VOLUME XXVI NUMBER 1IFIRST QUARTER 1986

MODERN STEEL
CONSTRUCTION
Architectural Creativity in Steel
They Worked by Night!
Fast Track on a Tight Site
A Tribute to Frank Lloyd Wright
Data Center- Six Months Early
Key to a Column-free Hangar
The Intelligent Building : Framed with Steel
DECK DESIGN DATA SlEET.
No.7 .. ---~-~

MAXIMUM FLOOR DECK CANTILEVERS FOR UNITED STEEL DECK, INC .

BEARING WIDTH
REINFORCING STEEL FOR NEGATIVE BENDING
SEE NOTE 3 . DECK DESIGN DATA SHEET 1/5)
.> POURSTQP SLAB
~~ECtJ=2~~~~~~~~~iL~~~ CELL CLOSURE DEPTH

NOTES:
ADJACENT CANTILEVER SPAN
I.) ALLOWABLE BENDING STRESS OF 20 KSI WITH LOADING OF
SPAN CONCRETE + DECK + 20 PSF OR CONCRETE + DECK + ISO LB.
CONCENTRATED LOAD, WHICHEVER IS WORSE.
2.) ALLOWABLE DEFLECTION OF FREE EDGE (BASED ON FIXED END
CANTILEVER) OF 11120 OF CANTILEVER SPAN UNDER LOADING
OF CONCRETE + DECK.
3.) BEARING WIDTH OF 3Y, " ASSUMED FOR WEB CRIPPLING CHECK
- CONCRETE + DECK + 20 PSF OVER CANTILEVER AND ADJA·
CENT SPAN; IF WIDTH IS LESS THAN 3Yo" , CHECK WITH SUMMIT,
NEW JERSEY OFFICE.
4.) CALL NICHOLAS J. BOURAS, INC. ANYTIME YOU NEED DECK
INFORMATION.

PL(X)R DECK CANTILEVERS


NORMAL llEIGHT CONCRETE (150 PCP)
UNITED STEEL DECK, INC. DECK PROFILE
1. 5 IN Jl..LOK 1. 5 IN LOK-PL(X)R 2. 0 IN LOK-FL(X)R 3.0 IN LOK-FL(X)R
Slab 22 20 18 16 22 20 18 16 22 20 18 16 22 20 18 16
Depth
4.00 " I'll " 2' 3" 2'10· 3 ' 4" I'll " 2 ' 4" 3 ' 0" 3 ' 6"
4.50" 1 '10· 2' 2" 2 ' 9" 3 ' 3" 1 ' 10" 2' 3" 2' 10" 3 ' 4" 2' 6" 2 ' 11 " 3' 8" 4 ' 3"
5.00 " 1'10 " 2 ' 2" 2' 8" 3 ' 2" 1'10 · 2' 3" 2 ' 9" 3' 3" 2' 5" 2 ' 10 " 3' 6" 4 ' I" 3' 8" 4 ' 3" 5 ' 3" 6 ' 0"
5.50 " l' 9" 2' I " 2' 7" 3' 0" l ' 9" 2 ' 2" 2 ' 9" 3' 2" 2' 4" 2 ' 9" 3 ' 5" 4 ' 0" 3' 7" 4' I " 5 ' 0" 5 ' 9"
6. 00 " l ' 9" 2 ' 0" 2 ' 6" 2 ' 11" l ' 9" 2' I " 2 ' 8" 3' I " 2' 3" 2 ' 8" 3 ' 4" 3 '1 0" 3' 5" 3 ' 11" 4'1 0· 5 ' 7"
6.50" l' 8" 2 ' 0" 2 ' 6" 2 ' U " l' 9" 2' I " 2' 7" 3 ' 0" 2' 3" 2' 8" 3 ' 3" 3' 9" 3' 4" 3' 10· 4' 8" 5' 5"
7.00 " 1 ' 8" l ' 11 " 2' 5" 2 ' 10 " 1 ' 8" 2' 0" 2 ' 6" 2 ' 11 " 2' 2" 2 ' 7" 3 ' 2" 3 ' 8" 3 ' 3" 3' 9" 4 ' 6" 5 ' 3"
7.50 " 1 ' 8" l' 11 " 2' 4" 2' 9" l ' 8" 2 ' 0" 2 ' 6" 2'10" 2' 2" 2' 6" 3 ' I " 3' 7" 3' 2" 3 ' 8' 4' 5" 5 ' I"
8. 00" l ' 7" I'll " 2 ' 4" 2' 8" l ' 7" I ' ll " 2 ' 5" 2'10· 2' I " 2' 5" 3' 0" 3' 6" 3' I " 3 ' 6" 4' 3" 4'1 1"

L..ooE....>I_ \.\-'- VJ--'/ f -JL....==-<::.L-J N ICH 0 LA S J. BO URA SIN C.


PO BOX 662, 47 5 SPRING FIELD AVE ..
----•
SUMM IT. NEW )ERSEY 0 790 1 (20 1) 2 77· 1617
• Lookingal
Computer Detailing?
I + r
1
1<
-+--t--H-I

• ..

If you've been evaluating computerized structural steel detail-


ing, you should know a new leader has emerged ... DETAIL'"
Compare, and you'll find, as others across the country have ...
nothing else comes close! DETAIl'"
Simply the Best.


FOR MORE INFORMATION:

~
GEOMETRIC DATA R.OW, INC.
337 N. Vineyard Avenue Suite 206
Ontario, California 91764
OR CALL TOLL FREE :
1·800·DETAll5 (338-2455) IN CALIFORNIA : 1· 714·984· 1269
MODERN STEEL CONSTRUCTION 3

VOLU ME XXVI NUMBER llFlRST OUARTER 1986
MODERN
CONSTRUCTION CONTENTS
Lambert International: Creativity in Steel 5
American Institute Golden Gate Bridge: They Worked by Night! 11
of Steel Construction, Inc. 525 Vine Building: Fast Track on a Tight Site 16
The Wrigley Building
400 North Michigan Avenue Domino's Farms: Tribute to Frank Lloyd Wright 21
Chicago. illinois 6061 1·4185 Southern Bell: Data Center Six Months Early 25
OFF1CERS
North Island: Key to Column-free Hangar 27
Wemer H. Quasebarth, Chairman The Intelligent Building: Framed with Steel 28
Norman G. Ridenhour. First Vice Chairman
1986 NATIONAL ENGINEERING CONFERENCE EMPHASIZES
C. Farnham Jarrard, Jr., Second Voce Chairman
LATEST TECHNOLOGY
Oscar W. Stewart, Jr., Treasurer
The 1986 National Engineering Conference will be held June 12·14 afthe
Neil W. Zundel, President
Opryland Hotel, Nashville, Tenn.
William W. Lanigan,
Its keynote session will focus on major advances in both building and
Secretary & General Counsel
bridge construction.
Lewis Brunner, VICe President, Marl<eting
Building construction seminars, workshop and panel discussion topics
Geerhard Haaijer,
will include: Load and Resistance Factor Design; bolted moment
Vice President, Research & Engineering
connections; ponding of concrete decks, systems approach for staggered
Richard F. Fox.
trusses; advances in the design and construction of mixed stee/-concrete
Vice President, FinanceiAdministration
buildings; deSigning for fire protection; examination of wind drift criteria;
Paul R. Johnson.
and the role and implementation of project specifications in the total
Vice President, Public Affairs
construction process.
William Y. Epling,
Bridge workshops will consider: 3D analysis of girder bridges; utilization
Vice President, Govemment Affairs
of the new AASHTO Guide Specification for beam bridges; design for

EDITORIAL STAFF
George E. Harper, Director of Publications
Brenda Follmer, Assistant Editor
James Herman, BUSiness
minimum total bridge costs; computer·aided design of horizontally curved
girders; joinl/ess steel bridges; and composite plate girder bridges. Both
long and short span bridge design will receive attention.
A special Saturday morning session will examine the implications of the
Mexico City Earthquake for future building design.
Concurrent sessions, with each session repeated /Wice, will permit

attendees ample opportunity to hear subjects of particular interest to their
own practice.
For details, call or write AISC, 400 N. Michigan Ave., Chicago, III. 60611 ,
REGIONAL OFFICES 3121670·2400. 0

NORTHEAST REGION AISC SHAPE DATA BASE NOW AVAILABLE FOR PC'S
New York . NY (Hdq ) 212695 429t
Boston. MA In a continuous effort to provide design aids to structural steel designers,
6171329 7417
Philadelphia. PA 609/858 9354
AISC has developed a Computer Data Base for properties and dimensions
P,llsburgh. PA 412/443 8840 of structural steel shapes, corresponding to data published in Rart I , 8th
SOUTHERN REGION Edition Manual of Steel Construction , for these personal computers:
Atlanta. GA (Hdq ) 404/458 7679 1. IBM· PC (and compatibles) 4. DEC Rainbow PC
Charlolle . NC 704 '541 0960
2. Hp·l50 5. Tandy/Radio Shack Models 3 & 4
Dallas. TX 214'630 5236
Houston, TX 3. Wang PC
713/270 6363
CENTRAL REGION The computer data base diskette contains:
Chicago. IL (Hdq ) 312,670 2400
DetroIt. MI 313/352 5558 1. The properties and dimensions of these structural shapes:
Minneapolis MN 612·647·0529 a. W shapes e. American Standard Channels (C)
SI LOUIS , MO 314721 1332 b. S shapes f. Miscellaneous Channels (MC)
WESTERN REGION c. M shapes g. Structural tees cut from W shapes (WT).
Los Angeles CA (Hdq ) 818/444 4519 d. HP shapes
Denver, CO 3031831 4622 2. Data base formats
San FranCISCO , CA 4 151132 ·0909 3. Explanation of variables specified in each of the data fields
AISC HEADQUARTERS 4. Usting of a read/write program and complete data base images.
Chicago. IL 312/670 2400
GOVERNMENTAL Cost of this data base is $40 ($30 to AISC members). To order, enclose
AFFAIRS check- specifying one of the 5 PC models-to AISC, P.O. Box 4588,
Washington DC 202/466 ·5548 Chicago, IL 60680.

