Professional Documents
Culture Documents
For
Aproval Ref:
DGCA:145D-1
PART 0
GENERAL
The current version of this AMO Manual is Issue N Revision 0 and comprises of the pages listed
below:
PART 0 GENERAL
PART 1 MANAGEMENT
Upon receipt of revisions, remove the deleted sections/ chapters of the manual and add the new
ones as instructed in amendments content and approval sheet (section 0.2.2).
Retain this record in the manual and return acknowledgment form to Quality Assurance & Safety.
K 0 1. Revise RSM & QP holder list based on new 0.4 All 26 April
office code. 2012
2. Revise abbreviation. 0.7 All
3. Rename VP Asset Management & Material 1.4 All
Services and delete EVP Corporate
Development & Marketing.
4. Revise management organization chart 1.5 All
based on new office code.
5. Revise by adding line station layout. 1.8 All
6. Revise by adding part for work performed at 1.9 All
another location.
7. Add new aircraft & engine type on the list. 4.1 All
8. Separate Part 7 to be published in a different Part 7 All
manual in accordance with DGCA
recommendation.
9. Remove reference to FAA & FAR. All All
K 15 1. Change Scope of work for ATR 72-600 (Pratt 5.3 ALL 05 June
& Whitney Canada PW127F) up to and 2015
including C checks.
Issue : N
Revision : 0
Date : 11 November 2020
√ Major Minor
0.3.1 Introduction
This AMO Manual has been developed in a format to cover the requirements of the current CASR
Part-145 in conjunction with the Quality Procedures (QP) and be suitable for PT Garuda
Maintenance Facility Aero Asia Tbk’s quality system documentation needs.
The AMO Manual provides the relevant Quality Procedures and also gives reference to quality
procedures (QP) with respect to the quality assurance and quality control system as required by
CASR Part 145.211. It is the interface between the above-mentioned regulations and the
documented quality system of GMF.
0.3.2 Objective
The objective of the AMO Manual is to demonstrate how GMF complies with the current CASR
Part 145.
In order to properly monitor the approval, it is essential that GMF clearly identifies the initial
edition of the AMO Manual and each subsequent change. Any change to the approved AMO
Manual shall be identified by:
• A new issue and/or revision number;
• A new issue and/or revision date;
• Clear identification of the modified text in each AMO MANUAL chapter/paragraph
2. Footer
• the issue number of the AMO Manual;
• the revision number of the AMO Manual;
• the revision date;
• the page number;
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 1 of 3
AMO MANUAL
PART -
The AMO Manual is distributed in electronic or in hard copy or CD- ROM format. For the electronic
format, all management and maintenance personnel have access via internet to web address
https://gmfaeroasia365.sharepoint.com. The Quality Assurance & Safety is responsible to maintain
the electronic files in current condition.
All management and maintenance personnel may access the electronic version of AMO Manual for
reference to the performance of their work provided:
Current hard copy or CD ROM of the AMO Manual are distributed to selected workstations or
maintenance personnel as listed in AMO Manual 0.4.2. The Quality Assurance & Safety is responsible
for the updates, reproduction and the distribution of the hard copies or CDs on a controlled basis
using the revision transmittal acknowledgement sheet, form GMF/Q-067. Specifically for DGCA
Indonesia, AMO Manual distribution will be done through a softcopy file sent via email and upload
to DGCA portal.
The NAA other than Indonesian DGCA will receive the AMO Manual (if requested) in CD ROM format
when conduct the audit to GMF facilities unless the specific distribution is required.
The Quality Assurance & Safety will notify the Authority for each revision of the AMO Manual as per
AMO Manual Section 1.10 and will submit current major amendments for approval. Controlled
copies are subjected to revision and will be marked:
When the proposed amendment of AMO Manual is approved, Quality Assurance & Safety will
update this revised Manual to Sharepoint website as described above and will notify all GMF
personnel through email announcement stating that the new revision of AMO Manual is available
in this website, and will distributed shortly based on list in Section 0.4.2 of this manual.
The manual holder upon receipt of a revision, will insert the revised pages or sections in the current
manual (for hardcopy). Then he/she will return the revision transmittal acknowledgement sheet;
form GMF/Q-067 to the Quality Assurance & Safety as evidence that the manual has been revised.
Records of form GMF/Q-067 will be kept by the Quality Assurance & Safety for two years. Specifically
for DGCA Indonesia, the evidence of acknowledgment is in the form of email.
Additionally, shortly after the revision is occurred, The Quality Assurance & Safety will also send a
softcopy of AMO Manual through email to outstations for backup purpose in the case of internet
connectivity interference / breakdown in the outstation when accessing the sharepoint website.
The AMO Manual file will be indicated by watermark “For Backup Purpose on Outstation”. Upon
receiving this AMO Manual file, the station manager are obligated to keep the file locally as a backup
accessible for every related personnel in those station, and reply the email from Quality Assurance
& Safety to report that the task has been done. To prevent any obsolete revision of this backup file,
every time if there is new email of latest revision of this AMO Manual file from Quality Assurance &
Safety, the station manager must replace the existing backup file with the new one.
The Quality Assurance & Safety may give uncontrolled copies of the AMO Manual to customers
and/or for training purposes. The uncontrolled copies will be stamped on the cover page as
“Uncontrolled copy”.
0.4.2 AMO Manual Distribution list related with the DGCA approval
Dept. Copy
No. Holder Name AMO Manual Format
Cod No.
1 Director General of Civil Aviation, Indonesia DGCA 001 Soft Copy
2 President & CEO (Accountable Manager) DT 002 Hard Copy
3 Director of Human Capital & Corporate Affair DC 014 Hard Copy
4 VP Quality Assurance & Safety TQ 003 Hard Copy
5 SM Base Maintenance Quality System & Auditing TQB 004 Hard Copy
6 SM Safety Inspection TQY 005 Hard Copy
7 SM Personnel Qualification & Quality System Documentation TQD 006 Hard Copy
8 Mgr. Personnel Qualification & Licensing TQD-1 007 Hard Copy
9 Mgr. Quality & Safety Development TQD-3 008 Hard Copy
10 Garuda Indonesia - Airworthiness Management MQ 009 CD Rom
11 Citilink – Airworthiness Management OEQ 010 CD Rom
12 SM Line Maintenance Aircraft Quality Inspection TQA 011 Hard Copy
13 SM Base Maintenance Aircraft Quality Inspection TQH 012 Hard Copy
14 SM Material & Shop Quality Inspection TQS 013 Hard Copy
The following Quality Procedures are distributed in hard copy (or electronic media as necessary).
For the electronic format, all management and maintenance personnel have access via internet to
web address https://gmfaeroasia365.sharepoint.com. The Quality Assurance & Safety is responsible
to maintain the electronic files in current condition.
When the procedures are distributed in hardcopy format, it will be distributed in a manual titled
“Quality Procedures”. The manual is presented in a ring binder for easy updates. Each manual
contains in the front cover the workstation code, the manual number and the volume number
(Volume 1 of 1 or Volume 1 of 2 & 2 of 2 as necessary).
The first page of the binder (the first volume only), contains the document distribution list, which
lists the procedures applicable to the workstation including:
The distribution of the quality procedures in hard copy or electronic media is controlled with the
same manner the AMO Manual is controlled as per Section 0.4.1
No QP No. Title
37 QP-225-01 Disciplinary Policy for Maintenance Event
38 QP-225-02 Hazard Identification and Risk Assessment & Mitigation
39 QP-228-01 Cabin Maintenance Process Control
40 QP-301-01 Internal SMS & Quality Auditing
41 QP-303-01 Investigation of Deficiency, Incident or Accident
42 QP-304-01 Personnel Training
43 QP-304-03 Qualification Training Program for Authorized Personnel
44 QP-304-04 Personnel competencies
45 QP-304-05 Personnel Assessment
46 QP-304-06 Critical Design Configuration Control Limitation Tracking
47 QP-306-04 Succession Planning
48 QP-308-01 Personnel Assessment, Stamp & Authorization Issue, Use and Control
49 QP-309-01 Control of differed job arising from maintenance by GMF
50 QP-311-01 Control of Special Process and Certifying Agent
51 QP-311-02 NDT Personnel Qualification
52 QP-311-03 Qualification Procedures for Welders
53 QP-311-04 Qualification Procedures for Special Process other than NDT and Welders
No QP No. Title
74 QP-601-25 Managing and Controlling of Aircraft Structure Damage
Special Process Classification, Requirements and Personnel other than
75 QP-601-26
NDT
76 QP-601-27 Service Bulletin Controlling
77 QP-601-28 Airworthiness Directive Controlling
78 QP-601-29 Airborne Software Management
79 QP-601-30 Configuration Control Management
80 QP-601-31 TDAM Monitoring and Controlling
81 QP-601-32 TDAM Process and Follow Up
82 QP-601-33 Technical Delay Handling Management
83 QP-601-34 Engine & APU Individual Phase In Procedure
84 QP-601-35 LLP Data Management
The following table provides a cross-reference matrix of the current CASR - Part 145 requirements
with AMO Manual. Management and maintenance personnel are required to become familiar
with the CASR - Part 145 and also to understand how its requirements apply to PT Garuda
Maintenance Facility Aero Asia Tbk as referenced to this manual.
SUBPART B. CERTIFICATION
145.51 0.2
Application for certificate 0.3
0.5
1.5
1.8
1.10
1.11
2.1
2.4
2.5
2.6
2.8
2.20
L2
3.4
3.8
4.2
145.53 1.9
Issue of certificate 3.4
3.14
145.55 1.9
Duration and renewal of certificates
145.57 1.10
Amendment to or transfer of certificate 1.11
SUBPART D PERSONNEL
145.151 1.1
Personnel requirements 1.7
3.4
3.7
3.8
3.11
145.153 1.3
Manager or Supervisory personnel requirements 1.7
3.4
3.8
3.14
145.155 1.6
Inspection personnel requirements 3.7
145.157 1.6
Certifying personnel to approve an article for return to service 2.16
3.4
3.5
3.7
145.159 Auditor requirements 3.6
DGCA Inspector will be granted access to PT Garuda Maintenance Facility Aero Asia Tbk facilities
to perform audits and other activities at any time related to the approval and to determine
compliance with the regulation.
0.7 ABBREVIATIONS
A/C Aircraft
A/P Airframe and Power plant
AC Advisory Circular
AD Airworthiness Directive
AMEL Aircraft Maintenance Engineer License
AMO Approved Maintenance Organization
APU Auxiliary Power Unit
ASA Aviation Supplier Association
ATE Automatic Test Equipment
ASL Approved Supplier List
C of C Certificate of Competency
CAA Civil Aviation Authority
CASR Civil Aviation Safety Regulations
CD Compact Disc
CEO Chief Executive Officer
CMM Coordinate Measuring Machine
CMM Component Maintenance Manual
CRS Certificate of Return to Service
DER Designated Engineering Representative
DGCA Director General of Civil Aviation
DT Department code for President & CEO
FADEC Full Authority Digital Electronic Control
FOD Foreign Object Damage
FTS Fuel Tank Safety
SM Related to organization means “Senior Manager “
GMF PT Garuda Maintenance Facility Aero Asia Tbk
IATA International Air Transport Association
IPC Illustrate Part Catalog
IMTE Inspection Measuring and Test Equipment
ISO International Standard Organization
LAN Local Area Network
MDR Maintenance Discrepancy & Rectification
MQ Department Code for Airworthiness Management of PT. Garuda Indonesia Tbk.
MRI Maintenance Requirement Item
MRO Maintenance, Repair, and Overhaul
NAA National Aviation Authority
NAS National Aerospace Standard
NCR Non Conformance Report
NDT Non Destructive Testing
NDI Non Destructive Inspection
OEM Original Equipment Manufacturer
PCM Personnel Competency Manual
PD Planning Data
Abbreviations (Cont‘d…)
0.8 DEFINITIONS
(Ref: CASR-145.3)
The following definitions are given to assist in the interpretation of this manual
Accountable The person designated by the certificated AMO who is responsible for and has
Manager the authority over all AMO operations that are conducted under part 145,
including ensuring that AMO personnel follow the regulations and serving as the
primary contact with Authority.
Alteration A permanent change to original airworthiness data.
Approved by the Approved by the Authority directly or in accordance with a procedure approved
Authority by the Authority.
Approved Standard A manufacturing/maintenance/quality standard approved by the Authority.
Authority Means the DGAC or any other National Aviation Authority related with the
Aircraft registration PT Garuda Maintenance Facility Aero Asia Tbk maintains as
mentioned in this manual
Calibration Written instructions developed per approved standards to provide guidance for
Procedures the calibration of inspection, measuring and test equipment.
Certificated Is a contractor who holds an approval or acceptance from the Authority of
contractor Aircraft registration for the contracted maintenance or service.
Certifying Agent Specialized services personnel who acting on behalf of the Senior Manager of
Personnel Qualification & Licensing to provide and/or arrange for special services
personnel training, certification and re-certification and approval of special
services personnel as necessary.
Certifying Staff Those personnel who are authorized by PT Garuda Maintenance Facility Aero
Asia Tbk Quality Assurance in accordance with a procedure acceptable to the
Authority to certify Aircraft and AIRCRAFT components for return to service of
Aircraft and Aircraft component after maintenance, preventive maintenance and
alteration.
Definitions (Cont’d…)
Directly in Charge Means having the responsibility for the work of a certificated AMO that performs
maintenance, preventive maintenance, alterations, or other functions affecting
aircraft airworthiness. A person directly in charge does not need to physically
observe and direct each worker constantly but must be available for consultation
on matters requiring instruction or decision from higher authority.
Halt points Stages during repair, assembly, installation process where inspection and or test
is required to be performed to ensure safety and airworthiness.
Inspection The examination of an Aircraft or Aircraft component to establish conformity
with an approved standard.
Job Card An internal origin document used to provide instructions to perform work
predominately on the aircraft as requested by customer/operator.
Line Maintenance 1) Any unscheduled maintenance resulting from unforeseen events; or
2) Scheduled checks that contain servicing and/or inspections including
AIRCRAFT trouble rectification up to A-Check/A-Phase base on operator
maintenance program
Maintenance Any one or combination of overhaul, repair, inspection, replacement,
modification or defect rectification of an Aircraft or an Aircraft component.
Maintenance Data / Any information necessary to ensure that the aircraft or aircraft component can
Approved Data be maintained in a condition such that airworthiness of the aircraft, or
serviceability of operational and emergency equipment as appropriate as
assured.
Maintenance A form used by PT Garuda Maintenance Facility Aero Asia Tbk to record any
Discrepancy & discrepancy found during maintenance process, and to give order and record for
Rectification rectification
Definitions
(Cont’d…)
Maintenance Tasks Step by step instructions developed per approved standards as required to
performed maintenance.
Major Repair That, if improperly done, might appreciably affect weight, balance, structural
strength, performance, powerplant operation, flight characteristics, or other
qualities affecting airworthiness; or that is not done according to accepted
practices or cannot be done by elementary operations.
Non-conforming Are all parts, processes, and documents, activities that are not conforming to the
materials Quality System requirements, airworthiness data or aviation authority
requirements
On condition Included parts or assemblies that are reused or replaced during overhaul based
replacement items / on inspection findings. Examples are: dowels, pins, inserts, bushings, bearings,
prediction springs, covers, brackets, etc. Include miscellaneous hardware items: such as
bolts, nuts, screws, and other fastening devises.
Overhaul The restoration of an aircraft or aircraft component by inspection/test, repair
and/or replacement of parts in conformity with the Overhaul Manual or the
detailed description of this task in the Overhaul Manual. The TSO becomes zero
after each overhaul.
Planning Data Sheet An internal origin document used to provide instructions to perform work
predominately on the aircraft components as requested by customer/operator.
Quality System Is the collective plans, activities and events that are provided to ensure that
product, process, or service will satisfy given needs.
Quality System Is a documented activity performed to verify by examination and examinations
Audit and evaluations of objective evidence, that applicable elements of the quality
system are appropriate and have been developed, documented, and effectively
implemented in accordance and conjunction with specified requirements.
Quality System All procedures ( AMOM, QP, and WI) related to the quality system.
Procedures
Definitions (Cont’d…)
Recoverable Recoverable are units with no detail parts breakdown. These are the parts, which
may be rehabilitated to a serviceable condition one or more times before
scrapping by a refurbishing service type operation such as patching, welding,
refurbishing, recharging, refilling, etc.
Repair The restoration of an Aircraft or Aircraft component to a serviceable condition in
conformity with an approved standard.
Repairable Items with detail parts breakdown. It is economically repairable and, in the
normal course of operations, is continuously rehabilitated to a fully serviceable
condition by an authorized repair.
Rotables An item that can be economically restored to a serviceable condition and, in the
normal course of operations, can be repeatedly rehabilitated to a fully serviceable
condition over a period approximating the life of the flight equipment to which it
is related. Almost without exception this is the type of item, which for controlling
purposes, bears a separate individual serial number. They are assemblies which
are subject to, and are capable of, replacement on the aircraft or engine based on
''time between overhaul, or ''on condition''
Routine material Is the material that is routinely required to support maintenance based on known
work scope. And the materials required executing the customer's work order
excluding defects rectification.
Support Staff For the purpose of this AMO Manual, support staff means the B1 & B2 (A/P & E/A)
staff who support the certifying staff ensuring that all relevant tasks or
inspections have been carried out to the required standard before the certifying
staff category C (See AMO Manual 3.4.3) issues the certificate of return to service.
Unscheduled Inspection and repairs to be carried out on aircraft/aircraft components when out
maintenance of defined time limits, and in accordance with the airworthiness data
Vendor Means any supplier or certificated contractor or non-certificated contractor
PT Garuda Maintenance Facility Aero Asia Tbk is a Subsidiary company of PT Garuda Indonesia
since 26 April 2002, GMF, previously part of the Strategic Business of PT Garuda Indonesia was
established to provide aircraft maintenance support for PT Garuda Indonesia operation since 1958
at Kemayoran airport Jakarta. Following the development of new airport (Soekarno-Hatta
International Airport), PT Garuda Indonesia base maintenance was moved to Cengkareng airport
area in 1984.
PT Garuda Maintenance Facility Aero Asia Tbk is a company provides extensive aircraft
maintenance, repair and overhaul services and its supporting activities. Furthermore, in the AMO
Manual and its appendices called “GMF”.
GMF is located in Soekarno-Hatta International Airport, Cengkareng, 5 km west of the main gate
and covers 115 Ha of area. GMF can be reached from Jakarta through airport highways Prof. DR. Ir.
Sedyatmo, and also can be reached from the west gate through Tangerang. GMF is located 11 km
from the northern coastline, 32 km from Jakarta, and 22 km from the town of Tangerang. The
facility is continuously being modernized and is being expanded to keep abreast of world aviation
developments.
The facility includes 4 all steel framed hangars with a total floor space of 129,193 M2, workshops
covering 56,232 M2, Engine Shop 20.736 M2, Jet engine test cell of 2,560 M2, stores, Office, Run-
up bay and apron area of 336,000 M2 capable of handling Line Maintenance activities and has the
capability to accommodate Narrow body aircraft and Wide body aircraft at any time. All is
standing on a total land area of 692,241 M2.
The GMF is equipped to service and overhaul a wide range of aircraft for any carrier/operator
international or domestic, looking for a quality and cost-effective maintenance solution. The GMF
is also equipped with Industrial water waste treatment.
It employs approximately 5,000 personnel and continues to invest heavily in technical staff
training to ensure it has the requisite skills, dedication and experience to meet the rapidly
changing high technology in civil aviation environment.
The GMF became an Indonesian Directorate General of Civil Aviation Approval Maintenance
Organization with the Certificate of Approval Number, 145D-1. It also holds AMO 145 approval
from FAA, EASA, CASA and other countries. The List of Certificate of Approval held by GMF is kept
by Quality Assurance & Safety.
PART 1
MANAGEMENT
This manual defines the organization and procedures upon which the approvals by the Authority
are based.
These procedures are approved by the undersigned and must be complied with, as applicable,
when work/orders are being progressed under the terms of the approvals.
It is accepted that these procedures do not override the necessity of complying with any new or
amended regulation published by the Authority from time to time where these new or amended
regulations are in conflict with these procedures.
It is understood that the Authority will approve this organization whilst the Authority is satisfied
that the procedures are being followed and work standards maintained. It is further understood
that the Authority reserves the right to suspend, vary or cancel the approval of the organization if
the Authority has evidence that procedures are not followed, or standards not upheld.
Achievement of the quality policy and objectives requires the full commitment, dedication and
support of all Management and employees.
All processes shall be subject to continuous assessment and subsequent improvements to ensure
the achievement of product quality.
All Management and other personnel are responsible to initiate continuous improvement plans.
Improvement plans will be properly monitored, evaluated and controlled by Vice Presidents to
ensure that they are followed, and they can meet the objectives. Improvement plans will be revised
as necessary when the objectives are not met.
An open relationship based on trust and a collective desire to satisfy fully customer requirements
and expectations shall be cultivated.
Resource Measurement,
Requirements management analysis, and Feed back
improvement
Product
Customers Realization Customers
Input Product
Output
The system includes the controls to be exercised on those functions that have an effect on quality.
Individual quality system procedures describe or show their respective processes at more detailed
level.
To achieve a level of safety and quality as required by aviation regulation and customer’s
requirements, the management and other personnel are committed to:
1. Recognizing SAFETY as prime consideration by:
❑ Implementing Aviation Regulation & Safety Management System effectively.
❑ Making everyone responsible for safer operations.
2. Focusing on CUSTOMER REQUIREMENTS by:
❑ Providing our customer with services that meet or exceed their stated and implied
requirements in a timely and cost effective manner.
❑ Maintaining a continual focus on fast and systematic response to our internal and
external customer needs.
3. Applying HUMAN FACTORS principles by:
❑ Encouraging free and frank reporting of safety related occurrence and establishment of
just culture (personnel are not inappropriately punished for reporting or co-operating
with occurrence investigations).
❑ Making everyone responsible for Human factor issues
All management of PT Garuda Maintenance Facility Aero Asia Tbk shall take all the responsibility, to
ensure that all necessary resources are available to accomplish maintenance in accordance with the
requirements of this manual.
My self, as President and Chief Executive Officer (Accountable Manager) of PT Garuda Maintenance
Facility Aero Asia Tbk, shall resolve any conflicts, which cannot be resolved by the Board of
Management, Vice Presidents and other managers. Resolution of such conflicts shall always be in
accordance with the requirements of the controlling documents and this manual.
The Chief Executive Officer / Accountable Manager of PT Garuda Maintenance Facility Aero Asia Tbk
has the overall responsibility for the accomplishment of works under the requirements of the
Authority requirements.
The VP for Quality Assurance & Safety has been assigned with responsibility for monitoring the
quality system, including the associated quality feedback system. The VP for Quality Assurance &
Safety shall have direct access to the Accountable Manager to ensure that the Accountable
Manager is kept properly informed on quality and compliance matters.
The corporate management commits the following activities to the Chief Executive Officer:
a) To ensure that the organization has sufficient personnel to plan, perform, supervise, inspect,
return to service and quality monitoring in accordance with the approval.
b) Responsible for any corrective action resulting from the quality compliance monitoring of
Authorities regulations.
c) Ensuring the maintenance of the aircraft, engine and component, as well as operating
procedures are in compliance with relevant regulatory authority requirements and customer
specifications.
d) Coordinating operational requirements and changes, as well as maintenance decisions and
actions, which effect other divisions of the company to assure proper flow of information.
The duties and responsibilities of senior management personnel are found in Section 1.4.
For the other management, maintenance and supporting personnel are found in GMF’s Personnel
Competency Manual (PCM).
The VP for Quality Assurance & Safety shall retain full power to alter, revoke or suspend any decision
of GMF if:
a) The customer requirements as defined in the contract and in the associated, operator’s
specifications and approved quality plans, if any, are not followed;
b) Improper maintenance affecting the airworthiness of the aircraft, engine and component is
being performed which violates the regulations of the involved airworthiness authority;
c) Unauthorized and/or non-certificated personnel performing work affecting airworthiness.
The roster of Management Personnel will be kept and controlled for updating by Human Capital
Management. The roster can be access via https://gmfaeroasia365.sharepoint.com and consist of
the following information:
a) Name;
b) Personnel number;
c) Title
d) Scope of assigned work as describe in Summary of Employee
The Human Capital Management will update the roster to reflect changes caused by termination,
reassignment, change in duties or scope of assignment, or addition of personnel.
The VP Quality assurance and Safety will notify authority any changes of the roster of Senior
Management Personnel as listed as Designated Persons in DGCA Operation Specification within 5
working days after the change. See Section 1.10 of this manual.
The President & CEO is accountable to the PT Garuda Maintenance Facility Aero Asia Tbk for
ensuring the effective organization and management of the company, including determining the
direction and strategy of the company. The CEO acts as the Accountable Manager for PT Garuda
Maintenance Facility Aero Asia Tbk and is accountable for ensuring that the company’s safety,
airworthiness and economic objectives are met in an effective and efficient manner.
Responsibilities
The Accountable Manager will provide leadership, direction and management in order to ensure
that:
1. The safety & quality policy statement is implemented, understood and maintained at all
levels in the organization
2. The integrated safety management systems is effectively implemented in the GMF
3. Maintenance carried out by GMF meets the standards required by the DGCA Indonesia.
4. The safety and quality policy are established and promoted.
5. The senior persons are nominated.
6. The necessary finance, manpower capital and facilities are available to enable the company
to perform the maintenance to which it is committed for contacted operators, and any
additional work which may be undertaken.
7. The progress of the remedial actions/review of the overall results in term of quality is
supervised.
8. The competence of all personnel including management personnel has been assessed.
9. Everyone is responsible for Human factor and Safety issues.
10. Realizing the achievement of sales.
11. The marketing and business development effectively.
12. The management of customer service and other aspects of commercial run effectively.
13. The audit and management of communication run effectively.
14. The administration and company secretarial run effectively.
15. The supervisory of compliance in the administration of the company, legal protection for
enterprises and service contract company that carried out in accordance with the legal
aspects in line with the application of the principles of good corporate governance.
16. Safety Committee Review is conducted with all relevant functional areas of the organization
being represented.
17. In case of absence for 30 days or more, assigned Director will be in charge.
The Director of Human Capital & Corporate Affairs is responsible for the management and
development of human capital management, corporate affairs & HSE and material and logistic
services.
Responsibilities
The Director of Human Capital & Corporate Affairs, with the Authority of the Accountable
Manager will:
1. Coordinate the activities of the human capital & corporate affair in the area of human capital
management, employee services, learning services & knowledge management to ensure
that maintenance activities in those areas are properly performed and in compliance with
DGCA Indonesian regulation and the principles of aim of producing safe and reliable aircraft,
engines and components. Ensure the effectiveness of the management and development of
human resources and Corporate Culture.
2. Monitor and control the plans to ensure proper execution based on established targets.
3. Ensure the VPs under his/her coordination transform the quality system procedure to an
effective & efficient process.
4. Be Responsible for training and knowledge management.
5. Ensure the effective management of Home affair.
6. Ensure maintenance and service facilities of the company including the procurement and
supply of materials (aircraft parts, related aircraft parts and non- aircraft part) to run in
accordance with the terms and conditions of the applicable DGCA Indonesia, and able to
support the way business GMF well as business growth.
7. Directing and controlling all logistics business activities, as well as asset management and
control through effective and efficient governance while still regulating the principles of
Good Corporate Governance (GCG) and follow applicable DGCA Indonesian regulation.
8. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
9. In case of absence for 30 days or more, assigned Director or VP will be in charge.
The Director of Line Operation is accountable to the CEO (Accountable Manager) for ensuring the
management for Line Operation Services that consist of Line Maintenance Cabin Maintenance
Services Engineering Services and another operational support which lead by Director of Line
Operation.
Responsibilities
The Director of Line Operation, with the authority of the Accountable Manager will:
1. Coordinate the activities of the operational management for Aircraft Line Maintenance,
Aircraft Cabin Maintenance, and Engineering Services are properly performed and in
compliance with DGCA Indonesia’s airworthiness regulation and the principles of aim of
producing safe and reliable aircraft, engines and components.
2. Monitor and control the plans to ensure proper execution based on established targets.
3. Coordinate and monitor all cross functional or departmental SMS activities in Line Operation
to ensure their relevant integration.
4. Ensure the VPs under his/her coordination transform the quality system procedure to an
effective & efficient process.
5. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
6. In case of absence for 30 days or more, assigned Director or VP will be in charge.
The Director of Business & Base Operation is accountable to the CEO (Accountable Manager) for
ensuring management Base Operation services, consist of Airframe Maintenance, Engine and
Auxiliary Power Unit (APU) Maintenance, Components, Aircraft Support & Power Services,
Company Sales & Marketing and another operational support which lead by Director of Business &
Base Operation.
Responsibilities
The Director of Base operation with the authority of the Accountable Manager will:
1. Coordinate the activities of the base maintenance operation in the area Wide & Narrow Body
Base Maintenance, Aircraft Engine and Auxiliary Power Unit (APU), Components, and Aircraft
Support & Power Services are properly performed and in compliance with DGCA Indonesia’s
airworthiness regulation and the principles of aim of producing safe and reliable aircraft,
engines and components.
2. Coordinate and monitor all cross functional or departmental SMS activities in Base Operation
to ensure their relevant integration.
3. Monitor and control the plans to ensure proper execution based on established targets.
4. Control and ensure Sales & Marketing achievement accordance to Company revenue target.
5. Ensure the VPs under his/her coordination transform the quality system procedure to an
effective & efficient process.
6. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
7. In case of absence for 30 days or more, assigned Director or VP will be in charge.
The VP for Quality Assurance & Safety is responsible for establishing an independent quality
system to monitor compliance of the Maintenance Organization with DGCA Indonesia
requirements and to facilitate and administer the organization’s SMS. He/She reports directly to
the Chief Executive Officer (CEO) of PT Garuda Maintenance Facility Aero Asia Tbk and he/she will:
1. Ensure the maintenance organization is in compliance with authority regulation, customer
requirement and applicable procedures.
2. Be responsible for implementing a quality audit programme in which compliance with all
maintenance procedures is reviewed at regular intervals, in relation to each type of aircraft,
engine/APU or component maintained, (including the Management/carrying out the audits
- writing the audit reports) any observed non-compliances or poor standards are brought to
the attention of the person concerned via his/her subordinate.
3. Shall retain full power to alter, revoke or suspend any decision of GMF if improper
maintenance affecting the airworthiness of the aircraft, engine/APU or aircraft components
is being performed which violates the regulations of the involve airworthiness authority or
the customer requirements as defined in the contract and in the associated, operator’s
specifications and approved quality plans, if any, are not followed or unauthorized and/or
non-certificated personnel performing work affecting airworthiness.
4. Monitor all cross functional or departmental SMS activities in GMF to ensure their relevant
integration.
5. Be responsible for managing the SMS implementation plan, facilitating hazard identification
and risk analysis activities, monitoring the effectiveness of mitigation actions, providing
periodic reports on safety performance, maintaining the SMS documentation also planning
and organizing staff safety training.
6. Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and with external sources.
7. Providing independent advice on safety matters to the senior management.
8. Follow up, coordination and control of the progress of remedial actions.
9. Be responsible for preparing standard practices and procedures (AMO Manual, including the
associated procedures) for use within the maintenance organisation and their adequacy
regarding CASR Part 145.
10. Be responsible for submission of the AMO Manual and the associated amendments to the
Authorities.
11. Be responsible for assessing suppliers of new and used components, and materials, for
satisfactory product quality in relation to the needs of the organisation.
12. Have direct access to the Accountable Manager in the event of any reported discrepancy
not being adequately attended to by the relevant person, or in respect of any disagreement
over the nature of a discrepancy.
13. Be responsible for Issuing/renewal/withdrawal of the staff certifying authorisations (possible
delegation).
14. Be responsible for defect analysis in respect of aircraft undergoing maintenance so that any
adverse trends are identified and responded to promptly. Moreover, he/she is also
responsible for processing of feedback in the scope of continuous training.
15. Be responsible for assessing sub-contractors for extension of the quality system and
maintaining the expertise necessary to be able to do so, to the satisfaction of DGCA
Indonesia. He/She is also responsible for assessing external specialized services required to
be used by the company in the performance of maintenance.
16. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
17. Be responsible to ensure base maintenance and line maintenance activity in accordance
with the standard and procedure by delegation to Quality Control function.
18. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the Wide body base maintenance in a manner to achieve product quality, cost and TAT
targets. Ensure all necessary resources are available to accomplish maintenance in accordance
with DGCA Indonesia requirements applicable to each order. Ensure that all A/C maintenance
required plus any defect rectification performed during base maintenance is carried out to the
designs and quality standards specified by the DGCA Indonesia requirements. Ensure that any
corrective action resulting from the quality compliance monitoring according to DGCA Indonesia
requirements is implemented and he/she will:
1. Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Wide body Base Maintenance including Aircraft cabin base
maintenance overseeing operational safety, managing the area’s hazard identification and
risk analysis activities, implementing mitigation or corrective actions, assessing the impact
of safety on operational changes and activating hazard and risk analysis process as
appropriate, maintenance and review of relevant performance indicators, managing safety
training and promotion activities within the area.
2. Be the Chairman of Safety Action Groups at Wide body Base Maintenance, which are
accountable to and takes strategic directions from the Safety Committee.
3. Be responsible for the satisfactory completion and certification of all work required by
contracted operators/customers, in accordance with GMF Approved Capability List
4. Be responsible for ensuring that the organisation's procedures and standards are complied
with when carrying out maintenance and with the result standard quality product.
5. Be responsible for ensuring the competence of all personnel engaged in maintenance by
establishing a programme of training and continuation training using internal and external
sources.
6. Be responsible for ensuring that all sub-contract orders to purchasing are correctly detailed
and that the requirements of the contract/order are fulfilled in respect of inspection and
quality control;
7. Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
8. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
9. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
10. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the Narrow body base maintenance in a manner to achieve product quality, cost and TAT
targets. Ensure all necessary resources are available to accomplish maintenance in accordance
with DGCA Indonesia requirements applicable to each order. Ensure that all A/C maintenance
required plus any defect rectification performed during base maintenance is carried out to the
designs and quality standards specified by the DGCA Indonesia requirements. Ensure that any
corrective action resulting from the quality compliance monitoring according to DGCA Indonesia
requirements is implemented and he/she will:
1. Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Narrow Body Base Maintenance including Aircraft cabin base
maintenance overseeing operational safety, managing the area’s hazard identification and
risk analysis activities, implementing mitigation or corrective actions, assessing the impact of
safety on operational changes and activating hazard and risk analysis process as appropriate,
maintenance and review of relevant performance indicators, managing safety training and
promotion activities within the area.
2. Be the Chairman of Safety Action Groups at Narrow body Base Maintenance, which are
accountable to and takes strategic directions from the Safety Committee. Be responsible for
the satisfactory completion and certification of all work required by contracted
operators/customers, in accordance with GMF Approved Capability List.
3. Be responsible for ensuring that the organisation's procedures and standards are complied
with when carrying out maintenance and with the result standard quality product.
4. Be responsible for ensuring the competence of all personnel engaged in maintenance by
establishing a programme of training and continuation training using internal and external
sources.
5. Be responsible for ensuring that all sub-contract orders to purchasing are correctly detailed
and that the requirements of the contract/order are fulfilled in respect of inspection and
quality control;
6. Be responsible for responding to quality deficiencies in the area of activity for which he/she is
responsible, Ensuring follow-up on any findings of the audit can shall implement effectively, a
systematic, disciplined and professional.
7. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
8. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
9. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the Aircraft line maintenance in a manner to achieve product quality, cost and on time
performance targets. Ensure all necessary resources are available to accomplish maintenance in
accordance with DGCA Indonesia requirements applicable to each aircraft. he/shewill:
1. Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Line Maintenance. Including overseeing operational safety,
managing the area’s hazard identification and risk analysis activities, implementing
mitigation or corrective actions, assessing the impact of safety on operational changes and
activating hazard and risk analysis process as appropriate, maintenance and review of
relevant performance indicators, managing safety training and promotion activities within
the area.
2. Be the Chairman of Safety Action Groups at Line Maintenance, which are accountable to and
takes strategic directions from the Safety Committee.
3. Be responsible for the satisfactory completion and certification of all work required by
contracted operators/customers, in accordance with GMF Approved Capability List.
4. Be responsible for ensuring that the maintenance organisation's procedures and standards
are complied with when carrying out maintenance and with the result standard quality
product.
5. Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System and/or customer requirement in maintenance by establishing a programme of
training, indoctrination and continuation training using internal and external sources.
