Dear Mayuri,
As discussed, for 6.1 MLD STP at Ratangarh,
Please note the following points,
• IL at the disposal location shall be 315.10 m(approximate, based on HFL of 316.224 m) and requires outfall
chamber at the disposal location.
• Encasement of disposal pipe should be ensured.
• Also HFL needs to be checked in the HFD shared by MTS
• GL at the disposal location is also required to be confirmed
Regards,
Nisha
Dear Mayuri,
With reference to the trailing mail,
As per MTS replies S.No. 2 & 28, it is mentioned as the final disposal by gravity is not possible and shall be through OHT
which shall be finalised after discussion with Client. – Hence the same needs to be updated in the HFD and Layout
drawings.
Also as mentioned in the previous communication (Refer mail attachment), the following details are required,
• Disposal pipe details – similar to that shared earlier for 3.8 MLD plant in Ratangarh town.
• The Alignment plan and L-section drawing of Disposal line