Accurate Batching
Excellent weighing sensor guarantees the precision and stability of weighing. Inching and
drop height control are available under different situations.
Features
Industrial computer with friendly user interface, centralized monitoring and VGA high-definition display.
Real-time monitoring mixer, ensure the normal operation and concrete quality.
High stability belt, rubber coating drum, nylon core belt enable long service life. Forward
roller is effectively anti-deviating. The head of conveyor is equipped with a gauge cover,
effectively preventing the material spilled.
Main frame
Ladder TRUEMAX 1 Set
Handrail and platform TRUEMAX 1 Set
Outrigger TRUEMAX 4 Pcs
Mixing platform TRUEMAX 1 Set
Measuring platform TRUEMAX 1 Set
Mixing system
Concrete Mixer Hydraulic discharge Sicoma China 1 Set
Aggregate & Powder connection joint TRUEMAX 2 Sets
Standard Configuration
Cement measuring system
Cement measureing hopper 1200kg TRUEMAX 1 Set
Sensor 1000kg TRUEMAX 3 Pcs
Vibrator MVE60/3 TRUEMAX 1 Pc
Discharge butterfly valve DN300 TRUEMAX 1 Pc
Waterway system
Standard Configuration
Pneumatic System
Pneumatic control
TRUEMAX 1 Set
component
0.5 m3
Gas tank TRUEMAX 1 Set
11kW(1.6m
Air compressor TRUEMAX 1 Set
3/min)
Gas tank 0.3 m3 TRUEMAX 8 Pcs
GFC-300-
Filter TRUEMAX 1 Pc
15-A-C-1
Pneumatic triplet TRUEMAX 1 Set
Standard Configuration
Main control room
Main control room TRUEMAX 1 Set
Cool and Warm AC
Outside decoration TRUEMAX 1 Set
(Only for 380V/50Hz)
Heating and air conditioning
Air Conditioner TRUEMAX 1 Set
(limited to 380V / 50Hz)
Swivel chair with armrests TRUEMAX 1 Set
Ladder, walk TRUEMAX 1 Set
Standard Configuration
1. The situation of locale should be provided as the requirement by the buyer before installa-
tion as follows:
(1) Buyer should finish the construct of plain floor for placing the equipment.
(2) Buyer should connect the main power cables to high voltage cabinet in the control room.
(3) Buyer should finish the installation of the pipes from the water source to the water pond,
and induct the water to the water pond.
(4) Buyer should prepare the raw materials for commissioning.
(5)Buyer should send the picture of the finished plain floor and arrived commodities to the
seller by e-mail before the seller dispatches the technician.
For purpose of smooth operation of the equipment, engineers will be arranged after the Buyer
finishes foundation construction including oil, water, electricity preparations etc. Pictures of
finished foundation construction need to be received by the Seller. When the equipment ar-
rives in the job site. The seller will send one competent technician to the job site for technical
service with a period of 10 days.
Project cases
Project cases