6. Be responsible for ensuring that all sub-contract orders to purchaser are correctly detailed
and that the requirements of the contract/order are fulfilled in respect of inspection and
quality control;
7. Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
8. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
9. Ensure that line maintenance required plus any defect rectification performed during line
maintenance is carried out to the designs and quality standards specified by the DGCA
Indonesia requirements and operator maintenance program.
10. Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
11. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
12. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the A/C components and emergency equipment maintenance activities in a manner to
achieve product quality, cost and TAT. Ensure the effective management of Component Services,
including but not limited to pooling and treatment components airplanes, Non Destructive Test
(NDT, calibration of tools and equipment, so that have a positive contribution in acquiring the
company's revenue ,in accordance with customer needs and meet the requirements of
airworthiness. Ensure all necessary resources are available to accomplish maintenance in
accordance with DGCA Indonesia requirements applicable to each order. Ensure that all
component maintenance required plus any defect rectification performed during maintenance is
carried out to the designs and quality standards specified by the DGCA Indonesia requirements..
Ensure tools and equipment are available and serviceable. Assign responsibility, DGCA Indonesia
and relationship for personnel who manage, perform, and verify work and he/she will:
1. Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Component Services. Including overseeing operational
safety, managing the area’s hazard identification and risk analysis activities, implementing
mitigation or corrective actions, assessing the impact of safety on operational changes and
activating hazard and risk analysis process as appropriate, maintenance and review of
relevant performance indicators, managing safety training and promotion activities within
the area.
2. Be the Chairman of Safety Action Groups at Component Services, which are accountable to
and takes strategic directions from the Safety Committee.
3. Be responsible for the satisfactory completion and certification of all work required by
contracted operators/customers, in accordance with GMF Approved Capability List.
4. Be responsible for ensuring that the maintenance organisation's procedures and standards
are complied with when carrying out maintenance and with the result standard quality
product.
5. Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and external sources.
6. Be responsible for ensuring that all sub-contract orders to purchaser are correctly detailed
and that the requirements of the contract/order are fulfilled in respect of inspection and
quality control;
7. Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
8. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
9. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
10. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the effectiveness of engineering services function in a manner to achieve cost effective
and product quality according to TC or STC standard design and authority aircraft registered
requirement to achieve aircraft readiness, reliable & airworthy, he/shewill:
1. Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Engineering Services. Including overseeing operational
safety, managing the area’s hazard identification and risk analysis activities, implementing
mitigation or corrective actions, assessing the impact of safety on operational changes and
activating hazard and risk analysis process as appropriate, maintenance and review of
relevant performance indicators, managing safety training and promotion activities within
the area.
2. Be the Chairman of Safety Action Groups at Engineering Services, which are accountable to
and takes strategic directions from the Safety Committee.
3. Ensure all necessary engineering data and resources are available to accomplish
engineering activities meet applicable DGCA Indonesia and customer requirements.
4. Ensure that all data required supporting the maintenance and reliability and development
of operator maintenance programs plus any defect rectification is carried out to the
technical designs and quality standards specified by the DGCA Indonesia operator
requirements.
5. Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and with external sources.
6. Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
7. Be responsible for availability of all necessary current maintenance data.
8. Be responsible for liaison with manufacturers or original equipment manufacturers (OEM).
9. Ensure aircraft maintenance planning effective & efficient.
10. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
11. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
12. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the effectiveness of procurement (related aircraft parts and non-related aircraft parts) &
logistic services unit through the provision and management of material and tools required to
support aircraft maintenance and certain components in accordance with the requirements of
airworthiness, and he/she will:
1 Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Material & Logistic Services. Including overseeing
operational safety, managing the area’s hazard identification and risk analysis activities,
implementing mitigation or corrective actions, assessing the impact of safety on operational
changes and activating hazard and risk analysis process as appropriate, maintenance and
review of relevant performance indicators, managing safety training and promotion
activities within the area.
2 Be the Chairman of Safety Action Groups at Material & Logistic Services, which are
accountable to and takes strategic directions from the Safety Committee.
3 Be responsible for the management and control of corporate assets well-maintained and
safe, as well as to formulate strategies and tools material supply in order to remain in line
with company policies.
4 Ensure the procurement and supply of materials (aircraft parts, related aircraft parts and
non-aircraft part) in accordance with the applicable DGCA Indonesian regulation, and able
to support the way business PT Garuda Maintenance Facility Aero Asia Tbk well as business
growth.
5 Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and with external sources.
6 Be responsible for ensuring that all sub-contract orders are correctly detailed and that the
requirements of the contract/order are fulfilled in respect of inspection and quality control;
7 Ensure all logistics business activities, as well as asset management and control through
effective and efficient governance while still regulating the principles of Good Corporate
Governance (GCG) and follow applicable DGCA Indonesian regulation.
8 Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
9 Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
10 Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
11 In case of absence for 30 days or more, assigned SM will be in charge.
Manage the Aircraft Cabin Maintenance and Aircraft Furnishing and Upholstery in a manner to
achieve product quality, cost and on time performance targets. Ensure all necessary resources are
available to accomplish maintenance in accordance with DGCA Indonesia requirements
applicable to each aircraft. Ensure that all Cabin Maintenance and Aircraft Furnishing and
Upholstery required plus any defect rectification performed during Cabin and Aircraft Furnishing
and Upholstery Maintenance is carried out to the designs and quality standards specified by the
DGCA Indonesia requirements and operator maintenance program. Ensure product quality
through efforts to improve the quality of care cabin functionality, interior appearance, exterior
appearance, treatment cabin in detail and in cooperation with partners and providers. Ensure that
any corrective action resulting from the quality compliance monitoring according to DGCA
Indonesia requirements is implemented and he/she will:
1 Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Cabin Maintenance Services and Aircraft Furnishing and
Upholstery. Including overseeing operational safety, managing the area’s hazard
identification and risk analysis activities, implementing mitigation or corrective actions,
assessing the impact of safety on operational changes and activating hazard and risk
analysis process as appropriate, maintenance and review of relevant performance
indicators, managing safety training and promotion activities within the area.
2 Be the Chairman of Safety Action Groups at Cabin Maintenance Services, which are
accountable to and takes strategic directions from the Safety Committee.
3 Be responsible for the satisfactory completion and certification of all work required by
contracted operators/customers, in accordance with GMF Approved Capability List.
4 Be responsible for ensuring that the maintenance organisation's procedures and standards
are complied with when carrying out maintenance and with the result standard quality
product.
5 Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and with external sources.
6 Be responsible for ensuring that all sub-contract orders to purchasing are correctly detailed
and that the requirements of the contract/order are fulfilled in respect of inspection and
quality control;
7 Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
8 Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
9 Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
10 In case of absence for 30 days or more, assigned SM will be in charge.
Manage the engine maintenance in a method to achieve product quality, cost and TAT targets.
Ensure all necessary resources are available to accomplish maintenance in accordance with DGCA
Indonesia requirements applicable to each order. Ensure that all maintenance required plus any
defect rectification performed during engine maintenance is carried out to the designs and
quality standards specified by the DGCA Indonesia requirements. Ensure that any corrective
action resulting from the quality compliance monitoring according to DGCA Indonesia
requirements is implemented and he/she will:
1 Be responsible for specific safety activities and the functional or operational safety
performance and outcomes in Engine Maintenance. Including overseeing operational
safety, managing the area’s hazard identification and risk analysis activities, implementing
mitigation or corrective actions, assessing the impact of safety on operational changes and
activating hazard and risk analysis process as appropriate, maintenance and review of
relevant performance indicators, managing safety training and promotion activities within
the area.
2 Be the Chairman of Safety Action Groups at Engine Maintenance, which are accountable to
and takes strategic directions from the Safety Committee.
3 Be responsible for the satisfactory completion and certification of all work required by
contracted operators/customers, in accordance with GMF Approved Capability List.
4 Be responsible for ensuring that the organisation's procedures and standards are complied
with when carrying out maintenance and with the result standard quality product.
5 Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and external sources.
6 Be responsible for ensuring that all sub-contract orders to purchasing are correctly detailed
and that the requirements of the contract/order are fulfilled in respect of inspection and
quality control;
7 Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
8 Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
9 Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
10 In case of absence for 30 days or more, assigned SM will be in charge.
Manage the effective management of human capital development, employee services & payroll,
performance & rewards, Leader & talent development, corporate culture & knowledge
management and learning services to support GMF’s business in accordance with DGCA
Indonesian regulation, he/she will:
1. Be responsible to Manage to Become a Strategic Partner or Advisor in managing the Human
Resources (HR) and Corporate Culture.
2. Responsible for the performance and availability of qualified resources.
3. Be responsible for the implementation of a strategic partnership and collaboration with
approved training provider to develop high standards of training services.
4. Be the Chairman of Safety Action Groups at Human Capital Management, which are
accountable to and takes strategic directions from the Safety Committee.
5. Be responsible for ensuring competence of all personnel engaged with GMF Quality System
and/or customer requirement by establishing a programme of training, indoctrination and
continuation training using internal and external sources.
6. Be responsible for ensuring that the organisation's procedures and standards are complied
with when carrying out training;
7. Be responsible for responding to quality deficiencies in the area of activity for which he/she is
responsible, Ensuring follow-up on any findings of the audit can shall implement effectively, a
systematic, disciplined and professional.
8. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
9. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
10. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the effective management of marketing and business development to have a positive
contribution to meet the company target revenue, through strategic business, planning and
product sales as well as business development and the company's products. Ensure that any
corrective action resulting from the quality compliance monitoring according to DGCA Indonesia
requirements is implemented and he/she will:
1. Responsible for building, developing and maintaining network marketing, determine the
product portfolio as well as the promotion, market research, market segmentation, market
penetration and carry out product delivery.
2. Increase corporate revenue through the efforts of business development of both organic and
inorganic.
3. Be responsible for responding to quality deficiencies in the area of activity for which he/she is
responsible, Ensuring follow-up on any findings of the audit shall implement effectively, a
systematic, disciplined and professional.
4. Be responsible for ensuring the competence of all personnel engaged in maintenance by
establishing a programme of training and continuation training using internal and external
sources.
5. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
6. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
7. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the effective management of maintenance Power Generator & Electrical Control Services
and Motorized Ground Support Equipment, Fabrication and assembly of aviation supporting
equipment in accordance with DGCA Indonesian regulation, he/she will:
1. Responsible the readiness of aircraft support equipment & power services to support GMF’s
business.
2. Be the Chairman of Safety Action Groups at Aircraft Support & Power Services, which are
accountable to and takes strategic directions from the Safety Committee.
3. Ensure Equipment support Is in accordance with equipment specification required.
4. Ensure the implementation of QCD (Quality, Cost, Delivery), Risk management, HSE (Health,
Safety & Environment) work value management and continues improvement in the
management process of aircraft support and power services.
5. Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, Ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
6. Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and with external sources.
7. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
8. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
9. In case of absence for 30 days or more, assigned SM will be in charge.
Manage the effective management of Innovation & digital transformation and Emergency
Response Plan (ERP) System & IT Service Delivery in accordance with DGCA Indonesian regulation,
he/she will:
1. Responsible for development of information & communication technology including but
not limited to IT Strategic planning, Architecture & Asset management, IT Business system
solution and IT Service Delivery to support GMF’s business.
2. Be the Chairman of Safety Action Groups at Corporate Strategy & Business Development,
which are accountable to and takes strategic directions from the Safety Committee.
3. Be responsible for responding to quality deficiencies in the area of activity for which he/she
is responsible, ensuring follow-up on any findings of the audit can shall implement
effectively, a systematic, disciplined and professional.
4. Be responsible for ensuring the competence of all personnel engaged with GMF Quality
System in maintenance by establishing a programme of training, indoctrination and
continuation training using internal and with external sources.
5. Be responsible for ensuring, through the workforce under his/her control that the quality of
workmanship in the final product is to a standard acceptable to GMF and DGCA Indonesia.
6. Be responsible for Human factor and Safety issues in GMF by improving human factor aspect
related with the safety and quality of aircraft and aircraft maintenance. He/She also fully
supports the human factor programs.
7. In case of absence for 30 days or more, assigned SM will be in charge.
BOARD OF MANAGEMENT
DIRECTOR OF VP CORPORATE
DIRECTOR OF DIRECTOR OF DIRECTOR OF HUMAN CAPITAL STRATEGY &
FINANCE LINE OPERATION BUSINESS & BASE & CORPORATE BUSINESS
OPERATION AFFAIR DEVELOPMENT
VP COMPONENT
SERVICES
VP AIRCRAFT
SUPPORT &
SBU MILITARY POWER SERVICES
Base
Maintenance Structure Structure Cabin Wide
Hangar 1 Hangar 3
Planning & Workshop Hangar Body
Engineering
Base
Maintenance Cabin Hangar Hangar
Structure Hangar
Planning & Narrow 4-A 4-B
Hangar Painting
Engineering Body
LINE MAINTENANCE
Line Maintenance LM - 01 LM – 03 LM - 05 LM - 07
Control & Garuda CGK Bali & Nusa Sulawesi & Sumatra
Coordination Tenggara Eastern
Line Hangar LM - 04 LM - 06
Maintenance LM – 02 Jawa Kalimantan
Support
Support Non-Garuda
COMPONENT SERVICES
ENGINEERING SERVICES
ENGINE SERVICES
Area Area
Revenue Customer
Manager Manager
Management & Support & Sales
2 4
Sales Support Administration
Quality
Management
Certifying Staff are those authorized personnel who have been appointed by the VP for Quality
Assurance & Safety to return to service aircraft, engine and components after maintenance,
preventive maintenance and alterations for which the organization is rated. This appointment is
based on individuals experience, education and training as described in Section 3.4 of this
manual. The roster of certifying staff is kept by Quality Assurance & Safety together with the
certifying staff records specified in Section 3.5 of this manual. The roster can be access via
https://olaps.gmf-aeroasia.co.id/
RII Personnel are those qualified personnel proposed by Quality Assurance & safety and
authorized by Operators to perform required inspections. List of RII Personnel will be given by
operator and develop base on operator standard. Will be kept by Quality Assurance and Safety.
The performance of a required inspection is restricted to an independent RII inspector who
reports to the Quality Assurance & Safety and that authorized person was not involved in the
performance of the work to be inspected. This appointment is based on individual experience,
education and training as described in Section 3.7 of this manual.
The Quality Assurance & Safety will update the roster within 5 working days to reflect changes
caused by termination, reassignment, change in duties or scope of assignment, or addition of
personnel.
Any deletion, limitation and updating of validity date of individual authorization is only approved
by VP Quality Assurance & Safety and the copy shall be sent to the contracted operator.
For any other changes, it will require approval or acceptance by the Authority before the change
is in effect. See Section 1.10 of this manual.
Authorized persons will have access to the certifying staff and RII personnel records.
Issue: N Revision No.: 0 Date: 10 February 2020 Page: 1 of 1
AMO MANUAL
Each Senior Manager will develop man-hours plan and will employ sufficient number of qualified
personnel to perform, inspect and supervise the work so that to enable the organization to achieve
quality product within the specified targets. The man-hours plan should be related to the
anticipated maintenance workload.
The man-hours plan will include personnel for planning the work, accomplishing the maintenance,
inspecting the work, inspecting required inspection item, certifying maintenance package,
checking and retaining maintenance records and controlling the production and maintenance
documents in process. The man-hours plan should be reviewed at least every 3 months and
updated when necessary. Deviation more than 25% shortfall in available man-hours during a
calendar month shall be reported by each VP Production to the VP Quality Assurance & Safety and
the Accountable Manager for review.
The production and supporting functions will plan the man-hours required versus production
needs as described in AMO Manual 2.22
Each Vice President may request to Human Capital Management Department to recruit short-term
contract staff to cover production shortfall provided:
a) Vice President, who requested such staff, will provide to Human Capital Management a job
description and the qualification required. The short-term contract staff must provide
evidence of their qualifications and experience and records must remain in file.
b) They will work under the supervision of permanent skilled employees unless the Quality
Assurance & Safety has authorized otherwise;
c) Their number will not exceed 50% of the total personnel required per Senior Manager;
d) They will not be responsible to perform required inspections or for releasing to service. Such
responsibility will remain to GMF certifying staff, unless the VP for Quality Assurance & Safety
after consultation with the Authority has approved such staff, providing meeting the
requirements of Section 3.4 & 3.7.
e) They are briefed about their intended work and they have been trained in GMF procedures
related to their assignment.
f) The Quality Assurance & Safety has assessed their training, qualification and experience.
The following numbers of management and maintenance personnel are permanent employees in
GMF
GMF will keep the number of its permanent employees updated, and the updating personnel data,
training and personnel qualification such licensing or authorization will be performed by human
resources management and or related unit/function see https://soe.gmf-aeroasia.co.id
The number of short-term contract employees depends on the workload from one period to the
other. A current list of short-term contracted employees is available at human capital management.
The Human Capital Management will develop and maintain in current condition and compile in an
easily retrieval manner and easy to access the personnel records and rosters. Records will be
maintained for each employee in the employee's training folder or in the computer. The following
records and rosters will be kept:
• Records for each individual's participation in the training conducted at GMF and/or
outside (attendance records),
b) Rosters of:
• All VP’s, Senior Managers and Managers responsible for the management of the
maintenance,
The rosters of VP’s, Senior Managers and Managers will include their name, title, and scope of
assigned work.
c) Administrative records
The records & rosters for permanent employees can be accessed at https://soe.gmf-aeroasia.co.id
RII personnel and Certifying staff records and rosters are kept by the Quality Assurance & Safety (see
Sections 1.6 and 3.5 of this manual). Short term contract staff records are kept by respective
Manager or Senior Manager.
Human Capital Management will update the roster within 5 working days to reflect changes caused
by termination, reassignment, change in duties or scope of assignment, or addition of personnel.
The Human Capital Management will establish procedures relating to the human capital
management and establish the organization system in order to maximize employee competency
and motivation. Procedures will include:
The Safety Inspection under Quality Assurance & Safety will develop safety management system for
all maintenance activity, which will include the following:
The regulation addresses aviation safety related safety management system describe in current
Safety Management Manual (SMM).
The PT Garuda Maintenance Facility Aero Asia Tbk Facilities consists of:
➢ 129,193 square meters of four steel-framed constructed hangars (hangar 1, 2, 3, and 4) with
attached offices and a stock room for each hangar, and component shops (hangar 4 only);
➢ 2,550 square meter painting hangar facility
➢ 56,232 square meter of Three component shops;
➢ 20,736 square meter engine shop;
➢ 972 square meters material receiving inspection area attached with an additional stock room
➢ 2,560 square meter Engine test cell.
➢ 2,268 square meter special store
➢ 5,832 square meters GSE Shop
➢ 1,215 square meters utility building
➢ 336,000 square meters of apron area
➢ 140,000 square meters of surrounding property
The total square area of the facilities is: 692,241 square meters
All Hangars, Workshops, Storage area, and Offices are sufficiently lighted. All shops and offices are
sufficiently lighted.
For base maintenance four hangars are available and large enough to accommodate the aircraft.
Hangar one is used for the Boeing 747 or Boeing 777 aircraft maintenance, hangar two for light
maintenance, hangar three is used for, Airbus 330, hangar four for narrow body aircraft
maintenance. GMF also has another fix location for performing aircraft base maintenance at
Hangar Angkasa Pura I Denpasar for narrow body aircraft maintenance.
For base maintenance five hangars are available and large enough to accommodate the aircraft.
Hangar space is arranged based on aircraft visit plan.
1. Hangar one is used for maintenance of Boeing B747, Boeing B777 and Airbus A330 wide
body aircraft. If necessary, Hangar one able to maintain 4 aircraft undergo base
maintenance in the same time, with configuration 2 aircraft base maintenance with fully
docking and 2 aircraft base maintenance which not need fully docking.
2. Hangar two for light maintenance able to maintain 3 widebody aircraft (B777, B747, A330,
and B787-8/9/10) and 6 narrow body aircraft (A320, B737-300/400/500, B737-
600/700/800/900, CRJ-1000 and ATR) in the same time, or 12 narrow body aircraft (A320,
B737- 300/400/500, B737-600/700/800/900 and ATR) in the same time.
3. Hangar three is used for Airbus A330, and if necessary, able to maintain 6 aircraft undergo
base maintenance in the same time, with configuration 3 aircraft base maintenance with
fully docking and 3 aircraft which not need fully docking.
4. Hangar four for narrow body aircraft maintenance (A320, B737-300/400/500, B737-
600/700/800/900, CRJ-1000 and ATR) can accept 26 narrow body aircraft undergo base
maintenance at the same time, with configuration 1 line is for aircraft painting, 15 aircraft
base maintenance with fully docking and 10 aircraft which not need fully docking.
5. Hangar Angkasa Pura I Denpasar for narrow body aircraft maintenance (B737-300/400/500
or B737-600/700/800/900 or A320 or CRJ-1000 or ATR) able to maintain 1 aircraft undergo
light or base maintenance.
Note:
GMF may perform work at a place other than its primary fix location in hangar Angkasa
Pura I Denpasar for light or base maintenance and Capability limitation will be stated at
GMF AMO Manual Appendix B and GMF approved capability list (DQ-001).
For aircraft component, engine/APU maintenance, workshops are large enough to accommodate
the components and engine/APU on planned maintenance.
Aircraft hangar and aircraft component workshop floors should be sealed to minimize dust
generation;
Shop spaces are lighted with fluorescent light and air conditioner system. Fire extinguishing
equipment is installed in all hangars, offices and shops. For Test Cell is equipped with noise
protection.
Run-up bay equipped with the reflector to eliminate the engine trust is available far away from
the hangar used to performed aircraft engine run.
The PT Garuda Maintenance Facility Aero Asia Tbk is restricted area; only authorized personnel
may enter into GMF area.
Office accommodation if properly lighted with fluorescent lights and properly air-conditioned for
the management, planning, technical records, quality or certifying staff, to carry out their
designated tasks in a manner that contributes to good aircraft maintenance standards;
Aircraft maintenance staffs are provided with a study area in the hangars and shops where they
can study maintenance instructions and complete maintenance records in a proper manner.
The Plant Maintenance function will establish document and maintain procedures to ensure that
the facility is properly maintained all the times. Maintenance and preventive maintenance
instructions will be developed together with maintenance schedules as required by each plant
equipment manufacturer and standard industry practices. The procedure will include the prompt
notification of the Plant Maintenance function by the users to rectify defects.
a. Storage facilities for serviceable/repairable components should be clean, well ventilated and
maintained at an even dry temperature. Manufacturers storage recommendations should be
followed;
b. Storage racks should be strong enough to hold aircraft components and provide sufficient
support for large components such that it is not distorted during storage;
c. Storage facility is able to segregate of serviceable components and unserviceable;
d. Access to all storage facilities will be restricted to authorize personnel only
For detailed layout of PT Garuda Maintenance Facility Aero Asia Tbk facilities will be provided in
current document DQ-041: GMF Facility Layout.
For detailed Line Maintenance Facilities layout of PT Garuda Maintenance Facility Aero Asia Tbk
will be provided in current document DQ-041: GMF Facility Layout.
Privileges and limitations of PT Garuda Maintenance Facility Aero Asia Tbk's certificate
PT Garuda Maintenance Facility Aero Asia Tbk's Marketing, Production, Procurement, Engineering
and Quality Assurance functions will arrange and ensure as necessary - based on the each Unit's job
descriptions - for the following:
The approval rating which listed on the Amended GMF Operation Specifications describe the scope
of approvals and limitation as listed in current GMF approved Capability list (DQ-001)
For the part(s) are intended to fabricate within GMF the procedures in section 2.9.3 of this AMO
Manual must be followed.
GMF allow to perform maintenance, preventive maintenance and alteration work away from GMF’s
fixed location on a temporary basis and certain duration in such conditions:
1. Special circumstances
2. Extended periods of time.
3. Recurring basis.
GMF may temporarily transport material, tools & equipment, qualified personnel and valid
maintenance program and current maintenance data needed to perform maintenance, preventive
maintenance, or certain specialized services on an aircraft, engine and components as mention
above for which is rated to a place at another fixed location.
When a special circumstance arises or aircraft facing the AOG situation or in preparation for a ferry
flight or extended period of time GMF may perform that work away from its fixed location on a
temporary basis by notify to DGCA Inspector for acknowledgement.
For recurring basis condition GMF may perform that work away from GMF’s fixed location on a
temporary basis with certain duration by request permission to DGCA Inspector.
Detail procedure for work performed at another location and the method of how to notify & request
permission to the DGCA Inspector will be explained in QP 109-01.
GMF may perform limited capability of engine maintenance onsite customer location or other than
GMF fixed location based on rating or portions in Appendix C and in compliance with QP 109-02.
GMF may perform limited task aircraft component test, recoding, replacement parts, and NDT
maintenance tasks away from fixed bases on an interim basis when special actions and/or recurring
maintenances are required to support aircraft line operation, based on portions thereof in
Appendix D and in compliance with QP 109-03.
VP Quality Assurance and Safety is responsible for ensuring all work away from GMF’s fixed location
follows the related procedures.
GMF will perform maintenance on Aircrafts, Engines and Components in accordance with Ratings
and Limitations as listed on Amended GMF Operation Specification of DGCA Indonesia’s Approval
Certificate No. 145D-1 and current GMF Capability list (DQ-001).
Duration of Certificate
GMF AMO Certificate 145D-1 shall remain in force for such period as determined by the DGCA but
shall not exceed 2 (two) years from the date of issue, unless the GMF surrenders the certificate or
the DGCA suspends or revokes it.
The appropriate production Senior Manager is responsible to develop the capabilities as requested
by Marketing. All functions mentioned in this section are responsible to provide the necessary
support to the Senior Manager for the effective development of the capabilities. The following
process will be followed for developing new capability:
a. The Marketing function will request to the relevant maintenance unit to develop new
capability for aircraft, engines and components.
b. The responsible Senior Manager will develop an action plan, including among other the
requirements listed in matrix table on page 4 to initiate and monitor the capability
development process. He will coordinate with the planning engineering and Quality
Assurance & Safety to perform a capability study and determine requirements in terms of
maintenance data, tools, personnel training & qualifications, expertise, certifying staff and
material.
c. The Planning Engineering will define the engineering requirements and the Quality
Assurance & Safety will define the Quality Assurance & Safety requirements related with the
capability. See matrix table on page 4.
d. The production and support functions (as mentioned in matrix table on page 4) will take the
appropriate actions based on engineering and Quality Assurance & Safety recommendations.
e. The production Senior Manager will monitor the development of the capability process as
planned and he will verify upon completion that the capability is present ensuring that the
requirements mentioned in this section have been met before requesting approval from the
Quality Assurance & Safety.
f. When the production Senior Manager is satisfied that the capability has been developed,
he/she will collect all relevant information which supports the presence of the capability and
he will present to Quality Assurance & Safety for review following with an official letter
requesting approval.
g. Appropriate QSA will review, evaluation and assessment application document refer to
appropriated Quality Procedure, to determine if capability is present and approve or
disapprove (if no present). If the capability is not present (as revealed from the result of review,
evaluation and assessment), the QA will provide written discrepancies for corrective action
and will assist as necessary the production and other support functions to effectively rectify
the problems.
h. The Production Senior Manager together with respective support function will initiate a self-
evaluation to add or remove capability into/from existing capability list. The result of self-
evaluation will then be submitted to QSA for verification. The QSA, based on the verification
result will approve or disapprove. When a new capability related to DGCA Indonesia is
approved by QSA and propose for DGCA Approval following DGCA procedure.
i. The QSA will revise the capability list as per section 1.9.3 and keep all supporting
data/information for each capability in soft copy file that proves the capability is present.
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 3 of 5
AMO MANUAL
1.9.2.1 Initial and Periodic Evaluation for the Aircraft, Component and Engine Capability
Initial evaluation for new aircraft type, Component and Engine capability will be performed as
instructed in section 1.9.2 of this manual. For periodic evaluations shall be performed by
responsible Senior Manager of production unit to assure that all requirement & resources listed in
approved capability is fulfilled and updated.
All production Senior Managers is responsible to inform the Quality Assurance & Safety for periodic
capability evaluation result or removal of any capability from the capability list for any reason which
the capability cannot be maintained.
Audit of the capability will be performed on product audits and procedures audits as per Section
3.1 & 3.2 of this manual.
The VP for Quality Assurance & Safety will remove any capability from the capability list for any
reason, the capability cannot be continued, and/or violates the airworthiness requirements.
The responsible Senior Manager of Quality System and Auditing, upon satisfied that a new
capability is present, or a capability has been terminated for any reason, he will revise the capability
list indicating the new components added or removed from the list. The revised capability list will
clearly indicate in the list of effective pages, the components added or removed the new revision
number and the revised page number. A vertical line on the left side of the page that the revision
takes place will indicate what has been revised.
The Vice President of Quality Assurance and Safety will approve the list of effective pages,
submitting every any changes of the capability list to DGCA Inspector for approval.
The first page of the capability list will indicate the list of effective pages. The second page will
indicate the issue number and date, the superseded issue number, and a description of the revision.
It will also include the name and the signature of Vice President of Quality Assurance and Safety
who revised the capability list. The subsequent pages will include:
A. Airframe
B. Powerplant
C. Component
D. NDT
E. Specialized Services
A specific document name and code number is given to the capability list as follows:
Approved for DGCA Approved Maintenance Organization No.: 145D-1; Approved GMF Capability
list Document Number: DQ-001
1.10.1 General
The VP for Quality Assurance & Safety is responsible to notify the Authority as soon as possible in
any changes mentioned below. These changes will not be valid unless the Authority determines
continued compliance with the requirements and prescribe the conditions under which PT
Garuda Maintenance Facility Aero Asia Tbk will operate during such changes. The VP for Quality
Assurance & Safety will also be responsible for the coordination and implementation of any
restrictions imposed by the Authority as a result of those changes.
1.10.2 Changes
Senior Managers, who intend to perform any changes as mentioned above, will inform the Quality
Assurance & Safety to assess the need of obtaining approval by the authorities before the changes
occur.
The VP for Quality Assurance & Safety will request for renewal of the certificate 30 days prior to its
expiration and he/she will arrange for the payment of any charges as prescribed by the Authority.
Submit to DGCA a maintenance service provides to Indonesian costumer within 2 years of reports.
Request for renewals and/or for additional rating must be done as instructed by the Authority
requirements.
The AMO Manual describes how PT Garuda Maintenance Facility Aero Asia Tbk meets the aviation
regulations giving summary and/or comprehensive information of the relevant CASR and other
Authority of Aircraft registration requirements.
The Chief Executive Officer of GMF As Accountable Manager approves this manual by signing the
commitment statement in Section 1.1.1. The VP for Quality Assurance & Safety is responsible for
the revisions and the availability of the manual to the workstation and will approve the Section 0.2
(Issue/ Revision Status) any time an issue/revision takes place and propose to DGCA for approval .
The management and maintenance personnel may submit proposed revisions to this manual to
Quality Assurance & Safety using the “Issue Revision Request” form GMF/Q-035.
The Quality Assurance & Safety will keep the manual current to any revisions come from
regulations and GMF’s policy/objectives and business plans. The Quality Assurance & Safety will
annual periodically review or if any change this manual. This review will either confirm that the
manuals are still current and valid or will identify changes.
The Quality Assurance & Safety will revise the manual any time the changes mentioned in Section
1.10. Such changes to this manual will be notified to the Authority as major changes and will not
be in effect until approved by the Authority.
Typing error and misspelling are classified as minor changes and may subject to revision by the
Quality Assurance & Safety without notifying the authorities
A list of effective sections/pages will be issued with each revision so each manual can be checked
and kept current. A vertical Line in the left margin of each revised paragraph will be used to
indicate the current revision.
When a revision takes place in any sections/pages of this manual, the revision will be marked by a
sequence number '1' as a first revision. If a second revision in the same sections/pages or different
sections/pages takes place, it will be marked as a sequence number '2'.
When the revisions of manual affect more than 50% of its content this manual may be reissued.
When an issue takes place, the revision number will start from zero and a next issue letter will be
assigned (from B to C for example). Issues are numbered in letters and revisions in numbers. The
Quality Assurance & Safety will have those revisions produced in a final form and approved by the
VP for Quality Assurance & Safety.
The authorized Quality Assurance & Safety personnel will keep the electronic version of the
manual current at all times. Security control using passwords will be applied for the maintenance
and control of the master back up files in database. Access and revisions will be performed by
authorized personnel. The Quality Assurance & Safety must:
a) Ensure that there is only READ ACCESS to the management and maintenance personnel
and,
b) The manual can be accessed via internet to web address :
https://gmfaeroasia365.sharepoint.com.
Quality Assurance & Safety Department notifies related Senior Manager when there is any revision
of the AMO Manual affected by updated regulations.
The related Senior Managers are responsible to familiarize their employees with the appropriate
content of this manual. The SM must ensure that each employee read, understands and follows
the manual in the area of their responsibility.
All management and maintenance personnel are responsible to become familiar with the
contents of this manual applicable to their function. They must fully follow the contents all the
time and report any errors, misunderstandings or any other problems regarding the
implementation to their superiors and Quality Assurance & Safety for corrections or further
clarification.
PART 2
MAINTENANCE PROCEDURE
PT Garuda Maintenance Facility Aero Asia Tbk as the maintenance organisation using other
organisation to supply part with approved supplier list.
The Quality Assurance & Safety will keep and update the Approved Supplier List (ASL) and the
purchaser have access to the ASL. The list of repair station, supplier, maintenance function, and
Calibration are parts of on the categorized on the ASL, Document No. DQ-005. Such list will become
available to the auditing Authority upon request.
2.1.1.1 Supplier
Any source providing components, standard parts or materials to be used for maintenance.
Possible sources could be: Part-145 organizations, Part-21 Subpart G organizations, etc. which is
accredited such as but not limited to ASA & CASE or approved by recognize body as aviation parts
suppliers. Except for TC & STC holder suppliers, an ASL including scope of approval is kept by the
Quality Assurance & Safety, document No.: DQ-005.
To support PT Garuda Maintenance Facility Aero Asia Tbk business process, GMF may contract to
another DGCA Part 145 organization or NAA approved organization in country which have Bilateral
Aviation Safety Agreement with DGCA. They will be selected on the basis of their ability to meet
contractual. The contractor listed in DQ-005.
Customer may agree with GMF to use contractors during maintenance process any maintenance
task which GMF not have capability or any circumstances that GMF are not capable to exercise the
privileges.
PT Garuda Maintenance Facility Aero Asia Tbk may arrange for maintenance of any aircraft, engine
or component task maintenance for which it is approved at another organization that is working
under the quality system of GMF This refers to work being carried out by an organization not itself
appropriately approved to carry out such maintenance under DGCA Part 145. This work scope shall
not include a base maintenance check of an aircraft or a complete workshop maintenance check or
overhaul of an engine or engine module.
2.1.1.4 Calibrator
GMF may subcontract the calibration work to the approved source which has calibration sources
traceable either directly or via a letter of equivalency, to the National Institute of Standards and
Technology (USA) or to a standard provided by the equipment manufacturer or National or
international standard acceptable to the Authority. The Quality Assurance & Safety will evaluate the
calibration sources
The Quality Assurance & Safety will evaluate the provider and contractors prior to engagement and
will keep records for two years. Initial and ongoing evaluations will take the form of:
The providers will be managed and controlled under Quality Assurance and Safety , in current GMF
Approved Supplier List, Document No. DQ-005. The Quality Assurance & Safety will evaluate the
provider, prior to engagement and will keep records of provider evaluation for two years. Initial and
ongoing evaluations will be performed in accordance with the validity period of each provider 's
certificate except for non certificated contractor, evaluations will be performed based on-site audits
every year, unless if in conditions of force majeure or special circumstances determined by the
government which do not possible to perform an on-site audit.
Audit records for providers will be kept by Quality Assurance & Safety for two years. On-site audits
will be scheduled and performed as per QP 301-01 utilizing a customized checklist.
a) Procurement requests to Quality Assurance & Safety to evaluate a candidate provider using the
'Candidate Supplier Quality Evaluation Request' Form No.: GMF/Q-041.
b) The Quality Assurance & Safety evaluates the proposed provider as per 2.1.1 above.
c) Based on the evaluation results, the Quality Assurance & Safety approves or disapproves the
providers. When they fulfill the criteria, they are listed on Document No. DQ-005 including the
scope of approval. Only VP for Quality Assurance & Safety or delegated personnel have
authorized to alter the ASL. The computerized system must ensure that no Purchase Order will
be executed if the provider is not in the ASL.
