Professional Documents
Culture Documents
MODERN STEEL
CONSTRUCTION
Architectural Creativity in Steel
They Worked by Night!
Fast Track on a Tight Site
A Tribute to Frank Lloyd Wright
Data Center- Six Months Early
Key to a Column-free Hangar
The Intelligent Building : Framed with Steel
DECK DESIGN DATA SlEET.
No.7 .. ---~-~
BEARING WIDTH
REINFORCING STEEL FOR NEGATIVE BENDING
SEE NOTE 3 . DECK DESIGN DATA SHEET 1/5)
.> POURSTQP SLAB
~~ECtJ=2~~~~~~~~~iL~~~ CELL CLOSURE DEPTH
NOTES:
ADJACENT CANTILEVER SPAN
I.) ALLOWABLE BENDING STRESS OF 20 KSI WITH LOADING OF
SPAN CONCRETE + DECK + 20 PSF OR CONCRETE + DECK + ISO LB.
CONCENTRATED LOAD, WHICHEVER IS WORSE.
2.) ALLOWABLE DEFLECTION OF FREE EDGE (BASED ON FIXED END
CANTILEVER) OF 11120 OF CANTILEVER SPAN UNDER LOADING
OF CONCRETE + DECK.
3.) BEARING WIDTH OF 3Y, " ASSUMED FOR WEB CRIPPLING CHECK
- CONCRETE + DECK + 20 PSF OVER CANTILEVER AND ADJA·
CENT SPAN; IF WIDTH IS LESS THAN 3Yo" , CHECK WITH SUMMIT,
NEW JERSEY OFFICE.
4.) CALL NICHOLAS J. BOURAS, INC. ANYTIME YOU NEED DECK
INFORMATION.
• ..
•
FOR MORE INFORMATION:
~
GEOMETRIC DATA R.OW, INC.
337 N. Vineyard Avenue Suite 206
Ontario, California 91764
OR CALL TOLL FREE :
1·800·DETAll5 (338-2455) IN CALIFORNIA : 1· 714·984· 1269
MODERN STEEL CONSTRUCTION 3
•
VOLU ME XXVI NUMBER llFlRST OUARTER 1986
MODERN
CONSTRUCTION CONTENTS
Lambert International: Creativity in Steel 5
American Institute Golden Gate Bridge: They Worked by Night! 11
of Steel Construction, Inc. 525 Vine Building: Fast Track on a Tight Site 16
The Wrigley Building
400 North Michigan Avenue Domino's Farms: Tribute to Frank Lloyd Wright 21
Chicago. illinois 6061 1·4185 Southern Bell: Data Center Six Months Early 25
OFF1CERS
North Island: Key to Column-free Hangar 27
Wemer H. Quasebarth, Chairman The Intelligent Building: Framed with Steel 28
Norman G. Ridenhour. First Vice Chairman
1986 NATIONAL ENGINEERING CONFERENCE EMPHASIZES
C. Farnham Jarrard, Jr., Second Voce Chairman
LATEST TECHNOLOGY
Oscar W. Stewart, Jr., Treasurer
The 1986 National Engineering Conference will be held June 12·14 afthe
Neil W. Zundel, President
Opryland Hotel, Nashville, Tenn.
William W. Lanigan,
Its keynote session will focus on major advances in both building and
Secretary & General Counsel
bridge construction.
Lewis Brunner, VICe President, Marl<eting
Building construction seminars, workshop and panel discussion topics
Geerhard Haaijer,
will include: Load and Resistance Factor Design; bolted moment
Vice President, Research & Engineering
connections; ponding of concrete decks, systems approach for staggered
Richard F. Fox.
trusses; advances in the design and construction of mixed stee/-concrete
Vice President, FinanceiAdministration
buildings; deSigning for fire protection; examination of wind drift criteria;
Paul R. Johnson.
and the role and implementation of project specifications in the total
Vice President, Public Affairs
construction process.
William Y. Epling,
Bridge workshops will consider: 3D analysis of girder bridges; utilization
Vice President, Govemment Affairs
of the new AASHTO Guide Specification for beam bridges; design for
EDITORIAL STAFF
George E. Harper, Director of Publications
Brenda Follmer, Assistant Editor
James Herman, BUSiness
minimum total bridge costs; computer·aided design of horizontally curved
girders; joinl/ess steel bridges; and composite plate girder bridges. Both
long and short span bridge design will receive attention.
A special Saturday morning session will examine the implications of the
Mexico City Earthquake for future building design.
Concurrent sessions, with each session repeated /Wice, will permit
•
attendees ample opportunity to hear subjects of particular interest to their
own practice.
For details, call or write AISC, 400 N. Michigan Ave., Chicago, III. 60611 ,
REGIONAL OFFICES 3121670·2400. 0
NORTHEAST REGION AISC SHAPE DATA BASE NOW AVAILABLE FOR PC'S
New York . NY (Hdq ) 212695 429t
Boston. MA In a continuous effort to provide design aids to structural steel designers,
6171329 7417
Philadelphia. PA 609/858 9354
AISC has developed a Computer Data Base for properties and dimensions
P,llsburgh. PA 412/443 8840 of structural steel shapes, corresponding to data published in Rart I , 8th
SOUTHERN REGION Edition Manual of Steel Construction , for these personal computers:
Atlanta. GA (Hdq ) 404/458 7679 1. IBM· PC (and compatibles) 4. DEC Rainbow PC
Charlolle . NC 704 '541 0960
2. Hp·l50 5. Tandy/Radio Shack Models 3 & 4
Dallas. TX 214'630 5236
Houston, TX 3. Wang PC
713/270 6363
CENTRAL REGION The computer data base diskette contains:
Chicago. IL (Hdq ) 312,670 2400
DetroIt. MI 313/352 5558 1. The properties and dimensions of these structural shapes:
Minneapolis MN 612·647·0529 a. W shapes e. American Standard Channels (C)
SI LOUIS , MO 314721 1332 b. S shapes f. Miscellaneous Channels (MC)
WESTERN REGION c. M shapes g. Structural tees cut from W shapes (WT).
Los Angeles CA (Hdq ) 818/444 4519 d. HP shapes
Denver, CO 3031831 4622 2. Data base formats
San FranCISCO , CA 4 151132 ·0909 3. Explanation of variables specified in each of the data fields
AISC HEADQUARTERS 4. Usting of a read/write program and complete data base images.
