The document outlines payments made for design and construction drawings for Mitz House totaling $320,000. Payments of $25,000, $50,000 and $50,000 were made on 10/24/2020, 12/23/2020 and 02/05/2021 respectively, totaling $125,000 and leaving a balance of $195,000. The balance was reduced by $95,000 for discontinuing construction documents, leaving a final total balance of $100,000.
The document outlines payments made for design and construction drawings for Mitz House totaling $320,000. Payments of $25,000, $50,000 and $50,000 were made on 10/24/2020, 12/23/2020 and 02/05/2021 respectively, totaling $125,000 and leaving a balance of $195,000. The balance was reduced by $95,000 for discontinuing construction documents, leaving a final total balance of $100,000.
The document outlines payments made for design and construction drawings for Mitz House totaling $320,000. Payments of $25,000, $50,000 and $50,000 were made on 10/24/2020, 12/23/2020 and 02/05/2021 respectively, totaling $125,000 and leaving a balance of $195,000. The balance was reduced by $95,000 for discontinuing construction documents, leaving a final total balance of $100,000.