PT Garuda Maintenance Facility Aero Asia Tbk may contract specialized services under which the
GMF has the rating to Non Certificated Contractors provided an on-site audit has performed and it
has been confirmed that the non certificated contractor meets the following criteria:
a) Those parts of the Non Certificated Contractor’s facilities, personnel and procedures involved
with the products undergoing maintenance should meet the specific Authority’s requirements
for the duration of that maintenance and it remains the GMF’s responsibility to ensure such
requirements are satisfied for the scope of the sub-contracted work;
b) GMF should have its own expertise and procedures to determine that the non certificated
contractor meets the necessary standards;
c) An audit procedure should be established whereby the Quality Assurance & Safety, will audit the
prospective non certificated contractor to determine whether those services of the non
certificated contractor that GMF wishes to use meet the intent of the Authority of aircraft
registration requirements;
d) GMF will need to assess to what extent it will use the non certificated contractor’s facilities.
GMF should require its own paperwork, maintenance data and material/spare parts to be used,
but it could permit the use of tools, equipment and personnel from the non certificated
contractor as long as such tools, equipment and personnel meet the requirements of the
Authority;
e) In the case of non certificated contractor who provide specialized services it may for practical
reasons be necessary to use their specialized services personnel, maintenance data and material
subject to acceptance by GMF Quality Assurance & Safety. Specialized service personnel should
meet any published by the Authority of aircraft registration qualification standards or PT Garuda
Maintenance Facility Aero Asia Tbk specialized services procedures;
f) PT Garuda Maintenance Facility Aero Asia Tbk will need to supervise the inspection and return
to service the work by its own certifying staff.
g) non certificated contractor procedure will need to record audits of the non certificated
contractor, to have a corrective action follow up plan and to know when non certificated
contractor are being used. The procedure should include a clear revocation process for non
certificated contractor who do not meet the GMF’s requirements.
h) The Authority of the aircraft registration and the customer must have the right to assess the
non certificated contractor;
i) The customer agrees to use such subcontractors.
j) PT Garuda Maintenance Facility Aero Asia Tbk has properly trained and certified the
subcontractor's employees per Part 3 of this manual as appropriate. Training should include PT
Garuda Maintenance Facility Aero Asia Tbk procedures as appropriate.
Note: Non Certificated Contractors are not allowed out of the scope of work PT Garuda
Maintenance Facility Aero Asia Tbk has been approved.
a) Procurement will select provider from the ASL. When a potential provider is not in the ASL, the
procurement will formally request to Quality Assurance & Safety to evaluate the potential
provider per Section 2.1.2. Procurement will place a Purchase Order only after approval and the
provider’s name is in the ASL and only for product and services indicated in the scope of
approval.
b) The Procurement will clearly indicate on each purchase order the product or service to be
ordered and the certificates required to be submitted based on the Authority of aircraft
registration requirements the part or component is intended for installation. All providers for
aeronautical products will be asked to provide the appropriate certificates or airworthiness
approval tags as indicated in Section 2.2.
c) Procurement will arrange for supplied parts/materials not conforming to specifications as found
by the receiving inspection to be brought to attention of the providers.
For defected components which sent to outside contractors, the procurement will follow the
requirements on AMOM Section 2.20.
Eligibility requirements
The procurement prior to placing purchase order will ensure that the parts and components are
eligible to be fitted when different modification may be applicable. Consult the Engineering
Services as appropriate depending on the purchase requisitions.
Providers information will be stated in Document No. DQ-005 and document such as, but not
limited to, Providers evaluation, certificate and evaluation record will be kept by Quality Assurance
and Safety for two years.
All material will be ordered, inventoried, controlled in the stocks, and distributed to operations
using the computerized system. The material planning will use database to develop and control
the spares provisioning in accordance with annual production schedules.
The Engineering Services is responsible to update the material master data on the computer
database.
Unserviceable components
Unserviceable components which shall be maintained in accordance with this Procedure.
Unserviceable components should typically undergo maintenance due to:
1. expiry of the service life limit as defined in the aircraft maintenance program;
2. non-compliance with the applicable airworthiness directives and other continuing
airworthiness requirements mandated by DGCA;
3. absence of the necessary information to determine the airworthiness status or eligibility
for installation;
4. evidence of defects or malfunctions;
5. being installed on an aircraft that was involved in an incident or accident likely to affect the
component’s serviceability.
Standard parts
Standard parts used on an aircraft, engine, propeller or other aircraft component when specified in
the maintenance data and accompanied by evidence of conformity traceable to the applicable
standard.
Salvageable Component
Component categorized salvageable is the component that has good physical condition, passed
functional shop check and serviceable with airworthiness release certificate.
For detail procedure see WI-TC-007.
The procurement, before placing a purchase order, must know the aircraft registration the part or
component intended for installation to identify and request from the supplier the appropriate
certificate or airworthiness approval tag as shown below.
For the maintenance of aircraft registered in DGCA maintained under the DGCA Part-145
regulations and for aircraft components (including engines) intended for installation on such
registered aircraft.
For Option 2, the information above may be included in one single CoC issued by
Materials
the supplier (containing cross reference to the manufacturer CoC) or be
(Expandable raw
composed by more documents, such as for example the CoC issued by the
material and/or
manufacturer plus a statement from the supplier source.
chemical)
In any case, the manufacturer CoC shall be made available upon request.
Aircraft parts (Rotable 1. DAAO / DGCA Form 21-18 with status “new”
& repairable part) 2. EASA Form 1 with status “new”
3. FAA Form 8130-3 with status “new” ;
4. TCCA Form One with status “new”;
5. ANAC Form F-100-01 with status “new” (former Form SEGVOO 003)
6. UK CAA Form 1 with status “new”.
STATUS “Used”
type of part/material document to be expected
Aircraft parts 1. DAAO / DGCA Form 21-18 issued by a CASR 145 approved maintenance
organization, or
2. Form FAA 8130-3, issued from FAA approved repair stations, or
3. Serviceable tag issued by a CASR 121 approved operator, released as
per CASR 43.9 or 43.11
4. As per FAA Advisory Circular (AC) 00-56B as amended
5. EASA Form 1
6. JAA Form One issued by EASA Part-21 production organizations prior
to 28 September 2005
7. UK CAA Form 1
From All accredited Conformity to specification (or Mill certificate for metals test report for other, if
providers and applicable)
manufactures
Assure that PMA mark is available material and/or on the packaging. The batch
number information shall also available. If any doubt exists, material must be
analyzed to prove conformance to specification.
Notes:
1. All material shall be completed with original certificate or true copy if from
split lot and applicable documentation
2. the material and or its packaging shall be marked with the specification and
where appropriate the batch number
2.2.3.1 Receiving inspection For Components / Materials/ Standard Parts received from external
sources:
The procedures for acceptance of components, standard parts and materials have the objective of
ensuring that the components, standard parts and materials are in satisfactory condition and meet
the GMF requirements. These procedures are based upon incoming inspections.
received in batches will be maintained using GMF computerization and transfer order as per QP
202-01.
4. Ensure that standard parts, materials and components meet the Purchase Order requirements
and have the appropriate certificates as mentioned in Section 2.2.2 of this manual. Eligibility for
installation on the appropriate registered aircraft will be determined based on the requirements
mentioned on Section 2.2.4 of this manual and QP 202-01.
Quarantine Procedure
The discrepant material or material which cannot be evaluated will be tagged with a Form No.
GMF/Q-018 and will be held in quarantine (hold area) until final disposition as per QP 202-01.
Material will be stored at the correct temperatures while in quarantine area. The appropriate
function (as mentioned in QP 202-01); will take the appropriate corrective actions for the disposition
of such materials.
Modification Standard and AD Compliance
The Material Inspection function must ensure that the component/part meets the approved
data/standard, such as the required design, AD compliance and modification standard as refer to
purchase order. This may be accomplished by reference to the manufacturer's parts catalogue or
other approved data (i.e. Service Bulletin).
2.2.3.2 Receiving inspection of components from internal sources (e.g. transfer between stores,
from the workshops to line maintenance and base maintenance site (including outstation):
All aircraft parts/components received and/or transferred between stores or from internal
workshop to stores shall be conform to the company and order requirement, such as:
1. For transfer from workshop, the maintenance record is kept in the Technical Documentation
unit;
2. All Parts/components shall be accompanied with proper documentation (original certificate
or true copy if from split lot and applicable documentation);
3. The component received from internal source shall meet the order requirement and
condition;
4. Follow the Quarantine procedure as mentioned in section 2.2.3.1
All received Parts/components found do not comply with requirement will be segregated
and make notification to responsible unit for further action refer to section 2.9.1
5. Control of store life limit shall be made refer to section 2.3
6. Internal fabrication parts shall be controlled and conform as per Section 2.9.2.
7. All Components removed serviceable from aircraft either intended to be reinstalled or
restored shall be controlled refer to Section 2.16.2
The user will ensure that the appropriate identification are attached with the parts before they are
used.
To ensure that the component is in satisfactory condition and has been appropriately released to
service, this shall be accomplished:
1. Refer to the manufacturer's parts catalogue or other approved data (i.e. Service Bulletin).
2. Ensure the compliance with applicable airworthiness directives and the status of any life
limited parts fitted to the aircraft component
All incoming tools and equipment will be inspected at the receiving inspection area if their size
permits or at the place of use. All appropriate documentation must be furnished with the
equipment. All tools and equipment need inspection measuring & test equipment will be sent to
calibration shop. The calibration laboratory will assign a registration number and will calibrate it as
QP 205-01.
The responsible Managers may rent tools and equipment, which are rarely required and/or has
been ordered, but pending delivery and the following requirements are met:
a) The rented equipment is the same as required by the aircraft and/or aircraft component
manufacturer;
b) The equipment will be available at PT Garuda Maintenance Aero Asia Tbk as long as it is
required;
c) The equipment has been loaned by a recognized source and it is supplied with its applicable
documentation;
d) Incoming and administrative inspection are performed;
e) A special inventory number is provided and for measurement equipment registration number
is put onto the calibration list;
f) The equipment is periodically calibrated as per established intervals and or its maintenance
and preventive maintenance is arranged;
g) The equipment is appropriately calibrated to standards traceable to National/International
standards acceptable to the Authority;
h) Place a label indicating that the equipment is loaned and where it is loaned from;
If a tool or equipment required for aircraft and/or aircraft components maintenance is not specified
in manufacturers' maintenance manuals, engineering function and/or certifying staff and quality
personnel will determine what tool will be used in accordance with standard practices and general
maintenance on aircraft practices.
b) In case there is sufficient information for the determination process, the determination takes
place by the tooling & equipment engineer and information will be recorded on files;
c) In case there is no sufficient information, information must be supplied by the company, which
issued the manual with a written no technical objection for using equivalent tools or
equipment.
Reference procedure
QP 204-01 Control and acceptance of tools and equipment
All workstations managers concern unit are responsible to identify with condemn tags for tools and
equipment that definitively scrapped and placed in segregate and secure area
The following will be performed by the unit concern:
Make a list of scrap tools and Equipment. Include the key number or registration number, name,
part number, serial number (if any) and quantity. The list must be as detailed as possible. The
scrapped parts should have the Condemned tag Form No.: GMF/Q-013 attached. Move the
scrapped tools and equipment to the scrap area and keep the scrap record for two years
The Facility Maintenance Function is responsible for their storage and mutilation as appropriate.
This function will list all mutilated tools and equipment and will arrange for the further disposal to
mutilation area. The Senior Manager of the Facility Maintenance Function will perform the
following:
• Make a list of scrap tools and equipment, which are to be mutilated. Include in the list the
key number/registration number, the part name, part number, serial number (if any) and
quantity. The list must be as detail as possible.
• Call the Quality Assurance & Safety to be present during the mutilation.
• Under supervision of the Quality Assurance & Safety, mutilate all the collected scraps as
listed.
• After mutilation, the Quality Assurance & Safety will sign the appropriate forms of the list of
mutilated parts that the parts have been mutilated.
A Quality Assurance & Safety auditor will witness the mutilation of tools and equipment will sign
the appropriate forms and will keep records for two years. He/She will ensure that in any case all
tools and equipment have been mutilated
The Scrapped Tools and Equipment shall be processes by the facility maintenance function and
witnesses by Quality Assurance & Safety Auditor for mutilate in the mutilation area, and shall be
recorded in the form GMF/Q-223. The Senior Manager of Facility Maintenance Function or his
delegate and the Quality Assurance & Safety auditor must put their signatures and the date on the
form.
After the mutilation those mutilated parts, material, tools should be place in the mutilated area for
disposal.
The Calibration Laboratory function will control, calibrate and maintain IMTE used to demonstrate
the conformance of product to the specified requirements. IMTE will be calibrated in a manner,
which ensures that the measurement uncertainty is known and is consistent with the required
measurement capability.
The IMTE will be calibrated at calibration intervals and on the basis of stability, purpose and
degree of usage but not exceeding one year unless the equipment’s manufacturer allows.
Calibration intervals will be kept on equipment list database and Calibration Record Card.
All reference standards used will be traceable to a standard provided by the equipment
manufacturer or National/International standards acceptable to the Authority.
Calibrations will be done in a controlled environment meeting the required standards. When the
controlled environment departs from the standards, the calibration processes will be stopped
until the conditions re-established.
The Calibration Laboratory Function will refer to ISO 10012 and ISO 17025 requirements for the
calibration of IMTE.
The calibration will be performed in accordance with the QP 205-01 (Calibration of Inspection
Measuring and Test Equipment) requirements.
Where product acceptance test software or comparative references such as test hardware are
used as suitable forms of inspection, they will be checked and periodically calibrated as required
by ATE manufacturers. The ATE shall be evaluated by self-test program at a frequency required by
the ATE manufacturers for the purpose of verifying the accuracy and serviceability. See QP 209-13:
Avionics Maintenance Process Control
The Vice Presidents and Senior Managers are responsible for the proper selection and provision of
tooling and equipment. The tools and equipment will be selected based on aircraft & aircraft
components manufacturer’s instructions when applicable and general maintenance requirements
or standard industry if no special tools and equipment is given. Equipment maintenance &
operating instructions will be requested as necessary when purchasing the equipment.
All Managers will ensure that all required tools and equipment are available to perform
maintenance as specified in maintenance data.
The responsible Managers and maintenance personnel will ensure that each tool and equipment,
in order to be acceptable for use, will meet the following conditions:
The storekeeper and/or responsible manager will keep a current register of tools handed over to
maintenance personnel.
The register will include:
a) Name of personnel who picked up the tools from the store;
b) Tool identification/register number;
c) Quantity;
d) Date out and date in and time.
e) Work instruction reference number
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 1 of 2
AMO MANUAL
2.6.2 Calibration Control of Inspection, Measuring and Test Equipment by Users and
Storekeepers
The Calibration Laboratory Manager will review the IMTE calibration status log and give a list of
IMTE which will require calibration to the production managers not less than fifteen days before
the equipment mentioned on the list are due.
The responsible managers will select those items requiring calibration and send for calibration
using Form No.: GMF/Q-085.
When the IMTE is proved that calibration is not required, Form No.: GMF/Q-086 shall be used.
Where test software or comparative references such as test hardware are used for product
acceptance, they will be checked to prove that they are capable of verifying the acceptability of
product, prior to release.
Any IMTE found without a current calibration label attached, or the due date is not visible, or with
an expired due date, or there is any suspicious about its precision, accuracy or its calibration status
shall be returned for re-calibration using Form No.: GMF/Q-085.
Loan tools must be inspected prior to use to ensure there is free from defect, complete and have
the current calibration status.
All IMTE are to be used, handled, transported and stored in a manner, which shall not adversely
affect their condition and serviceability. When not in use, all IMTE will be adequately protected from
collision, environmental contamination (dust, rust, and corrosion) and stored in a safe and properly
located area.
All Senior Managers will develop a plan for the periodic cleaning of the facility and they will make
aware to personnel the importance of the facility cleaning, maintenance and safety. Subcontracted
cleaning activities will subject to periodic controls by the Senior Managers who they remain
responsible for ensuring the cleaning standards are met.
Each employee must keep his work-area clean, according to the developed plans. The periodic
cleaning plans and inspections will ensure that the following requirements are met:
a) Maintenance areas shall be free from foreign object damage and foreign object debris that not
related to maintenance task
b) Dust and any other airborne contamination is kept to a minimum and is not permitted to reach
a level where visible surface contamination is evident;
c) Where maintenance is performed, the working environment should be such that the particular
maintenance or inspection task can be carried out without undue distraction. When the
working environment deteriorates to an unacceptable level in respect of temperature,
moisture, wind, light, dust/other airborne contamination, the maintenance will be suspended
until satisfactory conditions are re-established;
d) For both base and line maintenance where dust/other airborne contamination results in visible
surface contamination, all susceptible systems should be sealed until acceptable conditions are
re-established;
e) Temperatures will be maintained in an acceptable condition. Where the manufacturer specifies
maintenance to be performed under specific temperature and environmental conditions (if
any) such conditions must be established;
f) The lighting will be such as to ensure each inspection and maintenance task can be carried out;
g) Noise levels will not be permitted to rise to the point of distracting personnel from carrying out
inspection tasks. Where it is impractical to control the noise source, such personnel should be
provided with the necessary personal equipment;
h) Segregation and storage of parts and material as per their inspection status;
i) The handling of scrapped parts and material as per section 2.19.3 of this manual.
a) Separate facilities are used for nickel-cadmium and lead-acid batteries charging. Ventilation
arrangements are such that no cross contamination can occur.
b) Rooms used for purpose of charging batteries should be well lit and cool and should have a
good ventilation system. The floor surface is made of a material, which is impervious to acid
and alkali, has no-slips qualities and is quick drying and able to wash down easily.
a) Generally, during the aircraft painting process, standard practices including safety aspect for
personnel should be followed.
b) For aircraft painted in the Hangar 1 and Hangar 3, precautions must be taken to avoid the
contamination of adjoining aircraft. To avoid contamination due to over-sprays, all
aircraft/aircraft components/ tooling/ material located within a radius of 20 meters from the
aircraft to be painted will be covered with a plastic sheet.
c) Personnel will wear appropriate personnel protective equipment.
The detail procedure for Aircraft Painting as indicated in QP 209-15 Aircraft Painting Process.
The Facility Maintenance function will establish, maintain and operate as necessary the fire
protection system. Preventive maintenance will be performed for all fire extinguishers (portable
and stationary) and periodic operational tests will be performed as required by the National
Standards.
Trained personnel will be assigned as fire fighters and an alert system will be established. A system
to assure the prompt notification of fire fighters will be in place and will be validated from time to
time to ensure effectiveness when needed. A validation schedule will be in place.
The Facility Maintenance function will establish document and maintain procedures to ensure that
the facility is properly maintained all the times.
1. Avoid having non-conductive items such as trays, bags, packaging material, drawings,
or personal effects that are not essential for the work at hand within the immediate area
of the component;
3. Prior to removing any component from aircraft, the technician or engineer should
aware of the Handling Precautions for Electrostatic Discharge Sensitive Devices;
4. Prior to removing any component from a conductive package, the technician should
first touch the package. This also applies to re-packing the device. Care should also be
taken to ensure that the electrical terminals on the device do not come in contact with
any plastic or paper outer containers;
In addition to the cleaning standards specified on previous chapters, the following facilities (other
than clean rooms) will require the temperature to be monitored and controlled to the standards
indicated below:
For the purpose of achieving a necessary level of quality, certain maintenance functions must be
performed in facilities where the environment is rigidly controlled in terms of temperature,
humidity and cleanliness. An environmentally controlled facility or a clean room is a shop where
the temperature, humidity, pressure and dust must be controlled. The following shops are
environmentally controlled:
1. Instrument shop;
2. Gyro shop;
3. Composites shop;
4. Calibration shop;
5. Any other facility where a maintenance task requires specific environmental conditions such
as clean room as instructed in the manufacturer's maintenance data.
NOTE:
The production engineering for each unit is responsible for evaluating maintenance data
requirements and determining the appropriate environmentally controlled conditions for the
specific maintenance tasks.
a) The temperature is to be monitored and kept between 21.1 C and 26.7 C.
b) The relative humidity is to be monitored and should not exceed a maximum of 50 %. The air
is to be filtered and a positive pressure is to be kept inside the work area.
c) The particles of dust allowed should contain no more than 20,000 particles per cubic foot with
maximum average particle size not exceeding 5 microns.
d) A Positive pressure be maintained in the contamination-controlled area
e) Personnel shall wear protective clothing with negligible electrostatic generation.
f) A lighting of minimum 500 foot-candles shall be provided.
g) A maintenance program for the air-conditioning shall be established and implemented.
h) Eating and smoking are forbidden in the Instrument room
The personnel shall wear adapted and protective clothing. Coveralls and gloves (cotton) are
available. Work-clothes should be changed and laundered at least every week or when
contaminated.
As indicated in specific Calibration of Inspection Measuring and Test Equipment procedure, QP 205-
01
2.8.1 External Origin Documents & Maintenance Data Use & Control
All maintenance functions are responsible shall always using the current maintenance data in
accordance with the maintenance performed. The maintenance data is supplied/provide by
technical publication and/or Engineering function.
The engineering function is responsible to order the appropriate maintenance data (if not supplied
by the operator) in order to write the maintenance instruction / maintenance task and to distribute
such work instruction to the maintenance personnel.
The Technical Publication is responsible to order from the data provider, receive and register the
external origin maintenance data and any subsequent revisions. The data required will be ordered
on an on-going basis to ensure that always the current revision and update service from the data
provider is in place including supporting evidence. Contracts or agreement with the data provider
must be available as evidence that the maintenance data will be updated in the future.
The Technical Publication will keep the master documents and will establish the document control
and distribution system as required by QP 208-01. Distribution of maintenance data can be either
in electronic or CD rom format.
The Technical Publication will destroy obsolete documents, unless for historical purposes, which
will be identified as such and put separately.
The Technical Publication will monitor the amendment status of all documents. To ensure that all
amendments will be well received, Technical Publication will be a subscriber to any document
amendment scheme. Special attention should be given to Type Certificate related data such as
certification life limited parts, airworthiness limitations and Airworthiness Limitation Items (ALI) etc.
Current manufacturer indexes will be maintained to identify the current revision of external origin
data and the current documents will be distributed to the users as applicable.
When the maintenance data is distributed electronically via the network, the Technical Publication
will ensure that a backup system will be readily available for use in case of shutdowns or
malfunctions.
All Senior Managers and Managers are responsible to make available to personnel current
maintenance data as required to ensure the proper functioning of the operations. Data being made
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 1 of 13
AMO MANUAL
available to personnel means that the data shall be available in close proximity to the aircraft,
engine or aircraft component being maintained for maintenance reference.
Where computer systems or other electronic media are used, the number of computer terminals
should be sufficient in relation to the size of the work program to enable easy access via
https://etechpub.gmf-aeroasia.co.id/ , https://gmfaeroasia365.sharepoint.com/ and unless the
computer system can produce paper copies.
Engineering function will have access and use the following minimum current maintenance data:
▪ All maintenance related CASR/NAA Regulation and associated Advisory Circulars;
▪ All applicable national maintenance requirements, service bulletins and notices;
▪ DGCA airworthiness directives plus any national airworthiness directive required as per
Authority of aircraft registration plus any non-national airworthiness directive
The Aircraft Maintenance (Base and Line) should have and use the following maintenance data as
appropriate:
▪ The appropriate sections of the current operator's aircraft maintenance program;
▪ The current: aircraft maintenance manual, structure repair manual, supplementary structural
inspection Document, corrosion control document, service bulletins, service letters, service
Instructions, modification leaflets, NDI manual, illustrated parts catalogue, trouble shoot
manual, wiring diagram manual, operator technical procedure, etc.;
▪ Type certificate data sheet and any other specific document issued by the type certificate or
supplementary type certificate holder as maintenance data,
The Engine/APU should have and use the following maintenance data where published:
▪ The current: appropriate sections of the engine/APU maintenance manual, aircraft
maintenance manual, standard practices manual;
▪ Service bulletins, service letters, NDI manual, parts catalogue;
▪ Type certificate data sheet and any other specific document issued by the type certificate
holder as maintenance data.
The component workshops should hold the following maintenance data where published:
▪ The appropriate sections of the vendor maintenance manual, standard practices manual,
repair manual and Overhaul manual;
▪ Service bulletins and service letters plus any document issued by the type certificate holder
as maintenance data on whose product the component may be fitted when applicable.
The workstations with specialized services should hold following where published in respect of the
particular specialized service(s):
▪ Specialized services process specifications;
▪ Standards and specifications applicable to each specialized services as required by the
manufacturer and/or aviation authorities;
The Calibration shop should hold the following maintenance data where published:
▪ Standards and specifications applicable to each calibration as required by the manufacturer
and/or calibration certification body;
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 2 of 13
AMO MANUAL
The Laboratory should have the following standard & specification where published:
▪ Standard and specification applicable such as ASTM, AWS, etc other than maintenance data
published by OEM.
Technical publication services are responsible for maintenance data subsequent amendments
control and distribution. Engineering function will review maintenance data, amendments and
incorporating the revisions into the maintenance instructions, engineering function will distribute
the maintenance instruction to the related maintenance function.
A document control system will be in place by Engineering Services, which identifying the locations
where the documents are distributed and their current revision status. They will be responsible to
control and monitor the revisions of the data, which is available to maintenance personnel.
The engineering function and the maintenance personnel only use maintenance data that
provided by Technical Publication Services through https://etechpub.gmf-aeroasia.co.id/, and for
maintenance data provide by customer can be access through
https://gmfaeroasia365.sharepoint.com/ sharing data. Temporary revisions shall be considered as
normal technical data.
This data will be delivered from operator or customer to the responsible engineering function on
each workstations or line maintenance managers where the work is to be performed. For the
operators / customer’s, which have full maintenance contract, delivery and registry of the data must
be performed by Technical Publication Services.
GMF will use English for the performance of maintenance. When GMF receives maintenance data
published in other than English language, the document will be translated into English. All
Maintenance records given to the customer will be in English.
References:
QP 208-01 (Document and Data Control)
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 3 of 13
AMO MANUAL
2.8.2.1 General
PT Garuda Maintenance Facility Aero Asia Tbk will establish and maintain a documented quality
system as a means of quality assurance that the articles being maintained conform to specified
quality requirements. The primary objective of the quality system is to enable GMF to ensure that it
can deliver a safe product and that it remains in compliance with the Authority requirements. It will
include:
The quality system procedures will be developed by all responsible functions at GMF They will cover
all aspects of carrying out the maintenance activities and they will lay down the standards on which
GMF intends to work to meet the Authority regulations and describe how GMF will achieve its
policies and objectives.
The responsibility for integrating the quality related activities to all functions and monitoring
compliance with the quality system requirements will be on the Quality Assurance & Safety. The
Quality Assurance & Safety will identify and report operating quality deficiencies to the Accountable
Manager and will measure the effectiveness of the quality system. Below is the structure of the
quality system documentation.
The AMO Manual contains a summary of the relevant procedures with respect to the Authority
regulations/requirements. The AMO Manual is the interface between the above-mentioned
regulations/requirements and the documented quality management system of PT Garuda
Maintenance Facility Aero Asia Tbk
The GMF Quality Management System consists of the AMO Manual and detail procedures laid down
as Quality Procedures (QP) and Work Instructions (WI).
The Quality Procedures describe interdepartmental quality related activities issued by the
Department managers, controlled by every responsible department and accepted by VP of Quality
Assurance & Safety. The QP’s detailing how the AMO Manual implemented and responsibility of
every department in PT Garuda Maintenance Facility Aero Asia Tbk
The Work Instructions are developed, approved and controlled by the Departments and
predominately describes administrative departmental procedures and these procedures concurred
by VP Quality Assurance & Safety. The Quality Assurance & Safety ensures through auditing that the
WI's do not violate any requirements set forth by the AMO Manual and the QP’s. And the NDT
Procedures considered as the same level as Work Instructions.
The maintenance instructions including forms as appropriate describe the specific item work that
need to be done, by tailoring the customer’s and manufacturer’s quality requirements into the
specific maintenance tasks and recording those maintenance requirements.
PT Garuda Maintenance Facility Aero Asia Tbk Quality System Documentation structure
AMO Manual
(SEE Section 1.11)
QUALITY PROCEDURES
(SEE Section 2.8.3)
WORK INSTRUCTIONS
Departmental Procedures & NDT Procedures
MAINTENANCE INSTRUCTIONS
Job Cards, PD Sheets, MDR, Records, Engineering
Instruction
(AMO Manual 2.8 & 5.8)
2.8.3 Issue/Revision & Control of Quality Procedures, Work Instruction & Associate Forms Related
with the Approval
The Quality Procedures (QP), Work Instruction (WI) and the associated forms are issued and revised
by the responsible originator Senior Managers. They are the owners of the Quality Procedures and
they remain responsible to any changes and all related departmental responsible to full
implementation. The VP for Quality Assurance & Safety accepted all Quality Procedures by signing
the Procedures Issue Revision Status Log and the List of Effective Pages.
The originator of the QP & WI is responsible - prior to each QP & WI approval by him/her and prior
to submitting the QP & WI for acceptance for any initial or subsequent issue/revision - to:
a) Encouraging the management and maintenance personnel to submit proposed revisions to
the QP & WI using the “issue revision request” form GMF/Q-035.
b) Reviewing or revise the quality procedures with other responsible related functions if any
changes related to business process or management policy.
c) Incorporating all proposed changes into a final draft form and submitting to Quality
Assurance & Safety together with the ''Issue Revision Request''.
The Quality Assurance & Safety, when receives from the originator the draft of proposed initial or
amended QP & WI together with the appropriate forms mentioned in (c) above, will ensure the
changes do not violate the regulations and this manual requirements, comments as necessary and
will accept or reject the amendments or the new QP & WI.
The Procedures Issue Revision status Log and the List of Effective Pages will be available for each
QP so it can be checked and kept current. A vertical Line in the left margin of each revised paragraph
will be added to indicate the current revision. When a revision takes place in any page of the QP,
the revised page will be marked by a sequence number '1' as a first revision. If a second revision in
the same page or different page takes place, it will be marked as a sequence number '2'.
When the revisions affect more than 50% of its content, the QP or WI may be reissued. When an
issue takes place, the revision number will start from zero and a next issue letter will be assigned
(from A to B for example). Issues are sequenced in letters and revisions in numbers.
The Quality Assurance & Safety will have those revisions finds necessary produced in a final form
and accepted by the VP of Quality Assurance & Safety. Upon accepted by VP of Quality Assurance &
Safety, the revised copies will be distributed to each manual holder per Section 0.4 (applicable for
QP)
NOTE:
Spelling correction is not considered a revision and will not be handled as such.
The Quality Assurance & Safety will keep a log of canceled Quality Procedures and an issue revision
status log.
The logs will be kept updated and accessible via https://gmfaeroasia365.sharepoint.com/.
2.8.3.2 Quality Procedures, Work Instruction & Associate Forms Revision and Website Security and
Control
The authorized Quality Assurance & Safety personnel will keep the electronic version of the QP
current at all times. Security control using passwords will be applied for the maintenance and
control of the master back up files in database. Authorized personnel will have access and make the
revisions.
The Quality Assurance & Safety must ensure that there is only READ ACCESS to the users and that
the Quality Procedures are located only in the prescribed folders of the website.
Addition instruction for generating and controlling the forms as well as form numbering system,
see Section 5 of this manual. For distribution and control of QP, see section 0.4.3 of this manual
All Senior Managers are responsible to familiarize their employees with the appropriate content of
the Quality Procedures, Work Instruction & Associate Forms. The Senior Managers must ensure that
each employee understands and follows the Quality Procedures, Work Instruction & Associate
Forms in the area of their responsibility.
All management and maintenance personnel are responsible to become familiar with the contents
of the Quality Procedures, Work Instruction & Associate Forms as applicable. They must fully follow
the contents all the times and they must report any errors, misunderstandings and any problems
regarding the implementation to their superiors and Quality Assurance & Safety for corrections or
further clarification.
The VP for Quality Assurance & Safety may issue a Quality Bulletin when he deems necessary in
order to communicate quality and safety related matters, to further clarify procedures and
Authority requirements and to communicate specific customer requirements. The Quality
Assurance & Safety will keep a log of the Quality Bulletins issued and will define the numbering
control system.
Competencies required
Personnel who write maintenance instructions must be able to put into practice the following:
a) Properly interpret the maintenance requirements into maintenance tasks and have an
appreciation that they have no authority to deviate from the approved data. Any deviation
from approved data will invalidate the applicable TC or STC and will result in unapproved
parts or systems. Deviations of original values, materials, processes or text need TC or STC
Holder or Authority approval.
b) They are not allowed to carry out the engineering design of repairs and modifications.
c) All maintenance documents will accurately reflect the current operator's maintenance
program and the contracted work scope and the article's configuration requirements.
The Engineering function in each department will take the following steps to develop a customized
work package of maintenance instruction to meet the intended scope of work per operator /
customer's maintenance program. The customized work package will be developed using the
operator / customer's furnished maintenance data or using references given by the operator /
customer's and manufacturer (for aircraft components).
a) Defining operator's or maintenance data and other external origin maintenance data (see
section 2.8) and also defining tooling and equipment requirements.
3. Order through technical library the necessary documents based upon the official data
index provided by the manufacturers;
4. Obtain the new documents or revisions from library before being distributed. Evaluate
documents and document changes for validity, analyze the contents and make changes
to the computerized back up files as necessary;
6. Authorize the new documents or revisions for distribution after being evaluated.
Distribute the documents to the users;
a. Transcribe accurately all tasks in the approved maintenance data including CDCCL
into Job Cards, PD Sheets or MDR in a way the technician can understand. Refer to
decision-making diagram to determine when a required inspection item is
necessary. (See AMO Manual 2.23). Write the maintenance tasks in the proper
sequence as they are going to be performed;
2. Enter inspection and checks required together with recording instructions. Prompt the
maintenance personnel to record both qualitative (measurement, limitation, etc.) and
quantitative (ok or not ok) inspection and test results by giving appropriate space and
guidance for recordings. When there is not enough space to record the inspection and
test results on the Job Cards, PD Sheets or MDR, develop appropriate inspection and
test data sheets properly customized for the specific inspection or test. The inspection
and test data sheets must be traceable to the Job Card, PD Sheet, or MDR;
3. Complex maintenance task shall be subdivided into clear stages to ensure a record of
the accomplishment of the complete maintenance task. For the task requiring double
check, it must be clearly described mentioning the correct and clear reference.
4. Use simple, clear and imperative words, when necessary, write the maintenance tasks
in both Indonesian and English language, if necessary;
5. Define required inspections item as given by the operator or as per AMO Manual 2.23.
Refer to decision-making diagram to determine when a required inspection item is
necessary;
6. Write on the Job Card, PD Sheet or MDR, the tools (except tools in the drawer tool) and
equipment to be used (if different but equivalent to those given in the maintenance
approved data);
7. Incorporate Notes, Cautions and Warning thoroughly into the maintenance documents;
8. For Job Card, PD Sheet or MDR involving many units in its activities the process owner
remains responsible, the process owner of Job Card, PD Sheet or MDR is respective
planning engineering. Determine the workstation, skills required from the
technician/engineer to perform specific tasks. For examples: flight control checks,
compass swing, run up, etc, must be performed by technicians/engineer holding
appropriate licenses.
9. Write on the Job Card, PD Sheet or MDR statement of Clear from Foreign Object
Damage (FOD) on every removal and installation task in aircraft maintenance and re-
assembly task in workshop.
NOTE:
See AMO Manual 2.21 for “Security of Computer Generated Job Cards & PD Sheets”.
See AMO Manual 2.13 for “Preparing the work package”.
a) When maintenance instructions covered in maintenance data taken from different references
(like manufacturer standard practices, approved methods), they need to be harmonized in a
single document;
All quality requirements addressed in the engineering instructions will be referenced to and be in
compliance with approved maintenance data.
a) Where the TC or STC holders original intent can be carried out in a more practical or more
efficient manner;
b) Where the TC or STC holder’s original intent cannot be achieved by following the
maintenance documents. For example, where a component cannot be replaced following the
original maintenance documents, Inform the author as per AMO Manual 2.27;
c) For the use of alternative tools/equipment.
Important note:
Critical Design Configuration Control Limitations (CDCCL) are airworthiness limitations. Any
modification of maintenance instruction linked to CDCCL constitutes an aircraft modification that
must be approved in accordance with NAA regulation in which the aircraft is registered.
Procedure
The Engineering Services informs the manufacturer for the encountered problem (a), (b) above or
(c) as appropriate per AMO Manual 2.27. When the manufacturer agrees with that change, the
engineering services must give a written statement or additional instructions of how the change
will be done and distribute to planning engineer.
Upon approval by the manufacturer the engineer function in each department will modify the Job
Card, MDR, or PD Sheet to following the instruction given by engineering services.
Prior to distribute to maintenance The QC inspector will review the modified instructions and will
verify if a letter from manufacturer is in place. When satisfied, he/she will allow the practical
demonstration of the process using the modified instructions.