4
MODERN STEEL CONSTRUCTION
.1)
-:D
'D

.;: Lambert International:


• Architectural Creativity in Steel

irline deregulation proved very bene·


A flclal to business allambert·St loUis
International Airport. The physical growth
of the airport broke ground for arChitec-
tural Innovations In steel construcllOn De-
regulation led to the decision of two maiOr
airlines. TWA and Ozark. to bUild a hub In
St lOUIS, so much of the lambert project
responds 10 their hubblng and expansion
needs Since renovations began at the air-
port In 1979, Lambert has grown from 12th
to Sixth In the ranking of the nation's bus-
Iest airports The proJect, a $250-mllllon
proJect . has already more than doubled
the size of the airport and tripled the pas-
senger handling capacity Three maiOr
features of the expansion are a TWA con-
course extension , Concourse C, an entire
new concourse for Ozark Air Lines, Con-

• course D; and a cargo-handling faCIlity


Structurally, the expansion proleCt has
no new features to boast Standard com-
ponents and connections were used
throughout But what IS unique IS the ar-
chitectural use of these standard steel
components According to Pat Askew, TWA Concourse C, Lambert Fteld (above & below)
MBjestlc blue-colored columns and 40·ft diameter
deputy prolect director for the NE firm re-
skylight create gateway to mam lounge
sponSible for overseeing the entire land-
side prolect. the architectural and eco-
nomiC success of the expansion resulted
from thiS Innovative use of commonplace
components One such distinctive ele-
ment IS that Concourse D's curtain wall IS
In steel. which IS "pretty unusual" for an
airport concourse "Steel Siding used to be
lust used for utilitarian, Industrial applica-
tions, now It IS gaining acceptance for
public buildings as an architectural de-
sign element We used what comes out of
the catalog to really play With some con-
cepts that saved time and money and yet
produced a unique. dramatic bUilding "

Concourse C
TWA deCided to bUild the Concourse C
extension when It established St LoUIS as


ItS main hub The airline needed to extend
ItS eXisting concourse to double the num-
ber of gates, prOVide space for executive
offices and an Ambassador 's Club, and to
set up a special baggage-handling faCIlity
The $20-mllllon, 120,OOO-sq ft extension
accommodates these extra reqUirements

1st Ouarter!l986 5
deSign . The $46-million project used
about $4 million in steel Because Ozark
wanted the t 5 new gates opened qUickly,
the 210,ooo-sq It concourse was bUilt on
a special fast-track schedule-shaving •
nine months off construction time The fast-
track was In two steps: first , the project
was split IOtO separate bid packages ,
starting With construction of the founda-
tions, structural steel, extenor walls and
roof. The exterior was completed enough
by winter months for the second construc-
tion team to begin on the plumbing, HVAC ,
electncal systems and Intenor work, thus
saving six months construction time.
In the second phase of the fast-track,
three more months were saved by pre-
paring structural steel shop drawings dur-
Ing the deSign stage . Approved shop
draWings were ready before the contract
was awarded Askew notes, "Normally the
deSign is completed before shop drawing
detailing begins, but for Concourse D,
once we had framing plans underway, we
SpaCIOUS quality achieved by archlteclurallnteracllon of exposed sleef trusses and
skyllghtlng In 2-story flses of TWA concourse started talking to the detaller, who advised
us of the most practical and cost-effecllve
methods for connections and fabrication .
InvolVing a detaller early was a great way
with a unique three-story design which teraclion of the exposed steel trusses with to save time. Since we 're talking about
btends with the eXlsling two-story struc- the skyllghting and carpeted Interiors roughly 3,000 tons of steel, it was a prac-
ture. Standard features of an airport con- within the two-story rises. tical solution to a difficult problem.·
course are on the middle level: passenger Like other concourses at Lambert, the
hold rooms at gates on both sides of the HVAC system IS part of thiS architectural
building , lounges , shops and offices . expression Unique to Concourse C, how-
Three sections of moving walkways, each ever, are the Sizable columns which con-
140 tt long, make It easy for passengers duct steam and chilled water from an un-
to get to gates from the main terminal. The derground utility tunnel to the HVAC

third, or upper, level houses the Ambas- system on the roof, and also house ducts
sador's Club and TWA executive offices. to Circulate warm or cool air. Carpeted In
The lower level houses a baggage-han- blue to complement the Intenors, these 12-
dling faCility, Independent from the system ft and 10-ft-dlameter tubes nse maJesti-
In the main terminal , to allow transfer of cally Within the lounge areas to Circular
baggage qUickly from one TWA flighl to skylights on the ceiling MOVing walkways
another In the hub system. carry passengers Into the heart of the ex-
Because most airports do not have tenSion , marked by a dramatic comblna-
three-story concourses, the new arrange- lion of a 40-ft dla skylight and the large
ment permitted Innovative design fea- blue columns which serve as a gateway
tures. Over all lounge areas In the con- to the main two-story lounge.
course the third story IS left open to create The only structural difference between
a spacIous effect and a stimulating at- thiS concourse and existing concourses is
mosphere Extensive use of skyllghling ac- that the extension has three stones. Yet, it
cents the two-story spaces "The added IS within thiS difference that major archi-
height visually enlivens the area," notes tectural changes In the standard deSign
Askew, "while the skylights provide sub- could be Implemented The result is an
stantial supplementary lighting " extension which blends With the connect-
Steel played a significant role In the In- Ing bUilding , but has a distinctive, open
novative architectural features of the con- quality of ItS own. At the same time, the
course like eXisting concourses, the extenSion meets the functional reqUIre-
structural system of the extension includes ments of accommodaling executive of-
30-ft column spacing and 75-ft clear-span fices , club and baggage facilities
trusses Because the columns and trusses
are exposed to View, special care was Concourse O- a Fast Track
taken In welding and finishing the con- Concourse D IS the showpiece of steel Fast-track schedufe shaved mne months
neclions The fresh , spacIous quality of the construction at Lambert, both In terms of off construction time of 21O,OOO-sq ft
concourse results from the architectural in- construction methods and architectural Ozark Concourse 0

6 1st QuarterJ1986
hons and footings were deSigned to carry
the extra load
Another deSign reqUirement was the In-

• corporation of a moving walkway system


to carry passengers the length of the
3.ooo-ft long concourse ·about four times
longer than TWA's extension S'x sections
of moving walkways were deSigned Into
the concourse In the first phase of con-
struction a 3oo-ft x 12-ft hole was left In the
floor. and steel supports put In for later
Inslallatlon of the walkways
The structural outlines for the con -
course - the highway boundary. one-
Sided nature of the bUilding. and sup-
porflng columns for the people-mover-
were the baSIS for the olstlnctlve. aesthehc
architectural deSign elements featured
The walkways are set off to one Side of the
concourse. basically In an enVIronment of
their own Curving glass vaults rise above
the walkways fo stimulate the passenger
as he walks from the terminal to hiS gate
Staggered With the glass-vaulted walk-
ways are solid-vaulted sections made of
curved steel panels. supported by bent-
sfeel tubes These panels were then car-
peted to complement the concourse In-
terior.
The two-level bUilding houses aircraft
operations on the lower level while the up-

• per level Includes passenger hold rooms .


concesSions. restaurants and other public
conveniences . The concourse also
houses a 90.000 sq ft. two-gate Interna-
tional faCility
The location of the utility distribution sys-
tem for Concourse D was dictated by ught
scheduling criteria. which precluded dig-
ging an underground utility tunnel Be-
cause of fast-tracking . as well as the de-
sire to make the exterior of the bUilding
attractive to highway travellers. It was also
necessary to aVOid roof penetrations The
Ozark's concourse was designed to accommodate people-mover above (oof (top) Steel- roof could therefore be put In place more
'ramed project was split mto separate bids to speed completion. qUickly. and the entire Interior process
continue Without delay Instead of plaCing
the distribution system on the roof or un-
As In Concourse C. there was little un- existing west terminal. To facilltale the derground . a 10-11 Wide hOrizontal utility
usual about the structural design of Con- eventual movement of passengers from chase was bUilt Into the lower level , di-
course D Once again. standard steel one terminal to the other. a people-mover rectly below the moving walkways , to
components were used to salisfy require- was designed into D. The structure IS de- house HVAC and mechanical systems
ments. and at the same lime create an Signed to accommodate a rubber- Since the eXisting utility plant IS a full mile
architecturally dlsflnctlve bUilding Struc- wheeled car system to run along a track and a half from the middle of Concourse
tural reqUirements for the concourse were above the roof of the concourse D, a new utility plant and electrical sub-
dictated by several factors First of all . un- In conSidering these criteria. the con- station were bUilt on the apron level The
like Concourse C. Concourse D IS course was designed With 60-1t span plant, located adlacent to and below the
bounded on one side by a major highway trusses. as opposed to C's 75-ft spans publiC areas . IS Insulated and sound-
Boarding . therefore. can only take place Column spacing IS SO-ft 0 C Instead of 30- proofed , thus unnoticeable
on the other side of Ihe bUilding . ThiS ft 0 c . because the direction of the struc- The exterior of the concourse IS de-
called for a narrower building. with no pas- ture turns along the length of the con- Signed to complement the eXisting con-
senger hold rooms on the south Side of the course. Instead of fhe Width Interior col- courses and terminal, and also boast dis-
concourse Secondly. in the expansion umns In the north bay were extended tinctive architectural features One unique
master plan. Concourse D will serve as a through the roof to support the fu ture peo- feature of Concourse D's exterior IS that
link between a new east terminal and the ple-mover. And columns. beams. connec- steel plays more than a structural role In

lSi Ouarterl1 986 7


the design. One advan
technology in the use tage 01 the new
to Askew, is that "n w 01 steel, according
Into Ilat. lightweight 0 steel can be made
S
wich-type construct:n!I, , by uSing sand-
comb center The th a rig Id, honey- •
tween the two thPaper honeycomb be-
strength and I ht In steel layers adds
available give,gst n~ss. Coatings that are
ance and perlo ee panels the appear-
rmance 01 m h
., ~ ,~~ .. pensive metals" The . uc more ex-
.'. ~.'.~.,..........,,;,'=1-. 01 the concourse extqUalltyenor wasappearance
a ..
. ncern ' since the south s'd . critical
co
side visitor's lirst . I e IS the land-
T view 01 the air
he 22-ga. steel curtain port.
the entire length 01 th wall runs along
modules. The wall . e concourse in 5-lt
bUilding 'S steel Ir IS supported by the
. ame, hung 11th
whIch support the . 0 e beams
beams every tw;~f. It IS attached to the
studs. A 60% cost sa~~~ by 14-ga. steel
Ing this sandwlch-t gs resulted by us-
problem noticed b ype .construcllon. A
with anodized al y architects In the past
the metal has a t umd,num exteriors IS that
. en ency to d
Inconsistent lash'Ion. To pr t Iscolor In an
curtain wall, coalln I 0 ect the steel
gs 0 Kynar 500 Metal-
Curvingsteel
shows glass vaultswrise 0 ver walkways, set off In h
curtam t elf own envlfonment-(I)"-E-
8" which resulted In 60% saVings - -(r.)
xIerlor ---

-t .. I II
-t
--+-
..
..
+-

-+ t-
-+
-I-
I.C.B.O. and S.B.C.C. approved
Full range of A325 and A490 grade
bOlts, and complete complement of +
tools for installation. Call or write for the
+-

.. 1 location of the nearest distributor or t


warehouse, and start saving up to 50%
... ... in bOlt installation costs
o
r !,
t ... ... ... +-

...
+-
+-
-+
+-
...
+-
COMPANY
NEWEST OF t

J
FUll liNE Construction Fastener •
OFllGHT
WEIGHT
TOOLS
t, 1 Lambert Road, Brea. CA WATS
630 E
Systems Division
92622 • 714 -990-6555
,
+- ,
t 1·800-872-6587
8
lic, a state-of-the-art treatment , was ap- ented towards a common public truck ft trusses. The modular construction faCil-
plied . The coating, which has a 20-year court, ensuring efficient traHic flow and itates future expansion of the bUildings.
guarantee, makes the concourse blend in permitting future horizontal expansion of BUilding materials were chosen for their