Chicago. IL 312/670 2400
GOVERNMENTAL Cost of this data base is $40 ($30 to AISC members). To order, enclose
AFFAIRS check- specifying one of the 5 PC models-to AISC, P.O. Box 4588,
Washington DC 202/466 ·5548 Chicago, IL 60680.
4
MODERN STEEL CONSTRUCTION
.1)
-:D
'D
Concourse C
TWA deCided to bUild the Concourse C
extension when It established St LoUIS as
•
ItS main hub The airline needed to extend
ItS eXisting concourse to double the num-
ber of gates, prOVide space for executive
offices and an Ambassador 's Club, and to
set up a special baggage-handling faCIlity
The $20-mllllon, 120,OOO-sq ft extension
accommodates these extra reqUirements
1st Ouarter!l986 5
deSign . The $46-million project used
about $4 million in steel Because Ozark
wanted the t 5 new gates opened qUickly,
the 210,ooo-sq It concourse was bUilt on
a special fast-track schedule-shaving •
nine months off construction time The fast-
track was In two steps: first , the project
was split IOtO separate bid packages ,
starting With construction of the founda-
tions, structural steel, extenor walls and
roof. The exterior was completed enough
by winter months for the second construc-
tion team to begin on the plumbing, HVAC ,
electncal systems and Intenor work, thus
saving six months construction time.
In the second phase of the fast-track,
three more months were saved by pre-
paring structural steel shop drawings dur-
Ing the deSign stage . Approved shop
draWings were ready before the contract
was awarded Askew notes, "Normally the
deSign is completed before shop drawing
detailing begins, but for Concourse D,
once we had framing plans underway, we
SpaCIOUS quality achieved by archlteclurallnteracllon of exposed sleef trusses and
skyllghtlng In 2-story flses of TWA concourse started talking to the detaller, who advised
us of the most practical and cost-effecllve
methods for connections and fabrication .
InvolVing a detaller early was a great way
with a unique three-story design which teraclion of the exposed steel trusses with to save time. Since we 're talking about
btends with the eXlsling two-story struc- the skyllghting and carpeted Interiors roughly 3,000 tons of steel, it was a prac-
ture. Standard features of an airport con- within the two-story rises. tical solution to a difficult problem.·
course are on the middle level: passenger Like other concourses at Lambert, the
hold rooms at gates on both sides of the HVAC system IS part of thiS architectural
building , lounges , shops and offices . expression Unique to Concourse C, how-
Three sections of moving walkways, each ever, are the Sizable columns which con-
140 tt long, make It easy for passengers duct steam and chilled water from an un-
to get to gates from the main terminal. The derground utility tunnel to the HVAC
•
third, or upper, level houses the Ambas- system on the roof, and also house ducts
sador's Club and TWA executive offices. to Circulate warm or cool air. Carpeted In
The lower level houses a baggage-han- blue to complement the Intenors, these 12-
dling faCility, Independent from the system ft and 10-ft-dlameter tubes nse maJesti-
In the main terminal , to allow transfer of cally Within the lounge areas to Circular
baggage qUickly from one TWA flighl to skylights on the ceiling MOVing walkways
another In the hub system. carry passengers Into the heart of the ex-
Because most airports do not have tenSion , marked by a dramatic comblna-
three-story concourses, the new arrange- lion of a 40-ft dla skylight and the large
ment permitted Innovative design fea- blue columns which serve as a gateway
tures. Over all lounge areas In the con- to the main two-story lounge.
course the third story IS left open to create The only structural difference between
a spacIous effect and a stimulating at- thiS concourse and existing concourses is
mosphere Extensive use of skyllghling ac- that the extension has three stones. Yet, it
cents the two-story spaces "The added IS within thiS difference that major archi-
height visually enlivens the area," notes tectural changes In the standard deSign
Askew, "while the skylights provide sub- could be Implemented The result is an
stantial supplementary lighting " extension which blends With the connect-
Steel played a significant role In the In- Ing bUilding , but has a distinctive, open
novative architectural features of the con- quality of ItS own. At the same time, the
course like eXisting concourses, the extenSion meets the functional reqUIre-
structural system of the extension includes ments of accommodaling executive of-
30-ft column spacing and 75-ft clear-span fices , club and baggage facilities
trusses Because the columns and trusses
are exposed to View, special care was Concourse O- a Fast Track
taken In welding and finishing the con- Concourse D IS the showpiece of steel Fast-track schedufe shaved mne months
neclions The fresh , spacIous quality of the construction at Lambert, both In terms of off construction time of 21O,OOO-sq ft
concourse results from the architectural in- construction methods and architectural Ozark Concourse 0
6 1st QuarterJ1986
hons and footings were deSigned to carry
the extra load
Another deSign reqUirement was the In-
-t .. I II
-t
--+-
..
..
+-
•
-+ t-
-+
-I-
I.C.B.O. and S.B.C.C. approved
Full range of A325 and A490 grade
bOlts, and complete complement of +
tools for installation. Call or write for the
+-
...
+-
+-
-+
+-
...
+-
COMPANY
NEWEST OF t
J
FUll liNE Construction Fastener •
OFllGHT
WEIGHT
TOOLS
t, 1 Lambert Road, Brea. CA WATS
630 E
Systems Division
92622 • 714 -990-6555
,
+- ,
t 1·800-872-6587
8
lic, a state-of-the-art treatment , was ap- ented towards a common public truck ft trusses. The modular construction faCil-
plied . The coating, which has a 20-year court, ensuring efficient traHic flow and itates future expansion of the bUildings.
guarantee, makes the concourse blend in permitting future horizontal expansion of BUilding materials were chosen for their
Architect/Structurat Englneerl
Project Manager
Sverdrup Corporation
51 LoUIS. Missouri
General Contractors
Hercules Construction Co (Concourse C)
McCarthy Brothers Construction Co (Con -
course C)
Hankins ConstrucllOn Co (Cargo Complex)
SI LOUIS, MISSOUfl
Steel Fabricators
Ozark Slruclural Sleel Co (C)
Acme Structural , Inc (0)
•
Spnngfield, Mlssoun, and
Banner Iron Works (0)
St LOUIS, MI SSOUri, and
Kayslng Iron Works (Cargo)
Owner
City of St LOUIS , MIssouri
lsl0uarter/1986 9
•
on'• •
esn sow
See why to-mcclium thickness carbon plate and SW'e-
Luken stripped Foot safety plate.
plate is such an It's all in the latest edition of the Lukens
attractive alter- Constructional Plale Sleeis brochure ... along
native to uni - with gener"al infol1llation about Lukens' capa-
versa I mill plate
[01' fabricated
bridge girders.