The Quality Control inspector will witness the maintenance process to verify that the proposed
modification of the process results in the same or higher output. When the Quality Control
inspector is satisfied, he and the mechanic will stamp on the modified maintenance instruction.
The modified maintenance documents will remain in the work order file attached with all
supporting reference including manufacturer's letter.
Additionally, the planning engineer will keep a copy of the modified maintenance documents and
all supporting data.
NOTE 1:
When the manufacturer does not agree with proposed changes or the QC/RII inspector is not
satisfied after demonstrating the proposed change in process, the planning engineer WILL NOT
changes the maintenance documents.
NOTE 2:
THE ENGINEERING SERVICES IS NOT ALLOWED TO CARRY OUT THE ENGINEERING DESIGN OF
REPAIRS AND MODIFICATIONS
2.9.1 Control of Non-Conformities & Damage Assessment on Aircraft and Aircraft components
This Section is predominately related with damage assessment and for defining approved repair
solutions when the damage cannot be repaired per available approved maintenance data.
All repairs on aircraft or aircraft components will be accomplished in accordance with approved
maintenance data. The following requirements are covered:
a) Control of non-conformities and damage assessment of Aircraft and Aircraft components;
b) Damage assessment & control of components and parts pending disposition;
c) Fabrication of parts for the repair of operator’s aircraft and aircraft components;
Any aircraft defect or any deviation from TC/STC Holder design found on the aircraft, will be
properly identified with a Finding Inspection tag (form GMF/Q-130), recorded on MDR (form
GMF/Q-003) for further corrective actions as per the requirements of this procedure and QP 209-05.
The Engineering Function on each department will perform a damage assessment to assess if the
defect or deviation can be rectified per available approved current maintenance data. If it can be
rectified per available current approved data, he/she will write the instructions in the MDR (Form
GMF/Q-003).
If the defect cannot be rectified per available approved current maintenance data, the GMF
Engineering Services will seek a repair approval from TC Holder or authority as per AMO Manual
2.15.
Any aircraft component / part defect or any deviation found should be recorded on MDR (form
GMF/Q-003) remove from aircraft if necessary, for further corrective actions as per the requirements
of this procedure and QP 209-05 will be repaired or replaced per approved current maintenance
data.
Any component removed due to non-conformities will be tagged with a serviceability tag and will
be sent to temporary storage area and then to shops for repair.
Non conformance components will be analyzed, rectified and tested. Depending on the degree of
maintenance required based on the inspection or test results, further actions may be required such
as disassembly and detail parts inspection as necessary so that the component to become
airworthy. The disposition may be one of the following:
a) Accept. Accepted components are tagged and routed to accumulation areas waiting
installation to the next higher assembly. For components other than engines, the 'Serviceable
Tag' is used. For engine maintenance (engine components and parts) the GMF/Q-131 ''ready
for assembly item'' tag is used. The serviceable tag will remain in the work order file.
b) Salvageable, categorized salvageable, is the component that has good physical condition,
passed functional shop check and serviceable with airworthiness release certificate it’s
component parts may used to replace defect part in component shop.
c) Repairable, per available maintenance data. For components and parts other than engines,
Repairable components or parts are routed for repair using the following PD Sheets:
For engine maintenance (engine components and parts), repairable components or parts are
routed for repair using: MDR Form No. GMF/Q-375
d) Scrap. Scrapped components will be identified with a "Condemned Tag". Form No.: GMF/Q-
013. This tag will not remain in file. Traceability of the scrapped components will be
established with the PD sheets traceable to the work order. Scrapped parts are handled as per
section 2.19.3 of this manual.
For aircraft, which are maintained under the CASR-145 regulations, GMF Engineering Services,
Engineering Function will classify a repair as minor or major as per operator's General Maintenance
Manual (GMM) requirements. If no requirements are given in the operator's GMM, the requirements
of CASR Part 43 may be applied.
Should the repair be determined to be a major, an approved repair procedure must be given or a
procedure must be approved by the TC Holder.
When the repair is classified as minor, engineering function on each department will search for a
repair solution through the standard practice’s manuals or other current approved/accepted data.
If engineering function on each department cannot find a repair solution from the above data,
comply with the requirements of the major repair.
NOTE: GMF engineering function on each department is not allowed to perform the design
engineering services for both repairs design and/or STC design.
2.9.2 Damage Assessment and Control of Components & Parts Pending Disposition
Process Flow
START
Non-conformance is
documented
No Beyond
Economical
Repair
a. Issue a ''Pending Disposition Tag'' Form No.: GMF/Q-074 for any non-conforming part or
component which cannot be repaired per approved data and for which the approved data
does not explicitly requires scrapping it.
b. Move the defected part or component to the hold area if its size permit;
c. Submit a copy of the ''Pending Disposition Tag'' Form No.: GMF/Q-074 to PPC Manager.
a. Register the material on the ''Pending Disposition Log'' Form No.: GMF/Q-108.
b. Maintain the non-conforming material hold area;
c. Be responsible for the security of the hold area;
d. Control the incoming and outgoing material by completing the appropriate blocks of the
''Pending Disposition Log'' Form No.: GMF/Q-108;
a. Coordinate a preliminary review with related function to determine if the pending disposition
item can be repaired per approved data.
1. Accept, if all inspection characteristics fall within approved data requirements. Tick the
accept block on the Form No.: GMF/Q-074 and write on remarks the reason it is
considered acceptable;
2. Repair, if it can be repaired as per approved data. Tick the repair block in the tag No.
Form No.: GMF/Q-074 and write on remarks the reason the part is considered repairable
and the repair reference;
3. Scrap, if the manufacturers’ technical manuals say so, or if it is uneconomical to be
repaired. Tick the scrap block in the tag Form No.: GMF/Q-074 and enter reference;
4. Hold the item to hold area when it is still pending disposition waiting for a repair
approval. Tick the block “hold wait for repair approval” of form No.: GMF/Q-074 and
contact the engineering function.
a) Obtain an approved repair scheme by the manufacturer or submit a repair scheme to the
manufacturer for approval;
b) When an alternative means of obtaining approved data is desired and it has agreed by the
operator, contact the aviation authority of the registration country and provide a repair
scheme for approval. This procedure should be in compliance with operator's procedures and
the application form should be as required by the operator;
c) Enter in the form GMF/Q-074 the final disposition and sign the form.
NOTE 1:
A proposed repair scheme must be followed by the complete proposed repair instructions,
description of the defects, photos, as any other supported data as required.
NOTE 2:
When a repair scheme received from the OEM, and/or an approval obtained from the aviation
authority, this repair scheme is applicable only for the specific Serial Number. The approved repair
will be valid only for the specific Serial Number and not for same part numbers unless the TC holder
agrees.
NOTE 3:
All repair instructions and communications with manufacturer and operator will be in writing and
appropriate records will be kept as an evidence of the proposed repairs.
When approved repair scheme or maintenance data is available, release the item for repair. After
repair, it will be re-inspected to ensure it meets the approved repair scheme requirements.
NOTE:
When a repair is not allowed by the TC holder, the part or components will be immediately
scrapped using the form No.: GMF/Q-013.
GMF may fabricate parts for use during repair or modification of Aircraft to a restricted range of part
if:
▪ The fabrication, inspection assembly and test are clearly within the technical and procedural
capability of GMF.
▪ All necessary data to manufacture the part is approved either by the Authority of aircraft
registration or the Type Certificate Holder or Design Organization Approval Holder. This
mostly implies to the requirements that an approved drawing from the above sources must
be available.
If any specialized services involved, GMF must have the capability including qualified personnel,
equipment, applicable specialized services and procedures and specifications.
2.9.3.1 Limitations
▪ Items manufactured will only be used by GMF in the course of overhaul, maintenance,
modifications, or repair of aircraft or component itself under going work within GMF facility
only.
▪ GMF will not supply to any party, and those parts will not qualify for certification on DGCA
Form 21-18, or any other Airworthiness Approval Tag.
▪ The data specified may include repair procedures involving manufacture of non-standard
parts provided the data for such parts is sufficient to facilitate manufacture. Care must be
taken to ensure that the data include details of part identifications, dimensions, materials,
procedures, and any special manufacturing techniques, special raw material specification.
Where specialized services or inspection procedures are defined in the approved data and are
necessary for the fabrication of the parts which are not available, GMF cannot manufacture the part.
Example of part manufacturing under the scope of the PT Garuda Maintenance Facility Aero Asia
Tbk, but not limited to the following:
Note:
1. All the above parts manufactured, must be in accordance with data provided in overhaul or
repair manuals, modification schemes and service bulletins, or otherwise approved by the
Authority.
2. It is not acceptable to manufacture any item to pattern unless an engineering drawing of the
item is produced which include necessary fabrication processes and which is acceptable to
the Authority.
2.9.3.2 Procedures
Engineering function is responsible to ensure that all-necessary information; approved data and
approved drawings and capabilities are available. Should the availability of the data and capability
is satisfied, the production engineering will develop a PD Sheet, which will clearly describe the steps
to be taken for the fabrication of the parts. The PD Sheet should describe from the Identification of
materials, to the fabrication process step by step, the final inspection of the parts, the identification
and placement of GMF Number and final acceptance of the parts. Also the PD Sheet must clearly
identify the aircraft registration on which the parts will be installed.
Any locally manufactured part will be subjected to an inspection stage before, separately, and
preferably independently from, any inspection of its installation. The inspection must establish full
compliance with the relevant manufacturing data and the part must be unambiguously identified
as fit for use by stating conformity to the approved data. Adequate records must be maintained of
all such manufacturing processes including, heat treatment and the final inspections. All parts,
except those having not enough space, should carry a part number, which clearly relates it to the
manufacturing/inspection data. Additional to the part number the GMF identification number
should be marked on the part for traceability purposes.
The certifying staff will be responsible to ensure that overhauls, repairs, modifications,
replacements, inspections and tests have been carried out in conformity with approved
standards/specifications/requirements for the aircraft and/or components listed on their Schedule
of Approval. These activities shall be carried out in accordance with the approved manuals,
drawings and schedules related thereto, and any documents approved by the NAA. This implies to
the fact that only those parts fabricated in accordance with approved drawings and other
maintenance data.
The certifying staff will be responsible to ensure that all the requirements mentioned in this
paragraph have been followed. Before accepting the part for installation, will ensure that a GMF
identification number is identified/engraved on it, a serviceable tag has been issued and such tag
is traceable to the fabrication records such as PD sheets, etc. He/she will also ensure that the records
used to fabricate the part will remain as part of the aircraft maintenance records.
The objectives of the operator maintenance program is to bring the aircraft or aircraft component
to an airworthy condition in respect to the work requested by the customer/operator within the
agreed timetable and such work to be in accordance with the Authority of aircraft registration
regulations which describe in AMO Manual Section 6.
All maintenance shall be performed by qualified personnel as described in section 1.6, following
the methods, techniques, standards and instructions specified in maintenance data supplied by
engineering services for full contracted maintenance and planning engineering for others.
Upon the receipt of the customer’s work order and the maintenance program, the planning
engineering or engineering services will plan the work as per AMO Manual 2.28, will launch the
work package as per AMO Manual 2.13 and will initiate the performance of maintenance with the
following activities:
b) The preparation of the appropriate maintenance instruction for the repair of defects found
during the preliminary inspection. AMO Manual 2.8;
c) The disassembly of the article to the extend required for repairing defects found during
preliminary inspection plus to execute the customer's work scope;
f) In process Inspection;
h) The execution of the required inspections as appropriate. See AMO Manual 3.7 & 2.23.2;
The QC/inspection personnel will perform the preliminary inspection of the aircraft and aircraft
components. When a functional test is necessary as part of the preliminary inspection (aircraft
systems, engine or components), such test will be performed by the qualified personnel.
All inspection and test results, including missing parts, will be recorded in the following forms
together with any additional test data sheets and other supplemented documents traceable to
work orders:
The records of the defects found will be submitted to the planning function or production
engineers or AMEL holder staff who will supplement the customer's work order with the
appropriate maintenance instructions per AMO Manual 2.8 in order to rectify the defects.
Preliminary inspection also will check for Aircraft maintenance historical data in a certain time.
Damage assessment of non-conformities pending disposition will be done per AMO Manual 2.9. All
defects found will be rectified per approved current maintenance data.
Inspection for hidden damage may involve further disassembly as necessary to locate the
suspected damaged area. It will include a thorough and searching inspection for hidden damage
in areas adjacent to the damaged area and/or in the case of deterioration, a thorough review of all
similar materials or equipment in a given system or structural area.
Such inspection will involve visual non-destructive inspection to the suspected area and its
surroundings and predominantly will include the appropriate non-destructive tests (NDT) methods
given by the manufacturers.
Inspection results will be recorded on the appropriate documentation such as Job Cards, MDR, and
PD sheets.
NDT inspectors, as qualified by Section 3.11.1 will perform NDT. Results will be recorded on the
forms give below and will be traceable to the work order and the appropriate Job Card, MDR, or PD
Sheet.
The records will clearly indicate the kind of defect found such as crack, void, inclusion, corrosion or
any other kind of discontinuity, the length and the area the defect found.
The scope of this inspection will be governed by the type of article involved with special
consideration given to previous operating history such as Service Difficulty Report or Malfunction
or Defect Reports, service bulletins and AD Notes applicable to the unit involved.
The records of the defects found will be submitted to the planning or production engineers or
AMEL staff who they will supplement the customer's work order with the appropriate
maintenance instructions per AMO Manual 2.8 in order to rectify the defects.
Damage assessment of non-conformities pending disposition will be done per AMO Manual 2.9. All
defects found will be rectified per approved current maintenance data.
Authorized production inspection personnel and QC/RII personnel (per AMO Manual 2.23.2), will be
assigned to make inspections at various stages of maintenance and defects rectification.
This inspection will be accomplished with a frequency determined by the manufacture current
maintenance manuals and Job Cards, MDR or PD sheets and will mainly consist of:
c) Specific inspections or checks required to be made and stamp/sign for by the RII inspector;
The maintenance must be held until the inspections and tests have been completed or necessary
reports have been received and verified.
The records of the inspection result will be submitted to the production engineers or AMEL staff
who will supplement the customer's work order with the appropriate maintenance instructions
per AMO Manual 2.8 in order to rectify the defects if occurred.
Damage assessment of non-conformities pending disposition will be done per AMO Manual 2.9. All
defects found will be rectified per approved current maintenance data.
References:
Inspection and tests will be performed in accordance with the inspection and test criteria of the
current manufacture’s maintenance manuals. Required equipment, instrumentation, methods,
instructions, parameters, and test cell correlation will be monitored. Software used for acceptance
of components undergoing test at the test cell and ATE will be monitored through software
program. Faults encountered during test will be monitored and corrected per TC Holder
recommendations. See AMO Manual 2.9.
Rejected components will be analyzed, rectified and re-tested. Depending on the degree of
maintenance required based on the inspection or test results, further actions may be required such
as disassembly and detail parts inspection and rectification as necessary so that the component to
become airworthy. See AMO Manual 2.9
References:
2.10.6 Work performed at the Aircraft by Shop Personnel & Work Performed for aircraft
Maintenance in Shops
When an aircraft component is sent to shops for maintenance, the PPC must ensure that the shop
has the appropriate capability and approvals from the Authority requirements for the performance
of such maintenance. The following requirements will apply:
The operator will request GMF to incorporate the AD Notes as applicable. Additionally, the
Engineering Services will perform an AD search on the website every two weeks to retrieve biweekly
AD Notes applicable to the Aircraft or Aircraft components. He/she will keep a list of biweekly AD
Notes together with all applicable AD Notes and also have available the NAA AD Notes as applicable
to such Aircraft or Aircraft component. The list should be able to be accessed by other functions.
When the AD notes from authority of Aircraft registration are not available via the website and/or
the website is not a reliable course (not recommended by the Authority), Engineering Services will
subscribe to a recognized source.
The engineering function on each department will arrange for the incorporation of the AD Notes
as requested by the operator and will bring to the customer's attention any additional AD Notes
they require incorporation during the present ground time. Should the customer for any reason not
desire to incorporate the AD Note and that AD Note is due, while the Aircraft, engine and
components are under the maintenance and GMF is responsible for issuing the CRS, the
engineering will notify the certifying staff who is in turn will proceed as per Section 3.9 of this
manual.
2.11.2 AD Note & Service Bulletin Evaluation- Applicability and Capability Determination
The Engineering Services will evaluate each AD Note or Service Bulletin, which are provided by
operator, to determine Aircraft, engine and component applicability and the resources required
such as tools, material and man-hours, etc, for the development of the appropriate capability. If the
SB cannot be provided due to manufacturer’s policy, the AD evaluation should be ended without
AD Part Control. Engineering Services will enter the evaluation results on the Engineering
Evaluation Sheet (Form No GMF/Q -189) and will pass this information to production planning and
procurement. The production planning and procurement will arrange for the availability of the
resources as necessary.
The Engineering Services, in addition to the AD Note evaluation for determining and developing
the capability will evaluate if any part or component become obsolete or requires further rework
due to a design change coming from an AD Note. The Engineering Services will develop a file (Form
No GMF/Q-191), notify to purchaser, receiving inspection and store manager and will list any such
part or component. The list will include corrective actions such as scrap or rework.
Note:
See AMO Manual 2.3.3 for “Disposition & Withdrawal of Parts and Components from Stores Due to
AD Notes”.
2.11.4 Writing the Maintenance Instructions for the Incorporation of the AD & SB
The engineering function on each department will prepare the accomplishment instructions (job
cards or PD sheets) for the incorporation of the AD Notes as required by AMO Manual 2.8.
The engineering function will develop for each work order an AD/SB Compliance Status Record
(Form No.: GMF/Q-071), which will include the following:
Prior to incorporation of the AD Note and Service Bulletin, the engineering function in coordination
with the Quality Control in each department, will brief the maintenance personnel about the AD/SB
requirements to ensure they have an adequate understanding of what is to be done and also to
ensure that they can incorporate the requirements of the AD/SB. For any special case, the
engineering functions may request Engineering Services to assist.
Incorporation
Qualified personnel will incorporate the AD Notes and Service Bulletins in accordance with the
maintenance instructions (Job Card or PD Sheets). The Qualified inspection personnel in charge
will physically check if all SB/AD Notes have been effectively implemented and will check the SB/AD
Note Compliance Status Records for proper entries. Accomplishment of AD Notes will be
performed by inspection personnel and/or supervised and certified by RII inspector.
2.11.6 Control of Accomplished AD Notes and Service Bulletins for, Engines and Components
Controlled by PT Garuda Maintenance Facility Aero Asia Tbk
When PT Garuda Maintenance Facility Aero Asia Tbk is contracted by the operator to control the
AD Notes, the contract will describe how GMF will perform such functions based on operator's
maintenance program. In this case, GMF will keep records of all AD Notes performed. Such records
will become available to the operator. The list of AD Notes will indicate either one-time compliance
or recurring compliance or the next due date, hours or cycles.
Prior to perform of new AD Modification or Service Bulletin modification, the engineering function
shall brief or train to maintenance personnel and Quality Control who will perform that
modification and involve in first modification performing with production unit and quality control.
2.12.1 General
PT Garuda Maintenance Facility Aero Asia Tbk will not determine (unless otherwise specified in
chapter 2.12.4), what non-mandatory modifications will be performed on operator's Aircraft or
Aircraft components. The operator under his maintenance program controls the non-mandatory
modification (unless GMF is delegated to perform such controls). GMF may suggest to the operator
to comply with some modifications and as far as its capability permits will perform all modifications
requested by the operator.
When modifications requested for compliance, the engineering function will analyze the resources
required in terms of tools, material and man-hours, etc for the development of the appropriate
capability and also to develop the maintenance instructions and recording system for the
embodiment of the modification.
Engineering function on each department will prepare the maintenance instructions (Job Card or
PD Sheets) for the accomplishment of the modifications as per AMO Manual 2.8 to guide the
maintenance function to incorporate the modification.
When PT Garuda Maintenance Facility Aero Asia Tbk is contracted by the operator to control the
optional modifications, the contract will describe how GMF will perform such functions based on
operator's maintenance program. In this case, GMF will keep records of optional modifications
performed. Such records will become available to the operator.
This section is related with the preparation of the maintenance work package and any
amendments, the distribution of the work package to maintenance functions, the daily control of
routine and non-routine work records and certifying off the work performed.
The engineering function provide the job cards/PD sheet as per AMO Manual 2.8 After the job
cards/PD sheet have been developed, the engineering function will assign a unique number of each
job card/PD sheet and will inventory all the Job Cards/PD sheet on the Job Card Inventory / Internal
order list, traceable to Work Order Form.
Before he/she released the work package to PPC, he/she will perform an adequacy check to ensure
that the prepared work package is sufficient for the scope of work base on agreed contract and for
the configuration of the aircraft, engine & component. He/she will check all Job Cards/PD sheet
meet the customer's work scope, quality standard and Maintenance Requirements Items, or
Maintenance Planning Data, and he/she will ensure that:
a) All required routine maintenance tasks are included in the job cards/PD sheet. The total
number of job cards/PD sheet issued (as listed in the job card inventory form) and their
content (the maintenance tasks) must represent the full scope of work. This procedure may
refer to the AMO Manual section 5, as applicable, where the forms and templates in use by
the GMF are included.
b) The current maintenance data referenced to the job cards/PD sheet is the correct one for the
proper aircraft, engine and component configuration;
c) All the required inspection items by the customer have been planned;
d) All requirements mentioned in AMO Manual 2.8 are met, and
e) Any corrective actions on deficiencies from previous maintenance, from shop floor changes
or from any improvements requiring correction of maintenance instructions are incorporated;
f) Comply with the requirements of 2.13.1.1 (b) below as appropriate.
2.13.1.1 Using the customer's job cards/PD sheet (or equivalent) or specific instructions for the
performance of maintenance
When the customer requires the use of his own job cards (or equivalent work cards/sheets) or his
own specific instructions as per his maintenance program, a customer’s quality plan/procedure
reference manual will be developed by production planning and control to assist the maintenance
personnel for the proper understanding and execution of the work and the claiming off of such job
cards or work sheets.
In coordination with the customer and using his maintenance program requirements, develop a
customer’s quality plan/procedure reference manual, which may include as necessary, but not
limited the following:
1) Instructions to perform work using the customer job cards/PD sheet and other
maintenance instruction;
2) Instructions to claim off work performed on customer's job cards/PD sheet (or
equivalent) including personnel skills authorized for claiming work performed;
3) Customer's forms and return to service documents to be used (if any) and instructions
for completing such forms;
4) Specific maintenance instructions including CDCCL required to be followed as per
customer's maintenance program;
5) Instructions for parts, components and material requirements including handling of
rotables and scrap parts;
6) Customer requirements from the customer, which not accommodated in the GMF
Procedures but not against with aviation/authority regulation.
7) Any other requirements from the customer, which defers from the GMF procedures.
The Senior Manager of quality control or his/her delegate and customer representative will sign the
customer’s quality plan/procedure reference manual.
The customer’s quality plan/procedure reference manual will be developed in any format suitable
for the application and will be issued, distributed, used and controlled with the same manner as per
AMO Manual 2.8.
When the job cards/PD sheet (or equivalent work cards/sheets) are given by the customer, the
engineering function is responsible to review those job cards/PD sheet for adequacy, current
maintenance data, material requirements, define tools and equipment needs. Additional job
cards/PD sheet may require to be written to complete the work package. The planning engineering
will perform the following:
1) Ensure an inventory is given together with the job cards/PD sheet and signed by the
customer;
2) Check all the job cards/PD sheet (or equivalent) received against the inventory and
ensure they are all available and updated. If any job card/PD sheet is missing from the
list or from the work package inform the customer;
3) Request to responsible unit to issue the work order;
4) If the customer has not given an inventory, use the job card inventory/internal order list
and list all the job cards/PD sheet received. The customers have to sign the inventory;
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 2 of 8
AMO MANUAL
5) Review one by one the job cards/PD sheet (starting from the sequence of operations)
and define the resources needed for the execution of each job card:
▪ Maintenance data (drawings, ATA chapters, etc);
▪ Tools and equipment;
▪ Parts and material;
▪ Manpower and skills;
▪ Man-hours needed.
6) Register each job card/PD sheet number in the computerized system and enter the
resources defined above.
7) Define current maintenance data needs
8) Create a bill of material required as defined by each job card/PD sheet review. Enter data
for bill of materials to computerized system;
9) Create a bill of tools required and a separate the tools required or inform to responsible
unit to check the list of tools and equipment availability status. If they are not available,
pass this information to the responsible unit functions;
10) Identify job cards/PD sheet that cannot be applied, refer to customer maintenance
program/manufacture manual/effective configuration not applicable and write down
“N/A” followed by the reason completed with signed who write down the reason and
stamp in the Job cards/PD sheet and put Cross (X) Stamp in the mechanic and Inspector
Column.
The planning engineering will load each job card number to the computerized system database,
for any non-routine MDR entered by PPC. For monitoring and controlling the work and they will
provide the appropriate information and support. Both planning engineering and PPC will perform
the following prior to maintenance and on daily basis as appropriate:
a) Register each job card and MDR number in the computerized system together with the
following information:
b) Attach the appropriate maintenance data (ATA number) on each job card and MDR
performing the following:
▪ Retrieve the correct ATA number as given in the Job card and copy or print;
▪ Complete current maintenance data for MDR reference by engineer (AMEL Holder)
▪ Place a stamp for one time use only on the current maintenance data stating the Aircraft
registration;
▪ Keep the job cards attach with the appropriate current maintenance data.
NOTE:
During the defect rectification and when an MDR is issued, the PPC is responsible to comply
with the same requirements mentioned above for each MDR.
e) Utilizing the Tally sheets in the control room, register the job cards or non-routine cards
required on daily basis. Keep on separate Tally Sheets the open, close, pending, etc job cards
and also enter the appropriate information in the computerized system.
f) For any non-routine work generated, assign a control number on each non-routine card and
proceed with the steps a) to d) above.
g) All cards whether open, pending or closed must not leave the Control Room.
h) All closed cards must be secured by the Planner and no other personnel can access to the
closed cards unless with the Planner’s authority.
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 4 of 8
AMO MANUAL
II. Shop floor and/or emergency change to job cards, PD Sheets, MDR in process
Floor changes or emergency changes of the maintenance instructions during work in process may
take place any time a revision is necessary to correct improper statements, references, instructions
etc. The changes will be in hand writing, using black/blue ink, and will be done only by the planning
engineer or from the person who wrote the instruction or qualified personnel refer to current
maintenance data.
When a statement or other is deleted (or replaced by another one), a line will draw over the
statement or other is deleted, which will still be visible. Correction Fluid or any other means of
deleting a statement or other, which completely obscures it, are not allowed. The person who made
the change will enter his stamp or his name and signature. A statement that will describe the reason
of change will be written next to the appraise name & signature or stamp.
When an emergency change or shop floor change occur the back-up master document will be
revised to incorporate the revision.
The authorized person who made the revision must determine if this revision affects any other
maintenance instruction.
2.13.3 Reviewing records for completion and claiming the work performed
2.13.3.1 General
This procedure shall describe the completion of each of the documents identified in the previous
paragraph. This may be done by reference to AMOM Section 5 where the related sample document
is included together with its related filling instructions. This procedure shall detail:
Production Control will write down word “N/A” followed by the reason in the Job card inventory
and put signed close to the reason and put the Cross (X) Stamp in the production control stamp
and date.
• Process of recording materials/parts replaced together with the related traceability to the
accompanying documents
Every part usage shall be recorded on transfer order for the traceability of the related
jobcard/MDR/PD Sheet and included in maintenance record
In order to, minimize the risk of multiple errors and prevent omissions stated in AMO MANUAL
section 2.25.1 every maintenance task or group of tasks will be signed-off. To ensure the task or
group of tasks is completed; it will only be signed-off after completion at the same time.
Note 1:
A “sign-off” is a statement by the qualified person performing or supervising the work that signing
or stamping and entering the date as appropriate have correctly performed the task or group of
tasks
Note 2:
''Authorized personnel” means personnel formally authorized by PT Garuda Maintenance Facility
Aero Asia Tbk under the AMO Manual requirements to sign-off tasks as described in their current
Certificate of Competency and authorizations each employee holds. “Authorized personnel” are
may not as a “certifying staff”
Note 3:
A person is not allowed to sign off work performed if such work is not mentioned in his/her
certificate of competency or his/her authorization.
Before the authorized person is signing off work performed - apart from ensuring that the work has
been satisfactorily performed – he/she must ensure that:
a) The technician who carried out the particular maintenance task will stamp that he/she has
accomplished the task only when he/she is satisfied by self-inspection that the task has been
properly carried out in accordance with the approved current maintenance data.
b) If the Job Card, MDR, or PD Sheet requires an RII in addition to the one performed under
paragraph (a) or as set in customer procedure, the qualified and approved by the customer
RII inspection person will stamp for the second inspection at that time.
c) The technician who carried out the particular maintenance task from customer, shall be
trained customer’s Procedure Reference Manual.
In any circumstances refer to section 2.24, which there is no sufficient or no available in GMF
personnel available to perform specific tasks, GMF may hire other than GMF personnel from other
organization. These personnel shall meet qualification & be endorsed based on section 3.8 (such as
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 7 of 8
AMO MANUAL
NAA license for specific required type of aircraft, training record, and experience log applicable to
the aircraft type) & submit to GMF Quality Assurance & Safety.
2.13.3.3 Claiming work when defects found or work not satisfactorily performed
For PD Sheets, when discrepancy found out of limit refer to the current maintenance manual the
authorized personnel shall write the word reject and stamp on the appropriate step which the
inspection took place. Enter to another document traceable to that one, the discrepancy found. The
qualified technician or the production engineer will enter the rectification order on the of the PD
sheet, give reference to another document. When the work is satisfactorily completed, the
technician will stamp to indicate satisfactory completion of the task and put date. Continue to the
next step of the PD Sheet.
Note:
Work is not allowed to proceed to the next step until the previous step is satisfactory completed.
Claiming defects found during inspection and tests on routine aircraft checks
When a defect is found, the mechanic or inspector will record the discrepancy using the
Maintenance Discrepancy and Rectification (MDR). On the Job Card he/she will write the MDR
Number and the defect statement and will use his/her stamp and the date to indicate that the
inspection has been completed and the inspection results are recorded on the Job Card.
NOTE:
Claiming defect stamp follow customer procedure
If a multiple task Job Card is used, the next step will not be performed until the defects found on
the previous steps have been rectified.
When the MDR is used to record the discrepancies, the MDR Control List must be developed to
control the rectification of the defects found. Traceability of the Job Card with the MDR or any other
form used to record the discrepancy will be always established.
Prior releasing the aircraft to service the certifying staff must review the MDR issued to ensure that
all defects have been properly rectified.
2.14.1 General
Maintenance records are the records generated during the maintenance of aircraft, engine and
aircraft components and is related to customer's work order.
The records will remain legible throughout the required retention period. They will be stored and
retained in such a way that they are readily retrievable. A suitable environment will be provided for
the storage of the records in order to prevent damage or deterioration, fire, flood, alteration, theft
and loss. Customers and Authorities will have access to the records.
Maintenance records will be retained for at least three years. When the operator requires GMF to
keep the records as per customer’s maintenance program, such records will be kept as per
customer’s procedure and authority regulations.
The aircraft maintenance record function will keep whenever applicable the following:
17. Aircraft Maintenance Log page on which Certifying Staff signs for Return to Service.
Where the operator selects to keep all the maintenance records, a copy of all the records will be
made and kept in file.
The engine/component maintenance record function will keep whenever applicable the following:
Administration of records and reports under this section means to prepare the relevant documents
for filing. This is done after the certifying staff has reviewed the records for completion as required
by AMO Manual Section 2.16 to determine readiness for return to service.
The production control will receive the record package and will perform the following:
a) Arrange work package and all documents for handling, completeness and filing;
b) Report accomplished and deferred work;
c) Write maintenance report;
d) Compile and segregate records;
e) Provide components replacement list;
f) Provide certificate of return to service to customer;
g) Hand over the records to customer.
a) Aircraft information;
b) Certificate of Maintenance;
c) Customer Work Order and Amendments;
d) Preliminary Inspection Report;
e) Job Card Inventory;
f) AD/SB Compliance & Additional Works;
g) Finding / Rectification Report;
h) Structure Repair Report;
i) Component Replacement;
j) Deferred Work;
k) Weighing Report;
l) Run up report;
m) Swing Compass Report;
n) Test Flight Report;
o) Redelivery Report.
The total work package for each work order will be traceable to the customer work order number
and Aircraft registration or manufacture serial number, or engine serial number (for engines). The
following traceability must exist within the work package:
a) Store only those records and forms which require retention as required by this Procedure;
b) Control loan of maintenance records by maintaining a withdrawal log of records loaned and
returned;
c) Arrange for the disposal or expired records. Prior to actual records disposal, develop a disposal
records list for records intended for disposal and forward to QSA for approval. Assure those
records that have been approved for destruction by QSA are either torn or burned. Keep the
disposal records list for a period of 2 years;
The following general support records (see table 1) will be retained as an evidence of the quality of
the work performed. The responsible functions to retain the records and the retention period for
each record are shown in the table 1.
4 Receiving material inspection 10 years See Note Technical Record Technical Record
Records Management Management
5 Quality system management 2 Years Quality Assurance Quality Assurance
review & Safety & Safety
6 Calibration of IMTE 2 Years Calibration Lab. Calibration Lab.
NOTE:
The retention period of all purchased material starts by the time they installed on the end item. The
storage period of the material is not considered as a retention period.
2.15.1 General
All maintenance of the Aircraft will be performed in accordance with an approved current
maintenance program and maintenance data as dictated by the customer. The maintenance is
accomplished in accordance with the selected work package called routine maintenance.
Following the routine maintenance/checks, applicable maintenance instruction work will be
generated. If new defects or incomplete / deferred maintenance are found and shall be brought to
the customer for the specific purpose of obtaining agreement to rectify such defects or completing
the missing elements of the maintenance work order. In the case where the customer declines to
have such maintenance carried out, GMF may issue a certificate of return to service within the
approved aircraft limitations (with incomplete / deferred maintenance is unairworthy item which
requested and approved by customer), as addressed in AMO Manual section 2.16).
a. The inspection personnel will enter in the Job Card the defects found, will complete the
applicable current maintenance instruction, assign the applicable maintenance number and
record such number in the Job Card and they will propose rectification order refer to current
maintenance data or request from Qualified Licensed Personnel or engineering function.
b. The Authorized Licensed Personnel will evaluate defects found and will write the rectification
order following approved current maintenance data requirements. The rectification will take
place, based on the instructions in the aircraft Maintenance Manual, Structural Repair Manual,
Component Repair Manual, etc.
c. The maintenance personnel will rectify the defects following the repair order and approved
current maintenance data requirements per QP 209.
d. Required inspections item will be performed (depending on the rectification those that could
result in a failure, malfunction, or defect endangering the safe operation of the aircraft) to
ensure proper rectification of the defects.
Where structural repairs are required, detailed drawings will be developed by the Engineering
function referring to current SRM or other approved current maintenance data to illustrate specific
repair conditions. A copy of the drawing will be included in the aircraft records.
2.15.3 Damaged Assessment for Defect Rectification not Described in the Manuals
When a defect cannot be rectified per available current maintenance data (rectification is not
covered in the current manuals), the engineering function will assess the damage and obtain
instructions of an approved repair by the TC Holder. When a repair instruction is available by the
manufacturer (TC Holder), a rectification orders on the applicable Maintenance Instruction Form
will be written reference to the manufacturing instructions. The maintenance personnel will
perform the rectifications as per the instruction.
When defects found, they will be rectified during the current maintenance slot. GMF will not
postpone any defect rectification unless the customer wants to defer and approve a repair as per
Section 3.9 of this manual.
Certificate of Return to Service (CRS) means certifies the work specified, except as otherwise
specified, was carried out in accordance with the Air Navigation and in respect to that work, the
Aircraft or Aircraft components is considered ready for return to service.
A certificate of return to service shall be issued by appropriately current authorized certifying staff
on behalf of the PT Garuda Maintenance Facility Aero Asia Tbk when it has been verified that all
maintenance ordered has been properly carried out by GMF in accordance with the procedures
specified in GMF internal procedures, taking into account the availability and use of the current
maintenance data and that there are no non-compliances which are known to endanger flight
safety.
’Endangers the flight safety’ means any instances where safe operation could not be assured, or
which could lead to an unsafe condition. It typically includes, but is not limited to, significant
cracking, deformation, corrosion or failure of primary structure, any evidence of burning, electrical
arcing, significant hydraulic fluid or fuel leakage and any emergency system or total system failure.
An airworthiness directive overdue for compliance is also considered a hazard to flight safety.