• with the other, aluminum-si ded con-


courses. Says Askew, "The curtain wall is
another standard component of the con-
course- it IS out-of-the-catalog , off the
shelf-but we used it here in a distinctive
way."
all buildings along the length of the court.
The building complex is designed to
minimize energy consumption by maxI-
mizing use of natural elements, all within
the constralnls of the varied requirements
of the many airlines who occupy the fa-
permanence and performance In an In·
dustrial environment The structure IS a se-
rres of columns and long-span trusses wifh
jOists and roof deck. OutSide walls are de-
mountable precast concrete panels wllh
corrugated steel faSCia . A standard
spread-footing foundatron was used. The
cility. The roof system features a series of
Cargo Comptex south-facing, recessed clerestorres, de- high-bay buildings are 16 It clear to the
To make room for Concourse 0 , an existing' signed to allow light and heat in during underSide of the structure-large enough
cargo complex was torn down, requiring Winter, yet block out the summer sun. to allow palletized stac~ing of cargo, and
construction of a new facility. The new five- Sloped roofs behind the clerestories re- to proVide ample space for maintenance
building, 150,OOO-sq It cargo complex fol- flect light indirectly into the bUildings. Heat shops and offices. The fleXibility of the
lows the general theme of steel construc- is exhausted by fans in the truss space of space lets airlines bUild either a two-story
tion at Lambert : standard components the sidewalls. office or a single-story area with an upper
used to make architecturally attractive as The versatility of the structures comes mezzanine .
well as practical , effiCient , economical as a result of the 25-ft modular steel con- The architecture of the cargo complex
structures. Sverdrup worked closely with struction. For airlines With larger needs, the blends With the Similar, standard construc -
the nine airlines who were tenants of the modules are 120 ft x 25 ft , while smaller tion of the airport terminal, while the re-
$8. I-million complex so Ihe buifdings buildings have 25-ft x 80-11 modules. To peated use of clereslotles In the complex
would be deSigned to fit their needs. The maintain the economical nature of the contributes a distinctive aesthetic pattern
five warehouse-type buildings are all ori- larger buildings, a center column uses 60- to the complex Itself 0

• Nine 81flfnes share Lambert aIr cargo


complex (I) Structure's versatIlity comes
With 25·ft modular stee/·framed
constructIOn. adapted to each camer's
needs (below, I & above)

Architect/Structurat Englneerl
Project Manager
Sverdrup Corporation
51 LoUIS. Missouri

General Contractors
Hercules Construction Co (Concourse C)
McCarthy Brothers Construction Co (Con -
course C)
Hankins ConstrucllOn Co (Cargo Complex)
SI LOUIS, MISSOUfl

Steel Fabricators
Ozark Slruclural Sleel Co (C)
Acme Structural , Inc (0)


Spnngfield, Mlssoun, and
Banner Iron Works (0)
St LOUIS, MI SSOUri, and
Kayslng Iron Works (Cargo)

Owner
City of St LOUIS , MIssouri

lsl0uarter/1986 9

on'• •
esn sow
See why to-mcclium thickness carbon plate and SW'e-
Luken stripped Foot safety plate.
plate is such an It's all in the latest edition of the Lukens
attractive alter- Constructional Plale Sleeis brochure ... along
native to uni - with gener"al infol1llation about Lukens' capa-
versa I mill plate
[01' fabricated
bridge girders.
It' produced
from steels
made in our
bilities, specifics about available plate sizes,
specifications for grades o[ steel for bridges
and buildings, and our many heat treat-
ment option .
Don't miss this chance to update your
reference file.

modern elec- Fill out and return the coupon and
tric melt shop complex, well send you yow' copy of this usefull(-j-page
and most plates are cross-rolled [or superior brochure.
transverse properties.
Familiarize yow-self with th Lukens
Fineline family of low-sulfur constructional - - .. ~ UKENS . ( ..... -

plate steels for fractw'e-critical applications. The specialist in plate steels.


Find out how ow' Lukens-Conshohocken
facility can re pond to your need for light-
r- - - - - - - 1I
Lukl'Il S Sll,.'(·) ('ompHny

Write
lifj~
St.'rvit't'-; Ituildjl1~

I
('ual(·svillt." PA lHa'_}()
Pll'US4-' M,.'nd thl' lall·~t t'tlilinn or )o1)ur hrodllll""-" L"kl"U
Cflmotnl('liOfIfl/ Plate Sff ell;, to:


tnOw. I
NAl\m: _ _ _ _ _ _ _ _ _ _ _ __

1'ITI.,;: _" , -_ _ _ _ _ _ _ _ _ __
I
I

./'
C(1~ IPt\N' ·· _ _ _ _ _ _ _ _ __

AI)I)l(r;SS; _ _ _ _ _ _ _ _ _ _ _ __

ClTY _ _ _ _ _ _ ST:\'I'E _ _ Z I P'_ _ __


I
L- - - - - - - J
Golden Gate Bridge:
• They Worked by Night!
by Daniel E. Mohn

Damel E Mohn . P E M ASeE. IS chief engi-


neer . Golden Gale SJldge. Highway and
Transportation District, San FrancIsco, Cali -
fornia

majOr rnspecllon of Ihe Golden Gate


A Bridge In t 968·69 revealed the rein·
forced concrete roadway to have wide-
spread defects and local failures Further
Invesligatlons found the concrete of the
roadway With a high level of chloride Ion
contamination and fhat It was beyond the
threshold limit of one Ib of sodium chloride
per cu yd of concrete Therefore. the ex-
Isting roadway could not be restored eco-
nomically or practically Independent
studies confirmed complete replacement
of the roadway and Its supporting mem-
bers was economically preferable over re-
habilitation of the eXisting one.
Following a feasibility study of three po-
tential structural elements for the roadway
replacement. a scheme uSing orthotroplc
deSign technology was adopted as the re-
placement element

Work by Night
All work on the bndge that required traffiC
diverSion was performed at night. dUring
a time volume In which one lane In each
direction could provide the necessary lane
capacity All lanes were open and avail-
able for use dUring peak commute periods
starting at 5:30 a m. each weekday and
7 a m Saturday morning
On Aug 15, 1985. at 230 a m .. exactly
401 nights and days of work after the first
section of the 47 -yr old reinforced con-
crete deck was saw-cut from the Golden
Gate Bridge and replaced With a modern
orthotroplc steel deck section. the 747th
deck section was lowered Into place to
complete the structural work on the $60 3-
million project
ThiS project replaced the entire roadway


slab and ItS supporting steel stnngers With
an orthotrop'c steel deck system consist-
Ing , In general. of a 'Y.-In steel plate. stiff-
ened longitudinally With 'Y, -In steel trap-
eZOidal nbs II-In . deep, and 'I.-In . x 12-
World·renowned Golden Gate Bridge undergoes mBJor re-decl'(lng Careful plannmg
In deep sublloor beams spaced 25 It kept traffiC delays to mlnlmum - motOfJsts were only Inconvenienced 13 times
transversely

1sl Quarter' 1986 11


History of the Golden Gate
The Golden Gate Bridge was originally
opened to traffic May 27, 1937 The bridge
extends 9, t50 ft (2,79Om) from the PresI-
dio on the south to the Marin shores of San
FrancIsco Bay on the north. It IS the only
direct vehicular transportation link be-
tween San FranCISco and the counties to
the north via U.s. Hwy 101. Actually, the

bridge IS three separate structures: the
suspension bridge proper, consisting of a
4,200-ft (1 ,280m) malnspan and side-
spans of 1,125 It (343m) each; the San
FranCISco approach viaduct. 1,268 ft
(387m) long: and the Marin approach
viaduct, t ,432 It (437m) long.
Highway 101 , north of the Golden Gate
Bridge, IS an eight-lane divided freeway
serving the counties to the north of San
FranCISco, Including the Redwood Empire.
Between July I, 1983 and June 30, 1984 ,
the bridge carned 38,520,000 vehicles.
On a tYPical weekday, It Will carry between
tl 0,000 and lt5,ooo vehicles. About half
of these cross between 6 and 8 a.m., and
4 and 6 pm Peak traffiC is southbound
into San Francisco In the a.m. and north-
bound dUring the p m
To accommodate these directional peak
demands, the centerline of the bridge is
changed , using PVC pylons placed man-
ually on the structure, to provide four
southbound lanes and two northbound
lanes In the a.m., four northbound lanes
and two southbound lanes in the p.m. and
three lanes in each direction dUring mid-
weekdays and weekends DUring those

times when traffic volume demand is less
than the full capacity of the bridge, either
one or two lanes are taken out of service
to prOVide a space-buffer, for safety, be-
tween opposing dlrecllons of traffic.
Since completion of the bridge in 1937,
the salt atmosphere took ItS toll . Recog-
niZing the bridge had suffered a conSid-
erable amount of corrosion exposure, the
Huge new deck sectIOn drops mto place (top) dUfing afl-mght operations
board of directors in 1968 commissioned DISintegrating sections (bott .) come out In complex operation
Ammann & Whitney, consulting engineers,
of New York City, to Inspect major struc-
tural components. The report of thiS In- scheme. Final design engineering and the nlques was based on thiS deSign param-
spection on November 1969 stated , preparation of contract plans. specifica- eter An analYSIS of traffiC volume patterns
among other things, that the Original rein- tions and bidding documents started earty indicated all deck replacement work
forced concrete roadway was shOWing in 1979. would have to be performed at night. Start-
signs Of distress The consultants recom- ing at 8 p .m. week nights. It was poSSible
mended further study to determine the ex- Desfgn Determfned by Traffic to take three of the SIX lanes out of service
tent of, and sotutlon to, the probtem. In There are no practical alternative routes and stili accommodate the volume With
1976, It was determined the salt content between Sonoma and Marin Counties and only minor congestion.