It' produced
from steels
made in our
bilities, specifics about available plate sizes,
specifications for grades o[ steel for bridges
and buildings, and our many heat treat-
ment option .
Don't miss this chance to update your
reference file.
•
modern elec- Fill out and return the coupon and
tric melt shop complex, well send you yow' copy of this usefull(-j-page
and most plates are cross-rolled [or superior brochure.
transverse properties.
Familiarize yow-self with th Lukens
Fineline family of low-sulfur constructional - - .. ~ UKENS . ( ..... -
Write
lifj~
St.'rvit't'-; Ituildjl1~
I
('ual(·svillt." PA lHa'_}()
Pll'US4-' M,.'nd thl' lall·~t t'tlilinn or )o1)ur hrodllll""-" L"kl"U
Cflmotnl('liOfIfl/ Plate Sff ell;, to:
•
tnOw. I
NAl\m: _ _ _ _ _ _ _ _ _ _ _ __
1'ITI.,;: _" , -_ _ _ _ _ _ _ _ _ __
I
I
•
./'
C(1~ IPt\N' ·· _ _ _ _ _ _ _ _ __
AI)I)l(r;SS; _ _ _ _ _ _ _ _ _ _ _ __
Work by Night
All work on the bndge that required traffiC
diverSion was performed at night. dUring
a time volume In which one lane In each
direction could provide the necessary lane
capacity All lanes were open and avail-
able for use dUring peak commute periods
starting at 5:30 a m. each weekday and
7 a m Saturday morning
On Aug 15, 1985. at 230 a m .. exactly
401 nights and days of work after the first
section of the 47 -yr old reinforced con-
crete deck was saw-cut from the Golden
Gate Bridge and replaced With a modern
orthotroplc steel deck section. the 747th
deck section was lowered Into place to
complete the structural work on the $60 3-
million project
ThiS project replaced the entire roadway
•
slab and ItS supporting steel stnngers With
an orthotrop'c steel deck system consist-
Ing , In general. of a 'Y.-In steel plate. stiff-
ened longitudinally With 'Y, -In steel trap-
eZOidal nbs II-In . deep, and 'I.-In . x 12-
World·renowned Golden Gate Bridge undergoes mBJor re-decl'(lng Careful plannmg
In deep sublloor beams spaced 25 It kept traffiC delays to mlnlmum - motOfJsts were only Inconvenienced 13 times
transversely
•
of the Original reinforced roadway stab ex- the City and County of San FranCISco. So. At midnight . an additional lane was
ceeded the threshold limits for rehabltita- a maJor consideration dUring the deSign taken from service to prOVide four traffic
tlon, and the roadway would have to be of the replacement element was the ability lanes or a total of 40 It In which replace-
entirety reptaced Further studies con- to perform the work and sllli maintain a ment work was done . TraffiC volume al-
ctuded an orthotroplc steel deck reptace- sufficient number of lanes to accommo- lowed the four lanes to rema in out of ser-
ment scheme tor the roadway was more date traffiC at all times. day or night. The vice until 5:30 a.m . at which time the
cost-effective than any other replacement deciSion to use modular construction tech- bridge had to be configured to accom-
12 MODERN STEEL CONSTRUCTION
roadway element is approximately 40% tated sidewalk structural steel frames and
lighter than the original reinforced con- new precast concrete panels; complete
crete roadway element and its supporting replacement of all bridge utility services,
stringers, consideration to require bal- including air and water lines, hlgh- and
anced reduction In weight was examIned. fow-voltage electrical conduits, conduc-
ComputatIons proved, however, that no tors and electncat substations, signal ,
part of the structure would be stressed be- control and closed-circuit television ca-
yond allowable unit stresses under com- bles, District-owned and publiC telecom-
bined loading conditions if a balanced munication lines and other electrical and
roadway replacement sequence were not mechanical services used on the bridge
required . Since it would be less costly if and ItS approaches.
the deck replacement began at one end
of the structure and progressed Uniformly Constructfon Very Comptex
across the bridge to the other end, bal- The deck replacement profect was adver-
anced unloading was not a contract re- tised lor bids dUring the Fall of t982. Nine
quirement. bids , ranging from $52.495 million to
One of the price considerations during $79.993 million, were submitted . The low
this project was to accommodate peak bid was accepted and a contract was
commute-hour traffIC volume. As an added awarded Nov. 16, 1982. The Bridge Dls-
incentive for the contractor to plan his op- tricl retained the prolect deSigners to pro-
erations so that all lanes were available by vide construction engineering advice and
5:30 a.m .. a penalty program was part of perform shop plan checking services dur-
the contract. Under it the contractor was ing the construction phase The Trans-
Deck plates were fabflcated 'rom 5IB-tn. steel
assessed a penalty of $1 ,000 for each t 0- portation Laboratory of the California DOT
plate SectIOns were SAW-welded on site
minute segment of time past 5:30 a.m. the (Caltrans) was retained to provide offsite
structure was not cleared In retrospect, and fabrication Inspection along With ma-
thIS was a wise deciSion by the Golden terial testing services. Caltrans also pro-
Gate Bridge District. During 401 nights of Vided, on a loan baSIS, engineering per-
mod ate morning commuters. Therefore it roadway replacement work, mornIng com- sonnel to augment the District 's
was a contraclual requirement to have all muters were inconvenienced a total of only engineering department for job-site in-
•
six lanes in service no later than 5:30 a.m. 13 times. spection , construction engineering and
each weekday morning. contract administration services.
Generally, the Original bridge was con- Funding Unfque The contractor set up a profect man-
structed with a 50-ft longitudinal module. The total cost of this profect exceeded the agement office and yard at the north end
The replacement deck was designed to funding abIlity of the Bridge District. Prior of the Gofden Gate, and also a final as-
thiS same dimension . The typical replace- to 1978, all capital improvements and sembly and staging yard In Napa, Cal.
ment section IS about 15 ft , or one and maintenance of the structure was funded about 40 mlfes east. The contractor sub-
one-half traffic lanes Wide, and 50 ft long. entirely from tolls. Since the Golden Gate contracted structuraf steel fabrication
DUring Ihe design phase a prototype con- Bridge, Highway and Transportation Dis- Twenty-eight million pounds of ASTM
struction contract was performed 10 check trict is chartered as a California public cor- A709 Grades 36T and SOT, Zone 2 Impact.
deSign paramelers and Iraffic-handling poration and is not a part of any cIty or structural steel plate was rolled into plate
plans. Under thiS contract, Ihree 15 ft x county, nor part of the State of CalIfornia, and stockpiled for fabrication Into deck
50 ft roadway sections were replaced. neither state nor federal funding was avail- units that varied In sIZe and shape from
Based on Informallon obtained , It was de-
termined that two deck sections could be
replaced each night. Construction con-
able. The District successfully sought an
amendment to the 1978 Surface Trans-
portation Act whIch established eligibility
deck units were , .