When extensive maintenance has been carried out, it is acceptable for the certificate of return to
service to summarize the maintenance as long as there is a unique cross-reference to the work
package containing full details of maintenance carried out. Dimensional information should be
retained in the work package records.
The work package reference number should be cross reference with the certificate of return to
service, e.g. GMF sales order number.
After completion of all maintenance, certifying staff will perform a general verification to ensure the
article / Aircraft airframe, Aircraft engine, propeller, appliance or component part is clear of all tools,
equipment and any other extraneous parts, material and other object and that all access panels
removed have been complete refitted.
After the work completed but the certifying staff has found defects, incomplete records, or any
other problem, which leads to the conclusion that the maintenance has not been performed as per
customer's work order and maintenance program and/or as per the Authority regulations, the
certifying staff will perform the following:
a) For Aircraft, enter on the Applicable Work Order Form the discrepancies which must be
corrected before a CRS is issued.
b) For Engine/APU, enter on the Applicable Work Order Form the discrepancies which must be
corrected before a CRS is issued.
c) For other components, enter on the final step of the PD Sheet the word ''reject'' and on the
other page of the PD sheet enter the discrepancies, which must be corrected before CRS is
issued.
d) Inform the PPC.
NOTE:
New defects or incomplete maintenance work orders identified during the above maintenance
shall be brought to the attention of the Aircraft customer for the specific purpose of obtaining
agreement to rectify such defects or completing the missing elements of the maintenance work
order. In the case where the Aircraft customer declines to have such maintenance carried out under
this paragraph, the requirements of AMO Manual 3.9 will be applied.
2.16.1.5 Impossibility to sign a release certificate that could hazard flight safety.
Certifying Staff, as authorized per AMO Manual 3.4 will decide to release or not to return to service
a component article / Aircraft airframe, Aircraft engine, propeller, appliance or component part. The
return to service procedure will consist of a final inspection of the work and the issuance of a formal
CRS when appropriate.
b) The work has not been performed per approved current customer maintenance program and
current maintenance data; and the work which were carried out not in accordance with approved
current customer maintenance program and current maintenance data; and
c) There are any serious defects known to certifying staff, which could hazard flight safety.
d) AD due and not enforced
e) Unexpected non-availability of facilities, equipment, tooling, material, maintenance data or
certifying staff.
No person will issue CRS and Maintenance Release Statement unless he/she is the holder of a valid
certifying staff authorization appropriate for the article and scope of the work performed.
CRS of article / Aircraft airframe, Aircraft engine, propeller, appliance or component part will be
issued using the applicable maintenance release certificates as dictated by the Authority of Aircraft
registration below:
• For DGCA regulations and Indonesian registered Aircraft, follow the AMO Manual 2.16.4
• For any other NAA, as required by its regulations.
During the maintenance and before issuing a CRS for article / Aircraft airframe, Aircraft engine,
propeller, appliance or component part, the certifying staff and support staff (see categories in AMO
Manual 3.4.3) is responsible to:
At any scheduled or unscheduled maintenance task carried out to a fuel system feature classified
as a Critical Design Configuration Control Limitations (CDCCL) and before return to service, the
maintenance records shall reflect that the correct configuration is maintained and ensured.
Detailed procedures of CDCCL are described as per QP 304-06.
NOTES:
For Aircraft and Engines, when the support staff authorized personnel do the inspections or
checks, the certifying staff having the responsibility for signing the CRS, remains fully responsible
to ensure that such inspections and checks have been effectively performed and all defects are
cleared out.
For components (other than engines) the certifying staff must witness the final inspection and test
and verify by self-inspection the proper functioning of the component.
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 3 of 17
AMO MANUAL
Before issuing the CRS for Aircraft, the customer has to review and approve by sign the list of
deferred defects / items (if any). See AMO Manual 3.9
The certifying staff, before issuing a CRS must ensure that the components, parts and material
installed on the Aircraft or Aircraft Engine or Aircraft Propeller or Aircraft components are eligible
for installation based on the regulations of the Authority of Aircraft registration.
Eligibility status will be determined based on the appropriate Authorized Release Certificate,
Aircraft and components configuration requirements such as AD/SB or certificates furnished with
the parts, components or material as mentioned in AMO Manual 2.3.3.2 (b) and they must be in
work order record. A CRS will not be issued if the above requirements are not met.
Any new Aircraft component in storage having certificate as mention in AMOM 2.2 can be installed
on DGCA Indonesian registered Aircraft.
Any overhauled but unused Aircraft component in storage without DGCA Form 21-18 forms, the
following will be performed:
1) An acceptance test report or statement must be available for all used and unused Aircraft
components that are subjected to acceptance testing after manufacturing or maintenance
as appropriate.
2) The Aircraft component must be inspected for compliance with the manufacturer’s
instructions and limitations for storage and condition including any requirement for limited
storage life, inhibitors, controlled climate and special storage containers.
3) In addition or in the absence of specific storage instructions the Aircraft component must
be inspected for damage, corrosion and leakage to ensure good condition.
4) The storage life used of any storage life limited parts should be established.
5) If it is not possible to establish satisfactory compliance with all applicable conditions
specified in subparagraph (1) to (4) inclusive the Aircraft component must be disassembled
(when GMF holds the appropriate component approval rating) and subjected to a check for
incorporated airworthiness directives, repairs and modifications and inspected/tested in
accordance with the manufacturers maintenance instructions to establish satisfactory
condition and, if relevant, all seals, lubricants and life limited parts replaced. On satisfactory
completion after reassembly a DGCA Form 21-18 form may be issued stating what was
carried out and the reference of the current manufacturer maintenance instructions
included.
6) Meet the recording requirements of chapter 2.16.5 (4).
GMF is allowed to return to service components taken from other Aircraft based on Customer
procedure and customer approval:
a) Serviceable Aircraft components removed from an Aircraft registered by the same country
with the Aircraft on which the component is intended for installation, the following
requirements must be met:
NOTE: Procedure for used aircraft component remove from serviceable aircraft may follow
customer procedure manual
2.16.3.5 Used Aircraft components removed from an Aircraft withdrawn from service
GMF must have the appropriate Aircraft rating for the removal of a component from an Aircraft or
for the complete dismantling of the Aircraft for spares.
The removal from a single component to the complete dismantling of the Aircraft will be performed
in accordance with approved current maintenance data requirements using job cards detailing the
removal instructions. The following requirements will be met:
a) The planning engineer will develop the job cards for the removal of the components as per
AMO Manual 2.8;
b) The maintenance manager will ensure that each component is removed and tagged with a
repairable tag/serviceability tag following the requirements of QP 209-05;
c) Proper facilities, tools, qualified personnel and maintenance data is used;
d) The components are stored waiting for inspection as per AMO Manual 2.19.1;
e) The component(s) are moved to shops for inspection, tests and disposition as per AMO
Manual 2.9 and 2.10.5;
f) Meet the requirements of 2.16.5.1 & 2.16.5.2
g) Meet the recording requirements of chapter 2.16.5 (4).
2.16.3.6 Used Aircraft components maintained by organizations not approved in accordance with
the Authority requirements on which the component is intended for installation
For used components maintained by maintenance organization not approved by the Authority of
Aircraft registration on which the component is intended for installation, the following will be
performed:
a) Disassembly the component for sufficient inspection in accordance with the appropriate
current maintenance data;
b) Replacing of all service life limit components when no satisfactory evidence of life used is
available and/or the components are in an unsatisfactory condition;
c) Reassembling and testing as necessary the component;
d) Completing all certification requirements as specified in AMO Manual section 2.16.
2.16.3.7 Used Aircraft components removed from an Aircraft involved in an accident or incident.
a) The TC or STC Holder must be informed and give appropriate instructions for necessary tests
and inspections to be made as necessary by the accident or incident (unless such
instructions can be found in approved current maintenance data).
b) Such components are processed and inspected as per chapter 2.16.5.3
c) The work performed must be referenced in block 13 of the airworthiness approval tag.
2.16.3.8 Temporary fitting an Aircraft component without appropriate release certificate in AOG
condition
When an Aircraft is grounded at a location other than the main line station or main base
maintenance due to the non-availability of a component with appropriate release certificate, it is
permissible to temporarily fit a component without the appropriate release certificate for a
maximum of 30 flight hours or until the Aircraft first returns to the main line station or main base
maintenance, whichever is the sooner, subject to the Aircraft customer agreement, said component
having a suitable operational requirements and technical log record. Those action could be done
after GMF have agreement from the customer. After Aircraft arrive in base station, replacement or
reissuance of CRS will be perform.
Notes:
1. Suitable release certificate means a certificate which clearly states that the Aircraft component
is serviceable; that clearly specifies the organisation releasing said component together with details
of the authority under whose approval the organisation works including the approval or
authorisation reference.
2. Compliance with all other Part-145 and operator requirements means making an appropriate
entry in the Aircraft technical log, checking for compliance with type design standards,
modifications, repairs, airworthiness directives, life limitations and condition of the Aircraft
component plus information on where, when and why the Aircraft was grounded
a) The customer is informed in the case where full return to service compliance cannot be
achieved within the customer’s limitations. If the customer agrees to the deferment of full
compliance, then the certificate of return to service may be issued subject to details of the
deferment, including the customer’s authority, being endorsed on the certificate. See AMO
Manual 3.9
b) In case of doubt concerning such a decision of the customer, the certifying staff will inform
the VP for Quality Assurance & Safety who in turn will discuss the issue and resolve with the
customer.
c) If there still no decision has been taken, the VP for Quality Assurance & Safety will inform the
Authority of the Aircraft registration of such doubt, before issue of the certificate of return to
service. This will allow the Authority to investigate the matter as appropriate.
Note:
Authorized certifying staff are responsible for decide using maintenance data, whether an Aircraft
defect hazards seriously the flight safety and therefore decide when and which rectification action
shall be taken before further flight and which defect rectification can be deferred. However, this
does not apply when the MEL is used by the pilot or by the authorized certifying staff
2.16.5.1 Certificate of Return to service Statement & Forms under DGCA Approval
(CASR Part 43.9, 43 Appendixes B & 145.59(a))
"Example"
MAINTENANCE RELEASE
The Aircraft, airframe, Aircraft engine, or appliance identified above was repaired and inspected in
accordance with current Civil Aviation Safety Regulation is approved for return to service with
respect to the work performed. Pertinent details of the repair are on file at this Approved
Maintenance Organization under
Date __________________________________
Signed __________________________________
(For signature of authorized representative)
NOTE: Inspection stamp/symbol will NOT be used on the maintenance release only authorized
inspector’s signatures.
Stamp : Signature :
Form No.: GMF/Q-006A R2
Stamp : Signature :
Form No.: GMF/Q-007A R2
CERTIFICATE OF MAINTENANCE
Form No.: GMF/Q-010 A
CERTIFICATE OF MAINTENANCE
AIRCRAFT Type : AIRCRAFT Serial Number : AIRCRAFT Reg. :
Sales Order No. : File Ref. :
AIRCRAFT Total Flying Hours : AIRCRAFT Total Cycles :
Inspection Type :
Pertinent details of Inspection see overleaf.
VALID UNTIL
AIRCRAFT Total flying hours/Cycles : /, or Calendar Days :
From the date of certification which ever comes first.
GROUP CERTIFICATE OF COMPLIANCE
CATEGORY SIGNATURE AUTHORIZATION NO. DATE
The Aircraft identified above, was repaired and inspected in accordance with current instructions contained in
:
…………………………………………………….
(name operator and manual program)
Under which the operator is approved, and the current Civil Aviation Safety regulations and is approved for
return to service.
Pertinent details of the repair are on file at this Approved maintenance Organization under Sales Order No.:
Place ……………….. Date: ………………. Signed ……………… License or Auth. No. ………………
For PT Garuda Maintenance Facility Aero Asia Tbk, Certificate No. : 145D-1
Soekarno-Hatta Airport, Jakarta – Republic of Indonesia
Form No.: GMF/Q-010 A R4
Block-By-Block Instructions for Completing DGCA Form 21-18 for Authorized Release Certificate.
Block 2. Authorized Release Certificate, DGCA Form 21-18 for Authorized Release Certificate.
(Preprinted.)
Block 6. Item.
Enter line item numbers when there is more than one-line item. This block permits easy cross-
referencing to the Remarks block 12
Block 7. Description.
Enter the name or description of the product or article. Preference should be given to the term used
in the instructions for continued airworthiness or maintenance data (for example, illustrated parts
catalog, Aircraft maintenance manual, service bulletin and Component Maintenance Manual).
Block 9. Quantity.
Enter the quantity of each product or article shipped.
Table 1—DGCA Form 21-18 for Authorized Release Certificate Block 11 Terms
Enter— For—
“OVERHAULED” A process that ensures the product or article is in
complete conformity with the applicable service
tolerances specified in the type certificate holder’s or
equipment manufacturer’s instructions for
continued airworthiness, or in the data approved or
accepted by the authority. The product or article will
be at least disassembled, cleaned, inspected,
repaired as necessary, reassembled, and tested in
accordance with the approved or accepted data.
“REPAIRED” Repair of defect(s) using an applicable standard.
(3) When an authorized person completes Blocks 14a through 14e for the purpose of rebuilding
or altering a product they hold the approval for in accordance with CASR 43.3(f) of DGCA.
This section is related with the transmission of the maintenance records to the customer after the
performance of maintenance.
PT Garuda Maintenance Facility Aero Asia Tbk customer service after getting the records from the
records function will hand over it to the customer as agreed by the contract as appropriate:
When waivers/deferred defects are included in the report, there must be supporting evidence
following the letter or reference to the letter requested/approved the waiver.
The records will be transmitted to the customer as soon as possible after the maintenance is
completed. The time period will not exceed that specified by the customer.
When PT Garuda Maintenance Facility Aero Asia Tbk is contracted by customer the records, such
records will be kept as per customer’s procedure as specified in AMO Manual Section 2.14
2.18.1 General
Any condition identified on aircraft or aircraft components that could seriously hazard the aircraft
will be reported to the aircraft operator, the appropriate authority or the TC Holder.
Reports will be made by the VP for Quality Assurance & Safety as soon as possible within 96 hours
since the defect was found, on a form and in a manner prescribed by the Authority as follows:
• For DGCA Indonesia: Service Difficult Report Form No. DGCA 43-01;
• For any other Authority: As instructed by the NAA.
Prior to submitting the report, the VP for Quality Assurance & Safety will contact the Authority of
the Aircraft registration to ensure that such defect can be reported or not. The defect may not be
reported if such defect is known or it has been reported by any other organization. Defects, which
may be reported, are the following:
a) Damage on aircraft structure that could seriously hazard the aircraft or cause an Unairworthy
condition;
b) Severe cracks, heavy corrosion, burning or deterioration of aircraft structure, aircraft engines
and aircraft components exceeding allowed thresholds, detected during maintenance;
c) Failure of any emergency system during scheduled testing;
2.18.3 Reporting Deficiencies Caused by PT Garuda Maintenance Facility Aero Asia Tbk during
Maintenance after the Return to service is issued
The VP for Quality Assurance & Safety will determine the need to report and recall (if necessary) any
article which may subject to faults due to inappropriate process, incorrect use of material, etc.
He/she will inform the customer and the Authority as appropriate describing in detail the
deficiency. Such deficiencies may be identified from the following situations:
a) Records may reveal that an important maintenance task such as AD Note or defect
rectification has not been performed, or a component with improper configuration or
certification has been installed;
b) Similar maintenance tasks have resulted in deficiencies on Aircraft and components under
maintenance. The defects has been found by the customer during operation;
c) Any other reason that jeopardize the safety of the aircraft.
Prior to submitting the report, the VP for Quality Assurance & Safety shall discuss with the operator
about the possibility that an unsafe condition may exist on the aircraft. Depending on the
suspected defect, the operator may verify its existence or have GMF to verify and rectify the defect.
Should the suspected unsafe condition is related with an AD Note and the operator is unwilling to
cooperate for the prompt correction of the defect, the VP for Quality Assurance & Safety will inform
the Authority concerned and he/she will act accordingly. The reporting procedure to the Authority
may be the same as per AMO Manual chapter 2.18.2
2.18.4 Internal reporting system for deficiencies caused by PT Garuda Maintenance Facility Aero
Asia Tbk
Based on GMF Quality Policy, all employees are obliged to report defects created due to GMF fault
to their Managers in a manner that such reports will ultimately come to the attention of the Quality
Control personnel and certifying staff. Such staff will issue the appropriate forms for the initiation
of the corrective and preventive actions (AMO Manual 3.3 & 1.1.3).
The purpose of the report is to identify the factors contributing to deficiencies, and to make the
system resistant to similar errors. Management must establish the appropriate culture to
encourage all personnel for a free and frank reporting of any (potentially) safety related occurrence.
The Management must also ensure that personnel are not inappropriately punished for reporting
or cooperating with occurrence investigations.
Corrective action on deficiencies will be taken as instructed in AMO Manual chapter 3.3.3 and 1.1.3.
The reporting procedure is also mentioned in AMO Manual chapter 2.18.5.
INSTRUCTION FOR COMPLETING THE SERVICE DIFFICULTY REPORT DAC FORM 43-01
A. For Organizations submitting the SDR
1. Enter the name of Operator/Approved Maintenance Organization/ Manufacturer.
2. Enter the SDR Control Number as specified in section 5e.
3. Enter the aircraft system and subsystem, respectively by the numerical symbols (ATA spec. 100).
Example: Engine Cylinder 7230 enter only 7230.
4. Enter the registration mark shown on the aircraft such as PK-GAC, N-953AE.
5. Enter the stage of flight or ground operation the aircraft was engaged in when the reported
failure, malfunction, or defect occurred or was observed.
6. Place where the difficulty occurred such as Jakarta, Medan, Jeddah.
7. AIRCRAFT:
- MANUFACTURER: Enter the aircraft manufacturer's name. Any meaningful abbreviation will be
acceptable. Example: Beech, Cessna
- MODEL/SERIES: Enter aircraft model as identified on the aircraft data plate. Example: 172A, 180
- SERIAL NUMBER: Enter the serial number assigned by the manufacturer. Example: 81RK, 94RK
POWERPLANT:
- MANUFACTURER: Enter the engine manufacturer's name. Any meaningful abbreviation will be
acceptable. Example: Lyc., Cont.
- MODEL/SERIES: Enter engine model as identified on the engine data plate. Example: IO-540, O-
470R
- SERIAL NUMBER: Enter the serial number assigned by the engine manufacturer. Example: 4700,
2300
PROPELLER: Complete only if pertinent to the problem being reported.
- MANUFACTURER: Enter the manufacturer's name. Any meaningful abbreviation will be
acceptable. Example: Hartzl., Hamstd.
- MODEL/SERIES: Enter propeller model as identified in type certificate data sheet/propeller
specifications. Example: DHCC2Y, M74CC
- SERIAL NUMBER: Enter the serial number assigned by the propeller manufacturer. Example:
D800, D900
8. APPLIANCE/COMPONENT (Assembly that includes part):
- Comp/Appl Name: Enter the manufacturer's nomenclature for the component or appliance of
the specific part causing the problem. Example: engine, starter
- Manufacturer: Enter the part manufacturer's name. Example: Lyc., Lear
- Model or Part No.: If supplied by the manufacturer. Example: 0-362YK-1, 0-473GH-2
- Serial Number: If supplied by the manufacturer. Example: CH9693, DE8549
9. SPECIFIC PART (of component) CAUSING TROUBLE:
- Part Name: Enter the name of the specific part causing the problem. The appliance or
component is the assembly which includes the part. For instance: When the part is a burned
wire, the component would be the system using the wire, such as VHF communication system.
When the part is a bearing, the appliance should be the unit using the bearing, such as starter,
alternator, generator, etc. When the part is a stringer, the component name should be fuselage,
wing, or stabilizer, etc. Example: bearing, wire, etc.
- MFG. Model or Part No.: Enter the manufacturer's part number. Example: 14542, 23893
NOTE: If same as aircraft engine, or propeller, leave blank.
2.19.1 Serviceable Components/Parts found defective during Installation and Returned to Stores
When a component/part with a serviceable tag or equivalent tag is found non-conforming during
the installation/assembly, the Quality Control staff will inspect it and make disposition as per 2.18.5
and will attach the repairable tag/serviceability tag. The PPC will process it as per this procedure
and depending on its disposition (repairable, pending disposition, scrap). If investigation needed,
report the occurrences as per AMO Manual Section 2.18.
Furthermore, the quality control staff will report to the Quality Assurance & Safety to make a
preliminary determination of the source or cause of damage and request corrective actions to the
appropriate functions. Based on the severity of the situation, a non-conformance report may be
issued as per 3.3.
2.19.2.1 Storage & Identification of Defective Components/Parts Awaiting Inspection, Disposition &
Repair
All parts and components after removed from aircraft or their next higher assembly are inspected
to determine required actions. Components/parts found defective are identified as follows:
a) Repairable
If repairable per available maintenance data, components/parts are routed for repair with the
'Repairable Tag/serviceability Tag'. This tag will remain with the components/parts until the
repair is completed and replaced with a serviceable tag.
b) Pending disposition
If during inspection or test an inspection finding leads to a required repair not covered in the
current maintenance manuals, the planning engineering will assist the maintenance
personnel in defining an approved current maintenance data. In this case the maintenance
function and the planning engineering will follow the requirements of Section 2.9.3. Pending
decision components/parts are identified with the tag Form No.: GMF/Q-074.
c) Scrapping
Scrapped parts, due to lifetime expiration or totally defects, will be identified with a
"Condemned Tag". Form No.: GMF/Q-013. Scrapped parts are handled as per section 2.19.4.
The PPC will place the defective components/parts in the designated segregated temporarily
storage areas waiting for maintenance work orders and to be transported to the designated units
for maintenance or to contractor. The PPC will arrange for the proper packaging and preservation
per AMOM section 2.20.2.
For those components/parts requiring maintenance in house, the PPC will issue a delivery note and
will move the components/parts to the designated shop for maintenance. For those
Defective components/parts, which the customer is responsible for maintenance outsourcing, will
be temporarily kept by PPC in well preserved store area, packed and identified and will be
processed as agreed by the customer.
The PPC will segregate repairable, pending disposition and scrapped component/parts in the
temporary stores and will properly identify them.
2.19.2.2 Defective Components/parts (Including Engines) Received For Maintenance (directly from
the customer or from other units)
All components/parts received for maintenance will be temporarily stored at designated store
areas, properly packed and preserved and properly identified with the following tags/forms waiting
for repair:
a) For the components/parts received from Base Maintenance, a repairable tag/serviceability
tag, and delivery note.
b) For the components/parts other than engine received directly from customer, a customer's
repairable or unserviceable tag or equivalent shall remain attached and work order
The responsible unit will perform the requested maintenance as required by this manual and the
appropriate quality procedures.
PPC will be responsible for controlling the components/parts received for maintenance as well as
for arranging the proper preservation, handling and segregation. While in stores awaiting
disposition/maintenance, segregation for repairable, pending disposition and scrapped
components/parts shall be carried out.
Depending on the reason, the held components/parts will be completed with any applicable
documentation. The PPC is responsible for the proper handling and preservation while in storage.
2.19.2.4 Traceability
All components/parts will be traceable to the aircraft, engine and customer work order.
All workstations PPC Managers are responsible to collect and store definitively scrapped parts in
secured scrap containers identified per customer name and work order. The PPC will coordinate
with the customer service if the customer wants the scrapped parts to return back to his/her base.
The following will be performed by the PPC:
Make a list of scrap parts. Include in the list the customer's name, the part name, part number, serial
number (if any) and quantity. The list must be as detailed as possible. The scrapped parts should
have the Condemned tag Form No.: GMF/Q-013 attached.
Provide a list of scrapped parts to the customer and keep a copy for two years. If the customer does
not take the scrap parts within one week after the maintenance work order is completed, send the
parts to the scrap area.
The Facility Maintenance Function is responsible for their storage and mutilation as appropriate.
This function will list all mutilated parts, materials and will arrange for the further disposal to
mutilation area The Senior Manager of the Facility Function will perform the following:
▪ Make a list of scrap parts, material, which are to be mutilated. Include in the list the customer's
name, the part name, part number, serial number and quantity. The list must be as detail as
possible.
▪ Call the Quality Assurance & Safety to be present during the mutilation.
▪ Under supervision of the Quality Assurance & Safety, mutilate all the collected scraps as listed.
▪ After mutilation, the Quality Assurance & Safety will sign the appropriate forms of the list of
mutilated parts that the parts have been mutilated.
Scrapped dangerous material will be placed on sealed containers and will be disposed in
accordance with applicable Indonesian government regulations. Non-dangerous material will be
drained directly to the water waste treatment.
The Senior Manager of Facility Maintenance Function or his/her delegate and Quality Assurance &
Safety Auditor will witness the mutilation of parts, material and will sign the appropriate forms and
will keep records for two years. He/she will ensure that in any case all parts and material have been
mutilated.
After the mutilation those mutilated parts, material, should be place in the mutilated area for
disposal.
The Scrapped Parts & Material shall be processes by the facility maintenance and witnesses by
Quality Assurance & Safety Auditor for mutilate in the mutilation area, and shall be recorded in the
form GMF/Q-223. The Senior Manager of Facility Maintenance or his delegate and the Quality
Assurance & Safety auditor must put their signatures and the date on the form.
After the mutilation those mutilated parts, material, should be place in the mutilated area for
disposal.
2.19.3.3 Use of Scrapped Chemicals (other than the dangerous), for Non-Aircraft Use
The Facility Maintenance may use the scrapped shelf life material and other chemicals for non-
aircraft use provided a list will be kept to show where such material have been used.
The Procurement function will send the defective components to a Contractor listed in Approved
Supplier List (ASL). Approved Maintenance Organization will be selected depending on the
Authority of Aircraft registration where the component is intended for installation. Appropriate
certificates will be requested, together with other maintenance records, as required on section 2.2.1
of this manual.
The Procurement may select a contractor for the performance of maintenance provided:
a) The contractor has been approved by the Quality Assurance & Safety as instructed in Section
2.2.1 of this manual for the specific maintenance and listed in ASL.
b) The customer agrees to use such contractor.
Procedure
All defective components intended to be sent to contractors are properly preserved. For time/cycle
limit components, operating and remaining time and cycles must be indicated.
When a defective component has to be repair, distribution personnel will picked up and send the
defect part to unserviceable store before purchasing issue a repair order
The Repair order requisition shall clearly describe the following as appropriate:
a. Part name;
b. Part number;
c. Serial number (if any);
d. Description of defect;
e. Work to be carried out;
f. Agreed turn around time;
g. Other documents required executing the maintenance (if any);
h. Records required and airworthiness release certifications to be delivered (as customer
required);
i. AD/SB incompliance
j. Modification status
k. The documents of the defective component must be traceable to the work order and/or
Aircraft registration.
l. Dispatch location and date of return
The Purchaser shall ensure that the purchase order will clearly describe the work to be performed.
Attachments of the purchase order must include all the information required to execute the
maintenance.
All components received from contractors after maintenance will pass through the receiving
inspection and will be inspected as required by QP 202-01.
GMF may send the engine part, APU part, component parts to non DGCA certificated repair station
provided that:
1. GMF must has the related engine assy, APU assy and Component assy rating
2. Parts will be installed into engine, APU or component that will be completely tested according
to the manual and GMF will issue ARC of the NHA
3. The repair station must issue FAA 8130-3 and/or EASA form 1 for the repaired parts
4. Such of the parts shall not be installed as an LRU or directly on an Aircraft
GMF shall directly control to such of non DGCA certificated repair station refer to 2.2.1 or indirectly
control the DGCA certificated repair station that having mutual agreement with. GMF
All defective components intended to be sent to contractors or to the customers are properly
preserved. The identification and traceability status from the next higher assembly will remain
attached all the times. For time/cycle limit components, operating and remaining time and cycles
must be indicated (informed by customer).
Respective Production Planning & Control is responsible for the collection of the appropriate
documentation from engineering function and procurement and make the appropriate
arrangements with the Packaging and Shipping function.
The Packaging & Shipping function will properly pack and preserve the component following
appropriate packaging and preservation instructions ensuring the appropriate documentation is
included. The protection will be extended to include delivery to destination using the appropriate
means of transportation as required by maintenance manuals or customer requirements.
Removed unserviceable loan parts must be completed with removable tag indicating the status of
the parts.
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 2 of 2
AMO MANUAL
2.21.1 Security of Computer Generated Back up Files of Maintenance Instruction and Engineering
Instructions
Such maintenance instructions are developed as per AMO Manual 2.8. Back up files of Maintenance
Instruction will be secured by password to avoid access to unauthorized personnel. The name of
the engineering function who develops the job card, MDR or PD sheet and the subsequent revisions
will appear on the footer of each document and it represents the signature of the writer.
Provisions are made to secure for loss of data resulting from system failure. In all cases a back up file
must be available and updated every 24 hours.
GMF does not use computerized maintenance records system for the purpose of recording the
maintenance activities performed and for electronically claiming the work. In some instances, it
may be appropriate for GMF to scan and keep in a CD, copy of the maintenance records.
For general support records, electronic means are used to store data such as SAP and LAN. There is
at least one backup system that is updated every 24 hours. Each terminal is required to contain
program safeguards against the ability of unauthorized personnel to alter the database. The backup
former programs and release of programs in use must be able to read the data for at least two years.
Provisions are taken so that such computerized records to be accessible only to authorized
personnel using appropriate passwords.
Computer backup discs, tapes etc. are be stored in a different location from that containing the
working discs, tapes etc., in an environment that ensures they remain in good condition.
In case the computer system is shut down, the manual system (paperwork) is used to administrate
any recordings and/or transactions. When the computer system is back to normal, all the
transactions and records, which have been generated in paper, are transferred to the computer
system.
In order the man-hours for each work order to be sufficient to perform the maintenance program
within the prescribed program visit, the following must be taken into account:
a) Determination of the total manpower required based on the master production schedule;
b) Based of the existing available hours per employee, determine the number of man hours
required;
c) Based on the required special skills, determine the required number of staff per type of skill;
d) Determination of sufficient number of quality audit personnel to carry out the quality
monitoring compliance functions;
e) Determination of sufficient number of skilled and qualified inspection personnel to carry out
Required Inspections as required by operator or customer. These determinations will be made
based on operator's or customer’s maintenance program;
f) Determination of adequate number of qualified Certifying Staff for each product type;
g) The number of permanent employees of each hangar and workshop at least 50% of the total
required employee
In case of workload deviation, if necessary, man-hours plan shall be revised less than 3 months.
Revision process must consider item a up to g of the first paragraph of this chapter. Revision of man-
hours planning shall be approved by related VP’s.
A deviation of more than 25% of manpower availability will be reported to the Quality Assurance &
Safety and CEO for corrective actions.
Critical tasks are defined as those tasks, which the past experience has shown the possibility of an
error being repeated to reassemble aircraft components after removal especially when several
identical aircraft components are to be fitted to more than one system of the same aircraft.
Examples of such possible errors could be the possibility of failure to reinstall engine oil filters,
gearbox access covers, engine borescope access ports, etc.
List of critical task items are provided by operator and can be determined by reviewing Customer’s
Maintenance Program (MP). In case the owner or operator does not specify in his/her MP, the
critical task item list maybe developed by engineering function based on respective Maintenance
Planning Data from manufacture.
When only one person is available to carry out these same tasks then the job card should include
an additional stage for re-inspection of the work by the person after completion of all the same task
and that person must have current Aircraft Maintenance Engineer License appropriate to the type
of aircraft being maintained.
NOTE:
The inspection step should not be at the same step with the install/close step.
c) Identify the job card as Critical Tasks by placing such state or by code on the header of the
job card.
NOTE: This procedure applies also for the line maintenance tasks (AMO Manual L2.7)
Required Inspection Items (RII) as required by CASR Part 121.371 are items of maintenance and/or
alteration which could result in a failure, malfunction or defect which would endanger the safe
operation of the aircraft if not performed properly or if improper parts or materials are used. These
items require inspection prior to the release of an aircraft for flight.
Proper parts and materials must be used, and the maintenance accomplished in accordance with
applicable current aircraft manual specifications or other data acceptable to or approved by the
authority.
Each required inspection item will be accepted or rejected based on use of proper materials, correct
installation, security, and operation as applicable, and may be approved for return to service only
by a person with RII authority as authorized by VP Quality Assurance and Safety.
RII staff must be approved by the operator. Ensure that such staffs are appropriately trained and
approved per AMO Manual 3.7 before they perform required inspections.
The appropriate number of personnel will be assigned as per AMO Manual 2.22 and AMO Manual
2.28. The work performed will be claimed as required by AMO Manual 2.13.
Yes
Is work being No
RII does not apply as it is limited to
performed on installation and repair on aircraft
the aircraft?
Yes
No
Yes
Aircraft jacking shall be performed in accordance with applicable chapter of current maintenance
manuals. The supervisor and maintenance personnel will ensure that all safety precautions have
been complied.
2.24.9 Aircraft Technical Wash
The engineering function will develop tasks refer to manufacturer cleaning instructions for the
cleaning of the aircraft prior commencing the heavy maintenance.
The engineering function will develop tasks refer to current Aircraft type maintenance manual for
the storage and prolong inspection regarding interval storage time.
This section describe procedures to minimizing multiple errors, errors being repeated in identical
maintenance task compromising more than one system or function and preventing omissions
The procedure is also to aim identify the factor contributing to incidents or potential incident and
to make the GMF system resistant to such errors.
All members of staff are actively encouraged to submit reports using the GMF Internal Occurrence
Reporting (IOR) in accordance with QP 218-01.
PT Garuda Maintenance Facility Aero Asia Tbk has establish an environment in which maintenance
errors’ may be openly investigated in order that the contributing factors and root causes of such
errors’ can be addressed. GMF believes that a full and free reporting system is the best method for
establishing how and why events happen. Every effort will be made to avoid action that may inhibit
reporting.
2.25.1 Procedure to Minimize the Risk of Multiple Errors and Preventing Omissions
To minimize the risk of multiple errors and preventing omissions, maintenance personnel should
follow:
(1) That every maintenance task is signed off only after completion, for details of signing off ref
to AMO Manual 2.13.3;
(2) That work performed by personnel under supervision (i.e. temporary staff, trainees) is
checked and signed off by an authorized person as stated on AMO Manual 2.13.3;
Engineering function should group the tasks to allow maintenance personnel could sign-off
clearly identified. Grouping of maintenance task based on the complexity, critical item, and
workstation, which stated on AMO Manual 2.8.4.
Planning method
To minimize the risk of multiple errors or errors being repeated in identical maintenance task,
Production unit required to develop man hour planning vs workload which stated on AMO Manual
2.22.
2.25.3 Managing and Investigating Maintenance Potential Error and Error Occurrences
The Quality Assurance & Safety department will process and manage the occurrence report in
accordance with QP 218-01, raising the relevant report from and submitting it to manager of the
area for investigation and any corrective and/or preventive action.
All maintenance error occurrences are recorded on the Quality Assurance & Safety Department
database in accordance with QP 218-01and will be analyzed accordingly.
Once the root cause has been identified and corrective/preventive action carried out, feedback to
staff will be carried out by either a change in procedure(s) or by Quality Bulletin. Pertinent
information on occurrences is also fed back at engineers’ continuation training.
(Ref: CASR-145.211)
2.26.1 General
The primary objective of the shift/task handover maintenance status is to ensure effective
communication between the incoming Manager / Supervisory Personnel and outgoing Manager /
Supervisory Personnel or detail last status maintenance task in a maintenance instructions progress
at the point of handing over the continuation or completion of the maintenance.
All production Managers / Supervisory Personnel will provide a Handover Maintenance Status
Record located at each production line in which the maintenance that is to continue from the
previous shift will be recorded and communicated with the next shift Manager/Supervisor.
The communication between the incoming and outgoing Manager / Supervisory Personnel must
be sufficient and effective in order the succeeding maintenance Manager / Supervisory Personnel
to continue the work without leaving any maintenance or inspection tasks unfinished due to
misunderstandings.
This section only applicable for production workstation which have shift crew rotation.
The outgoing Manager / Supervisory Personnel at the end of the shift will:
c) When it is applicable, meet with the incoming Manager/ Supervisory Personnel and brief him
of the exact status of the work in progress and show him at the site what is to be continued
based on what is written on the record. This briefing includes accounting for the in-progress
maintenance status of the work orders and availability status of tools/equipment and any
other resources that are to be used to assure continuation of the work.
a) Meet with the outgoing Manager/Supervisory Personnel and be briefed of the exact status of
the work in progress. Read and understand what was written in the handover maintenance
record and ask the outgoing Manager/ Supervisory Personnel to show at the site what is to be
continued based on what is written on the record. This briefing includes accounting for the in
progress maintenance status of the work orders and availability status of tools/equipment and
any other resources that are to be used to assure continuation of the work. For outgoing
Manager/Supervisor who do not meet with the incoming Manager/Supervisor due to
discontinue working time if they need further information may use communication devices
b) Sign and date on the hand over maintenance record.
