4124

You might also like