9 ft-6 In x 25 ft to 17 ft x 75 ft , Most of the
t4 ft-3 In x 50 ft. The odd-
SIZed deck units were used at abutments,
tract time was set at 600 tOlal working days of the Golden Gate Bridge to compete for pylons, towers and curved parts of the San
for the performance of all the work In the FHWA Bridge Rehabilitation and Replace- Francisco and Marin approach Viaducts.
prolect. Including mobilization, off-site fab- ment discretionary funds . Following en- The deck plates were fabricated from
ricalion, deck and Sidewalk replacement . actment of this legislation, FHWA agreed 0/8-ln thick ASTM A709 Gr. 36T mill-run
The original reinforced concrele side- to fund 80% of the particIpating prolect steel plate welded to size uSing full-
walks and their structural steel supporting costs, whIch amounts to approximately penetration butt welds. The longitudinal
systems needed rehab,litallon as well. This 78% of the $65 million total project cost. stiffeners were formed Into trapezoidal
work was Incorporated in the deck re- The remainIng costs are funded from shape from %-In ASTM A709 Gr 36T
placement contract . Incidenlal to replac- bridge tolls and no increase In tolls was plate welded to the deck plales uSing 80%
Ing the roadway deck and sidewalks, the requrred . penetration welds Each deck unit was fll-
total Width of the roadway was increased The total $65-mllllon prolect cost In- ted wilh a '12-ln x t 2-ln deep end subfloor
•
from 60 ft to 62 ft. ThiS permits curb lanes cludes design, preparation of plans, spec- beam and a '12-ln x 12-1n deep interme-
to be 11 ft Wide for safer operation of ifIcations and bidding documents; the diate floor beam 25 ft 0 c , fabricated from
trucks, buses and recreational vehicles. construction contract: contract adminis- ASTM A709 Gr. 36T steel plale.
ThiS IS the maximum roadway Width that tration and on- and off-site Inspecllon for Pedestals fabricated from ASTM A709
can be accommodated between the tower the complete replacement of the bridge Gr. SOT y,-in, %-In , I-In and 1Y,-In plale
legs of the bridge. deck and supportIng members; removing attached Ihe orlholroplc deck units 10 the
Since the orthotropic steel replacement and replaCing sidewalks using rehablll- main floor beams uSing ASTM A325 hlgh-
1st Ouarter/1986 13
STRUCTURAL
PRODUCTS
What % of your needs
require ST. LOUIS
SCREW & BOLT HIGH
STRENGTH Bolts?
Consider this -
.American Made
• Tested & Certified
• Full Range of
Type I &.ill. Products
• Fast Delivery
.95 Years of
New sidewalk section IS set In place Dependable Service
Phoros by 0 Slemans
strength bolts. and compensated for the Video and security systems and Dlstrlct-
difference In depth between the 7-In orig- owned telecommUnications-the bridge
Inal concrete deck supported on 24-ln prOVides four condUits for use by the U.S
deep steel silingers and the orthotroplc Army and two condUits for publiC com-
deck units. Deck units were sandblasted mUnications links uSing fiber OptiCS media.
and painted with organiC zinc primer and The epoxy reinforced Fiberglas was
vinyl top coats prior to shipping to the con- speCIfied in lieu of rigid galvanized steel
tractor 's Napa yard conduit because experience has shown
A seal coat of 'I.-in crushed rock that galvanized steel condUit would rust
embedded In an epoxy asphalt mastic was through at the threaded JOints In 5-7 years
applied to the riding surface of the units of weathering unless an extensive main-
at Napa to form a temporary riding sur- tenance program was performed It IS an-
face. The final 2-1n of epoxy asphalt con- ticipated the Fiberglas condUit Will last for
crete Will be applied over the temporary many years. With little or no maintenance
riding surface dUring the Spring of t 986. Further. It IS lighter weight and less costly
The structural steel Sidewalk framing. In- to lurnlsh and Install 0
cluding traffic curb, pedestrian railing and
elect roller standards. was taken to Ihe
Napa yard lor sandblasting , rehabilitation
and painting Each Sidewalk frame was fit-
ted With a new precast. lightweight con-
crete sidewalk slab prior to being rein- Design/Consulting Engineer
Ammann & Whitney
stalled Nineteen 4-ln dla. Fiberglas utility We wantto be involved.
New York , New York
ducts, one 3-in dla water line and one 6-
In dla. all line were Installed under the Consulting Engineers/Administration CALL US COLLECT!
Sidewalk slabs, Within the structural steel California Dept of Transportation
framing . by mechanical and electrical sub- Todayat314-389-7500
contractors each day prior to the Sidewalk General Contractor
ST. LOUIS SCRE W & BOLTCO.
unit's Installallon. Each condUit run was DllhnghamITokoia (JOint venture)
Sao Fraoclsco, California 6902 NORTH 8ROADWAY
jOined together the day 10llowlng the unit
ST. LOUIS. MISSOURI 63147-9990
Installation. Pullboxes for the u"',t,es were PHONE (314) 389-7500
Installed In blockouts In the Sidewalk slabs Steef Fabricators
~
Flint Steel Corporation
The main bridge expansion JOints at the
Tulsa, Oklahoma, and
pylons and the towers were spanned With
Chicago Bridge & Iron Co
bronze fleXible condUits. Fiberglas slip
Sail Lake C,ly. Ulah
JOints were used at all other expansion 10lnt
crossings In addition to condUits for Owner
bridge operations- which Include all. GOlden Gate Bridge, Highway & Transportallon
water , hlgh- and low-voltage electrical District
power, roadway lighting . closed-CIrCUit San FranCISco, California
he 525 Vine office tower, a 23-story, the building at the second floor. The sky- nallayout (core, atrium, and lobby) of this
T 494,000-sq fI bUilding, is situated on
one of the most attractive sites in down-
walk is an elevated walkway connecting
five hotels, five major department stores,
building have an integral relationship with
Fountain Square and the skywalk. The
town Cincinnati Its front yard is Fountain the Convention Center, and downtown's front of the bUilding is kitty-corner to, and
Square, a very successful urban plaza In mafor parking garages. More than 8,000 faces the Square Large windows are ar-
the heart of downtown Another desirable people pass through the building's lobby ranged In a wing-spread pattern to em-
feature of this site IS a skywalk which has In uSing the skywalk at noontime. phasize the front of the building , which In-
one of ItS bUSiest arteries Integrated with The external appearance and the inter- terestingly enough, IS actually a corner.