2.26.3 Information exchange between outgoing and incoming Manager/ Supervisory Personnel
for line maintenance activities
The outgoing Manager/ Supervisory Personnel at the end of the shift will:
a) Ensure that all completed work is signed or stamp by the qualified engineers as per operator’s
procedure at that time in shift input record to the computerized system and write in handover
maintenance status.
b) Enter on the Handover Maintenance Status record the unfinished work on that shift, and the
finished hand over work from the shift before. The incoming Manager should continue the
unfinished work. Outgoing manager should give the following information:
▪ Operator’s name, aircraft registration and flight number;
▪ The step number of transit/before departure/weekly-check check list or A-check
jobcard number to the incoming Manager/Supervisor must continue the work;
▪ If there is any unfinished trouble shooting of defect / malfunction, enter the slip or
sequence number of aircraft technical log in which the defect reported and give
reference to the manufacturer's maintenance data for trouble shooting.
▪ Give information regarding outstanding issue
▪ Give information resources required for finishing the works
▪ Give any other information as necessary;
▪ Sign and date on the hand over maintenance record.
c) Meet with the incoming Manager/ Supervisory Personnel and brief him of the exact status of
the work in progress and show him at the site what is to be continued based on what is written
on the record. This briefing includes accounting for the in progress maintenance status of the
work orders and availability status of tools/equipment and any other facilities that are to be
used to assure continuation of the work
a) Meet with the outgoing Manager/Supervisory Personnel and be briefed of the exact status of
the work in progress. Read and understand what was written in the hand over maintenance
record and ask the outgoing Manager/Supervisory Personnel to show at the site what is to be
continued based on what is written on the record.
2.27.1 General
This section is referring to the procedure, which will be followed by engineering function when
inaccurate, incomplete or ambiguous practice or information, etc, mentioned in the maintenance
data and maintenance instruction has been found during maintenance.
Engineering function will evaluate maintenance data and Maintenance Instruction inaccuracies
and ambiguities by review:
1. Sequence of performing works.
2. Validity of reference, engineering must ensure the reference used is still valid.
3. Different statement in the same reference,
4. Applicability of Aircraft/engine/component type/register/serial number & tools and material
used.
5. Identify the suspected ambiguity words by analyze the words structure are consisting of
subject, predicate and object.
6. Compare the developed job card task either by using transcribe accurately or precise
reference with the valid reference. Ensure that the meaning is the same between the
reference and the developed job card.
Based on AMO Manual 2.25.4 procedure, the maintenance personnel will inform engineering
through their Manager when such incomplete or ambiguous information is found in the
maintenance data and maintenance instruction and maintenance instruction. In this case, the
related on-going maintenance task shall be held until the incomplete / ambiguous information is
clarified by Engineering Function.
Engineering Services will take the appropriate and immediate actions as per the requirements of
this procedure to ensure that such information will arrive to the manufacturer for corrective action.
2.27.2 Procedure
NOTE:
1. Engineering is not allowed to modify any maintenance data and maintenance instruction
unless a written approval by the manufacturer/author is obtained as per AMO Manual 2.8.7
2. In case the manufacturer or the author of the maintenance data and maintenance instruction
notifies that the data is correct and must be followed as is, the capability of the specific
maintenance task must be terminated until the appropriate training is received from the
manufacturer or another approved AMO. See AMO Manual 3.4 & 3.8.
a) Receive the information and the corrections of the maintenance data and maintenance
instruction from the manufacturer and transcribe that information to the Maintenance
Instruction Sheet per AMO Manual 2.8 giving reference to the manufacturer’s letter. Ensure
that a copy of such letter is kept as a work order maintenance record (2.14);
b) Provide the corrected maintenance instructions (job card/MDR/PD Sheet) to the maintenance
personnel. Consider the need to make any shop floor changes (AMO Manual 2.13) to any
previously issued Maintenance Instruction sheet.
Prior to accepting a contract, GMF shall evaluate its capability and its capacity in order to be able
to fulfill the contractual requirements.
When the maintenance program is contracted, the maintenance units are responsible to execute
the maintenance within the agreed maintenance program, quality product standard and schedule.
Ensure needed of special facilities and hangar slot are available based on aircraft base maintenance
planning and hangar slot management for line maintenance.
For the aircraft maintenance or as otherwise required, the Senior Manager will assign personnel
who manage the maintenance project. These personnel will control the execution of the
maintenance and will be the interface between maintenance managers, supporting and customer.
The VP of every production unit ensures that all management has established measurable quality
objectives in line with the company's policy and customer's requirements when planning for
production.
a) The maintenance will be performed in accordance with the operator's maintenance program
and other customer requirements and in line with the requirements of the Authority of the
Aircraft registration
b) The lead times required by the customer as agreed, will be met.
START
No
The material planning and procurement arrange for the provision of the right materials in the right
place and at the right time at reasonably cost for aircraft, engine, and components maintenance.
Having the right material in the right place at the right time requires an understanding of GMF
complete supply chain from consumption of the part for maintenance back through to the time
that the use of the part was forecasted. All functions mentioned in this procedure are required to
implement the requirements of this chart.
Un-scheduled Maintenance
(by Production planning) Material on Hand –
Existing Inventory
ACCURATE (by Material Planning)
INVENTORY
FORECAST
Work Order Requirements
(by Planning engineering) Customers’ Supplied Material
(by Customer)
Failure/Defects Information –
Historic Data Supplier Lead times
(by Material Planning & (by Procurement)
Production)
Min max part list
Purchase requisition
issued
Purchase Order
Receiving Inspection
Central Store
a) The material planning function manage inventories by anticipating their use and production
planning. Such anticipatory approach to inventory is to maintain the safety stock levels and
the turnover ratio.
b) For Components and Mandatory replacement items, the Planning Engineering bears the
responsibility to determine routine material quality / specification requirements and quantity
required based on confirmed contracts, customers' work orders and maintenance manual
requirements.
c) The material planning function will utilize the ERP (Enterprise Resources Planning)
computerized system (e.g.: SAP) to plan and control the inventories. The ERP computerized
system will be updated on regular basis to ensure a current material planning system is in
place. A means to accurately update the ERP computerized system is to predict as accurate as
possible the material required to cover the following three months production schedules
while expendables routine materials are always available.
AMO Manual 1.7 and 2.22 describes the procedure for the determination of the manpower required
for the execution of maintenance as well as manpower availability for quantity and qualification.
This chapter gives instructions for considering human factors performance and limitations when
the production managers and planning function managers plan the maintenance tasks and
organize the shifts for the execution of maintenance.
The production and planning function managers must consider the following requirement when
they assign personnel to work day shift:
II. Assigning manpower for second shift work - Guidelines to design a shift system
There are some general guidelines for decreasing the effects of shift work:
a) Excessive numbers of consecutive workdays should be scheduled with caution, and screening
workers for physical and mental stress may be necessary;
b) The amount of off-time should increase as does the number of consecutive workdays and the
length of the work shifts increase;
c) A shift system should aim to maximize the amount of off-time between work shifts;
d) The length of a work shift should be dependent on the type of tasks being performed and
workload on the job. Critical tasks will be planned on day shift whenever possible;
The tools and equipment planning function prepare the tools and equipment refer to maintenance
work package needed and make Bill of Tools. The responsible manager responsible to ensure that
all tools and equipment are sufficient available and serviceable to perform maintenance as
specified in maintenance data.
The PPC and Production Manager coordinate for prepare job cards as per daily controlled schedules
using the daily menu. This daily menu gives to maintenance personnel an overview of what job
cards will be accomplished, what Job Cards are still open or to be continued and what job cards
have been accomplished, and. The status of the work in progress is controlled by the data base
system. The same requirements apply for defects rectification using MDR (see Section 2.15).
Production meeting takes place at regular intervals headed by the project management incharge.
Participants will discuss the progress of the maintenance, bring up quality and production
problems and define corrective actions to bring the program in track. The customer representative
will participate in the meeting.
All Senior Managers & Managers are responsible to assign only qualified personnel to perform
maintenance and inspections including required inspections. No one person is allowed to perform
unsupervised work other than that allowed by his/her certificate of competency (C of C) or his/her
authorization. In addition, in order for the personnel to properly perform their maintenance tasks,
they should have available in close proximity and follow without deviation the:
Amendments means adding maintenance tasks and or deleting some tasks previously planned for
incorporation. In either case the customer will communicate any amendments using the GMF Form
GMF/Q -028. The customer must state in this form what is to be added or deleted, sign it as
appropriate and hand it over to the Project Management in charge.
The project manager or the PPC is responsible to assign a control number of each amendment and
control the number of amendments issued. For additions, he/she will process each amendment to
the planning engineer for the development of the appropriate maintenance documents and also
to customer service for billing.
For the deletions, he/she will hand over a copy to certifying staff. The certifying staff will evaluate if
any airworthiness requirements are violated and he/she will proceed as per section 3.9. At the end
of the maintenance, all amendments will be handed over to certifying staff to determine
appropriate incorporation.
I. Defining the daily works (daily menu) based on the pre-established daily schedules & Control
Room Operations
Project Management in Charge, QC manager and productions manager will be part of the control
room team having their responsibility to perform the following on a daily basis:
a) Monitoring the daily work ensuring problems have been identified at the early stages and
correcting them as soon as possible;
b) Ensuring the daily work is finished as planned and meets quality targets;
c) Obtaining evidence that all maintenance and inspection operations have been completed as
planned;
d) Defining contingency plans and applying as necessary;
e) Scheduling the next shift or next day production and ensuring it will be carried out under
controlled conditions. Controlled conditions shall include as applicable the following:
▪ The job cards and non-routine cards for execution;
▪ The applicable drawing and other approved maintenance data;
▪ The establishment of process controls for the next day by identifying the key inspection
points;
▪ Determining manpower and qualified skills based on the above requirements and
considering human factors;
▪ Determining available and serviceable of tools and material needed;
▪ Monitoring and controlling the utilities and supplies such as compressed air, electricity and
chemical products, to extend they may affect product quality.
II. Scheduling of safety-critical tasks during periods when staff are likely to be most alert
The production managers will make any effort to minimize the impact of fatigue by:
▪ Allocating more critical tasks during day shifts when staff are likely to be more alert;
▪ Brief/remind for more pay attention to performing critical tasks;
▪ Ensuring that appropriate checks are carried out after night shift work;
▪ Breaking up lengthy repetitive tasks into smaller tasks, with breaks in between;
▪ Consider the human performance limitations as instructed in AMO Manual chapter 2.28.3
The project management in charge will make any effort possible so that the safety critical tasks as
per AMO Manual 2.23.
PART L2
General - Contracted Line Maintenance at Line Stations and/or Work performed at locations other
than GMF Fixed Location.
In order for GMF to perform line maintenance at line stations it will be required, to obtain the
necessary approvals from the Authority of the aircraft registration. The VP for Quality Assurance &
Safety will request for the necessary approvals as per Section 1.10 of this manual.
Should the necessary approval from the Authority of aircraft registration is obtained and the GMF
operations specifications indicated, so the VP for Line Maintenance will arrange for the performance
of the line maintenance as indicated in the PT Garuda Maintenance Facility Aero Asia Tbk operation
specifications, Appendix B and at the designated line stations or locations.
The VP for Line Maintenance will assign line station Senior Managers and Supervisory Personnel as
appropriate for managing, supervising, performing and inspecting the work and he will also have
the prime responsibility for ensuring the requirements of this manual are followed. The VP for Line
Maintenance before executing the work, will ensure that:
a) The line maintenance is performed as per operator's current maintenance program and
operator’s current maintenance manual;
b) All the requirement of material, equipment, qualified personnel, current maintenance data
and GMF Quality System as per Sections Part 2 & Part 3 of this manual are followed;
c) A supervisory personnel holding the appropriate CASR Part 65 AMEL will supervise the work;
d) Certifying staff holding an appropriate Certifying Staff Authorization issued per Section 3.4 of
this manual, as approved by the Authority of aircraft registration will be available all the time
for releasing (if appropriate) the work to service;
e) The applicable operator’s current maintenance program, current maintenance data, Quality
System Manuals referred to this Part L2 and this Manual shall be accessed at the all line station;
f) The forms used are given by the operator as per technical form manual;
g) Control of operator’s maintenance data as per section 2.8;
h) Component / material acceptance shall meet requirement as per Section 2.2.
i) All the requirements of L2.1, L2.2, L2.3, L2.4, L2.5, L2.6 and L2.7 are followed.
The Quality Assurance & Safety will schedule and perform audits at line stations as per QP 301-01
for ensuring that the requirements of this manual are met.
The VP for Quality Assurance & Safety, prior to issuing a formal request to the Authority of aircraft
registration for approval in temporary basis to perform work away from GMF’s fixed location on a
temporary basis with certain duration for condition of:
1. Special circumstances.
2. Extended periods of time.
3. Recurring basis.
GMF allow to perform maintenance, preventive maintenance and alteration work away from GMF’s
fixed location on a temporary basis and certain duration in line maintenance activities as described
in section 1.9 of this manual.
Detail procedure for work performed at another location and the method of how to notify & request
permission to the DGCA Inspector will be explained in QP 109-01.
This section describes the procedure followed by PT Garuda Maintenance Facility Aero Asia Tbk
regarding the rectification of defects in line maintenance. The responsibility to identify and
manage the repetitive defect is an operator. In coordination with the operator, GMF may identify
such repetitive defects and take involve in relation with rectification action.
Defects occurring during the aircraft operation are reported and recorded as per operator
requirements. Based on the contract between GMF and Operator, the qualified line maintenance
technicians will inspect/check for defects, record the defects on the aircraft line maintenance
defect log and will perform the rectifications and clearing out all defects recorded on the log as
per applicable the operator approved maintenance data.
The Line maintenance certifying staff will report to the operator any serious defects found. The
operator is responsible to report any serious defect to the Authority of the aircraft registry in
accordance with applicable requirements of the Authority of the aircraft registry.
When the operator does not desire to rectify a defect recorded at the maintenance log, and GMF
is responsible for the return to service, the operator must determine what defects may be
deferred and must provide an agreement or letter to GMF Certifying Staff that allows deferring
the defect identifying the authority for such action.
When the letter or agreement is present, the certifying staff will issue a certificate of return to
service (CRS), provided the deferred defects are within the limits of the operator's maintenance
program as approved by their operator's authority. The certifying staff will identify the defects not
rectified on the CRS and he he/she will also identify on the CRS specific actions required by the
operator related to the deferred defect.
When such an agreement or letter is not present, or the letter/agreement does not identify the
Authority for such action, or the deferred item is not included in the operators maintenance
program the certifying staff will inform the VP for Quality Assurance & Safety for further actions.
The VP for Quality Assurance & Safety will conduct the operator's Authority to clarify whether a
CRS must be issued indicating the defects not rectified. A non-compliance with an AD Note on
due is to be reported to Authority as well.
Base on operator agreement, managing and controling the operator deffered defect will be done
by Line Maintenance control function.
Line Maintenance Control function will make coordination with others function for all aspects
needed to rectify the deffect at the first opportunity before interval limitation due.
Line Maintenance Control also monitoring defects through technical log including cabin log item
database and other aircraft specifics onboard maintenance systems data (such as : PFR, AHM,
Airman etc).
Any repeated defects indication and will inform GMF Central Engineering (depend on contracted
agreement) for deep evaluation and plan the further rectification action.
The technical log will be completed as required by each operator company manual and Authority
of Aircraft registration.
The release of the aircraft has to be done as per section 2.16 of this AMO Manual.
Primarily, the operator is responsible for the supply of his his/her own components for the
installation of his/her aircraft. When the customer wants to use GMF parts, the following will apply:
a) The source of parts including loaned and pooled parts shall be listed in GMF Approved
Supplier List;
b) The supplied item must meet the minimum available service time required by customer,
Modification Standard and AD Compliance;
c) Each loan/pool item will be in serviceable condition identified by one of the following tags :
1) A CASR Airworthiness Approval DGCA Form 21-18 for Indonesian registered aircraft
only.
2) EASA Form 1 issued by an EASA Part-145
3) A shipping ticket, invoice or other document which provides evidence that the part was
produced by a manufacturer holding an FAA/JAA Approved Production Inspection
System.
d) The certifying staff will ensure that the component/part is compatible for installation to the
next higher assembly.
e) AOG Situation
In case AOG situation see section 2.16;
f) Component remove serviceable from aircraft shall be managed refer to section 2.16
g) Loaned parts installed in the customer aircraft shall be indicated in the Aircraft Maintenance
Log Book as per paragraph (b)
h) When loaned parts removed from the aircraft, it shall be completed with removable tag
indicating the status of the parts and also made traceable to the Aircraft Maintenance Log
Book;
L2.6 LINE PROCEDURE FOR RETURN & INSPECTION OF DEFECTIVE PARTS REMOVED FROM
CONTRACT MAINTENANCE AIRCRAFT
L2.6.1 Line Maintenance Procedures for Returning of Defective Parts Removed from the
Operator's Aircraft.
After the operator returned the loaned components to GMF AeroAsia the following will apply by
an appropriate certifying staff:
a) Check the shipping ticket/tag issued by the operator and record the operating time of the
component while in use by the operator;
b) Depending on the component involved, it may require overhaul bench-check or repair. Sum
up the accumulating hours/cycles and take the appropriate actions;
c) Check the received component for any obvious damage;
d) Perform a visual inspection and if necessary a functional check to determine serviceability of
the component.
e) If applicable to the component involved, check filters and magnetic plugs and verify possible
contamination. If chips and other metallic particles found, consider the need for disassembly
and inspection as necessary to determine further defects.
L2.6.2 Inspection and Disposition of Components Removed from the Operator's Aircraft.
Upon removal of a component, the authorized certifying staff will perform and record the
following:
a) Details of the removed component including reason for removal;
b) For the hard time components and rotables, check life consumed (hours, landings, calendar
time) checking against the operator's maintenance records. Enter consumed life (hours,
cycles, calendar time).
c) Perform visual inspection as appropriate for the component involved. Check general
condition, cleanliness, blanking of all ports and electrical plugs. Check of filters & magnetic
plugs as applicable;
d) Perform a visual inspection and if necessary a operational or functional check on wing to
determine serviceability of the component.
e) If it is certain the component is in serviceable condition based on the above requirements
attach serviceability document. Also, for the hard time components and rotables, locate the
airworthiness approval tag from the last maintenance and attach with the component.
NOTE:
1. The serviceable tag MUST indicate the remaining operating time since overhaul or
unserviceable tag must indicate for defect part.
2. The removed component must be installed on an aircraft under the same Authority of
aircraft registration. It is not allowed for a component removed from PK registered aircraft,
for example, to be installed on a “N” or “EASA” registered aircraft unless GMF holds the
approval rating for the Authority of aircraft registration for the specific component and an
authorized certifying staff inspects the component and issues the appropriate airworthiness
release certificate.
Critical tasks are defined those tasks which the past experience has shown the possibility of an
error being repeated to reassemble aircraft components after removal especially when several
identical aircraft components are to be fitted to more that one system of the same aircraft.
Examples of such possible errors could be the possibility of failure to reinstall engine oil filters,
gearbox access covers, engine borescope access ports, etc
The performance of items identified by the operator maintenance program as critical/difficult task
will be in accordance with the operator requirements and Section 2.23 of this manual.
When only one person is available to carry out these same tasks then the job card should include
an additional stage for re-inspection of the work by the person after completion of all the same
task and that person must have current Aircraft Maintenance Engineer License appropriate to the
type of aircraft being maintained.
PART 3
3.1.1 General
The Quality Assurance & Safety will plan and implement independent quality audits to verify
whether quality activities and related results comply with planned arrangements, determine the
effectiveness of the quality system to ensure it can deliver a safe product and that PT Garuda
Maintenance Facility Aero Asia Tbk remains in compliance with the requirements.
Composition and functions of management quality group are reflected in AMOM section 1.5.2
and the function briefly as described below:
1. The function VP Quality Assurance and Safety as Quality Manager described in AMOM
section 1.4.5
2. SM of Quality System & Auditing shall define quality assurance standard and aviation
regulation applicable to GMF, ensure the revisions of GMF’s quality system include Quality
Manual and Quality Procedure, develop audit program include prepare schedule audit,
perform audit, issue NCR and handle quality audit records.
3. SM of Personnel Qualification & Quality System Documentation shall develop technical
personnel ability, investigate human error in aircraft maintenance, coordinate with the
trainer’s/training department, train certifying staff, develop training program for certifying
staff, perform personnel qualification assessor grade 1 & 2 and perform any other tasks as
instructed by his/her manager within his qualification scope and quality system
requirements.
4. SM of Safety Inspection shall analyze, manage, supervise and control Analysis, Investigate
and evaluate of Significant Occurrence regarding human performance error which effect to
quality standard deviation by using MEDA method as necessary and issue corrective action
recommendation to prevent the same cases in future. He/she shall manage, supervise and
control all safety promotion activities and safety risk in order to build safety culture in the
organization, responsible to manage their resources and by the result they get from them
and ensuring that all activities, rules and procedures refer to aviation authorities
requirement.
Records of quality audits and the corrective actions will be kept for at least 2 (two) years from the
date of the finding is closed.
An audit schedule will be developed to include all workstations and ensure that all procedures are
scheduled at least once a year. The schedule will be periodically adjusted on the basis of the status
and importance of the activity to be audited. That means some workstations with significant non-
compliances will be audited more than one time a year.
An audit checklist will be developed covering the DGCA Indonesia requirements and quality related
procedures (applicable for audited workstation. The audit results will become the audit report for
each workstation.
Audits schedule will include audits during the night for those workstations that work at night, which
will be randomly selected.
Audit schedule will be issued by the Senior Manager of related Quality Assurance and Safety and
approved by VP Quality Assurance and Safety. If there is any change of the schedule, Auditor shall
made revision records and those change should be approved by VP Quality Assurance and Safety.
The Quality Assurance & Safety will raise a report each time an audit is carried out describing what
has been checked and the findings against applicable requirements, procedures and products. The
report including corrective action request will be sent to the audited department(s) for corrective
actions. The audited department(s) shall reply the non-conformity findings within the time
specified on the audit report. The corrective actions plan including the date of implementations will
be submitted to Quality Assurance & Safety for acceptance.
The results of the quality audits will be an integral part of the input to management review activities.
The Quality Assurance & Safety will keep a data of significant non-compliance and will be brought
to the attention of the Accountable Manager during the management review.
The lead auditor who reports directly to VP for Quality Assurance & Safety and is independent of
those who have direct responsibility for the activity as well as the activity being audited shall carry
out the internal quality audits.
The VP for Quality Assurance & Safety shall ensure that the number of auditing personnel is
sufficient to carry out the audits, raise finding reports and perform follow up activities to verify that
findings being rectified are in accordance with applicable requirements and effective.
The Quality Assurance & Safety will plan and perform the following type of audits:
The Quality Assurance & Safety will plan and perform procedure audit, product audits, specialized
services audit and special audit. The quality audits will be performed by sample checking every
once a year as a demonstration of the effectiveness of the quality system.
Procedure Audit
To assess process conformity and processes implementation to ensure that Quality
System remains fully implemented.
Product Audit
Product audit means that the sample check of a product means to witness (if necessary) of any
relevant testing and visually inspect the product and associated documentation. The sample check
should not involve repeat disassembly or testing unless the sample check identifies findings
requiring such action
Special Audit
This type of special audit may be conducted in conjunction with a surveillance audit. A special audit
may also be necessary on short notice to investigate significant finding complaints, assess major
changes, or to follow up on special cases.
The Quality Assurance & Safety will plan and perform product audits for aircraft components. The
product audits will be performed by sample checking one product on each of the following
workstations every once a year as a demonstration of the effectiveness of the quality system. The
following workstations will be audited:
a) Engine shop;
b) Avionics shop;
c) Accessories shop;
d) Emergency equipment shop;
e) Sheet metal shop;
f) Wheels and brakes shop;
g) Composite shop.
Procedures will be combined by the selected component and sample checking all the requirements
associated with it, to ensure that the end result will be an airworthy component. The auditor will
witness any relevant testing and visually and dimensionally as appropriate and will inspect the
component and the associated documentation.
Aircraft audits will be performed once a year for each aircraft type inducted for base maintenance
and line stations. The following hangars and line stations will subject to aircraft audit:
To be effective, the audit for aircraft will be accomplished through the whole maintenance process
at different periods and maintenance phases. When product audit is performed on aircraft, the
audit may be extended to the shops where components are repaired for installation onto aircraft
being audited.
The product audits will be planned and performed as required by the QP 301-01. Product audit
records will be kept by the Quality Assurance & Safety for two years from the date of clearance of
the findings.
When serious non-conformity is found, it will automatically come to the attention of the responsible
function for immediate corrective action before further maintenance is performed.
The VP for Quality Assurance & Safety - primarily responsible for the audit process - will initiate
immediate actions when a serious deficiency in the quality system has been found having an
impact on product quality. This may require stopping the production until significant non-
conformities corrected. He will sign the 'Immediate Action Notice' (form No GMF/Q-073) and will be
submitted to the audited manager responsible for the deficiency found.
The audited VP - primarily responsible for the audited function - will initiate all actions necessary to
comply with the 'Immediate Action Notice' as submitted to him/her by the VP for Quality Assurance
& Safety when a serious deficiency in the quality system has been found having an impact on
product quality.
The product audits will be planned and performed as required by the QP 301-01. Records of
product audits and the corrective actions including the notification, audit reports and audit plan
will be kept for at least 2 (two) years from the date of the finding is closed.
All Management personnel will take corrective and preventive actions to eliminate the causes of
actual or potential non-conforming products, systems and procedures to a degree appropriate to
the magnitude of problems and proportionate with the risks encountered. Quality, cost,
turnaround time and conformance to airworthiness requirements will be taken into consideration.
When the corrective and preventive actions require long time period or high cost budget, the
Management personnel will set timescales and activity plans to resolve the problems.
a) The effective handling of non-conformance reports issued by the Quality Assurance & Safety;
b) The effective handling of customer complaints of product non-conformities;
c) The Investigation of the cause on deficiencies for the articles under maintenance or in
operation (maintained by GMF) and the effective corrective and preventive actions.
The Quality Assurance & Safety will keep records of corrective and preventive actions resulting from
raised non-conformance reports including minutes of meetings with management for two years.
Each Senior Manager, will keep records of corrective and preventive actions he/she has taken to
rectify problems or to improve processes (see (a) to (c)) above for two years.
3.3.1.1 Corrective Actions Request from Quality Assurance & Safety Audits
Upon completion of the audit, all deficiencies found will be discussed with the responsible
managers and agree with the required corrective actions and target dates. Then, the Auditor will
initiate non-conformance report (NCR) Form No.: GMF/Q-045 to responsible Senior Manager for any
Level 1, Level 2, and Level 3 findings.
When non-conformity is found which has a direct impact on product quality, the VP for Quality
Assurance & Safety will issue an 'Immediate Action Notice' (Form No.: GMF/Q-073) to the
responsible Senior Manager and Vice President stating the immediate actions, which must be taken
to correct deficiencies. Such actions may require disassembly; re-inspection, product recall and/or
even production halt or provide acceptable alternative means of performing work until the
appropriate conditions are established.
The Auditors will issue NCR to responsible Senior Manager when non-compliance has been found
from one of the following parties:
b) Customer audits
c) Customer complaints
If necessary, the Authorities and the customer will be timely informed of the corrective actions
taken.
For corrective/preventive actions due to NCR, all Senior Managers as appropriate will:
a) Submit answers to QSA by the due date noted and not more than 14 days, for NCRs and/or
Immediate Action Notice that were issued during the audit. The responses should address
root cause, systemic corrective actions, and corrective action implementation date. See
QP301-01.
b) Initiate action to correct all deficiencies and ensure that all corrective actions consist of
investigating the source and the root cause of the noncompliance. Each finding will be
reviewed, signed and dated before being submitted to QSA for acceptance on or before the
established due date. Apply problem-solving techniques to identify the root cause of the
problem and correct it with the most effective way.
Note:
Due to extenuating circumstances, it may become necessary to extend the due date. The Auditor
may grant extensions on a situational basis.
c) For corrective actions rejected by QSA, appropriate actions will be taken by the audited
Function to resolve any problems or misunderstandings. QSA will communicate with the
Function for appropriate adjustments/additions.
d) Corrective actions that have not been received by the date specified on the NCR will result in
a delinquent notification or equivalent, issued to the audited Function. Delinquencies will
result in the situation being brought to higher levels of management and may result in the
issuing of an Immediate Action Notice per QP301-01 requirements.
e) Initiate all actions necessary to comply with the 'immediate action notice' (QP301-01)
submitted by the VP for Quality Assurance & Safety when a serious deficiency in the Quality
System have been found having an impact on product quality. Sign the immediate action
notice as indicated in the form.
3.3.1.4 Compliance with the Immediate Action Notice Report (form GMF/Q-073)
The audited Senior Manager will take all actions instructed by the VP for Quality Assurance & Safety
to comply with the 'Immediate Action Notice' when a serious deficiency of the quality system has
been found having an impact on product quality. Such actions may require disassembly; re-
inspection, product recall and/or even production halt or provide acceptable alternative means of
performing work until the appropriate conditions are established. Furthermore, he/she will initiate
corrective and preventive actions as mentioned in Section 3.3.1.3 above.
The Quality Assurance & Safety will perform follow up audits to ensure, verify and record the
implementation and effectiveness of the corrective actions taken.
Depending of the follow up audit results and based on the significance and occurrence of
discrepancies at the workstations, the Quality Assurance & Safety will periodically adjust the audit
schedule to increase the audits periods. That means some workstations with significant non-
compliances or taking inadequate corrective actions will be audited more than one time a year.
Management review is a formal evaluation by top management of the status and adequacy of the
quality system in relation to quality policy and new objectives to ensure that (apart from the
required output mentioned below):
a) The quality system continues to be effective and suitable - fulfilling the changing and future
needs of the company and its customers;
b) The quality system is updated as necessary;
c) The results of internal audits are reviewed, to ensure that the defined quality system is being
followed.
The Management shall review the quality system twice a year to ensure its continuing suitability
and effectiveness. The CEO/Accountable Manager will chair the quality system review meeting.
Procedure
The CEO/Accountable Manager and/or the VP for Quality Assurance & Safety will identify the need
of quality system management review and will initiate the meeting based on any of the following
criteria:
The VP for Quality Assurance & Safety will prepare the agenda of the meeting, which will include
but not limited to:
The output from the management review shall include the decisions and actions related to:
For all identified deficiencies, corrective actions will be defined and taken by the responsible
Management personnel within a timeframe as per AMO Manual 3.3. The Quality Assurance & Safety
will be responsible to ensure that the stated corrective actions have been properly implemented
and are effective. Records of management review shall be kept by the Quality Assurance & Safety
for 2 years after the clearance of the corrective actions and will be distributed to the responsible
Senior Management.
All Production Senior Managers are responsible to make the appropriate investigations to define
the root cause of the deficiencies created to aircraft and aircraft components due to GMF faults
while is still under maintenance and during operation and take the appropriate corrective and
preventive actions.
The Quality Assurance & Safety is responsible to lead such investigations and ensure the immediate
and effective corrective actions are taken. The Quality Assurance & Safety will develop quality
measurement trends and will record each deficiency including recurring deficiencies and will use
them as a measurement of the effectiveness of the quality management system.
Investigations and corrective and preventive actions to correct a deficiency will be taken in two
situations:
Deficiencies due to GMF fault may come, but not limited to, the following:
1) Engine rejected at the test cell after it has been repaired/overhauled. The engine cannot be
repaired at the test cell and requires to return to shop;
2) Components rejected during repair due to wrong processes or personnel carelessness;
3) Components rejected during test due to wrong assembly, or handling;
4) Aircraft maintenance not properly performed resulting in systems malfunction during tests
and operations;
5) Parts damaged due to mishandling, lack of preservation and due to poor storage conditions;
6) aircraft and aircraft components malfunctioning during operation as claimed by customer;
7) Any other deficiency, which jeopardize quality and wasting resources.
3.3.3.1 Deficiencies identified after the Aircraft or Aircraft component is return to service
a) Records may reveal that an important maintenance task (such as AD Note incorporation,
incomplete rectification of defects, etc), has not been performed;
b) Similar maintenance tasks have resulted in deficiencies on aircraft and components under
maintenance. The same process was used, material, tools, etc.
c) Any other reason.
The VP for Quality Assurance & Safety will determine the need to recall any article which may
subject to faults due to inappropriate process, material or, etc. He/She will inform the customer and
the DGCA Indonesia of the aircraft registration describing in detail the possible deficiency.
3.3.3.2 Controlling the Investigation and Corrective Action Process by the Quality Assurance & Safety
3.4 CERTIFYING STAFF & SUPPORT STAFF QUALIFICATION AND TRAINING PROCEDURES
(Ref: CASR-145.51, 53, 151, 153, 157, 163, 213)
Certifying Staff mean personnel who authorized by maintenance organization to release and issue
certificate of return to service Aircraft, Engine or Component.
For the purpose of this procedure, support staff means the Airframe Powerplant (A/P) & Electronic
Avionic (E/A) certifying staff who support the final certifying staff ensuring that all relevant tasks or
inspections have been carried out to the required standard before the final certifying staff category
C as described in AMO Manual 3.4.3, issues the certificate of return to service.
The VP for Quality Assurance & Safety has the authority to issuing certifying staff authorizations for
GMF qualified personnel including scope of work. A roster of certifying staff is in data base TQ folder
DQ -004 and kept by the Quality Assurance & Safety.
The VP for Quality Assurance & Safety is also responsible for the proper training and qualification of
the certifying staff following the requirements of this manual. He/she must ensure that before a
person becomes a certifying staff and issue or re-issue the authorization, the candidate certifying
staff has an adequate knowledge and experience of the relevant aircraft, engine or components to
return to service and relevant to the associated GMF procedures.
a) Has passed the examination of the product type and holds a valid CASR 65 basic and type
license (for Aircraft certifying staff), or he/she has the qualifications and experience
mentioned in QP 304-03 and hold COMA for other than Aircraft authorizations (components
and engine certifying staff);
b) Be trained in human factor and safety management system and its continuation training
c) Has relevant maintenance experience as mentioned in QP 304-03;
d) Has received training Aviation Regulation;
e) Has received quality system training relevant to his assignment;
f) Has received initial and continuation training as mentioned in QP 308-01;
g) Understands how the product functions;
h) Knows what are the more common defects with associated consequences, and
i) Understands, reads and writes English;
j) Has received training in Fuel Tank Safety (FTS). Detailed procedures of Fuel Tank Safety will
be described as per QP 304-06.
Type training for candidate AMEL holder, who intends to become a certifying staff, will be
performed by a CASR -147 approved training school or a TC Holder training school before he/she is
eligible for type training exams, subject to appropriate maintenance experience mentioned in QP
304-03.
For engines and components certifying staff who hold COMA, the training function will develop the
curriculum and standards for training as well as pre-qualification standards. The training will be
performed in house or outsourced.
The QP 304-03 has been developed to meet the requirements for the certifying staff qualifications
and training program.
The certifying staff components and engines will have the training, qualification and experience
required by QP304-03. All other requirements as given in this section are applicable for the
components and engines certifying staff.
The Quality Assurance & Safety will keep experience, training and assessment records for all
certifying and support staff. The records will be kept for as long as the staff is employed by the
organization plus for three years after their retirement.
3.4.2 Certifying Staff and Support Staff, Initial Assessment and Authorization
Before an authorization for certifying staff is issued or re-issued, the candidate person will be
assessed by the Quality Assurance & Safety for their competence, capability and qualification.
a) Qualification Assessment
Collecting and checking all relevant requirements such as education level, CASR-65 or by other
authority licenses, any authorizations held, type/specialized training, examination results amount
of experience in respect to the required training and function) as laid down in QP 304-03. These
documents if not issued by GMF should be followed by a confirmation check with the organizations
that issued such documents. A comparison check for differences between the product type ratings
on the qualification documents and the relevant product types maintained by GMF will be made.
This assessment may reveal a need for product type differences training. All document attest to
qualification will be retained in file by the Quality Assurance & Safety.
When all qualification requirements are successfully fulfilled, additional assessment will ensure that
the personnel have the talent to successfully demonstrate to the degree necessary their
qualifications against their work requirements as certifying staff.