of the Original reinforced roadway stab ex- the City and County of San FranCISco. So. At midnight . an additional lane was
ceeded the threshold limits for rehabltita- a maJor consideration dUring the deSign taken from service to prOVide four traffic
tlon, and the roadway would have to be of the replacement element was the ability lanes or a total of 40 It In which replace-
entirety reptaced Further studies con- to perform the work and sllli maintain a ment work was done . TraffiC volume al-
ctuded an orthotroplc steel deck reptace- sufficient number of lanes to accommo- lowed the four lanes to rema in out of ser-
ment scheme tor the roadway was more date traffiC at all times. day or night. The vice until 5:30 a.m . at which time the
cost-effective than any other replacement deciSion to use modular construction tech- bridge had to be configured to accom-
12 MODERN STEEL CONSTRUCTION
roadway element is approximately 40% tated sidewalk structural steel frames and
lighter than the original reinforced con- new precast concrete panels; complete
crete roadway element and its supporting replacement of all bridge utility services,
stringers, consideration to require bal- including air and water lines, hlgh- and
anced reduction In weight was examIned. fow-voltage electrical conduits, conduc-
ComputatIons proved, however, that no tors and electncat substations, signal ,
part of the structure would be stressed be- control and closed-circuit television ca-
yond allowable unit stresses under com- bles, District-owned and publiC telecom-
bined loading conditions if a balanced munication lines and other electrical and
roadway replacement sequence were not mechanical services used on the bridge
required . Since it would be less costly if and ItS approaches.
the deck replacement began at one end
of the structure and progressed Uniformly Constructfon Very Comptex
across the bridge to the other end, bal- The deck replacement profect was adver-
anced unloading was not a contract re- tised lor bids dUring the Fall of t982. Nine
quirement. bids , ranging from $52.495 million to
One of the price considerations during $79.993 million, were submitted . The low
this project was to accommodate peak bid was accepted and a contract was
commute-hour traffIC volume. As an added awarded Nov. 16, 1982. The Bridge Dls-
incentive for the contractor to plan his op- tricl retained the prolect deSigners to pro-
erations so that all lanes were available by vide construction engineering advice and
5:30 a.m .. a penalty program was part of perform shop plan checking services dur-
the contract. Under it the contractor was ing the construction phase The Trans-
Deck plates were fabflcated 'rom 5IB-tn. steel
assessed a penalty of $1 ,000 for each t 0- portation Laboratory of the California DOT
plate SectIOns were SAW-welded on site
minute segment of time past 5:30 a.m. the (Caltrans) was retained to provide offsite
structure was not cleared In retrospect, and fabrication Inspection along With ma-
thIS was a wise deciSion by the Golden terial testing services. Caltrans also pro-
Gate Bridge District. During 401 nights of Vided, on a loan baSIS, engineering per-
mod ate morning commuters. Therefore it roadway replacement work, mornIng com- sonnel to augment the District 's
was a contraclual requirement to have all muters were inconvenienced a total of only engineering department for job-site in-


six lanes in service no later than 5:30 a.m. 13 times. spection , construction engineering and
each weekday morning. contract administration services.
Generally, the Original bridge was con- Funding Unfque The contractor set up a profect man-
structed with a 50-ft longitudinal module. The total cost of this profect exceeded the agement office and yard at the north end
The replacement deck was designed to funding abIlity of the Bridge District. Prior of the Gofden Gate, and also a final as-
thiS same dimension . The typical replace- to 1978, all capital improvements and sembly and staging yard In Napa, Cal.
ment section IS about 15 ft , or one and maintenance of the structure was funded about 40 mlfes east. The contractor sub-
one-half traffic lanes Wide, and 50 ft long. entirely from tolls. Since the Golden Gate contracted structuraf steel fabrication
DUring Ihe design phase a prototype con- Bridge, Highway and Transportation Dis- Twenty-eight million pounds of ASTM
struction contract was performed 10 check trict is chartered as a California public cor- A709 Grades 36T and SOT, Zone 2 Impact.
deSign paramelers and Iraffic-handling poration and is not a part of any cIty or structural steel plate was rolled into plate
plans. Under thiS contract, Ihree 15 ft x county, nor part of the State of CalIfornia, and stockpiled for fabrication Into deck
50 ft roadway sections were replaced. neither state nor federal funding was avail- units that varied In sIZe and shape from
Based on Informallon obtained , It was de-
termined that two deck sections could be
replaced each night. Construction con-
able. The District successfully sought an
amendment to the 1978 Surface Trans-
portation Act whIch established eligibility
deck units were , .
9 ft-6 In x 25 ft to 17 ft x 75 ft , Most of the
t4 ft-3 In x 50 ft. The odd-
SIZed deck units were used at abutments,
tract time was set at 600 tOlal working days of the Golden Gate Bridge to compete for pylons, towers and curved parts of the San
for the performance of all the work In the FHWA Bridge Rehabilitation and Replace- Francisco and Marin approach Viaducts.
prolect. Including mobilization, off-site fab- ment discretionary funds . Following en- The deck plates were fabricated from
ricalion, deck and Sidewalk replacement . actment of this legislation, FHWA agreed 0/8-ln thick ASTM A709 Gr. 36T mill-run
The original reinforced concrele side- to fund 80% of the particIpating prolect steel plate welded to size uSing full-
walks and their structural steel supporting costs, whIch amounts to approximately penetration butt welds. The longitudinal
systems needed rehab,litallon as well. This 78% of the $65 million total project cost. stiffeners were formed Into trapezoidal
work was Incorporated in the deck re- The remainIng costs are funded from shape from %-In ASTM A709 Gr 36T
placement contract . Incidenlal to replac- bridge tolls and no increase In tolls was plate welded to the deck plales uSing 80%
Ing the roadway deck and sidewalks, the requrred . penetration welds Each deck unit was fll-
total Width of the roadway was increased The total $65-mllllon prolect cost In- ted wilh a '12-ln x t 2-ln deep end subfloor


from 60 ft to 62 ft. ThiS permits curb lanes cludes design, preparation of plans, spec- beam and a '12-ln x 12-1n deep interme-
to be 11 ft Wide for safer operation of ifIcations and bidding documents; the diate floor beam 25 ft 0 c , fabricated from
trucks, buses and recreational vehicles. construction contract: contract adminis- ASTM A709 Gr. 36T steel plale.
ThiS IS the maximum roadway Width that tration and on- and off-site Inspecllon for Pedestals fabricated from ASTM A709
can be accommodated between the tower the complete replacement of the bridge Gr. SOT y,-in, %-In , I-In and 1Y,-In plale
legs of the bridge. deck and supportIng members; removing attached Ihe orlholroplc deck units 10 the
Since the orthotropic steel replacement and replaCing sidewalks using rehablll- main floor beams uSing ASTM A325 hlgh-
1st Ouarter/1986 13
STRUCTURAL
PRODUCTS
What % of your needs
require ST. LOUIS
SCREW & BOLT HIGH
STRENGTH Bolts?

Consider this -
.American Made
• Tested & Certified
• Full Range of
Type I &.ill. Products
• Fast Delivery
.95 Years of
New sidewalk section IS set In place Dependable Service
Phoros by 0 Slemans

strength bolts. and compensated for the Video and security systems and Dlstrlct-
difference In depth between the 7-In orig- owned telecommUnications-the bridge
Inal concrete deck supported on 24-ln prOVides four condUits for use by the U.S
deep steel silingers and the orthotroplc Army and two condUits for publiC com-
deck units. Deck units were sandblasted mUnications links uSing fiber OptiCS media.
and painted with organiC zinc primer and The epoxy reinforced Fiberglas was
vinyl top coats prior to shipping to the con- speCIfied in lieu of rigid galvanized steel
tractor 's Napa yard conduit because experience has shown
A seal coat of 'I.-in crushed rock that galvanized steel condUit would rust
embedded In an epoxy asphalt mastic was through at the threaded JOints In 5-7 years
applied to the riding surface of the units of weathering unless an extensive main-
at Napa to form a temporary riding sur- tenance program was performed It IS an-
face. The final 2-1n of epoxy asphalt con- ticipated the Fiberglas condUit Will last for
crete Will be applied over the temporary many years. With little or no maintenance
riding surface dUring the Spring of t 986. Further. It IS lighter weight and less costly
The structural steel Sidewalk framing. In- to lurnlsh and Install 0
cluding traffic curb, pedestrian railing and
elect roller standards. was taken to Ihe
Napa yard lor sandblasting , rehabilitation
and painting Each Sidewalk frame was fit-
ted With a new precast. lightweight con-
crete sidewalk slab prior to being rein- Design/Consulting Engineer
Ammann & Whitney
stalled Nineteen 4-ln dla. Fiberglas utility We wantto be involved.
New York , New York
ducts, one 3-in dla water line and one 6-
In dla. all line were Installed under the Consulting Engineers/Administration CALL US COLLECT!
Sidewalk slabs, Within the structural steel California Dept of Transportation
framing . by mechanical and electrical sub- Todayat314-389-7500
contractors each day prior to the Sidewalk General Contractor
ST. LOUIS SCRE W & BOLTCO.
unit's Installallon. Each condUit run was DllhnghamITokoia (JOint venture)
Sao Fraoclsco, California 6902 NORTH 8ROADWAY
jOined together the day 10llowlng the unit
ST. LOUIS. MISSOURI 63147-9990
Installation. Pullboxes for the u"',t,es were PHONE (314) 389-7500
Installed In blockouts In the Sidewalk slabs Steef Fabricators

~
Flint Steel Corporation
The main bridge expansion JOints at the
Tulsa, Oklahoma, and
pylons and the towers were spanned With
Chicago Bridge & Iron Co
bronze fleXible condUits. Fiberglas slip
Sail Lake C,ly. Ulah
JOints were used at all other expansion 10lnt
crossings In addition to condUits for Owner
bridge operations- which Include all. GOlden Gate Bridge, Highway & Transportallon
water , hlgh- and low-voltage electrical District
power, roadway lighting . closed-CIrCUit San FranCISco, California

14 MODERN STEEL CONSTRUCTION


525 Vine Building:
Fast Track on a Tight Site
by Shayne 0 Manning

Shayne 0 Manmng IS a partner in the structural
engineering firm 01 THP limited, CinCinnati,
OhiO

he 525 Vine office tower, a 23-story, the building at the second floor. The sky- nallayout (core, atrium, and lobby) of this
T 494,000-sq fI bUilding, is situated on
one of the most attractive sites in down-
walk is an elevated walkway connecting
five hotels, five major department stores,
building have an integral relationship with
Fountain Square and the skywalk. The
town Cincinnati Its front yard is Fountain the Convention Center, and downtown's front of the bUilding is kitty-corner to, and
Square, a very successful urban plaza In mafor parking garages. More than 8,000 faces the Square Large windows are ar-
the heart of downtown Another desirable people pass through the building's lobby ranged In a wing-spread pattern to em-
feature of this site IS a skywalk which has In uSing the skywalk at noontime. phasize the front of the building , which In-
one of ItS bUSiest arteries Integrated with The external appearance and the inter- terestingly enough, IS actually a corner.
The lobby, with ItS seven-story atrium
topped by a three-ton stainless steel ro-
sette/ceiling sculpture, was placed at the
second floor 10 take advantage of the sky-
walk concept. The core IS along the north
wall, which faces a blank wall of an ad-
jacent building. This provided an excellent
opportunity to conceal the longitudinal and
transverse bracing, as well as to maximize
a clear view of the Ohio River and the
Square to the south and west of the build-
ing . ThiS arrangement created a more de-
sirable open layout of office space giving
tenants maximum fleXibility, and permits
emphasIs of the openness of the seven-

story atrium.
The building skin is a combination of
precast concrete and glass. The concrete
aggregate IS green granite and the cement
IS slandard grey. To blend with these
colors, a blue-green glass with charcoal-
green mullions were used . This, combined
With relief from the half-round topped pre-
cast panels, produced a very attractive
building envelope. The city granted air
rights over the skywalk, which not only in-
creased the tenant space in Ihe first seven
levels, but also Increased the building
footprint enough to permit an additional 11
tower floors based on code-permissible
heights.