The lobby, with ItS seven-story atrium
topped by a three-ton stainless steel ro-
sette/ceiling sculpture, was placed at the
second floor 10 take advantage of the sky-
walk concept. The core IS along the north
wall, which faces a blank wall of an ad-
jacent building. This provided an excellent
opportunity to conceal the longitudinal and
transverse bracing, as well as to maximize
a clear view of the Ohio River and the
Square to the south and west of the build-
ing . ThiS arrangement created a more de-
sirable open layout of office space giving
tenants maximum fleXibility, and permits
emphasIs of the openness of the seven-
•
story atrium.
The building skin is a combination of
precast concrete and glass. The concrete
aggregate IS green granite and the cement
IS slandard grey. To blend with these
colors, a blue-green glass with charcoal-
green mullions were used . This, combined
With relief from the half-round topped pre-
cast panels, produced a very attractive
building envelope. The city granted air
rights over the skywalk, which not only in-
creased the tenant space in Ihe first seven
levels, but also Increased the building
footprint enough to permit an additional 11
tower floors based on code-permissible
heights.
H---l=ITtrnfiimM~nw
I
"
,
'''ICA,,-
-
-
- ~ ...
~ I::::!
12' , ·
' l OOf! TO
..
~~ '-111 118- II I-
IIIlTJ-11111 1-' (7'f- 1--1 vu. •t
,
""l :::s I::::!-
.
r+-- dlll-jI~-IIUlITII-11 1116 I - 1-"
k-
'tiL 10
•
-
WI~I
0"
-r ~ ~~-- :d-' CIItOMlNT CON,unPI ~ "IOIO FR"Me:
u
.. i
~
-1I l088Y' SKY WA LK AT LEVEL 2
r- -- - - ~ -
"
.... ! I
- .. ,
L-- ---1 I
I
V ""
L ________~_ ~~~~:;~:; _ _ ~~-_------~ /
,
SECTION
•
tages and minimizing the lost tenant
space. However, Ihe other two schemes
were incorporated into the final structure
where they were most advantageous. The
concrete scheme was used In the tower
level garage area, and the rigid-frame
scheme where diagonal braces were not
permitted
You
Bracing DeSign name
In the longitudinal direction of the building ,
the structural anchor, bolt,
a conventIOnal braced bent-frame was
used to take advantage of the blank ex- nut or rod you need in the
terior wall along one side of the core (see size, metal and finish you
Fig . 1). ThiS resulted In an unacceptable want. Either we have it in our
torsional rotallon on the building axis, large inventory, or we can
therefore a rigid frame was added on the
make it for you in a hurry.
opposite exterior wall to control this move-
ment. This rigid frame , necessary only be- We've been known for quality
cause of the torsional movement, added and fast service since 1864.
$100,000 to the cost of the building be- And , we'll quote prices and
cause of the heaVier beams required for give details right over the
both stiffness and strength. phone. Try us. Call :
Handsome seven·story lobby/atrium /5 The transverse bUilding dlrecllon was
topped by three-ton sculpture more difficult to brace. No braCing was
permitted on the exterior column lines and
(215) 537-8700
only minimal disruptions to Interior tenant
space were allowed With a relatively high HAYDON BOLTS, lnc.
bUilding aspect ratio of 6 to I , It is advan- Adams Ave. & Unity St. ,
tageous to use the full building Width to Philadelphia, PA 1912 4 •
resist lateral load overturntng moment In
terms of both stress and building dnft. With
that critetla, a non-conventional braCing
scheme was chosen.
•
by the eccentnc longitudinal bracing . The as field-bolted connections, With gusset then erecting the steel frame, the steej col-
diagonals extend up nine floors from one plates shop-welded to columns (Fig . 3). umns continued down to and were sup-
Side of the bUilding to the other (see To establish the correct length of a brace ported on the foundation , Structural steel
Fig. 2). The diagonal typically Intersects nine stories long, bUilding shortening dur- was erected to the fifth level pnor to place-
Interior column lines every third floor, and ing construction had to be taken Into ac- ment of the first conctete structural level
is braced by and supports each floor level count while allowing for standard con- 01 the garage. In thiS manner, completion
In between. Only about one third of one struction procedures. Some of the gusset of the tower and garage proceeded SI-
bay width IS obstructed by the braced bent plates had to be field-reamed to fit the 1Va- multaneously. The concrete levels are sup-
at each floor level and the diagonal's ef- in. A325 bolts and/or field-welded , be- ported off concrete encasements poured
fecllve length IS also smaller than a di- cause of inadequate tolerance. around the steel columns
agonal found in a conventional braced
bent In addilion to the major bent, a sec- Garage Constructed Later Tower Crane Interesting
ondary bent on the same column line The garage structure and first floor with The tower crane was another Interesting
transmits lateral shears from the floors loading dock were constructed with cast- feature of thiS project. Because of the nar-
above and below to the major floor/diag- in-place concrete framing to maximize the rowness of the site, a standard saddle jib
onal nodes. ThiS secondary bent causes advantages of durability and fire protec- tower crane which rotates 360" when It IS
minimal space disruption since it is con- lion In these areas. All concrete exposed weather vanlng In a wind storm could not
cealed within the core walls. to salt contamination was constructed us· be used Instead, a Pecco SN 355 luffing
In the transverse direction, not only do ing epoxy-coated reinforcement, and all jib tower crane With a movable counter-
the extenor chord columns resist overturn- concrete surfaces were treated to mini- weights below the turntable was chosen.
Ing stresses, but also the longitudinal mize water absorption. There was only one other SN 355 In the
braced and ngld frames act as flanges to Construction of the concrete levels With U.S. at the time of constrUClion. The crane
was mounted to an enlarged foundation
which also supported the bUilding col-
umns. Every five floors, the crane was lied
to the structural frame uSing a Wide-flange
beam strut. Because 01 the high floor dia-
phragm brace forces , temporary diagonal
cable braces were reqUired to lie back the
strut to the braced frames .