The technician/engineer who is intended to become a certifying person will practical act as
certifying staff for a month or more under the supervision of either another certifying person until
the Quality Assurance assessor arrives at a conclusion. That time counts from the time the
technician's/engineer’s Senior Manager applied to Quality Assurance & Safety for that
technician/engineer to become certifying person. The technician/engineer before is
recommended, as certifying person he/she should work at the same type of aircraft, engine or
component.
c) Authorization
The VP for Quality Assurance & Safety will issue a certifying staff authorization to authorize those
personnel to issue CRS in accordance with the DGCA Indonesia requirements and the requirements
of this manual subject to the validity of the license the certifying staff and support staff holds. The
Quality Assurance & Safety will keep a copy of the authorization. Before the authorization is given
to the certifying person, the Quality Assurance & Safety will ensure that he/she has understood the
scope and limitation of his/her authorization. The certifying person must present within 24 hours
his/her authorization to the DGCA Indonesia.
The validity of all certifying staff authorizations shall not exceed two years from the date of issue or
previous renewal of the document. Authorizations related to aircraft maintenance are invalid when
the holder does not work for at least six months on the respective aircraft in a period of two years.
The VP for Quality Assurance & Safety remains responsible to revoke any authorization when a
certifying person does not comply with the requirements set forth in this manual, and the DGCA
Indonesia requirements.
3.4.3 Certifying Staff & Support Staff Categories, Authorities & Responsibilities
The following are the certifying staff categories and their interrelations between DGCA, EASA and
PT Garuda Maintenance Facility Aero Asia Tbk
"A/P" Line Maintenance Certifying Airframes & Engines and CASR 145 B1
Technician-Airframe Power plant Requirements
"E/A" Line Maintenance Certifying Electrical, Instrument & Radio and B2
Technician-Electrical Avionics CASR 145 Requirements
"A/P" Base Maintenance Certifying Airframes & Engines and CASR 145 B1 support staff
Technician-Airframe Power plant Requirements
"E/A" Base Maintenance Certifying Electrical, Instrument & Radio and B2 support staff
Technician-Electrical Avionics CASR 145 Requirements
"C" Certifying staff for Base Maintenance Airframes & Engines and CASR 145 C Certifying staff
Requirements
"D" Certifying staff for Engines / Not defined Not defined
Components
‘SP” Specialized Services Not defined Not defined
Note:
The function of EASA Category A certifying staff is covered by category A/P
a) Rating: Aircraft type, engine type, component type, or kind of specialized services;
b) Category: GMF categories identified above
c) Scope of authorization: The limitations of the authorizations
d) Period of validity: The period the authorization is valid.
They report to VP for Quality Assurance & Safety. They are responsible to take all necessary actions
to ensure that all the work is performed in accordance with current DGCA Indonesia of Aircraft
registration requirements, operator specifications, operator manual, maintenance manuals and the
requirements of this manual. The authorization allows the certifying staff to independently perform
or supervise maintenance and for releasing to service Aircraft, engine or components.
They are responsible and have the authority to:
a) To decide if the aircraft, engine or component is ready or not ready to return to service;
b) Not to release an aircraft, engine or component to service if unairworthy conditions are found;
NOTE:
The Certifying Staff will NOT delegate his responsibilities to any personnel and he will not exercise
the privileges of his certification authorization if he/she knows or suspects that their physical or
mental condition makes him unfit to exercise such privileges.
The Quality Assurance & Safety will limit, suspend or withdraw the authorization if for any reason
(including voluntary withdrawal) the authorized person cannot fulfill the requirements of this
procedure. See QP 304-03.
3.4.4 Continuation Training Program for Certifying Staff and Support Staff
The objective of the continuation training program is to ensure that the certifying staff and support
staff remain current in terms of procedures, human factors, and technical knowledge and that there
is a feedback system on the adequacy of the procedures of this manual, and any changes to aviation
regulations.
The continuation-training program will cover the quality system training module and the
engineering training module. Both modules will cover as a minimum the following requirements:
The Quality Assurance & Safety is responsible for the continuation-training program for the
certifying staff personnel. Responsibility includes arranging with the training function for the
contents of the training, the duration and the frequency and for ensuring all the training
requirements as mentioned in this manual and the associated QP 304-03 are incorporated.
The training function is responsible to develop the training syllabus, prepare the training material
and conduct the training, unless some parts of the training are subcontracted to approve training
schools.
The continuation training will be performed every two years. Each training module may be
performed separately and at different periods provided the whole training program is covered
within the two years period.
3.4.4.2 Certifying Staff, Support Staff Continuation Assessment for Renewal the Authorization or
Additional Authorization
Before an authorization is re-issued, the Quality Assurance & Safety will ensure that the candidate
staff for re-issuing the authorization complies with the following:
a) Appropriate recent maintenance experience in the last two years as per AMO Manual 3.4.2
(d). The Quality Assurance & Safety assessor must accumulate the maintenance experience
having the responsible staff presenting a list of functions performed related to Certifying staff,
support staff functions;
b) Successful completion of the continuation training as mentioned in 3.4.4. above;
c) Being assessed (especially for additional authorization) as per AMO Manual 3.4.2 & 3.14.
The Quality Assurance & Safety will keep all authorization documents for certifying staff personnel.
The records will be kept for as long as the staff is under employment. For those personnel who have
ceased employment with PT Garuda Maintenance Facility Aero Asia Tbk, the records will be kept
for three years on separate files.
Persons authorized to access the records will be maintained at a minimum to ensure that records
cannot be altered in an unauthorized manner or that such confidential records become accessible
to unauthorized persons.
The DGCA Indonesia is an authorized person when investigating the records system for initial and
continued approval or when the DGCA Indonesia has doubt about the competence of a particular
certifying person. The certifying person will be given reasonable access on request to his/her own
records.
The following information will be kept in records in respect of each certifying staff person:
a) Name;
b) Personnel identification number;
c) Date of birth;
d) Present title;
e) AMEL/Authorized License;
f) General License;
g) Training Certificate;
h) Experience log book;
i) Assessment result / test result.
The certifying staff and support staff must be able to provide to the auditors their authorization
within a reasonable time not exceeding 24 hours.
The CEO/accountable manager has appointed the VP for Quality Assurance & Safety with
responsibility for monitoring the quality system, including the associated feedback system and
requesting corrective actions as necessary to any Senior Management. The VP for Quality Assurance
& Safety, as per his/her job description (AMO manual Section 1.4), will have direct access to the CEO
/ accountable manager to ensure that he is kept properly informed on quality and compliance
matters.
The VP for Quality Assurance & Safety will select the appropriate number and skilled auditing
personnel for the performance of audits and will have the final responsibility for the proper
planning, auditing, follow up audit and reporting of the auditing management system. The VP for
Quality Assurance & Safety must:
a) Ensure the auditors are knowledgeable and suitably trained as required in this procedure;
b) Monitor and evaluate the performance of their audit team in order to improve
their efficiency and effectiveness;
c) Ensure that all auditors make the same observations and draw the same conclusions
when confronted with the same evidence;
d) Rotate the Auditors at periodic intervals to ensure the integrity of the independent audits.
The auditors must have at least four year experience relevant to Aircraft, engine or components
maintenance or supporting functions.
Specific skill requirement are base on related scope of quality system and auditing unit.
Training and qualification requirement for the auditors is specified in the PCM.
All auditing personnel will be assessed for having the appropriate knowledge and skills and the
talent before they are allowed to perform audits.
The candidate auditor will participate with skilled auditors in the audit process until they reach to
the point where they can demonstrate and equal or better performance by drawing the same or
better conclusions of an experience auditor of a selected workstation with a given procedure. A
customized performance assessment plan will ensure that the auditors have the appropriate skills
and knowledge.
They report to VP for Quality Assurance & Safety and their responsibility is to:
a) Define Quality Assurance & Safety standards and aviation regulations applicable to
b) Ensure revisions to procedures do not violate standards and regulations;
c) Coordinate quality projects and activities in the units concern;
d) Advise the units in matters concerning quality related subjects;
e) Participate in investigations with responsible units;
f) Develop audit program and perform procedure and product audits;
g) Raise non-conformance reports to units concern;
h) Verify effectiveness of the corrective actions;
i) Communicate with the units regarding quality issues;
j) Escort customers and authorities within the units;
k) Handle quality audit records;
l) Perform vendor audits as required;
m) Develop Approved Vendor List.
n) Review evaluation and approved maintenance capability list.
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 2 of 3
AMO MANUAL
a. Accept or reject (if not effective) the corrective actions and preventive actions taken by audited
managers;
b. Make a reminder for overdue response;
c. Stop maintenance activities or processes if there any Immediate Action Notice issue;
d. To make arrangements with other functions to meet the quality objectives;
e. Approve or disapproved suppliers if there are written authorization by the VP for Quality
Assurance & Safety;
f. Accept or reject self-evaluation maintenance capability.
For the purpose of this procedure, inspectors means Inspection personnel who have I-stamp
holder, the RII personnel who is authorized to perform Required Inspection Item which authorized
by the operator and Material receiving inspection personnel who is authorized to inspect and
approved incoming part from external.
The CASR 145 and 121 requires inspections for a particular operator to be performed by RII
inspection personnel designated by the air operator. The performance of a Required Inspection is
restricted to independent RII inspection personnel who directly report to the Quality Assurance
and that authorized person was not involved in the performance of the work to be inspected.
a) The person must be a GMF employee unless a short term contract employee is authorized by
the Quality Assurance;
b) The person must be able to read, write, speak and understand Technical English;
c) The person must have a competency and qualifications for the specific Aircraft type, engine,
component or specialized process method
3.7.1.3 Inspector for Aircraft, Engine, Component and Specialized services Personnel
Authorization
After satisfactory completion of competency and qualification of Aircraft, Engine, Component and
specialized services VP Quality Assurance and Safety will authorized them as inspection
personnel or RII personnel and will be listed in inspection or RII personnel list. Evidence of such
qualification must be in place before the work commences.
The VP for Quality Assurance will ensure that inspection personnel have adequate license related
to Aircraft, Engine, Component and Specialized Services.
The scope of the Inspector Authorization will be limited to the skill requirements fall within the
scope of the issued GMF. authorization
Any Inspection that could not be completed by the aircraft, engine, component or specialized
services inspector as a result of a shift change or other work interruption must be adequately
turned over to the next Inspector, through written and/or verbal communications.
Available to all Inspector personnel will be meet with the operator's maintenance program,
current specifications involving inspection tolerances, limits, and procedures as set forth by
manufacturer of the product undergoing inspection and other forms of inspection information
such as airworthiness directives, manufacturers bulletins, etc.
The Quality assurance will keep the training records of the Inspection personnel and RII personnel,
and the roster as required by Sections 1.6 of this manual.
3.7.1.5 Activities
The inspector personnel, they are responsible to:
Personnel who represent the repair station in the performance and approving the required
inspections must fulfill the following requirements:
d) The person must be a GMF employee unless a short term contract employee is authorized by
the Quality Assurance as per Section 3.8.3 of this manual;
e) The person must be authorized by the Operator or by the Quality Assurance if delegated by
the operator, through a valid GMF Authorization;
f) The person must be able to read, write, speak and understand Technical English;
g) The person must have a competency and qualifications for the specific aircraft type (see
Section 3.8.2, 3.8.3 of the manual);
h) Must have taken the operator’s RII training.
The Quality Assurance is responsible to ensure that prior to conducting work on an aircraft of
which the Authority of aircraft registration (such as ''PK'' registered aircraft), requires the RII
inspection personnel involved, they have been properly trained on the Air Carriers procedures in
general and specifically on procedures regarding the performance and recording requirements of
the required inspection items. The training will be done by the contracted operator or, when
authorized by operator the training may be delegated, to GMF.
After satisfactory completion of the training, a list of recommended RII inspection personnel is
presented to the operator to authorize these persons in accordance with their manual. In cases
the operator has delegated GMF by letter to authorize the RII personnel. GMF will authorize them
as per operator’s procedures. Evidence of such qualification must be in place before the work
commences.
The VP for Quality Assurance will ensure that RII inspection personnel have adequate license
related to aircraft type training and have passed the RII inspector course prior to approval.
The scope of the RII Authorization will be limited to those Required Inspection Items whose skill
requirements fall within the scope of the issued GMF authorization.
For the items performed under the means of an RII authorization, RII personnel are solely
responsible to the VP for Quality Assurance. Any conflict of interest shall be reported and solved
by the VP for Quality Assurance, in order to guarantee full independence from production
management decisions.
The Quality assurance will keep the training records of the RII personnel and the roster as required
by Sections 1.6 and 3.5 of this manual.
The Operator’s maintenance manual contains among others the operator's required inspection
items and procedures. An RII, as stated in CASR Part 121 subpart L, is a designation of the items of
maintenance and alteration that must be inspected (required inspections), including at least those
that could result in a failure or defect, endangering the safe operation of the aircraft, if not
performed properly or if improper parts and materials are used.
With regards to RII’s incorporated in the operators’ General Maintenance Manual, only specially
trained personnel – the RII inspection personnel – are allowed to sign for the RII’s performed. The
performance of a required inspection is restricted to an RII authorized person who was not
involved in the performance of the work to be inspected.
The RII personnel must be present at the work site to physically verify the work performed by the
mechanics and effectively inspect all points related to the RII.
Any Required Inspection that could not be completed by the RII inspector as a result of a shift
change or other work interruption must be adequately turned over to the next RII inspector,
through written and verbal communications.
Available to all RII personnel will be the operator's maintenance program, current specifications
involving inspection tolerances, limits, and procedures as set forth by manufacturer of the
product undergoing inspection and other forms of inspection information such as airworthiness
directives, manufacturers bulletins, etc.
The RII personnel report to Quality Assurance for the performance of the required inspection
items. They are responsible to:
NOTE:
The RII Inspection personnel will NOT delegate their responsibilities to any other personnel.
The material receiving inspection personnel is formed by a selected group of personnel based on
their formal training status, experience and knowledge of maintenance and inspection functions
and having met the competencies for their specific job title in the organization.
The material receiving inspection personnel will receive initial training prior to their assignment as
material inspectors. The continuation training will be given every two years.
1. The person must be a GMF employee unless a short-term contract employee is authorized
by the Quality Assurance;
2. Be trained in human factor, safety management system, suspect unapproved part and
hazardous material awareness
3. Be trained in inspection techniques, procedures, and electrostatic discharge sensitive.
4. Pass the examination of proficiency test material receiving inspection
5. The person must be able to read, write, speak, and understand Technical English
Current specifications involving inspection of shelf life material, instructions from DGCA Indonesia
regarding suspected unapproved parts, IPC, purchase orders, GMF procedures related to their
work, and any other information aids will be available to the material receiving inspection
personnel to ensure proper inspection and disposition of the receiving material.
a) Visually inspect incoming material for conformance to procedure, quantity and physical
condition;
b) Make sure the traceability of the material;
c) Inspect and report for suspected unapproved parts;
d) Decide all incoming material based on their inspection status, accepted or not conform;
e) Keep non-conforming material in quarantine area waiting disposition;
f) Send records of all incoming material traceability document to the unit concern.
The Human Capital Management function will plan the training and development program and
will develop the training process in conjunction with other functions.
The Vice Presidents will assign trainers/training coordinators for their operation and they will
coordinate with Human Capital Management assisted by the Senior Managers for the
development units/elements of competencies and performance criteria. They will identify and
record the training needs for each job title as per Section 3.8.2 of this manual and they will ensure
that trained and qualified personnel perform activities affecting product quality.
The Human Capital Management function will develop the personnel competencies by defining
for each job title and competency level, the work requirements and the training and qualifications
required for the maintenance and inspection personnel.
The competencies will be developed to meet the CASR requirements and will be documented in
competency charts, which in turn, will be compiled in each unit's personnel competencies manual
(PCM) together with the unit's organization chart.
In order to determine the competencies and the necessary training, the Human Capital
Management, assisted by Senior Managers for each unit and trainers will perform a task analysis
for each job title in order to:
GMF Training program management is specified in AMO Training Program (AMOTP) DQ-046.
The Quality Assurance & Safety will monitor the development of the technical personnel
competency charts and will have the final responsibility to ensure maintenance personnel
training needs are in compliance with the authority of the aircraft registration and with the
requirements of this manual. Each Department will issued the PCM, The Quality Assurance &
Safety will reviewed the PCM and Human Capital Management will Verified the PCM.
Human Capital Management will keep the complete master of PCM and be responsible to control
and distribute it.
3.8.2 Non-Certificated Aircraft and Shop Technicians Training Program and Activities
For Aircraft maintenance, non-certificated aircraft maintenance technicians are those technicians
who do not hold an aircraft maintenance engineer license but they may have a basic Aircraft
license and for Component and Engine/APU Maintenance, non-certificated
component/engine/APU maintenance personnels are those personnel who have Certificate of
Maintenance Approval (COMA) which will have Certificate of Competency given by the Quality
Assurance & Safety as appropriate, for their assigned work.
Non-certificated Aircraft technicians responsible to perform under supervise AMEL Holder, only
the activities described in the scope of their C of C, such as:
a) Perform minor maintenance tasks not requiring Aircraft systems removal and installation;
b) Open panels and components;
c) Installing safety devises;
d) Perform lubrication and servicing;
e) Install components limited to certain aircraft types;
f) Responsible to perform work following the current approved maintenance data and quality
procedures.
g) To properly claim the work performed after he/she has verified by self-inspection that is has
been in accordance with current approved maintenance data;
h) Report non-conformities, defects and malfunctions and any problems to his/her Superior
for investigation and corrective action before any further work is performed;
Non-certificated component technician responsible to perform only the activities described in the
scope of their C of C under supervise COMA holder or authorized person , such as:
e) Report non-conformities, defects and malfunctions and any problems to his/her Superior for
investigation and corrective action before any further work is performed;
Non-certificated engine personnel responsible to perform only the activities described in the
scope of their C of C under supervision COMA holder or authorized person, such as:
Certificated or licensed technicians are those personnel who hold an aircraft or aircraft
component maintenance engineer license (AMEL or COMA) as given by the DGCA Indonesia and
an authorization as given by the Quality Assurance & Safety appropriate for their assigned work.
Certain inspection, repair and test process and specialized services personnel are qualified as
license technicians for the purpose of supervising repair processes and releasing components to
service after maintenance including specialized services maintenance.
The VP for Quality Assurance & Safety will grant a GMF authorization to those personnel
recommended by the production provided the individual meets certain qualification criteria as
per QP 304-03.
Depending on the scope of the authorization the following training are performed:
a. CASR - Part-21
b. CASR - Part-39
c. CASR - Part 43
d. CASR - Part 121
e. CASR - Part 145
f. AMO Manual/Quality Procedures training in relation to their job function;
g. On the job training for the particular assignments;
h. Human factors and Safety management system training as per AMO Manual 3.13
I. Others training as described at QP308-01
The licensed personnel will NOT delegate their responsibilities to any personnel when they
perform work described in the scope of their authorization.
Short-term staff recruited as per Section 1.7.1.1 of this manual will have their qualifications,
training and experience presented for assessment by the Quality Assurance & Safety as per QP
308-01.
a) The Unauthorized contracted staff will not be responsible to perform required inspections
or for releasing to service. Such responsibility will remain to GMF certifying staff, unless
the VP for Quality Assurance & Safety - after consultation with the DGCA Indonesia - has
approved such staff, (and providing they meet the requirements of Section 3.4 and 3.7 of
this manual).
b) The short-term staff is briefed about their intended work and they have been trained in
GMF procedures related to their assignment.
The Quality Assurance & Safety will issue a special design stamp and C of C to those short-term
contracted staff if found competent to perform maintenance affecting product quality.
Supervisory personnel are selected among the qualified employees in GMF who have been
qualified as competency and tasks they are assigned to supervise. All managers are required to be
thoroughly familiar with the requirements of this manual, aviation regulations, and any
maintenance data related to the maintenance tasks they supervise. All aircraft and aircraft
components maintenance supervisors must be able to understand, read, and write English.
Airframe & Power plant (A/P) supervisors as well as Electrical and Avionic (E/A) supervisors at the
base maintenance or line maintenance are required to have a valid aircraft maintenance engineer
license in order to be eligible for supervisors.
3.9.1 General
PT Garuda Maintenance Facility Aero Asia Tbk does not have the authority for exemption process
for a maintenance interval and/or to defer extension of defects that may be found during
maintenance of customer's aircraft. It is the responsibility of the operator to arrange for an
extension of an interval or to defer a defect with the Authority of aircraft registration.
The operator must determine what defects may be deferred and must provide an agreement or
letter to PT Garuda Maintenance Facility Aero Asia Tbk and presented to certifying staff that
allows deferring the defect identifying the authority for such action.
When the letter or agreement is present, the certifying staff will issue a certificate of return to
service (CRS), provided the deferred defects are within the limits of the operator's maintenance
program as approved by their operator's authority. The certifying staff will identify the defects not
rectified on the CRS and he will also identify on the CRS specific actions required by the operator
related to the deferred defect.
NOTE:
The certifying staff prior to issuing CRS must ensure that the deferred item is within the operator's
limitations. Any violation of this procedure, the holder of authorization who is issuing CRS will be
noted and processes accordingly.
When such an agreement or letter is not present, or the letter/agreement does not identify the
DGCA Indonesia for such action, or the deferred item is not included in the operator’s
maintenance program, the certifying staff will inform the VP for Quality Assurance & Safety for
further actions.
The VP for Quality Assurance & Safety will contact the DGCA Indonesia to clarify whether a CRS
must be issued indicating the defects not rectified. A non-compliance with an AD Note on due is
to be reported to DGCA Indonesia as well.
Concession for deviation may be required whenever there is a need to deviate from quality
system procedures. The Quality Assurance & Safety remains responsible to ensure any
concessions do not violate any DGCA Indonesia requirements. Deviation from quality system
procedures requires concession if:
a) One time or limited use instructions or information relative to the maintenance;
b) A specific process must be performed which is not covered in this manual or QPs;
c) A process is to be executed which goes beyond any limit as described in this manual and
quality procedure.
3.10.2 Procedure
Any Senior Manager may request a concession for deviation from procedures by sending an e-
mail titled: ''Request for Concession'' to VP for Quality Assurance & Safety. Concession may initially
by requesting verbally so that to be determined if the approval will be given before officially
request is issued.
The VP of Quality Assurance & Safety will evaluate the request for concession and will approve or
disapprove the concession.
NOTE:
The concession should clearly describe the purpose, procedures involved, justifications, required
conditions, applicability and the limitation.
When the concession is approved, the Quality Assurance & Safety will issue and distribute the
Quality Bulletin. All Management and maintenance personnel are responsible to follow the
instructions of the Quality Bulletin as written.
3.11 QUALIFICATION PROCEDURE FOR SPECIALIZED ACTIVITIES SUCH AS NDT, WELDING, ETC.
(Ref: CASR-145.151, 153)
An authorization for NDT will be issued to personnel based on results of qualification exams and
written Quality Procedures describing qualification criteria for NDT personnel. All levels of NDT
personnel shall be re-certified periodically in accordance with evidence of continued satisfactory
performance and re-examination in the general written or specific written exams as determined by
the level 3 NDT personnel.
Level 1 and 2 NDT personnel will be trained, qualified and re-qualified by GMF level 3 NDT personnel
or other approved sources. Level 3 NDT personnel who is re-qualified by external approved is
designated as responsible level 3. Responsible level 3 NDT personnel having qualified may qualify
another individual level 3 NDT personnel in accordance with his/her certified NDT methods based
on NAS410.
An authorization for NDT will be issued to personnel based on results of qualification written exams
and Quality Procedures describing qualification criteria for NDT personnel. All levels of NDT
personnel shall be re-certified periodically in accordance with evidence of continued satisfactory
performance and re-examination in the general written or specific written exams as determined by
the employer's level 3 NDT.
NDT Levels
Level 1: Issued to NDT personnel who are capable to perform preparations for NDT inspections in
accordance with the documented procedures. He/she is not allowed to sign off any
relevant maintenance documents. Level 2 verifies and/or reads the inspection results.
Level 2: Issued to NDT personnel who perform the inspections in accordance with documented
procedures. He/she is allowed to sign off relevant maintenance related documents.
He/she can evaluate and interpret imperfections and inspection results, convert
manufacturer data into work instructions and train and supervise Level 1.
Level 3: Issued to personnel with college level knowledge regarding NDT methods and
techniques and capable to train, supervise and re-qualification Level 1 and 2. Level 3
personnel are responsible for the training and examination of level 1 and 2 personnel.
Performance of NDT:
All non-destructive tests will be performed using NDT methods, maintenance data, tools and
equipment described by the manufacturer’s maintenance manuals. See quality procedures:
a) Developing and approving non-destructive test procedures for the control of NDT processes
using references from manufacturers manuals , acceptable document and/or current
approved data;
b) Determining the kind of NDT required based on material, location, accessibility, etc, when no
clear instructions are given by the quality plans;
c) Coordinating NDT operations for indications such as internal and external cracks, voids,
inclusions, slams, laps, cold shuts, shrinkage porosity, gas holes, and shrinkage tears;
d) Assisting personnel to perform NDT and for the interpretation and evaluation of inspection
results. Ensure that the kind of defects found (cracks, voids, inclusions, laps, etc,) are recorded
in the inspection records together with the location and the length of the defects;
e) Evaluating and determine required amount of amperage and number of shots where not
clear instructions are given;
f) Determining and controlling the type and method of magnetic particle inspection to be used.
Mix and test inspection solution as required. Control all tools and equipment.
g) Planning the shielding requirements and barrier distances, danger areas, length of exposure,
and position of X-ray equipment so that all precautions have been met;
i) Detecting and identify and interpret defects in various types of metals and metal joints;
l) Setting up and assist for the operation of various types of ultrasonic and eddy-current
equipment and performing the appropriate calibrations verifying results against masters;
m) Developing NDT personnel training curriculum, schedule and train them or arrange for
training as necessary in order to obtain and/or retain NDT certification. Follow the regulations
as applied to national or international standards;
Note:
The NDT level 3 will NOT delegate his duties to any personnel.
The Welding, thermal spray, shot peening, electroplating, heat treating, painting, anodizing and
etching specialized services personnel are granted authorizations following a qualification check
based on periodic specimen evaluations and approvals. Appropriate authorizations will be issued
to personnel who perform those specialized services after passed the qualification checks.
3.11.3.1 Activities for the specialized services Managers (other than NDT):
a) Develop good welding and brazing techniques to welders working with quality plans and
welding related specifications. Maintain current welding certification on various metal groups
by submitting weld and braze test pieces for examination on the fusion welding and brazing;
b) Assist welders in setting up of welding machines according to specifications for rod type and
position, gas and oxygen flow, machine feed, amperage, voltage and pressures;
c) Observe initial set up during welding operations and techniques used and authorize
operational corrections or additional passes;
d) Verify fixtures needed for welding and assure that: parts are welded in fixtures, apply heat sinks
and holding devices, to retain the part in correct alignment and obtain proper heat distribution
to minimize distortion as described on the operation sheets;
e) Monitor the identification and traceability status against AMS specification numbers of welding
& brazing wire rods, and other consumables used for penning, metal spraying etc;
f) Submit for examination welding, plasma sprayed, penning, specimens to certify/re-certify
operators;
g) Prepare engine parts, tools and fixtures by grit blasting, cleaning and masking. Apply various
plasma spray coatings to these parts per quality plans;
h) Monitor the shot peen and glass bead peen operations by ensuring acceptable penning results
by making tests at regular intervals, proper gun pressure and feed and proper sprayed material;
i) Support the parts repair and welding by accomplishing various blending, polishing, cutting and
miscellaneous repairs as required on quality plans. Miscellaneous repairs will consist of cutting
away old damaged areas and fitting new details into correct position. Incorporating radii,
chamfers and blending to original contour on various engine parts;
j) Verify and assist as required for the proper preparation for welding like –V- grooving, and
polishing the area to be welded.
Personnel who carry out borescope and interpret defects are properly trained and assessed for their
competence as required by QP 304-03. Borescope is performed in accordance with maintenance
manuals requirements.
3.12.1 General
This procedure is to describe the communication between the manufacturer field representatives
and also for maintenance support teams that may occasionally contracted by GMF to perform
maintenance.
When maintenance-working teams are contracted to perform maintenance for GMF, the VP for
Quality Assurance & Safety will take actions to ensure the subcontractor (the maintenance working
team) has been approved as required by Section 2.1 of this manual and that the work is
accomplished in an airworthy manner so as to permit certification.
The engineers and other Management personnel will request in writing any advice for the
representatives. In turn, they will advise and instruct production personnel based on written
instruction by the representatives. These instructions will be transferred into GMF's maintenance
forms such as Engineering Instructions, Job Cards, and PD Sheets, giving reference to formal
documents from the field representatives.
The VP for Quality Assurance & Safety will assign a certifying staff and support staff to ensure good
maintenance practices are followed and that all work meets the AMO Manual Section 2.16
requirements before accepting the work from the maintenance working team.
The responsible maintenance Senior Manager will assign maintenance personnel to attend the
maintenance performed and be trained as necessary. Such training will be performed as per QP
304-01.
3.13.1 General
In respect to the understanding of the application of human factors, safety management system
and human performance issues, maintenance, management, and quality personnel will be assessed
for the need to receive Initial human factors and safety management system training for the
differences between the existing GMF syllabus they have been trained.
In any case all maintenance, management, and quality personnel should receive human factors and
safety management system continuation training. This will concern to a minimum:
a) Accountable manager and appropriate directors;
b) VP, SM , Managers,
c) Certifying staff, engineers and mechanics;
d) Technical support personnel such as, planners, engineering function staff, technical record
staff;
e) Quality control/assurance/safety inspection staff;
f) Specialized services staff
g) Store department staff, purchasing department staff;
h) Ground equipment operators;
i) All staff and Short term contract staff in the above categories.
NOTE:
The training curriculum and syllabus will be prepared by GMF Learning Services department.
Training curriculum and syllabus control and monitored by Safety Inspection Department and
it must meet the DGCA Indonesia requirements.
b) Prepare the training program and the training syllabus. Initial human factors and safety
management system training will cover all the topics of the training syllabus either as a
dedicated course or else integrated within other training. The syllabus may be adjusted to
reflect the particular nature of the organization or workstation. The syllabus may also be
adjusted to meet the particular nature of work for each function within the organization.
c) Conduct complete training or differences training to existing employees as instructed in this
procedure;
d) Conduct training to new employees not later than six months after their employment
e) Conduct training to short term contract employees not later than a week after their
employment
Issue: N Revision No.: 0 Date: 11 November 2020 Page: 1 of 3
AMO MANUAL
The purpose of human factors and safety management system continuation training is primarily to
ensure that management and maintenance personnel remain current in terms of human factors
and safety management system, also to collect feedback on GMF human factors and safety
management system issues.
Human factors and safety management system continuation training will be of an appropriate
duration in each two-year period in relation to relevant CASR part 65.
The continuation training will cover knowledge and skills related to human performance and safety
management system, including co-ordination with other maintenance personnel and flight crew,
limitations relevant to the duties of an aircraft maintenance authorization holder.
a) Ensure the non-conformities and deficiencies are properly analyzed and the root cause is
defined by the responsible managers
b) Accumulate corrective action reports as per AMO Manual 3.3
c) Provide deficiencies and non-conformities related to human error and also route causes and
corrective actions to the Quality Assurance & Safety personnel assessor and trainers.
d) Lead the human factors and safety management system coordination meeting.
▪ Workstations not working in shifts may cover in less depth subjects related to teamwork
and communication;
▪ Planners may cover in more depth the scheduling and planning objective of the syllabus
and in less depth the objective of developing skills for shift working.
3.13.4 Human factors and safety management system issues coordination, communication and
feedback
Every three months, the VP for Quality Assurance & Safety will assign a SM of Safety Inspection to
lead a meeting with the personnel assessors, learning services personnel and other related
personnel to discuss human factor and safety management system issues at GMF. They will collect
data regarding problem performance, personnel behavior and any other information that is
necessary to improve human performance. They will develop a feedback system to collect and
analyze information as described in the requirements above.
3.14.1 General
The Quality Assurance & Safety will assess the maintenance personnel based on the competency
chart requirements to ensure they have received the appropriate training and are competent to
performing maintenance tasks before unsupervised work is permitted.
All personnel changing positions will be trained and assessed by responsible managers for
competence to their new positions. Short term contracted employees will have their training
records and past experience assessed to ensure they fit for the specific assignment The QP 308-01
will be used for the assessment and issuance of stamp and certificate to personnel.
who also carry out maintenance tasks that they understand such tasks should not be
undertaken when incompatible with their management responsibilities.
h) Quality audit staffs are able to monitor compliance with the regulations of the Authority of
aircraft registration and identifying non-compliance in an effective and timely manner in
order that the organization may remain in compliance with the regulations and quality
system.
All maintenance personnel after they have passed the basic training, they are subsequently
located to their respective departments and they are assigned to perform specific maintenance
functions under the supervision of supervisory personnel. While under on-the-job-training, their
progress is monitored on regular basis.
When his Manager is satisfied that the employee has fulfill the requirements, he requests to the
Qualification & Licencing assessor to assess the employee for competent against the performance
criteria set in the PCM applicable for the job title (see AMO Manual 3.8).
Upon satisfactory assessment as per QP 308-01, the Qualification & Licencing assurance assessor
issues a stamp; a certificate of competency (C of C) or an Authorization describing the scope and
limitation of the work the employee can perform without being supervised.
The certificate of competency (C of C) is valid for as long as the employee maintains his job title
and effectively performs the functions described in the scope of his C of C. The Authorization is
valid for as long as the License given by the authority is valid but not more than 2 years.
The criteria for personnel assessment and qualification are described in the appropriate PCM and
also for the authorizations in the QP 304-03.
The criteria of all authorization, the applicant must have physical and mentality health, and
submit the medical fitmess statement.
According to the job functions and the scope, the assessment shall consider the regulatory
training if specified in PCM. For Certifying/ Support Staff and other technical personnel which
need authorization and certificate of competence to perform their task the required regulatory
training are also as defined in QP-304-03 and QP-308-01.
QP 308-01 Personnel assessment and stamp & license issue use and control
PART 4
CONTRACTED OPERATORS
The Sales & Marketing handles all contracts with aircraft operators and owners who have fully
function and long term contracted maintenance to PT Garuda Maintenance Facility Aero Asia Tbk.
A list of contracted operators will be added to this Section when the Sales & Marketing function
make contract with such operators.
The maintenance services provided by GMF to the operator will be listed by Sales & Marketing
function.
List of maintenance & support contracts GMF and contracted operators can be found in Appendix
A – List of Contracted Operators of this Manual.
Note :
1. All line maintenance activities for contracted operator are perform at the station listed in
Appendix B.
2. As approved by DGCA, line maintenance activities limited for walk around check for all
Air Operator Certificates which have maintenance & support contracted with GMF at the
station listed in operator’s ACL (Authorization, Condition and Limitation) but not listed in
Appendix B can be performed by means of engineer onboard and fly away kit. GMF shall
provide authorized engineer onboard and fly away kit for that purpose.
3. If during walk around check found defect non DDG, GMF shall provide qualified engineer,
part and tools/equipment as needed.
4.2.1 General
For each individual operator there might be different procedures and requirements to control the
particular paperwork, forms, and overall procedures. For this reason, Business cooperation and
development compiles those requirements for each operator, with a listing of the particulars as
required by the operator and based on the contractual agreements.
The Account Manager and Sales functions as appropriate arrange with the Operator/Owner and
ensure through agreement the following document depending on the Operator/Owner, the kind
of maintenance and the Authority involved:
a) Contact persons: Who is controlling the contract for the operator, who shall be contacted
when a problem arises, etc;
b) Scope of work: What type of maintenance is performed (Line/Base), does it include
maintenance of components, special services, etc.
c) Responsibility for pool parts, loan parts, replaced parts, etc.
d) The availability of the operator's approved and maintenance program, time and planning
schedule, quality system, reliability program etc. Maintenance personnel receive training of
operator’s procedure from customer including how to implement the maintenance program
and specifications and making the appropriate work preparation for the maintenance and
completing the job card/worksheet in accordance with operator procedure.
e) The availability of operator's maintenance data and the responsibility of the operator to
ensure that it remain current all the times. Evidence can be established by:
1. Having a written confirmation from the operator/customer that all such
maintenance data is up to date; or,
2. The work order specifies the amendment status of the maintenance data; or,
3. It can be show it is on the operator/customer maintenance data amendment list.
f) It must be established whether the operator requires any specific maintenance procedure,
different types of servicing, etc;
g) The operator's forms may be used for any concluding maintenance, usually the operator's job
cards is used;
h) Compliance with all mandatory AD Notes and optional modifications;
i) Required Inspection Item by the operator. The operator may require to train and approve
the Required Inspection Item personnel. The Required Inspection Item list and Personnel
must be available at GMF;
j) At time of release, the operator's release procedures and forms/certificates may be observed
and/or used. Aspects like signing the Aircraft Log Book, issuance return to service, etc must
be considered;
k) After concluding any maintenance, agreements regarding delivery of the maintenance
documentation that must be observed with regard to the individual operator;
l) Customer representative accommodation and work interface with GMF functions and
personnel;
m) Any other requirements as appropriate.