Difficult Sfte Problems


The 83-ft X 224 -fl site IS constrained by an
existing hOlel on two Sides, a skywalk and
alley on the third Side and a street on the
fourth There was no on-site storage of
construction materials , but permiSSion •
was granted to block temporarily only one
traffiC lane of Vine Street, a downtown
525 Vme Buddmg, Cmcmnatl, 0.
Skywalk IS busy traffiC artery

16 MODERN STEEL CONSTRUCTION



street with a very heavy traffic ffow. This reqUIted on the nlnlh level to separate of-
lane also provided the only major access fice and retail space; and on the second
to the site. The alley with the skywalk over- level to protect retail space from the load-
head had to remain open for service ac- ing dock area. These two floor decks were
cess to adjacent businesses. and the City sprayed With a cementltlous fireproofing to
required the eXisting skywalk to be open meet the three-hour fire rating.
around Ihe clock seven days a week to TYPical floor beams are cambered W14
minimize any economic impact on busi- sections at 8 or 10 I! o.c . supported by
nesses. When the lower was under con- W21 girders on 30-1! modules. All beams
struction. the skywalk was first rerouted and girders. except those on the ngld
Ihrough the lower via a temporary en- frame . were deSigned composite With Sim-
closed bndge. Another enclosed bridge ple. Type 2 connections. The ffoor framing ,
had 10 be bUilt over the existing skywalk checked for Vibration potential, has per-
to provide access to a department store formed satisfactonly.
cutoff by the initial rerouting. The bUilding columns. which vary In size
from W14x605 to W 14x45, were all de-
Structural Steel Framing tailed long to account for graVIty Induced
There are 23 levels of structural steel floor shorlenlng . The typical columns and the
framing in the tower-3.150 Ions of almost extenor chord members of the braced
100% A572. Gr. 50 structural steel-steel bents had an V. In. and V,. in. added per
weight averages 12 psf. In addition, bear- floor. respectively. The deSign of the
Ing bars and other miscellaneous metal braced-bents extenor columns were con-
required for the attachment of the precast Fast trackmg With steel frame made early trolled by stress due to combined Wind
panels. added another one psf. occupancy posSible . TYPical frammg plan and gravity loads They shorten only about
To achieve the required slab two-hour (FIg . 1. below) and section (FIg 2. below r) one-half the amount of the typical columns
fire rating . a 3-ln . composite metal deck detail bulldmg structural deSign. during construction. Without the differen-
with 3V>-in. lightweight (115 pcf) concrete tial column length detailing . the four majOr
fill was used . A three-hour fire rating was wind bent columns would have been ap-

' -. 0· .,.r-' .· lI' O' pl' ~

H---l=ITtrnfiimM~nw
I
"
,
'''ICA,,-
-
-
- ~ ...
~ I::::!
12' , ·
' l OOf! TO

..
~~ '-111 118- II I-
IIIlTJ-11111 1-' (7'f- 1--1 vu. •t
,
""l :::s I::::!-
.
r+-- dlll-jI~-IIUlITII-11 1116 I - 1-"
k-
'tiL 10


-
WI~I
0"
-r ~ ~~-- :d-' CIItOMlNT CON,unPI ~ "IOIO FR"Me:
u

.. i
~
-1I l088Y' SKY WA LK AT LEVEL 2
r- -- - - ~ -
"
.... ! I
- .. ,
L-- ---1 I
I
V ""
L ________~_ ~~~~:;~:; _ _ ~~-_------~ /
,
SECTION

1st Quarter' 19S6 17


proximately t 1', In higher than the typical 3. Large shear walls required for trans-
columns at the roof. verse stability would have interfered

Three Framing Systems Considered


with the open office layout.
4. The lobby/atrium framing with hangers
STRUCTURAL
Selection of the framing system for the
tower had to not only consider the basIc
and setbacks would be very expensive CONSTRUCTION •
economies of the structural frame, but also
In concrete.
5. Future tenant changes would be diffi-
FASTENERS
site constraints, phased construction and cult to handle.
Ihe architectural considerations of column From foundation to roof
locallon and open space. Three basIc The rigid-steel frame scheme was Inef-
framing systems were considered: fiCient because of the excessive floor Haydon is your one
1. A concrete flat plate with shear walls
depth required and an extra 3-4 psf steel source. Quality bolts to
weight premium above a comparable
2 A rigid -steel frame braced-steel frame . This translated into ASTM standards at
3 A braced-steel frame over a $1 ,000 ,000 premium , including competitive prices. Direct
steel weight, skin costs and electrical/me-
The concrete scheme proved uneconom-
chanical systems
from the
Ical for several reasons :
The convenllonal braced-steel scheme manufacturer.
The frame would have required a mat had the advantages of low steel weight,
foundalion because of frame dead minimum cost premium for lateral load re-
weight and constraints on exterior col- Sistance, Simple framing connections and
umn footing size maximum fleXibility for economical and
2. EffiCient flYing formwork could not be easy tenant changes . The use of the struc-
used with eXisting construction so light tural steel framing system also facilitates
on all Sides. fast-track construction. The primary diS-
advantage was the interference of at least
one bay of diagonal braCing framing per
story.
The conclUSion of this study was to de-
sign a braced - steel frame building ,
thereby maximizing ItS economical advan-


tages and minimizing the lost tenant
space. However, Ihe other two schemes
were incorporated into the final structure
where they were most advantageous. The
concrete scheme was used In the tower
level garage area, and the rigid-frame
scheme where diagonal braces were not
permitted
You
Bracing DeSign name
In the longitudinal direction of the building ,
the structural anchor, bolt,
a conventIOnal braced bent-frame was
used to take advantage of the blank ex- nut or rod you need in the
terior wall along one side of the core (see size, metal and finish you
Fig . 1). ThiS resulted In an unacceptable want. Either we have it in our
torsional rotallon on the building axis, large inventory, or we can
therefore a rigid frame was added on the
make it for you in a hurry.
opposite exterior wall to control this move-
ment. This rigid frame , necessary only be- We've been known for quality
cause of the torsional movement, added and fast service since 1864.
$100,000 to the cost of the building be- And , we'll quote prices and
cause of the heaVier beams required for give details right over the
both stiffness and strength. phone. Try us. Call :
Handsome seven·story lobby/atrium /5 The transverse bUilding dlrecllon was
topped by three-ton sculpture more difficult to brace. No braCing was
permitted on the exterior column lines and
(215) 537-8700
only minimal disruptions to Interior tenant
space were allowed With a relatively high HAYDON BOLTS, lnc.
bUilding aspect ratio of 6 to I , It is advan- Adams Ave. & Unity St. ,
tageous to use the full building Width to Philadelphia, PA 1912 4 •
resist lateral load overturntng moment In
terms of both stress and building dnft. With
that critetla, a non-conventional braCing
scheme was chosen.

Ie MODERN STEEL CONSTRUCTION


Two Intenor bays of bracing resist the limit chord shortening and the resultant lat- ramps and depressions would have de-
transverse lateral load . They also assist in eral drift. layed structural steel erection. Instead of
stiffening the building from torsion caused All bracing connections were designed constructing the garage levels first and


by the eccentnc longitudinal bracing . The as field-bolted connections, With gusset then erecting the steel frame, the steej col-
diagonals extend up nine floors from one plates shop-welded to columns (Fig . 3). umns continued down to and were sup-
Side of the bUilding to the other (see To establish the correct length of a brace ported on the foundation , Structural steel
Fig. 2). The diagonal typically Intersects nine stories long, bUilding shortening dur- was erected to the fifth level pnor to place-
Interior column lines every third floor, and ing construction had to be taken Into ac- ment of the first conctete structural level
is braced by and supports each floor level count while allowing for standard con- 01 the garage. In thiS manner, completion
In between. Only about one third of one struction procedures. Some of the gusset of the tower and garage proceeded SI-
bay width IS obstructed by the braced bent plates had to be field-reamed to fit the 1Va- multaneously. The concrete levels are sup-
at each floor level and the diagonal's ef- in. A325 bolts and/or field-welded , be- ported off concrete encasements poured
fecllve length IS also smaller than a di- cause of inadequate tolerance. around the steel columns
agonal found in a conventional braced
bent In addilion to the major bent, a sec- Garage Constructed Later Tower Crane Interesting
ondary bent on the same column line The garage structure and first floor with The tower crane was another Interesting
transmits lateral shears from the floors loading dock were constructed with cast- feature of thiS project. Because of the nar-
above and below to the major floor/diag- in-place concrete framing to maximize the rowness of the site, a standard saddle jib
onal nodes. ThiS secondary bent causes advantages of durability and fire protec- tower crane which rotates 360" when It IS
minimal space disruption since it is con- lion In these areas. All concrete exposed weather vanlng In a wind storm could not
cealed within the core walls. to salt contamination was constructed us· be used Instead, a Pecco SN 355 luffing
In the transverse direction, not only do ing epoxy-coated reinforcement, and all jib tower crane With a movable counter-
the extenor chord columns resist overturn- concrete surfaces were treated to mini- weights below the turntable was chosen.
Ing stresses, but also the longitudinal mize water absorption. There was only one other SN 355 In the
braced and ngld frames act as flanges to Construction of the concrete levels With U.S. at the time of constrUClion. The crane
was mounted to an enlarged foundation
which also supported the bUilding col-
umns. Every five floors, the crane was lied
to the structural frame uSing a Wide-flange
beam strut. Because 01 the high floor dia-
phragm brace forces , temporary diagonal
cable braces were reqUired to lie back the
strut to the braced frames .
The execution of the deSign, develop-
ment and construction of a fast-track proj-
ect such as this reqUired extraordinary ef-
fort by all concerned to maintain the
continued emphaSIS upon the Importance
of coordination With vanous disclphnes
and trades There were unusual time and
GUSSI.T PL ... n: S HOP space constraints which called for re-
WIElOE D TO COLUMN
sourceful solutions The successful com-
pletion of this building was the result of the
combined effort of the many participants
involved in all phases of construction 0

Architect
Glaser & Myers and ASSOCiates, Inc
CinCinnati. OhiO

Structurat Engineer
THP Limited
Cinclnnah, OhiO
All bracmg connections are fleld-
bolted. with gusset plates shop-welded
to columns (/.). Typical bracmg detail Construction Manager
(Fig 3, above) Photos by David
P R Duke Construction Company, Inc
McCullough and THP urn/ted Indlanapohs, Indiana


Steel Fabricator/Erector
Southern OhiO Fabricators, Inc
CinCinnati , OhiO

OwnerlDeveloper
Phillip R. Duke Associates
Indianapolis, Indiana

tst Quarterf 1986 19


SOLUTIONS IN STEEL ~
~

National
Engineering
Conference
aponsored by the Am.rlce" InlUtute of Steel Conl'ructlon, Inc.