The execution of the deSign, develop-
ment and construction of a fast-track proj-
ect such as this reqUired extraordinary ef-
fort by all concerned to maintain the
continued emphaSIS upon the Importance
of coordination With vanous disclphnes
and trades There were unusual time and
GUSSI.T PL ... n: S HOP space constraints which called for re-
WIElOE D TO COLUMN
sourceful solutions The successful com-
pletion of this building was the result of the
combined effort of the many participants
involved in all phases of construction 0
Architect
Glaser & Myers and ASSOCiates, Inc
CinCinnati. OhiO
Structurat Engineer
THP Limited
Cinclnnah, OhiO
All bracmg connections are fleld-
bolted. with gusset plates shop-welded
to columns (/.). Typical bracmg detail Construction Manager
(Fig 3, above) Photos by David
P R Duke Construction Company, Inc
McCullough and THP urn/ted Indlanapohs, Indiana
•
Steel Fabricator/Erector
Southern OhiO Fabricators, Inc
CinCinnati , OhiO
OwnerlDeveloper
Phillip R. Duke Associates
Indianapolis, Indiana
• PRACTICAL SOLUTIONS:
Ponding of Concrete Decks
Beam-Column Design
Jointless Steel Bridges
Economical Short Span Bridges
• NEW DESIGN PROCEDURES:
Moment Connections
Composite Construction
Bracing for Heavy Structures
Plate Girder Bridges
•
Staggered Truss Systems • NEW SPECIFICATIONS:
Useful Steel Design Literature
AISC-Load and Resistance Factor Design
• KEYNOTE SESSION ON RCSC-Structural Connections (Boiting)
AASHTO-Guide for Braced Compact
BUILDINGS AND BRIDGES Sections (Autostress)
NEW ANALYTICAL TECHNIQUES:
Horizontally Curved Girders
3D Analysis of Bridges
• NINE HALF-DAY SEMINARS
• SPECIAL SESSION: r-------------------l
Lessons Learned from the Mexican I To receive complete information on program,
Earthquake I speakers . transportation , hotel accommodallons ,
I and the official registration form. return this coupon
• EDUCATOR MEETINGS J today/ Direct your Inquiry 10:
Department of PubliC Atfalfs
1 American Institute of Steel Construction, Inc.
• PRINTED PROCEEDINGS I 400 N. Michigan Avenue , Chicago, IIhnols 6061 1
•
1I c:ompiny' Anilllltlon:
• FAMILY FUN AT OPRYLAND I
1
• RIVERBOAT DINNER-CRUISE I Addr...:
I (CIty) (S'_Ie/County, IZ.plPost.1 CoOe)
* Technology + Common Sense L __________________ _
1
= Reliable Steel Structures
Domino's Farms:
• A Tribute to Frank Lloyd Wright
by Vural Uygur and Donald Cualt
·11
t
Model of Dommo's Farms' new
headquarters (above), which features 30-
story Golden Beacon tower and 7SO,0CJ0-
sq It low-f/se bUlldmgs Near-completed
structure (top, r) Construction photo (r)
shows steel framing details 01 roof and
cantilevers
•
1st Ouarterl1986 21
Master Plan Phased
The master plan calls lor phased construc-
•
tion of Domino's Farms. The flfst phase.
with December t985 occupancy date. In-
cludes 220.000 sq It of the low-rise head-
quarters building. parking for 400 cars and
a relocated mile of country road The
headquarters structure will contain exec-
utive offices. lease space. a cafetefla.
phYSical fitness facilities . a video produc-
tion area. food preparation and food ser-
vice equipment. testing laboratory facIli-
ties. and word processing and computer
faCilities The rest of the 750.000-sq It low
flse will be completed later.
A demonstration farm . lodge and con-
ference center. daycare center and facil-
Ities for Domlno's PIZza Dlstflbutlon Cor-
poration and regional dlstflbutlon ware-
housing will complete the complex. The
site will be modified to include an artificial
lake. fed by a natural watercourse. to
separate the tower and the low-flse bUIld-
Ing
Domlno's Farms uses several unique
concepts to develop ItS Frank Lloyd Wflght
characteflstlcs It IS Intended to have a
practical functional use And. as with any
contemporary office bUilding . budget and
schedule are Cfltlcal factors In liS deSign
and construction. To meet a December
Steef·'rame supported trellis cames through on Wflght design. 1985 occupancy date. the entire deSign
~ .•
~,,,,~~ .. ~ .
•
"" CYI ..-".....Q!.., - 1'0.
M." ~'i .... " c..~ ...,
... ,.. •a.F'u;._~.Q..
" f::-::........::'"
1
•i>
"
•
--"\"\- -- -- ~. LI,
••
•
team developed an 18-monlh schedule. lormed by sloped steel rafters which sup· system has an applied patina f.nlsh . and
Incorporaling materials and design con- port a un.que copper roof. The roof ter- mon.lor roofing and overhangs below gut-
•
cepts wh.ch permitted maximum flexibility minates along the long bu.ld.ng edges w.th ters feature a lead-coated copper fln.sh
and fast-track construction. canttlevers. at some points as much as t 4 - Add,t.onal copper features Include w.n-
It from the build.ng frame . The un.que roof dow s.lIs. copings. balcony and planter
Fast and Flexible and use of copper throughout reflect faSCias. beam covers and flashings
Structural steel was a logical choice for the Wflght's philosophy of Incorporaling nat- Phase 1 also leatures a 2.350-sq ft OUI-
superstructure because It provided the ural maleflals Into structure. Su.IHn gutters door patio area w.th a treilts-like roof of
fleXibility reqUifed to deSign and bUild a handle all expansion and roof dra.nage exposed structural steel tub.ng latllcework
projOCt of this magnitude with utmost In- (see Fig. 1). At all roof levels. 6-ft canti- support.ng a mult'ple arch-shaped sky-
tegflty. and stili meet the budget and levers extend from the edge of the bUild- I.ght. The peflmeler of the pat.o roof .s
schedule reqUifements The deSign team Ing . Their top surfaces are pitched 3/12 to brtmmed w.th a trtple-stepped wood out-
began Immediately on working drawings form a continual.on of the roof. They are rtgger and a continuous planter. also sup-
for the site. arChitectural. foundations and cut out near the high end to provide .n- ported by the steel framework .
struclural steel contracts To meet the 18- board gutters for roof drainage. The out-
month construction schedule . it was .m- rtggers are 3I16-in. plate bent alon9 the Challenges Three-fotd
perative to complete the superstructure as bottom to form an L-shape and then cut Site work. which was considerable. began
soon as poss.ble . Nearly all structural along the top to accommodate the 3/12 In the Fall of 1984. With most slle work
draw.ngs were completed us.ng .n-house pitch and bUIIHn gutters The top edge .s completed for all phases The challenges
CADD workstalions. The steel deSign pre- then reinforced With 3/16-ln . plate to form w.th a prolect of th.s magnitude were trt-
ceeded wtthout the benefit of finished ar- a C-shaped cross section. fold The arch.tect was respons.ble for de-
chitectural draw.ngs Flexlb.llty to accom- Several areas of the top floor. framed as veloping a plan which complements the
modate the yet-te-be developed archi- hip roofs. reqUife skewed. sloping con- rural site. the deSign had to be In keep.ng
tectural des.gn and dela.ls was maln- nections Single- and double-plale con- With Frank Lloyd Wflght's unique pralrte
ta.ned by us.ng steel. nect.ons were used . The mon.tor along the architectural style; and most Importantly.
DUfing the conceptual des.gn of the low- peak of the roof at the north end of the very real budget and schedule reqUire-
flse headquarters structure . fUll-story bUlld.ng provides areas of the fourth floor ments had to be addressed
he.ghl Vlerendeel trusses were antlc'- With natural sunlight Special features . One part.cular problem posed by both
pated to cant.tever 34 ft at each end of the such as narrow copper fasc.as of 2 It-2 In the schedule and M.ch.gan·s harsh w.nter
butldlng Eventually. more convent.onal h.gh and benl heavy copper sheet relurns was the east elevation between the Itrst
•
cantilevered syslems of reduced length .nto soHit will develop a narrow. thln-ap- and second lloors On the west. the flfSI
were used . and several courtyards as peartng roof overhang approximately 5 It floor .s at grade and overlooks a man-
large as 70 It x 28 It and 56 It x 36 It were wide. The copper standing-seam rooltng made lake. and eventually Will overlook the
.ntroduced .nto the slructure The typical
bu.ldlng bay IS 28 It x 28 It and uses only
ASTM A36 grade structural steel The ar-
chitectural wall system is a 6-ln. steel stud
and bflck veneer. with StflP glaZing reflect-
Ing Wrtght's long . continuous Window
style The floor system consists of fully
SEE ARCH. Ow ~
o
I
compos.te beams and glfders w.th a 5- V, ~
•
I~ , ~ 'Ill "
tlon. Typ.cal two-bay and four-bay bents
were modeled and analyzed by a STRUDL
program to delerm.ne applicable Wind mo-
ments Details of gutter and cantilever from rool were dr8wn With CADD
The most stflk.ng element of the butld-
Ing. however. IS the roof. Its 3/12 p.tch .s
15t Quarter/1986 23
Golden Beacon tower. On the east build·
mg elevation. however. the grade is at sec·
ond·floor level. about 14 tt higher. Con·
ventlonal design would have been a •
cantilever wall or one spanning from foun·
dation to the second floor with the steel
frame extending up from that level. This.
however. would have requ ired wall con·
crete placement dUring January and Feb·
ruary. the two worst construction months
in Michigan. In addition. structural steel
erection had to start In February 1985. If
the December 1985. occupancy date was
to be met.
To aVOid a steel erection delay. it was
decided to extend all columns and framing
on the east side down to the foundation
level. The concrete wall would be placed
after the steel was erected and lateral
backfill forces would be resisted by the
steel frame. Construction of only those
foundations necessary to receive struc·
tural steel was completed by December
1984. Steel erection began in February
1985 and completed in April. Spring
brought more SUitable weather. and the
concrete wall and site structure work were
completed.
Architectural development of details
was compfeted simultaneously and mod·
ifications coordinated with the erected
structure . Most modllicatlons required •
only minor adjustments. with little impact
on budget and schedule.
Conclusion
The use of steel for the superstructure of
First is Arbed's new rolled 40" beam . . . available in 16
Domino's Farms' Phase 1 played a vital
sections from 149 to 328 Ibs. It gives high section moduli,
role as a simple. workable solulion 10 help
great lateral buckling resistance, and competes economically the architect/engineer team meet design.
with both fabricated sections, as well as reinforced precast schedule and budget considerations. The
and prestressed concrete. team is pleased to be closely involved in
Then there's Arbed's rolled "taIIoHTIade" series (up to a prolect which helps the owner accom·
42.45 " x 18.13" x 848Ibs.)... that lets you specify the beam pllsh a boyhood dream- to open the com·
weight you need, other than what is normally available. pany's new headquarters on ItS 25th an·
Result? Big savings: in fabrication costs and weight. niversary- and at the same time salute the
Why not get all the facts? Send the coupon now for creativity and unique designs of Frank
information including complete specifications. Lloyd Wright. 0
I~;~~~ru~~~~~~~~~~n Architect/Engineer
I (212) 486-9890. Domestic Telex: (W.U.) 125159, Int'l Telex (1Tl) 421180.