June 12-14, 1986 Opryland Hotel Nashville, Tennessee

• PRACTICAL SOLUTIONS:
Ponding of Concrete Decks
Beam-Column Design
Jointless Steel Bridges
Economical Short Span Bridges
• NEW DESIGN PROCEDURES:
Moment Connections
Composite Construction
Bracing for Heavy Structures
Plate Girder Bridges

Staggered Truss Systems • NEW SPECIFICATIONS:
Useful Steel Design Literature
AISC-Load and Resistance Factor Design
• KEYNOTE SESSION ON RCSC-Structural Connections (Boiting)
AASHTO-Guide for Braced Compact
BUILDINGS AND BRIDGES Sections (Autostress)
NEW ANALYTICAL TECHNIQUES:
Horizontally Curved Girders
3D Analysis of Bridges
• NINE HALF-DAY SEMINARS
• SPECIAL SESSION: r-------------------l
Lessons Learned from the Mexican I To receive complete information on program,
Earthquake I speakers . transportation , hotel accommodallons ,
I and the official registration form. return this coupon
• EDUCATOR MEETINGS J today/ Direct your Inquiry 10:
Department of PubliC Atfalfs
1 American Institute of Steel Construction, Inc.
• PRINTED PROCEEDINGS I 400 N. Michigan Avenue , Chicago, IIhnols 6061 1

• DRAWING FOR MICROCOMPUTER


I
I ......,
and other door prizes


1I c:ompiny' Anilllltlon:
• FAMILY FUN AT OPRYLAND I
1
• RIVERBOAT DINNER-CRUISE I Addr...:
I (CIty) (S'_Ie/County, IZ.plPost.1 CoOe)
* Technology + Common Sense L __________________ _
1
= Reliable Steel Structures
Domino's Farms:
• A Tribute to Frank Lloyd Wright
by Vural Uygur and Donald Cualt

VuraJ Uygur. PE is executive vice president,


bUSiness development for Glffels Associates.
Inc , architects and engineers , Southfield ,
Michigan
Donald R Guatt. AlA , is Glffels Associates' proJ-
ect director for the Domino's Farms project

D omino's Farms IS the new $t20-mllhon


headquarters complex for Domino's
Pizza Company, Ann Arbor, Mich. Phase
Wnght 's architectural philosophy As a re-
sult, Domino's Farms , With more than
t .000,000 sq ft of office space, features
t was ready for a pre-Chnstmas opening . several Wrlghl-lnsplred structures Includ-
Designed as a tribute 10 Ihe philosophy Ing a 750,000-sq ft , low-rise headquarters
and slyle of one of Amenca 's best-known bUilding: and a Usonlan home, purchased
architects, Frank lloyd Wnght, the 300- disassembled by Monaghan In 1984
acre complex. located In the roiling coun- Focal po<nt of the Farms IS Wnght's Gold-
tryside northeast of Ann Arbor, Will be rec- en Beacon, a tower he onglnally designed
ognized by ItS low-lYing bUildings cut Into as a 56-story apartment bUilding for Chi-
the landscape. much like Tallesln East, cago's watertron1. Tallesln Associates will
Wright's summer home/studio In Madison, modify the design for use as a 250,000-SQ
WISC. ft. 3D-story office tower Many of his design
An aVid admirer of Wnght, Thomas S. features Will be viSible From the standing
Monaghan, founder and president of Dom- seam. copper-hipped roofs, and long rib-
Ino's Pizza, Inc. , commissioned a South- bon Windows and extended cantilevers, all
field-based architectural and englneenng blended Into a natural surrounding. the
firm. and its architectural design consul- complex Will showcase Wright's unique
tant to create a design In keeping with prairie style of architecture

·11
t
Model of Dommo's Farms' new
headquarters (above), which features 30-
story Golden Beacon tower and 7SO,0CJ0-
sq It low-f/se bUlldmgs Near-completed
structure (top, r) Construction photo (r)
shows steel framing details 01 roof and
cantilevers


1st Ouarterl1986 21
Master Plan Phased
The master plan calls lor phased construc-


tion of Domino's Farms. The flfst phase.
with December t985 occupancy date. In-
cludes 220.000 sq It of the low-rise head-
quarters building. parking for 400 cars and
a relocated mile of country road The
headquarters structure will contain exec-
utive offices. lease space. a cafetefla.
phYSical fitness facilities . a video produc-
tion area. food preparation and food ser-
vice equipment. testing laboratory facIli-
ties. and word processing and computer
faCilities The rest of the 750.000-sq It low
flse will be completed later.
A demonstration farm . lodge and con-
ference center. daycare center and facil-
Ities for Domlno's PIZza Dlstflbutlon Cor-
poration and regional dlstflbutlon ware-
housing will complete the complex. The
site will be modified to include an artificial
lake. fed by a natural watercourse. to
separate the tower and the low-flse bUIld-
Ing
Domlno's Farms uses several unique
concepts to develop ItS Frank Lloyd Wflght
characteflstlcs It IS Intended to have a
practical functional use And. as with any
contemporary office bUilding . budget and
schedule are Cfltlcal factors In liS deSign
and construction. To meet a December
Steef·'rame supported trellis cames through on Wflght design. 1985 occupancy date. the entire deSign

~ .•
~,,,,~~ .. ~ .

"" CYI ..-".....Q!.., - 1'0.
M." ~'i .... " c..~ ...,
... ,.. •a.F'u;._~.Q..

.....:._ ..... '.o~~


_~&O .., - ......" ..... ..n

" f::-::........::'"
1
•i>
"


--"\"\- -- -- ~. LI,
••

'".. CROSS SECTION

Atch,tecturaf cross Section shows monitor area at top for courtyards



22 MODERN STEEL CONSTRUCTION
--- - - - - - -- - -

team developed an 18-monlh schedule. lormed by sloped steel rafters which sup· system has an applied patina f.nlsh . and
Incorporaling materials and design con- port a un.que copper roof. The roof ter- mon.lor roofing and overhangs below gut-


cepts wh.ch permitted maximum flexibility minates along the long bu.ld.ng edges w.th ters feature a lead-coated copper fln.sh
and fast-track construction. canttlevers. at some points as much as t 4 - Add,t.onal copper features Include w.n-
It from the build.ng frame . The un.que roof dow s.lIs. copings. balcony and planter
Fast and Flexible and use of copper throughout reflect faSCias. beam covers and flashings
Structural steel was a logical choice for the Wflght's philosophy of Incorporaling nat- Phase 1 also leatures a 2.350-sq ft OUI-
superstructure because It provided the ural maleflals Into structure. Su.IHn gutters door patio area w.th a treilts-like roof of
fleXibility reqUifed to deSign and bUild a handle all expansion and roof dra.nage exposed structural steel tub.ng latllcework
projOCt of this magnitude with utmost In- (see Fig. 1). At all roof levels. 6-ft canti- support.ng a mult'ple arch-shaped sky-
tegflty. and stili meet the budget and levers extend from the edge of the bUild- I.ght. The peflmeler of the pat.o roof .s
schedule reqUifements The deSign team Ing . Their top surfaces are pitched 3/12 to brtmmed w.th a trtple-stepped wood out-
began Immediately on working drawings form a continual.on of the roof. They are rtgger and a continuous planter. also sup-
for the site. arChitectural. foundations and cut out near the high end to provide .n- ported by the steel framework .
struclural steel contracts To meet the 18- board gutters for roof drainage. The out-
month construction schedule . it was .m- rtggers are 3I16-in. plate bent alon9 the Challenges Three-fotd
perative to complete the superstructure as bottom to form an L-shape and then cut Site work. which was considerable. began
soon as poss.ble . Nearly all structural along the top to accommodate the 3/12 In the Fall of 1984. With most slle work
draw.ngs were completed us.ng .n-house pitch and bUIIHn gutters The top edge .s completed for all phases The challenges
CADD workstalions. The steel deSign pre- then reinforced With 3/16-ln . plate to form w.th a prolect of th.s magnitude were trt-
ceeded wtthout the benefit of finished ar- a C-shaped cross section. fold The arch.tect was respons.ble for de-
chitectural draw.ngs Flexlb.llty to accom- Several areas of the top floor. framed as veloping a plan which complements the
modate the yet-te-be developed archi- hip roofs. reqUife skewed. sloping con- rural site. the deSign had to be In keep.ng
tectural des.gn and dela.ls was maln- nections Single- and double-plale con- With Frank Lloyd Wflght's unique pralrte
ta.ned by us.ng steel. nect.ons were used . The mon.tor along the architectural style; and most Importantly.
DUfing the conceptual des.gn of the low- peak of the roof at the north end of the very real budget and schedule reqUire-
flse headquarters structure . fUll-story bUlld.ng provides areas of the fourth floor ments had to be addressed
he.ghl Vlerendeel trusses were antlc'- With natural sunlight Special features . One part.cular problem posed by both
pated to cant.tever 34 ft at each end of the such as narrow copper fasc.as of 2 It-2 In the schedule and M.ch.gan·s harsh w.nter
butldlng Eventually. more convent.onal h.gh and benl heavy copper sheet relurns was the east elevation between the Itrst


cantilevered syslems of reduced length .nto soHit will develop a narrow. thln-ap- and second lloors On the west. the flfSI
were used . and several courtyards as peartng roof overhang approximately 5 It floor .s at grade and overlooks a man-
large as 70 It x 28 It and 56 It x 36 It were wide. The copper standing-seam rooltng made lake. and eventually Will overlook the
.ntroduced .nto the slructure The typical
bu.ldlng bay IS 28 It x 28 It and uses only
ASTM A36 grade structural steel The ar-
chitectural wall system is a 6-ln. steel stud
and bflck veneer. with StflP glaZing reflect-
Ing Wrtght's long . continuous Window
style The floor system consists of fully
SEE ARCH. Ow ~
o
I
compos.te beams and glfders w.th a 5- V, ~

.n concrete stab .nelud.ng a 3-.n. metal


deck Floor beams are typically spaced at
9 ft-4 In. o.c The compos.te floor system
.s consistent With AISC Spec.ficalions and
vlbralion crtlefla. The structural steel flfe-
proofing . a spray-on type. prov.des a 2-hr
life rating for Ihe floors and a 3-hr. fife
rating for columns. ,,,
Type 2 seml-flgld framing was assumed
,,
,
.n the deSign of the structural steel frame . ,,, ,
Typ.cally. end-plate type moment connec-
t.ons were used for beams spanning .n the
narrow (east-west) dtrection and web-
angle type connechons w.th top and bot-
tom clip angles were used for glfders \.... PROYlDE wiN. • 801.1~
\'[RT. 0 OUTAIW"R$
spanning In the long (north-south) dlfec- BENf It Il\'P..r


I~ , ~ 'Ill "
tlon. Typ.cal two-bay and four-bay bents
were modeled and analyzed by a STRUDL
program to delerm.ne applicable Wind mo-
ments Details of gutter and cantilever from rool were dr8wn With CADD
The most stflk.ng element of the butld-
Ing. however. IS the roof. Its 3/12 p.tch .s

15t Quarter/1986 23
Golden Beacon tower. On the east build·
mg elevation. however. the grade is at sec·
ond·floor level. about 14 tt higher. Con·
ventlonal design would have been a •
cantilever wall or one spanning from foun·
dation to the second floor with the steel
frame extending up from that level. This.
however. would have requ ired wall con·
crete placement dUring January and Feb·
ruary. the two worst construction months
in Michigan. In addition. structural steel
erection had to start In February 1985. If
the December 1985. occupancy date was
to be met.
To aVOid a steel erection delay. it was
decided to extend all columns and framing
on the east side down to the foundation
level. The concrete wall would be placed
after the steel was erected and lateral
backfill forces would be resisted by the
steel frame. Construction of only those
foundations necessary to receive struc·
tural steel was completed by December
1984. Steel erection began in February
1985 and completed in April. Spring
brought more SUitable weather. and the
concrete wall and site structure work were
completed.
Architectural development of details
was compfeted simultaneously and mod·
ifications coordinated with the erected
structure . Most modllicatlons required •
only minor adjustments. with little impact
on budget and schedule.