II OntariO,
In Canada: TradeARBED Canada, Inc., 1176 Blair Road, Burlington,
Canada L7M 1K9. (416) 335·5710, Telex 0618256
II Giliels Associates, Inc
Southfield. Michigan
Architectural Design Consultant
.Please send complete Information on TradeARBED's 40 ' beams and I Gunnar Blrkerts & Associates
I " TAILOR·MADE" beams. Birmingham, Michigan
I Addressl____________________________________________
Firm I Barton Malow Company
•
Oak Park, Michigan
ii"~E
Thomas S Monaghan, Inc
Inc. Ann Arbor, Michigan
• Southern Bell:
A Corporate Data Center-
Six Months Early
Architect/Structural, Electrical,
Mechanical & Civil Engineer
J N Pease ASSOCiates
Charlotte. North Carolina
General Contractor
McDevitt & Street Company
Charlotte, North Carolina
Seismic Consultant
S B Barnes and Associates
Los Angeles , California
Steel Fabricator
Southern Engineering Company
Charlotte. North Carolina
Owner
Southern BeU , Building Design & Construction
Charlotte. North Carolina
•
26 MODERN STEEL CONSTRUCTION
"North Island Ai r Station:
• Cantilever Trusses-
Key to Column- Free Hangar
by James A. Willis
•
space, shop space, crew and equipment
space, maintenance/administrative of-
fices, operallons offices and squadron of-
fices were constructed to house three new
helicopter squadrons Cost of the bUilding
was $6 8 million
A large column-free area In the hangar
bay Without columns In the door line was
reqUIred to allow lIexlbllity and future use
by different types of aircraft. To prOVide the
clear area, a steel cantilever-type of struc-
ture was used : 100 fl-Iong high-strength
steel (50 kSI) 33-ln . WF rolled beams,
spaced 36 11 0 C., are supported by steel Hangar bay shoWing steel trusses OperatIOnal side of North Island hangar
forestays , backstays and center columns
to frame the column-free 100-11 by 470-11
area The cantilever beams support open complement the InstruCtion bUilding . Of- Architect
web steel JOists, metal decking and a 5- fice and shop areas are enclosed with the James McGraw ASSOCiates
San Diego, California
Ion bridge crane. The cantilever structure same 4 -In high sandblasted gray con-
IS supported by, and anchored to, a 2- crete masonry units Similar massing of the Structurat Engineer
story box type office and shop bUilding . exterior stairs was deSigned to break up Blaylock,Wlllls and ASSOC iates
The operating side of the hangar consists the long facade exposed on the street side San Diego, Callfornta
of a 470-11 long by 28-11 high column-free of lhe building Roof metat decking over
opening enclosed by SIX sets of self-pro- the office and shop modute was filled With General Contractor
pelled steel doors that slide on ralls The concrete to prOVide mass for an acoustical Trepte Construction Company
top of the doors "float" In a header at- envelope San Diego. California
tached to the cantilever beams allowing The wall between the hangar and office
the roof to move freely With temperature IS reinforced masonry With a 2-hr fire re- Steet Fabrtcator/Erector
changes Peck Steet
sistant rating The enllre building IS pro-
Tucson , Anzona
The bUilding , the first In a series of hang- vided With an automatic fire sprinkler sys-
ars on thiS Site, sets the level of exterior tems of wet-type automatic sprinklers and Owner
deSign quality. It IS also Sited near the new a foam deluge system which IS activated United States NallY
Naval Flight Instruction BUilding Conse- by a system of automatically supervised North Island Naval Air Statton
quently, deSign features were made to pneumatic detectors. 0 San Otego, Call forma
•
rental and equipment services Income
that much earlier
The 10 newest Intelilgeni bUildings, all
developer-owned and all steel-framed and
AcCOfdmg to steel Industry. two essentials celfular-floored, Include Multi Foods
that keep an Intelligent bUlldmg up-to-date Tower, Minneapolis; 33 West Monroe, Chi-
and adaptable are structural steel 'rammg cago; 10 South LaSalle, Chicago, World
and electfll/ed Iloorlng (I and above) The FinanCial Center. New York: Conneclicut
tunneM,ke raceways hold wifing and fiber Plaza, Hartford, One Oxford Center, PittS-
opIlCS that control systems and services
burgh, Prudenlial Insurance, JacksonVille,
Central sWitching system (r.) /s lully d/g/tal,
Barclay Bank. New York. 1600 Market
capable 0/ vOIce and data transmiSSIOn
sImultaneously , Street, Philadelphia, and 301 Howard San
FranCISCO
tSIOuarter/ l986 29
lloor height while proViding longer, col-
umn-free spans.
3, Fast Track. Another cost saver, the
fast-tracking technique, where construc- •
tlon starts even before a final deSign IS
completed, is practical with structural steel
framing . II permits substantial off,slte fab-
riCation, with such elements as site clear-
Ing, foundations and grade beams con-
structed on·site before final design work.
II IS not unusual for fast tracking to permit
far earlier occupancy at significantly lower
first costs.
4. Sensftfvlty. In controlling bUilding
functions, the Intelligent bUilding can fine·
tune Individual aspects to a high degree
of sensitivity. Take a fire emergency as an
example By interconnecting maJOr eqUip-
ment, all systems communicate with each
other, all activation is automallc. Sensors
detect and locate the fire. The computer
system is notified as well as security and
the local fire department. Alarms ring In-
Side and outside the bUilding Elevators
return to and remain In the lobby. Smoke
IS purged from the fire floor And , to pre-
vent ItS spread, adfacent stairwells are
pressurized along with floors above and
befow the fire.
5. Preset Outtets. With electrified floor·
. g , preset outlet boxes are pos.ltloned on •
In
a predetermined grid to deliver power,
light, telephone and data service to any
workstation location or relocation One
preset opening for each 25 sq ft should
be about the minimum; one per 12.5 sq ft
IS more adequate; and one every 6.25 sq
ft provides maximum flexibility.
6. Tenant Setectfon . In an Intelligent
bUilding , the developer gains added oc-
cupancy and revenue by seiling electroniC
office services to tenants who cannot af-
ford or do not wish to own the eqUipment.
What thiS may come to mean IS preferential
selection of small-to·medium-size tenants,
who could be major rente rs of equipment
lime Even non· tenan ts, those in nearby
bUildings Or areas, can be an extra source
of revenue for these services, assuming
time-sharing capacity IS available
7. On Premfse. After planning and In-
stallation IS complete, one approach to
successfu l operation of a bUilding's func-
tions/tenant services system is mainte·
nance of a service facility In the building
Itself, with a permanent , on·slte staff. Re·
IntellIgent bUlldmgs already erected or under constructIon are. Denver's Tabor Center sponse to technical problems can be SWift,
(top I), whlC/llncludes 32- and 4O-stOty towers, One Flnane/al Place (top r ), said to be
aided by an on-premise inventory of re-
most technically advanced struclure In Chicago, Cily Plac e (c), a 38-sIOty lower In
placement parts. It should also be thiS
Hartford, Conn , whICh claIms to be world's lust mtelligent building, and LTV Center
(boN ), a 5O-slOty tower In Dallas
staff 's responSibility to prepare for future
needs In the hlgh·tech, fast·changing of·
f,ce systems field, so the bUilding can be
We are Indebted for Information and photos In this feature to the adapted to new office arrangements and
Committee 01 Structural Steel Producers, Amencan Iron and Steel Institute equipment as they are available 0
I 1.
2.
3.
4.
Water Infiltration
Air Infiltration
Seismic Siruciural Loading
Dynamic Wind Loading
5. Stalic Pressure
6. Calking and Construction Inspection
.
1 (2 [3) 74!J-34 ••
..•
~-'~1il ".
~
tI '.. -.. C onstructlOn
.
'-- ', ' ~_ . . Testing & Inspection
......4 :;.i
' J''?' SMITII-EMERY COMPANY
AFuIIServicelndept.ndentTetdnlubontory,Eat.l904
781 East Washington Boulevard
Los Angeles, California 90021