Conclusion
The use of steel for the superstructure of
First is Arbed's new rolled 40" beam . . . available in 16
Domino's Farms' Phase 1 played a vital
sections from 149 to 328 Ibs. It gives high section moduli,
role as a simple. workable solulion 10 help
great lateral buckling resistance, and competes economically the architect/engineer team meet design.
with both fabricated sections, as well as reinforced precast schedule and budget considerations. The
and prestressed concrete. team is pleased to be closely involved in
Then there's Arbed's rolled "taIIoHTIade" series (up to a prolect which helps the owner accom·
42.45 " x 18.13" x 848Ibs.)... that lets you specify the beam pllsh a boyhood dream- to open the com·
weight you need, other than what is normally available. pany's new headquarters on ItS 25th an·
Result? Big savings: in fabrication costs and weight. niversary- and at the same time salute the
Why not get all the facts? Send the coupon now for creativity and unique designs of Frank
information including complete specifications. Lloyd Wright. 0

I~;~~~ru~~~~~~~~~~n Architect/Engineer
I (212) 486-9890. Domestic Telex: (W.U.) 125159, Int'l Telex (1Tl) 421180.
II OntariO,
In Canada: TradeARBED Canada, Inc., 1176 Blair Road, Burlington,
Canada L7M 1K9. (416) 335·5710, Telex 0618256
II Giliels Associates, Inc
Southfield. Michigan
Architectural Design Consultant
.Please send complete Information on TradeARBED's 40 ' beams and I Gunnar Blrkerts & Associates
I " TAILOR·MADE" beams. Birmingham, Michigan

I Name Title I General Contractor

I Addressl____________________________________________
Firm I Barton Malow Company


Oak Park, Michigan

~~ _ _ _ _ _ _ _ _5.!!!.e_ _ ~I~ _ _ J Steel Fabricator/Erector


J L Peters Company
Ferndale. Michigan
Owner

ii"~E
Thomas S Monaghan, Inc
Inc. Ann Arbor, Michigan

INNOVATORS OF STEEL CONSTRUCTION PRODUCTS


24 MODERN STEEL CONSTRUCTION
Southern Bell had thelf corporate data center SIX months early. thanks
to steel-framed construction Column stubs (top. r.) provide for vertical
expanSIon . Completed structure In heavily wooded site (r.J

• Southern Bell:
A Corporate Data Center-
Six Months Early

R ecognizing the need to reptace


leased computer space. 1. S. Cates.
operations manager- Building Design and
The site selected for the Carolina Cor-
porate Data Center was 27 acres In Uni-
versity Research Park. a 3.500-acre com-
bid packages. on-site delivery of materials
also was eaSily monitored
Completed In December 1984. the Data
Construcllon for Southern Bell In North plex of high technology and research Center IS clad In clear and black anodized
Carolina. appointed Dan Wilson In early facilities near the University of North Car- aluminum panels. With areas of solar grey
1982 to direct and coordinate the plan- olina Charlotte. glass and a four-story expanse of glass
ning. deSign and construction for a new In January 1983. architects and engi- block at one end of the computer wing A
facility that consolidated their North and neers and members of the Bell organiza- common bUilding core area links the live-
South Carolina computer operations tion teamed up with a noted construction level . 270.000-sq It data processing wing
In the Fall of 1982. Southern Bell se- firm . A CPM schedule was developed by to a three-story administrative wing of ap-
lected a Charlotte. NC architectural- the project team. with a fast-track ap- proximately 50.000 sq It Future vertical
engineering-planning firm With a long as- proach for deSign and construction "By expansion has been planned for two com-
sociation of working With the Bell organi- fast tracking we were able to cut more than puter lloors and one administrative lloor.
zation. to deSign the Carolina Corpcrate 26 weeks from the normal project sched- as well as lateral expansion lor the admin-
Data Center. "With leases expiring In May ule," Komlsln commented Istrative wing
1985. Bell's first Priority was to have the Site clearing began In May 1983 The Special care was given to the preser-
bUilding deSigned . constructed and op- proJect. bid In five separate packages. al- vation of the heaVily wooded site. and
erational In 211, years." states John Komi- lowed Bell to benefit from the cost savings parking was broken Into small areas With
Sin. the project architect of competitive bidding . By uSing separate treed bullers Mechanical and electrical

151 Ouarter" 986 25


systems are designed for maximum effI- an automatic primary selective radial dis- up above the roof to allow future vertical
ciency with stand-by power provided for tribution system. expansion with a minimum interruption of
all systems. The distribution system incorporates a the roof membrane. The four-story ex-
Heat generated by the computers
warms the administrative areas of the
building through a reclaim chiller.The hy-
dronlc cooling and heating systems are
designed as primary-secondary pumping
systems and use variable flow in the sec-
ondary system for economical operation.
by-pass switching arrangement whereby
substation testing is accomplished while
providing continuous service to the UPSI
computer systems. Over three megawatts
of UPS equipment serve the computer
wing . The UPS features a central battery
system with DC switchgear and on-fioor
panse of glass block in the computer wing
required an Intermediate steel support
system, which was easily attached to the
baSIC steel frame .
In accordance with the Uniform Building
Code, the faCility was designed not only
for the prescribed lateral wind loads, but

All variable-speed drives are also Installed mobile power distribution units. also for seismic Zone II loads. The impact
on all variable volume air systems in the A structural steel frame with a composite of the seismic loads was reduced by the
administrative areas of the building . The slab on metal deck, beams and girders lighter weight steel structure. The facility
computer wing employs on-floor chilled was selected for ItS compatibility with the has no central core areas and Interior ver-
water air handlers. Other loads and hu- overall design concept of fast construc - tical bracing was prohibited . Therefore,
midity requirements are handled by an tion, versatility and economy. lateral seismiC and wind loads were re-
overhead spray coil system. The steel system provided the versatility sisted by moment-resisting frames In the
Almost without exception, all mechani- to meet several project requirements. The short direction and vertical K-bracing lo-
cal , electrical , life safety and security data processing wing requ ired a raised cated in the exterior walls In the long di-
equipment within the building is controlled floor to permit adequate space below for rection Lateral loads were distributed to
and monitored by a direct digital control cable distribution. However, the adminis- the frames and bracing by the lloor dia-
system. trative wing reqUired distribution of power, phragm.
Medium voltage sWitch and fuse distri- data processing and telephone cables The CPM schedule included an early
bution sWltchgears , coupled with four within the floor slab. A three-cell metal mill order and only a few days for the pro-
1,400 KW emergency engine generators, deck with preset inserts was provided in cessing of shop drawings. On-site delivery
supply power to nine substations through this area. The steel columns were stubbed of steel had to coincide with foundation
construction .
"We were fortunate to be working with
an excellent fabricator and contractor, as
speed of construction was especially Im-
portant to the owner. The use of structural
steel certainly enhanced the overall suc-
cess and economy of this facility," states •
Wyatt Bell, the prolect's structural planner
Handsome entry (I.) IS ·steel-framed. and a senior vice president of the archi-
Lateral seismiC and wmd loads resisted by tecVengineer firm .
K-bracmg In exterior wafls (below). Three· Superior teamwork and cooperation
cell metal deck (bott., I.) with preset among the architects, engineers, owner,
Inserts proVides adequate power outlets. contractors and material suppliers re-
sulted In a completion date several months
aarlier and a construction cost under the
owner's budget. 0

Architect/Structural, Electrical,
Mechanical & Civil Engineer
J N Pease ASSOCiates
Charlotte. North Carolina

General Contractor
McDevitt & Street Company
Charlotte, North Carolina

Seismic Consultant
S B Barnes and Associates
Los Angeles , California

Steel Fabricator
Southern Engineering Company
Charlotte. North Carolina

Owner
Southern BeU , Building Design & Construction
Charlotte. North Carolina

26 MODERN STEEL CONSTRUCTION
"North Island Ai r Station:
• Cantilever Trusses-
Key to Column- Free Hangar
by James A. Willis

James A Willis is president of Blaylock·Wlllis


and Associates, Structural Engineers, San
Diego. California

--- ........... _"'"


""""""'-'- .....
elicopter Maintenance Hangar BUild-
H Ing 1474, now In place at the North
Island Naval Air Station , San Diego, pro- North Island Air StallOfl-Street side Building section of San Diego faCIlity
vides covered. weather-protected space
for maintenance of Sikorsky SH-60B heli-
copters. A lQ4,OOO-sq 11 alrcral1 hangar


space, shop space, crew and equipment
space, maintenance/administrative of-
fices, operallons offices and squadron of-
fices were constructed to house three new
helicopter squadrons Cost of the bUilding
was $6 8 million
A large column-free area In the hangar
bay Without columns In the door line was
reqUIred to allow lIexlbllity and future use
by different types of aircraft. To prOVide the
clear area, a steel cantilever-type of struc-
ture was used : 100 fl-Iong high-strength
steel (50 kSI) 33-ln . WF rolled beams,
spaced 36 11 0 C., are supported by steel Hangar bay shoWing steel trusses OperatIOnal side of North Island hangar
forestays , backstays and center columns
to frame the column-free 100-11 by 470-11
area The cantilever beams support open complement the InstruCtion bUilding . Of- Architect
web steel JOists, metal decking and a 5- fice and shop areas are enclosed with the James McGraw ASSOCiates
San Diego, California
Ion bridge crane. The cantilever structure same 4 -In high sandblasted gray con-
IS supported by, and anchored to, a 2- crete masonry units Similar massing of the Structurat Engineer
story box type office and shop bUilding . exterior stairs was deSigned to break up Blaylock,Wlllls and ASSOC iates
The operating side of the hangar consists the long facade exposed on the street side San Diego, Callfornta
of a 470-11 long by 28-11 high column-free of lhe building Roof metat decking over
opening enclosed by SIX sets of self-pro- the office and shop modute was filled With General Contractor
pelled steel doors that slide on ralls The concrete to prOVide mass for an acoustical Trepte Construction Company
top of the doors "float" In a header at- envelope San Diego. California
tached to the cantilever beams allowing The wall between the hangar and office
the roof to move freely With temperature IS reinforced masonry With a 2-hr fire re- Steet Fabrtcator/Erector
changes Peck Steet
sistant rating The enllre building IS pro-
Tucson , Anzona
The bUilding , the first In a series of hang- vided With an automatic fire sprinkler sys-
ars on thiS Site, sets the level of exterior tems of wet-type automatic sprinklers and Owner
deSign quality. It IS also Sited near the new a foam deluge system which IS activated United States NallY
Naval Flight Instruction BUilding Conse- by a system of automatically supervised North Island Naval Air Statton
quently, deSign features were made to pneumatic detectors. 0 San Otego, Call forma

lsi OU3r1e,,' 1986 27


The Intelligent Building:
Steel Framing and Flooring are "Musts"

n the next decade, billions of doltars may
I be spent to erect what are known as
"smart" or "Intelligent" buildings. Scores of
them are already going up or planned , and
there is little question they will comprise
the next generation of large commercial
office bUildings, whether developer-built
or company-owned .
The steel industry contends these bUild-
Ings Wilt achieve their fult potential ... and ,
more Important, be adaptable to upcom-
Ing and even unforeseen technologies ...
only If they encompass the ftexlbllity of two
structural elements: electrified ftooring
supported by structural steel framing
First, let's update the still-new concept of
the Intelligent bUilding.
Basec on computer control of building
functions, a centrafty directed system reg-
ulates electronicafty the total building envi-
ronment and alt equipment. Plus, building
owners gain extra revenue by offering ten-
ants such sharec services as information
processing and telecommunications.
In operating the bUilding itself, this state-
of-the-art approach controls elevators,
IIghllng, cooling , heating , ventilation, se-

curity and fire protection. As its name Im-
plies, the bUilding has the "Intelligence" to
diagnose, adlust and regulate ItS enVIron-
ment. For example, Ilghling- the Single
largest energy cost Item- can be turned
on or off automallcalty by microprocessors
which detect people movement. Elevators
are programmed to handle alt the daily
traffic patterns and could even incorporate
vOice syntheSIZers to announce floors and
provide emergency Information. Sensors
are alert to temperature changes and au- of transmitting vOice and data; telex; video owner keep an intelligent building per-
tomaticalty adlust HVAC controls. teleconferencing; and word processing manently up-to-date? The solution lies in
The bottom line here IS today's ultimate These days, complex office technolo- remembenng thiS structure operates via
in effiCiency, comfort and safety, alt at gies change every 18 to 24 months. On an organized highway of wires and/or fiber
lower energy, labor, maintenance and the average, 25% of alt electronic equip- OptiCS which control building functions
other operallng costs Keep In mind that ment IS relocated annualty within an office. and eqUipment The economical, ftexlble
In a bUilding with a 40-year life span, only For an Intelligent bUilding to remain com- and proven method IS in-floor electrical
14% of the total hfe cycle cost is for deSign petitive, It has to keep ahead of these distribution - combined with a steel-
and construction- but 86% IS for opera- changes. The key essential IS ftexlbility, Im- framed building.
tion and maintenance portant both In attracting sophisticated What we are deSCribing is cellular steel ~
Electronic services, the latest in office tenants In an era of surplus office space, ffoorlng Instaltec on each bUilding level ,
technologies, are shared and paid for by and In preventing building obsolescence It consists of tunnel -like raceways through
tenants, and could Include: access to da- at resale time. which pass alt current and future electrical
tabases ; computers/data processing ; wiring or glass fiber-optic strands that In-
electronic mall; faCSimile ; telecommuni- How to Keep a BuildIng Up-to-date tegrate building systems and services Into
cations systems, Including a PBX capable How does a developer or a corporate a single network.

28 MODERN STEEL CONSTRUCTION



to save 1 to 1\I, psf of steel when com-
pared to non-composite construclion.
Uke electflfled Itoors, structurat steet
framing also fulfills the Intelligent building's
need for fleXibility.
• Framing can be changed to SUit a new
tenant's reqUirements for a stairwell or
other feature
... • Framing can be reinforced to accom-
modate heaVier floor loads
• Routing of WIfing, pIping and ducts IS
Simpler, faster and more fleXible In steel-
, .I .. '
framed structures
• It economically affords greater spans
between columns to permit Imaginative
deSign or redeSign of tenant space
• And ItS faster erection and enclosure
lime reduces Inteflm finanCing costs,
permits winter construction and starts


rental and equipment services Income
that much earlier
The 10 newest Intelilgeni bUildings, all
developer-owned and all steel-framed and
AcCOfdmg to steel Industry. two essentials celfular-floored, Include Multi Foods
that keep an Intelligent bUlldmg up-to-date Tower, Minneapolis; 33 West Monroe, Chi-
and adaptable are structural steel 'rammg cago; 10 South LaSalle, Chicago, World
and electfll/ed Iloorlng (I and above) The FinanCial Center. New York: Conneclicut
tunneM,ke raceways hold wifing and fiber Plaza, Hartford, One Oxford Center, PittS-
opIlCS that control systems and services
burgh, Prudenlial Insurance, JacksonVille,
Central sWitching system (r.) /s lully d/g/tal,
Barclay Bank. New York. 1600 Market
capable 0/ vOIce and data transmiSSIOn
sImultaneously , Street, Philadelphia, and 301 Howard San
FranCISCO

Ideas for " Smart" Buildings

1. Low-rise. The minimum bUilding area


necessary to support the Intelligent bUild-
Ing concept has been estimated In a Wide
Paul Blanchard, manager of structuraV nlficant amount of office space should be
range from 200,000 10 500,000 sq ft Al-
electrical systems at H, H. Robertson, wary of a bUilding 's proviSions and fleXI-
though new, high-rise ofllce structures are
Pittsburgh, says, "The cellular floor IS the bility for communlcalions needs He feels
the Immediate targets. the lOW-rise, sub-
single most Important element to keep an that good wIfing provIsions are essential
urban office bUilding adaptable to both
Intelligent bUilding constantly contempo- to be compalible With IBM cable plans.
corporate and multHenant occupancy
rary Th/s electrical dlStfibutlon and deliv- And he says the numbers and locations of
IS also a candidate And also, the concept
ery system permits any-time rearrange- risers are Important to service each floor's
IS applicable to a central system serviCing
ment of eqUipment locations and has lateral wifing needs, WhiCh, In a steel bUild-
satellite bUildings In an office park.
ample capacity for expansion Changes Ing, are best done through properly SiZed
ate made at preset outtet boxes at regu- cellular floors 2. Framing Grade. A572-Gr SO. a hlgh-
larly spaced Intervals" At each level. the cellular floor IS welded strength steel. can prOVide lurther econ-
Robert McFarlane, vice president and to the steel beams at that level, thus com- omy as an Intelligent bUildings framing
dlfector of technology for the Wilke Or- bining floor and framing Into a comple- material Compared to conventional A36
ganization, New York City. one of the oldest mentary system known as "composite steel. It prOVides a materials cost saving
communications consulting engineering construction" It unites the concrete-sur- 01 15 to 20% AS72-Gr.·SO also permits
IIrms, believes any tenant who rents a slg- faced floor With the structural steel beam shallower-depth beams to reduce floor-to-

tSIOuarter/ l986 29
lloor height while proViding longer, col-
umn-free spans.
3, Fast Track. Another cost saver, the
fast-tracking technique, where construc- •
tlon starts even before a final deSign IS
completed, is practical with structural steel
framing . II permits substantial off,slte fab-
riCation, with such elements as site clear-
Ing, foundations and grade beams con-
structed on·site before final design work.
II IS not unusual for fast tracking to permit
far earlier occupancy at significantly lower
first costs.
4. Sensftfvlty. In controlling bUilding
functions, the Intelligent bUilding can fine·
tune Individual aspects to a high degree
of sensitivity. Take a fire emergency as an
example By interconnecting maJOr eqUip-
ment, all systems communicate with each
other, all activation is automallc. Sensors
detect and locate the fire. The computer
system is notified as well as security and
the local fire department. Alarms ring In-
Side and outside the bUilding Elevators
return to and remain In the lobby. Smoke
IS purged from the fire floor And , to pre-
vent ItS spread, adfacent stairwells are
pressurized along with floors above and
befow the fire.
5. Preset Outtets. With electrified floor·
. g , preset outlet boxes are pos.ltloned on •
In
a predetermined grid to deliver power,
light, telephone and data service to any
workstation location or relocation One
preset opening for each 25 sq ft should
be about the minimum; one per 12.5 sq ft
IS more adequate; and one every 6.25 sq
ft provides maximum flexibility.
6. Tenant Setectfon . In an Intelligent
bUilding , the developer gains added oc-
cupancy and revenue by seiling electroniC
office services to tenants who cannot af-
ford or do not wish to own the eqUipment.
What thiS may come to mean IS preferential
selection of small-to·medium-size tenants,
who could be major rente rs of equipment
lime Even non· tenan ts, those in nearby
bUildings Or areas, can be an extra source
of revenue for these services, assuming
time-sharing capacity IS available
7. On Premfse. After planning and In-
stallation IS complete, one approach to
successfu l operation of a bUilding's func-
tions/tenant services system is mainte·
nance of a service facility In the building
Itself, with a permanent , on·slte staff. Re·
IntellIgent bUlldmgs already erected or under constructIon are. Denver's Tabor Center sponse to technical problems can be SWift,
(top I), whlC/llncludes 32- and 4O-stOty towers, One Flnane/al Place (top r ), said to be
aided by an on-premise inventory of re-
most technically advanced struclure In Chicago, Cily Plac e (c), a 38-sIOty lower In
placement parts. It should also be thiS
Hartford, Conn , whICh claIms to be world's lust mtelligent building, and LTV Center
(boN ), a 5O-slOty tower In Dallas
staff 's responSibility to prepare for future
needs In the hlgh·tech, fast·changing of·
f,ce systems field, so the bUilding can be
We are Indebted for Information and photos In this feature to the adapted to new office arrangements and
Committee 01 Structural Steel Producers, Amencan Iron and Steel Institute equipment as they are available 0

JO MODERN STEEL CONSTRUCTION


Pick the Profile that's right for you!
Need Some Help?
Manufacfurlng Plants:
EpiC Metals Corporation is involved daily • Pittsburgh. Pa • Chicago. III
In engineering and manufacturing • Toledo. Ohio • Lakeland. Fla
Composite Decks, EPC Cellular Raceway Contact us today for Prompt DomestIC
and International Shipments
System, Cellular Decks, Roof Decks, Form
Decks, Roofing and Siding.
Our staff IS ready to serve your needs. EPIC

Architects, Engineers, Contractors ... Eleven Talbot Avenue. Rankin PA 15104
give us a call ... write ... telex . .. or PHONE 412/351·3913
fWX: 71()'664·4424
come and VISit. EPIC METAL BOOK
We olso manufacture some of the above profiles in aluminum
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
The Wrigley Building . 400 North Michigan Avenue BULK RATE
US POSTAGE
Chicago. IL 60611
PAID

Address Correction Requested KANSAS CITY . MO


Permit No. 4119

Window Wall/ Curtain Wall Testing


is Now Available in Los Angeles
1'ot,1I Load C.'IJacity of our Los Angeles facility is 450
pounds per square foot (ncgitlivc or positive pressure).
QUI' facilily is capable of lesling 10 Ihe s landards of ASTM.
4 AAMA and MMM. We "'Ill
perform the following lesls:

I 1.
2.
3.
4.
Water Infiltration
Air Infiltration
Seismic Siruciural Loading
Dynamic Wind Loading
5. Stalic Pressure
6. Calking and Construction Inspection

Coniaci Jim Partridge for lechniatl


assistance and facility avnilability.

.
1 (2 [3) 74!J-34 ••

..•
~-'~1il ".
~
tI '.. -.. C onstructlOn
.
'-- ', ' ~_ . . Testing & Inspection
......4 :;.i
' J''?' SMITII-EMERY COMPANY
AFuIIServicelndept.ndentTetdnlubontory,Eat.l904
781 East Washington Boulevard
Los Angeles, California 90021