When an operator is contracted with GMF, Contract Agreement Element’s (specific for each
operator) shall describe the special procedures and paperwork as agreed. For knowing contracted
item with the customer, summary contract of the customer shall be provided to unit concern.
When the operator provides the Logbook to record maintenance performed by PT Garuda
Maintenance Facility Aero Asia Tbk, the certifying staff holding the appropriate rating is
responsible for completion of such records on the logbook as per operator procedures.
GMF sales & marketing function after getting the records from the records function will hand over
it to the operator as agreed by the contract
The records will be transmitted to the operator as soon as possible after the maintenance is
completed. The time period will not exceed that specified by the contract agreement.
When GMF is contracted to keep the operator records on behalf of the operator, the records
retention period as well as the records which will be kept and method of retention will be
determined by the operator.
Note: Procedure for record control and retention period describe in AMOM Section 2.14 & 2.17
The sales & marketing function will negotiate the contract requirements with the customer and
will make those requirements available for review and coordination with the appropriate
departments and personnel to ensure that GMF has the capability to meet the contractual
requirements before the work starts. Records of contract reviews shall be maintained.
The sales & marketing will contract work based on the privileges and limitations given by the
Approval certificates and ratings held by the Authorities and only if GMF has the capability to
perform such work. See Section 1.9 of this manual.
The Quality Assurance & Safety will participate in contract reviews as appropriate to ensure that
contractual requirements do not violate any quality requirements and aviation regulations.
The sales & marketing function will take the lead in establishing the quality requirements of the
product or service to be delivered to the customer. Therefore it must:
a) Ensure that they have received a clear work order from the customer;
b) Nominate a technical person or persons as a customer service with responsibility for
communicating with the customer and ensuring that initial work order and any
amendments are properly executed;
c) Ensure that the customer has either provided the maintenance data or has confirmed that
the GMF's maintenance data is current and data is approved;
d) Ensure hangar space (slot) will be available at the time of maintenance.
PART 5
LIST OF APPENDICES
PART 6
Full Maintenance contracted between GMF and the operator shall be arranged by Sales and
Marketing which described in AMO Manual Section 4.
Engineering service is responsible for the compilation of such maintenance program for aircraft,
engines and components. An agreement between GMF and the operator shall describe the
limitations and the authorizations of GMF, the interface between the two parties, and the
operator procedures may use. The agreement should include who will control operator’s
maintenance manual.
1) The procedure agreed by both parties for the execution of maintenance & predominantly line
maintenance is Operator’s Company Maintenance Manual.
2) The procedure for the execution of the maintenance related to Line Maintenance and
Engineering Services is Operator’s Company Maintenance Manual.
All maintenance management task performed by PT Garuda Maintenance Facility Aero Asia Tbk
on behalf of the Operator, based on contract required such as:
▪ Material Management
▪ Aircraft, Engine and Component Maintenance
▪ Engineering Services including Reliability Control Program
▪ Maintenance Record
▪ Maintenance Planning & Control
▪ Aircraft External damage identification
are performed in accordance with procedures in part 2 of this manual, in conjunction with the
total maintenance agreements and their Company Maintenance Manual.
Quality Assurance & Safety ensuring that all maintenance activities and engineering services are
performs in accordance with Company Maintenance Manual.
PT Garuda Maintenance Facility Aero Asia Tbk will, on behalf of Contracted Operator maintain all
necessary aircraft maintenance, engine maintenance, APU maintenance log books to ensure the
operator compliance with CASR 121 requirement as stated in the Company Maintenance Manual.
GMF will retain the contracted operator maintenance records in such manner that ensures all
maintenance records are available for review/transfer as necessary. The storage of the record will
ensure that the record are not subjected to damage from water, fire, smoke, vermin, and are
secure from theft.
GMF will not impede the review of the maintenance records by contracted operator contracted
operator or their nominated agents.
Knowledge and skills related to human performance, including co-ordination with other
maintenance personnel and flight crew, limitations relevant to the duties of an aircraft
maintenance authorization holder.
APPENDICES
APPENDICES
RECORD OF REVISIONS
Issue APPENDIX
Detail Date
No. Rev.
00 New Format of APPENDIX of AMO Manual: 01-Mar-2019
A - Rev.00 1. Appendix A: LIST OF CONTRACTED OPERATORS
B - Rev.00 2. Appendix B: LIST OF LINE MAINTENANCE LOCATIONS
C - Rev.00 3. Appendix C: LIST OF CONTRACTED ORGANIZATIONS /
REPAIR STATION LIST
D - Rev.00 4. Appendix D: LIST OF SUB-CONTRACTED ORGANIZATION /
MAINTENANCE FUNCTIONS
E - Rev.00 5. Appendix E: SAMPLE OF DOCUMENTS
01 B - Rev.01 1. Addition capability of : 15-Apr-2019
- ATR Transit Check at DPS, WYK for Citilink
- ATR up to Weekly Check at HLP for Citilink
- A320 Series up to Weekly Check at SOC for Citilink
- A320 NEO up to Weekly Check at SOC for Citilink
2. Deletion capability of :
- ATR Transit Check at BEJ, BPN, BKS, KTG, LBJ, TJQ for Citilink
02 B - Rev.02 1. Addition capability of: 26-Apr-2019
- A320 Series up to Weekly Check and A320 Neo up to Weekly
Check at sta. Kulon Progo (YIA) for Citilink
- ATR Transit Check at sta. Banda Aceh (BTJ) for Citilink
03 B - Rev.03 1. Addition capability of: 09-May-2019
- A320 Series and ATR Transit Check at sta. Muara Bungo (BUU)
for Citilink
2. Revise definition of “TR”
04 B - Rev.04 1. Addition capability of: 21-May-2019
- ATR Transit Check at sta. Labuan Bajo (LBJ) & Tasikmalaya
(TSY) for Citilink
- B737-300/500 Transit Check at sta. Kuabang (KAZ) for
Sriwijaya Air
- B737NG up to Service Check at sta. Tarakan (TRK) for
Sriwijaya Air
- ATR up to Weekly Check at sta. Solo (SOC) for NAM Air
- ATR up to Daily Check at sta.Sampit (SMQ) for NAM Air
2. Deletion Capability of:
- B747 Series up to Weekly Check at sta. Balikpapan (BPN),
Denpasar (DPS), Kualanamu (KNO), Makassar (UPG), Padang
(PDG), & Surabaya (SUB) for Garuda Indonesia
- B747 Series Transit Check at sta. Palembang (PLM) for Garuda
Indonesia
05 B - Rev.05 1. Addition capability of: 29-May-2019
- B737-800NG up to Before Departure Check at sta. Kulon
Progo (YIA) for Garuda Indonesia
- ATR up to Daily Check at sta. Banjarmasin (BDJ) for NAM Air
06 B - Rev.06 1. Deletion capability of : 14-Jun-2019
- B737 B737-800NG up to Before Departure Check at sta.
Kulon Progo (YIA) for Garuda Indonesia
APPENDICES
Issue APPENDIX
Detail Date
No. Rev.
2. Addition capability of :
- ATR up to Transit Check at sta. Solo (SOC) for Citilink
- B737-800NG up to Before Departure Check at sta. Kertajati
(KJT) for Garuda Indonesia
- A320 NEO up to Transit Check at sta. Malang (MLG) for
Citilink
- ATR up to Weekly Check at Sta. Bandung (BDO) for Citilink
07 B - Rev.07 1. Addition Capability of: 09-Jul-2019
- A330 Series up to Before Departure Check at sta. Palembang
(PLM) for Garuda Indonesia
- CRJ-1000 up to Transit Check at sta. Samarinda (AAP) for
Garuda Indonesia
- ATR up to Transit Check at sta. Semarang (SRG) for Citilink
- ATR up to Weekly Check at sta. Bandung (BDO) and Surabaya
(SUB) for NAM Air
2. Change IATA Code for Samarinda from SRI to AAP
08 B - Rev.08 1. Addition Capability of: 29-Jul-2019
- B737-500 up to Daily Check at sta. Banjarmasin (BDJ) for NAM
Air
09 B - Rev.09 1. Addition Capability of: 01-Aug-2019
- A330 Series up to Transit Check at sta. Ahmedabad (AMD) for
Garuda Indonesia
- B777-300ER up to Pre Departure Check at sta. Surabaya (SUB)
for Garuda Indonesia
10 B - Rev.10 1. Addition Capability of: 26-Aug-2019
- ATR up to Before Departure Check at sta. Bandung (BDO) for
Garuda Indonesia
11 B - Rev.11 1. Addition Capability of: 28-Aug-2019
- B737-800 NG up to Transit Check at sta. Labuan Bajo (LBJ) for
Garuda Indonesia
2. Deletion capability of :
- ATR up to Transit Check at Sta. Baubau (BUW), Ende (ENE),
Jember (JBB), Luwuk (LUW), Maratua (RTU), Sintang (SQG)
and Tasikmalaya (TSY) for Garuda Indonesia
- CRJ-1000 up to Transit Check at Sta. Manokwari (MKW) for
Garuda Indonesia
- A320 NEO up to Transit Check at sta. Jambi (DJB) for Citilink
12 B - Rev.12 1. Addition Capability of: 17-Sep-2019
- A320 Series up to Weekly Check at sta. Semarang (SRG) for
Citilink
- A320 Neo up to Weekly Check at sta. Semarang (SRG) and
Yogyakarta (JOG) and Palembang (PLM) for Citilink
13 B - Rev.13 1. Addition Capability of: 25-Sep-2019
- ATR up to Before Departure Check at sta. Manado (MDC) for
Garuda Indonesia
14 B - Rev.14 1. Addition Capability of: 03-Oct-2019
- A330 Series up to BD Check at sta. Kulon Progo (YIA) for
Garuda Indonesia.
APPENDICES
Issue APPENDIX
Detail Date
No. Rev.
- B737-800 NG up to BD Check at sta. Kulon Progo (YIA) for
Garuda Indonesia.
15 B - Rev.15 1. Addition Capability of: 08-Oct-2019
- CRJ-1000 up to Transit Check at sta. Halim Perdana Kusuma
(HLP) for Garuda Indonesia.
- CRJ-1000 up to BD Check at sta. Lombok Praya (LOP) for
Garuda Indonesia.
16 B-Rev. 16 1. Addition Capability of: 11-Oct-2019
- Airbus A330 Series up to Transit Check at Sta Hang Nadim
(BTH) for Garuda Indonesia.
C - Rev.01 2. Change the title & content of Appendix C to become : Engine
Services on Site Support Capability
D - Rev.01 3. Change the title & content of Appendix D to become : Limited
Maintenance Tasks
E - Rev.01 4. Change the title & content of Appendix E to become : Roster of
Management
F - Rev.00 5. Create new Appendix F and move Appendix “List of Contracted
Organizations / Repair Station List” from Appendix C to
Appendix F
G - Rev.00 6. Create new Appendix G and move Appendix “List of Sub-
Contracted Organization / Maintenance Functions” from
Appendix D to Appendix G
H - Rev.00 7. Create new Appendix H and move Appendix “Sample of
Documents” from Appendix E to Appendix H
17 B-Rev. 17 1. Addition Capability of: 18-Oct-19
- ATR up to Before Departure Check at Sta Penggung (CBN)
for Garuda Indonesia
18 A-Rev. 01 1. Deletion of B747-400 powered with CF6-80C2 from list of 31-Oct-19
contractors for Garuda Indonesia
B-Rev. 18 2. Add description for ‘A-‘ (maintenance up to A-Check) in remark
section.
3. Update Maintenance Limitation to include ‘A-‘ type, based on
Operation Specification A005 – Additional Fix Location (dated
5 March 2019) which has been moved to this Appendix B, with
detail as follow:
- A330 Series up to A-Check at Sta. CGK and DPS for Garuda
Indonesia
- B777 Series up to A-Check at Sta. CGK for Garuda Indonesia
- B737-800 NG up to A-Check at Sta. CGK, DPS and SUB for
Garuda Indonesia
- B737 MAX up to A-Check at Sta. CGK for Garuda Indonesia
- CRJ-1000 up to A-Check at Sta. BPN, CGK, KNO, SUB and UPG
for Garuda Indonesia
- ATR up to A-Check at Sta. AMQ, BIK, BPN, CGK, DPS, KNO,
LOP, PLM, PNK, SUB, and UPG for Garuda Indonesia
- A320 Series up to A-check at Sta. CGK and SUB for Citilink
- A320 NEO up to A-Check at Sta. CGK and SUB for Citilink
APPENDICES
Issue APPENDIX
Detail Date
No. Rev.
- B737 Classic up to A-Check at Sta. CGK, SUB and DPS for
Citilink.
- ATR up to A-Check at Sta. AMQ, BPN, CGK, DPS, KNO, LOP,
PLM, PNK, SUB, and UPG for Citilink
- B737 NG up to A-Check at Sta. CGK, DPS and SUB for Sriwijaya
Air
- B737-300 up to A-Check at Sta. CGK, DPS, and SUB for
Sriwijaya Air
- B737-500 up to A-Check at Sta. CGK, DPS and SUB for
Sriwijaya Air.
- B737-500 up to A-Check at Sta. CGK, DPS, and SUB for NAM
Air.
- ATR up to A-Check at Sta. BIK, CGK, DPS, LOP, PLM, PNK, and
SUB for NAM Air.
4. Addition capability of:
- ATR up to A-Check at Sta. BDO for Garuda Indonesia
- CRJ-1000 up to BD Check at Sta. LBJ for Garuda Indonesia
5. Deletion capability of:
- ATR up to Before Departure Check at Sta Penggung (CBN) for
Garuda Indonesia
- Aircraft B747 Series for Garuda Indonesia (at Sta CGK, HLP &
Jeddah)
19 B-Rev. 19 1. Addition Capability of: 11-Nov-19
- A320 Neo up to Weekly Check at sta. Tanjungkarang (TKG)
for Citilink
20 B-Rev. 20 1. Addition Capability of: 14-Nov-19
- A330 NEO up to Weekly Check at sta. Cengkareng (CGK),
Denpasar (DPS) and Surabaya (SUB) for Garuda Indonesia
- A330 NEO up to Before Departure Check at sta. Makassar
(UPG) for Garuda Indonesia
- A330 NEO up to Transit Check at sta. Kulanamu (KNO) for
Garuda Indonesia
- A330 NEO up to Weekly Check at sta. Cengkareng (CGK),
Denpasar (DPS) and Surabaya (SUB) for Citilink
- A330 NEO up to Transit Check at sta. Kulanamu (KNO),
Balikpapan (BPN), Makassar (UPG) and Batam (BTH) for
Citilink
- A320 NEO up to Transit Check at sta. Bengkulu (BKS),
Makassar (UPG), Manado (MDC) and Padang (PDG) for
Citilink
- ATR up to Weekly Check at sta. Manado (MDC) for Garuda
Indonesia
21 A-Rev. 02 1. Addition of A330-941 powered with Trent 7000 to list of 18-Nov-19
contractors for Garuda Indonesia and Citilink
B-Rev. 21 2. Addition Capability of:
-ATR up to Transit Check at sta. Batam (BTH) for Garuda
Indonesia.
APPENDICES
Issue APPENDIX
Detail Date
No. Rev.
22 B-Rev. 22 1. Addition Capability of: 28-Jan-20
- A320 NEO up to Transit Check at sta. Timika (TIM) for Citilink
- A320 Series up to Transit Check at sta. Timika (TIM) for
Citilink
23 A-Rev.03 1. Deletion Sriwijaya Air and NAM Air from List of Contracted 30-Jan-20
Operators
B-Rev.23 2. Addition Capability of:
- A330 Series up to Weekly Check at sta. Melbourne (MEL) for
Garuda Indonesia
- A320 NEO up to Transit Check at sta. Banyuwangi (BWX) for
Citilink
3. Deletion list of Line Maintenance Approval for Sriwijaya Air and
NAM Air
24 B-Rev.24 4. Addition Capability of: 27-Feb-20
- A330 Series up to Before Departure Check at sta. Halim
Perdana Kusuma (HLP) and Kertajati (KJT) for Garuda
Indonesia
25 B-Rev.25 5. Addition Capability of: 02-Mar-20
- A330 Series up to Weekly Check at sta. Kertajati (KJT) for
Garuda Indonesia
- ATR up to Transit Check at sta. Babo (BXB) for Garuda
Indonesia
- A320 NEO up to Transit Check at sta. Ambon (AMQ)
- ATR up to Transit Check at sta. Putussibau (PSU), Tanjung
Pinang (TNJ) and Ketapang (KTG) for Citilink
26 B-Rev.26 6. Addition Capability of: 10-Mar-20
- A330 NEO up to A-Check at sta. Cengkareng (CGK) for
Garuda Indonesia
- CRJ-1000 up to Transit Check at sta. Kulon Progo (YIA) for
Garuda Indonesia
- ATR up to Weekly Check at sta. Jogjakarta (JOG) for Citilink
27 B-Rev.27 1. Addition Capability of: 30-Jul-20
- B737-300/400/500 up to Daily Check at sta. Jayapura (DJJ)
for Citilink.
- B737-300/400/500 up to Transit Check at sta. Ambon
(AMQ), Biak (BIK), Gorontalo (GTO), Kendari (KDI), Merauke
(MKQ), Manokwari (MKW), Sorong (SOQ), Timika (TIM),
Ternate (TTE) dan Wamena (WMX) for Citilink.
- A320 NEO up to Transit Check at sta. Balikpapan (BPN) for
Citilink.
28 B-Rev.28 1. Addition Capability of: 04-Aug-20
- ATR up to Before Departure Check at sta. Tanjung Karang
(TKG) for Citilink.
APPENDICES
Issue APPENDIX
Detail Date
No. Rev.
30 B-Rev.30 1. Addition Capability of: 31-Aug-20
- A320 Series up to Weekly Check at sta. Banjarmasin (BDJ),
Manado (MDC) for Citilink
- A320 NEO up to Weekly Check at sta. Banjarmasin (BDJ),
Manado (MDC) for Citilink
- A320 NEO Up to Transit Check at sta. Lombok (LOP),
Kupang (KOE), Pangkal Pinang (PGK), Gorontalo (GTO),
Tanjung Pandan (TJQ) for Citilink
31 B-Rev.31 1. Addition Capability of: 21-Sep-20
- ATR up to A-Check at sta. Halim Perdana Kusuma (HLP) for
Citilink
- ATR up to BD Check at sta Kendari (KDI) for Citilink.
- A320 Series up to Daily Check at sta. Bandung (BDO) for
Citilink
- A320 NEO up to Daily Check at sta. Bandung (BDO) for
Citilink
- A330 NEO up to Transit Check at sta. Padang (PDG) and
Palembang (PLM) for Citilink
32 B-Rev.32 1. Addition Capability of: 26-Oct-20
- A330 NEO up to Transit Check at sta. Balikpapan (BPN) and
Batam (BTH) for Garuda Indonesia
- A330 NEO up to Weekly Check at sta. Solo (SOC) for Citilink
- A320 Series up to Transit Check at sta. Samarinda (AAP) for
Citilink
- A320 NEO up to Transit Check at sta. Samarinda (AAP) for
Citilink
- ATR up to Transit Check at sta. Palopo (LLO) for Citilink
33 A-Rev.4 1. Change wording GMF AeroAsia to PT Garuda Maintenance 09-Nov-20
Facility Aero Asia Tbk
B-Rev.33 2. Addition Capability of:
- B737 NG up to BD Check at sta. Banyuwangi (BWX) for
Garuda Indonesia
- A320 NEO up to Weekly Check at sta. Makassar (UPG) for
Citilink
- ATR up to Transit Check at sta. Toraja (TRT) for Citilink
3. Change wording GMF AeroAsia to PT Garuda Maintenance
Facility Aero Asia Tbk
C-Rev.02 4. Change wording GMF AeroAsia to PT Garuda Maintenance
Facility Aero Asia Tbk
D-Rev.02 5. Change wording GMF AeroAsia to PT Garuda Maintenance
Facility Aero Asia Tbk
E-Rev.02 6. Update Roster of Management
G-Rev.01 7. Change wording GMF AeroAsia to PT Garuda Maintenance
Facility Aero Asia Tbk
H-Rev.01 8. Change wording GMF AeroAsia to PT Garuda Maintenance
Facility Aero Asia Tbk
APPENDICES
Issue APPENDIX
Detail Date
No. Rev.
34 B-Rev.34 1. Addition Capability of: 22-Dec-20
- A330 NEO up to Transit Check at sta. Kulon Progo (YIA) for
Garuda Indonesia.
- ATR up to BD Check at sta. Kupang (KOE) for Citilink
- ATR up to Transit Check at sta. Babo (BXB) for Citilink
35 A-Rev.5 1. Add Air Asia Indonesia to List of Contracted Operators 18-Jan-21
B-Rev.35 2. Addition Capability of:
- A330 NEO up to Transit Check at sta. Banda Aceh (BTJ) for
Garuda Indonesia
- A330 NEO up to Before Departure Check at sta. Kertajati
(KJT) and Solo (SOC) for Garuda Indonesia
- B737 NG up to Transit Check at Station Berau (BEJ) and
Manokwari (MKW) for Garuda Indonesia
- B777-300ER up to Pre-Departure Check at sta. Kertajati
(KJT) for Garuda Indonesia
- CRJ up to Transit Check at sta.Manokwari (MKW) for Garuda
Indonesia
- ATR up to Before Departure Check at sta. Mamuju (MJU)
and Nabire (NBX) for Garuda Indonesia
- A320 Series up to A Check at station Denpasar (DPS) for
Citilink
- A320 Series up to Weekly Check at sta. Bandung (BDO) and
Padang (PDG) for Citilink
- A320 Series up to Transit Check at sta. Sorong (SOQ),
Tanjung Pinang (TNJ), Ternate (TTE), Palu (PLW) and
Pangkalan Bun (PKN) for Citilink
- A320 NEO up to Weekly Check at sta. Balikpapan (BPN),
Bandung (BDO), Kendari (KDI) and Padang (PDG) for Citilink
- A320 NEO up to Transit Check at sta. Jayapura (DJJ) for
Citilink
- ATR up to Before Departure Check at sta. Banyuwangi
(BWX) and Jayapura (DJJ) for Citilink
- ATR up to Transit Check at sta. Bajawa (BJW), Bengkulu
(BKS), Ende (ENE) and Jambi (DJB), Nabire (NBX), Waingapu
(WGP) and Wamena (WMX) for Citilink
- A320 Series up to Transit Check at sta. Bandung (BDO),
Cengkareng (CGK), Denpasar (DPS), Kertajati (KJT),
Kulanamu (KNO), Labuan Bajo (LBJ), Sorong (SOQ),
Surabaya (SUB) and Tanjung Pandan (TJQ) for Air Asia
Indonesia.
- A320 Series up to Before Departure Check at sta. Kulon
Progo (YIA), Padang (PDG), Palembang (PLM), Pekanbaru
(PKU), Pontianak (PNK), Semarang (SRG) and Solo (SOC) for
Air Asia Indonesia.
E-Rev.3 3. Update Roster of Management
H-rev.2 4. Revise List of form with Additional Form GMF Q-436 “Audit
Matrix”.
APPENDICES APPENDIX A
1. Garuda Indonesia
PT Garuda Maintenance Facility Aero Asia Tbk has maintenance and support contracts with the Garuda
Indonesia.
2. Citilink
PT Garuda Maintenance Facility Aero Asia Tbk has maintenance and support contracts with the Citilink.
APPENDICES APPENDIX A
APPENDICES APPENDIX B
PT Garuda Maintenance Facility Aero Asia Tbk holds line maintenance approval at the following line
stations from DGCA Indonesia
Aircraft Type
Line IATA
No.
Maintenance Code A330 A330 B737- B737 B777-
CRJ ATR
Series NEO 800 NG MAX 300ER
1 Ahmedabad AMD TR
2 Ambon AMQ TR TR A-
3 Babo BXB TR
4 Balikpapan BPN WY TR BD A- A-
5 Banda Aceh BTJ WY TR BD PD TR
6 Bandung BDO BD A-
7 Banjarmasin BDJ WY BD WY TR
8 Banyuwangi BWX BD TR TR
9 Batam BTH TR TR BD TR TR
10 Bengkulu BKS TR TR TR
11 Berau BEJ TR TR TR
12 Biak BIK TR TR A-
13 Bima BMU TR
14 Cengkareng CGK A- A- A- A- A- A- A-
15 Denpasar DPS A- WY A- PD WY A-
16 Gorontalo GTO TR
Gunung
17 GNS TR
Sitoli
Halim
18 Perdana HLP BD BD PD TR TR
Kusuma
19 Jambi DJB BD TR TR
20 Jayapura DJJ TR TR TR
21 Jeddah JED TR PD
22 Jogjakarta JOG BD TR TR
23 Kendari KDI BD BD
24 Kertajati KJT WY BD BD PD
25 Ketapang KTG TR
APPENDICES APPENDIX B
Aircraft Type
Line IATA
No.
Maintenance Code A330 A330 B737- B737 B777-
CRJ ATR
Series NEO 800 NG MAX 300ER
Kuala
26 KUL BD
Lumpur
27 Kualanamu KNO WY TR BD PD A- A-
28 Kulon Progo YIA BD TR BD TR
29 Kupang KOE BD WY WY
30 Labuan Bajo LBJ TR BD BD
31 Langgur LUV WY
Lombok
32 LOP WY BD BD A-
Praya
33 Madinah MED TR TR
34 Makassar UPG WY BD BD A- A-
35 Malang MLG TR TR
36 Mamuju MJU TR BD
37 Manado MDC WY BD WY WY
38 Manokwari MKW TR TR
39 Maumere MOF TR
40 Melbourne MEL WY
41 Merauke MKQ TR
42 Nabire NBX BD
43 Padang PDG WY BD PD TR
44 Palangkaraya PKY TR TR
45 Palembang PLM BD BD WY A-
46 Palopo LLO TR
47 Palu PLW BD TR WY
Pangkal
48 PGK TR BD
Pinang
49 Pekanbaru PKU BD WY TR
50 Pinangsori FLZ TR
51 Pontianak PNK BD TR A-
52 Putussibau PSU TR
53 Raha RAQ TR
54 Samarinda AAP TR TR
55 Saumlaki SXK TR
56 Selayar KSR TR
57 Semarang SRG BD WY TR
APPENDICES APPENDIX B
Aircraft Type
Line IATA
No.
Maintenance Code A330 A330 B737- B737 B777-
CRJ ATR
Series NEO 800 NG MAX 300ER
58 Silangit DTB TR
59 Singapura SIN WY BD TR TR
60 Solo SOC WY BD BD TR
61 Sorong SOQ TR TR TR
62 Sumbawa SWQ TR
63 Surabaya SUB WY WY A- PD A- A-
64 Tambolaka TMC TR
Tanjung
65 TKG BD TR TR
Karang
Tanjung
66 TJQ TR TR BD
Pandan
Tanjung
67 TNJ TR
Pinang
68 Tarakan TRK TR TR
69 Ternate TTE TR TR TR
70 Timika TIM TR TR TR
71 Wangi-wangi WNI TR
APPENDICES APPENDIX B
Aircraft Type
Line
No. IATA CODE A330 A320 A320 B737
Maintenance ATR
NEO Series NEO Classic
1 Aek Godang AEG TR
2 Ambon AMQ TR TR TR A-
3 Babo BXB TR
4 Bajawa BJW TR
5 Balikpapan BPN TR WY WY DY A-
6 Banda Aceh BTJ WY WY DY TR
7 Bandung BDO WY WY TR WY
8 Banjarmasin BDJ WY WY DY
9 Banyuwangi BWX TR TR DY BD
10 Baubau BUW TR
11 Batam BTH TR WY WY DY
12 Bengkulu BKS TR TR TR TR
13 Biak BIK TR
14 Cengkareng CGK WY A- A- A- A-
15 Denpasar DPS WY A- WY A- A-
16 Ende ENE TR
17 Gorontalo GTO TR TR TR
18 Gunung Sitoli GNS TR
Halim Perdana
HLP WY WY TR A-
19 Kusuma
20 Jambi DJB TR TR TR
21 Jayapura DJJ TR TR DY BD
22 Jember JBB TR
23 Jogjakarta JOG WY WY DY WY
24 Kendari KDI WY WY TR BD
25 Kertajati KJT TR TR TR
26 Ketapang KTG TR
27 Kualanamu KNO TR WY WY DY A-
28 Kulon Progo YIA BD WY WY
29 Kupang KOE TR TR BD
30 Labuan Bajo LBJ TR TR
APPENDICES APPENDIX B
Aircraft Type
Line
No. IATA CODE A330 A320 A320 B737
Maintenance ATR
NEO Series NEO Classic
31 Lhoksemauwe LSW TR
32 Lombok Praya LOP TR TR DY A-
33 Makassar UPG TR WY WY DY A-
34 Malang MLG TR TR TR
35 Manado MDC WY WY WY
36 Manokwari MKW TR
37 Merauke MKQ TR
38 Muara Bungo BUU TR TR
39 Nabire NBX TR
40 Padang PDG TR WY WY TR
41 Palangkaraya PKY TR TR TR
42 Palembang PLM TR WY WY DY A-
43 Palopo LLO TR
44 Palu PLW TR
45 Pangkalan Bun PKN TR
46 Pangkal Pinang PGK TR TR
47 Pekanbaru PKU TR TR DY
48 Pinangsori FLZ TR
49 Pontianak PNK WY WY DY A-
50 Putussibau PSU TR
51 Samarinda AAP TR TR
52 Sangia PUM TR
53 Selayar KSR TR
54 Semarang SRG WY WY DY TR
55 Silangit DTB WY WY
56 Solo SOC WY WY WY DY TR
57 Sorong SOQ TR TR
58 Sugimanuru RAQ TR
59 Surabaya SUB WY A- A- A- A-
60 Tanjung Karang TKG WY TR BD
61 Tanjung Pandan TJQ TR TR TR
62 Tanjung Pinang TNJ TR TR
63 Tasikmalaya TSY TR
APPENDICES APPENDIX B
Aircraft Type
Line
No. IATA CODE A330 A320 A320 B737
Maintenance ATR
NEO Series NEO Classic
64 Ternate TTE TR TR
65 Timika TIM TR TR TR
66 Toraja TRT TR
67 Waingapu WGP TR
68 Wangiwangi WNI TR
69 Wamena WMX TR TR
70 Wippo WYK TR
APPENDICES APPENDIX B
For transit activity, station which has no PT Garuda Maintenance Facility Aero Asia Tbk
representatives, material such as Engine / APU Oil, Hydraulic Fluid will be stored in Operator
representative office.
APPENDICES APPENDIX C
PT Garuda Maintenance Facility Aero Asia Tbk holds maintenance on Site customer location
or other than PT Garuda Maintenance Facility Aero Asia Tbk fixed location with the following
capability provided personnel, tools & equipment, maintenance data and material transported into
the location.
Partial
Borescope QEC / Light Modular Modular
No Engine Type Modular
Inspection EBU Maintenance Separation Repair
Repair
1 CFM56-3 √ √ √ √ √ √
2 CFM56-5B √ √ √ √ √ √
3 CFM56-7B √ √ √ √ √ √
PW100
4 √ √ √ √ - -
Series
5 LEAP - 1A √ - - - - -
6 LEAP 1B √ - - - - -
7 GE90-115B √ - - - - -
DESCRIPTION
Borescope Inspection: Means that borescope inspection can be performed refer to the current
Aircraft Maintenance Manual
Quick Engine Change or Means that QEC or EBU parts (components, tubes, hoses, wiring) are
Engine Build Up: removed from engine and reinstalled in accordance with Power Plant Build
Up manual (manual provides all necessary information necessary to install
components between bare engine and aircraft)
Light maintenance: Means that tasks of the approved current Engine Manufacture Manual and/or
Aircraft Maintenance Manual (AMM) defined as “Continued Time Maintenance
Tasks” are applied. These are assembly, disassembly, inspection and repair
tasks that do not require modules separation and that do not increase the
scheduled time to the next shop visit for LLP
Modular separation: Means that modules are partially disassembled and reassembled in
accordance with the current Engine Manufacture Manual. The disassembled
parts will be inspected or replaced, such as: Fan Booster Module, Bearing #1
and #2 Support Module, AGB, TGB, and LPT/Power Turbine Pack
Modular repair: Means that modules are disassembled at piece part level and reassembled
in accordance with the ESM data and parts are inspected in accordance with
current Engine Manufacture Manual
APPENDICES APPENDIX D
PT Garuda Maintenance Facility Aero Asia Tbk holds limited maintenance Task on Site
customer location or other than PT Garuda Maintenance Facility Aero Asia Tbk fixed location with
the following capability provided personnel, tools & equipment, maintenance data and material
transported into the location.
1. ELT Testing, Recording and ULB Battery Replacement, Testing
Part Test Equipment
No Scope of Work Description Reference Tool
Number PN Description
ELT Testing;
1 01N6590(X) ADT406 AF/ AP ELT CMM ATA 25-60-10 Portable
Recoding
02N65739 STB-06-LA
ELT Testing; 01N65920
2 ADT 406 S ELT CMM ATA 25-60-11 Portable
Recoding Series
ELT Testing; Measuring
3 453-5004 B406-4 ELT CMM ATA 25-62-03 Portable BT100AVS
Recoding Device
ELT Testing; 8700 ELT Test &
4 453-5002 B406-1 ELT CMM ATA 25-62-10 Portable
Recoding Programmer
ELT Testing; Sets
5 453-5000 B406-2 ELT CMM ATA 25-62-11 Portable
Recoding
ELT Testing; B406-1 EMERGENCY
6 453-5003 CMM ATA 25-62-10 Portable
Recoding LOCATOR TRANSMITTER
ELT Testing; ME406P EMERGENCY
7 453-6611 CMM ATA 25-61-31 Portable
Recoding LOCATOR TRANSMITTER
ELT Testing; B406-2 EMERGENCY
8 453-5001 CMM ATA 25-62-11 Portable
Recoding LOCATOR TRANSMITTER
ELT Testing; C406-N EMERGENCY
9 453-5060 CMM ATA 25-62-13 Portable
Recoding LOCATER TRANSMITTER
ELT Testing; C406-N EMERGENCY
10 453-5061 CMM ATA 25-62-13 Portable
Recoding LOCATER TRANSMITTER
ELT Testing; RB406-1HM EMERGENCY
11 453-5056 CMM ATA 25-62-14 Portable
Recoding LOCATOR TRANSMITTER
ELT Testing; G406-4 EMERGENCY
12 453-5012 CMM ATA 25-62-21 Portable
Recoding LOCATOR TRANSMITTER
ELT Testing;
13 453-6603 ME406/ME406HM ELT CMM ATA 25-62-30 Portable
Recoding
ELT Testing;
14 453-6604 ME406/ME406HM ELT CMM ATA 25-62-30 Portable
Recoding
ELT Testing; DGL-1 PROGRAMMING
15 453-4010 CMM ATA 25-69-01 Portable
Recoding DONGLE
Measuring
BT100AVS
ELT Testing; S1821502- EMERGENCY LOCATOR Device
19 CMM ATA 25-63-05 Portable
Recoding SERIES TRANSMITTER Programming
PR600
Equipment
TECHNICAL
ULB Battery
UNDERWATER ACOUSTIC MANUAL
20 Replacement; DK120/90 Digital
BEACON MODEL DK120/90, Fluke 87V
Testing Multimeter
NOV 13, 2017 REV E Portable and
and Pinger
ULB Battery TS200
UNDERWATER ACOUSTIC Test
21 Replacement; ELP-362D CMM ATA 23-70-40
BEACON
Testing
APPENDICES APPENDIX D
2. Non-Destructive Testing
Scope of
No Method Applicability Reference Tools
Work
ASTM E 1004 and Non General Eddy Current
Destructive Testing Flaw Detector or Special
Manual (NDTM) from Tool kit Eddy Current or
Eddy Current Airframe &
Aircraft Manufacture Eddy Current
Inspection Engine
or Service Bulletin Conductivity
from Aircraft Measurement Equipment
Manufacture (refer to work order)
ASTM E 587 or ASTM E General Ultrasonic Flaw
797 and NDTM from Detector or Special Tool
Ultrasonic Airframe & Aircraft Manufacture kit Ultrasonic or Ultrasonic
Inspection Engine or Service Bulletin Thickness Measurement
from Aircraft Equipment (refer to work
Manufacture order)
ASTM E 709 or ASTM E
Portable Yoke and
1444 and NDTM from
Magnetic Chemical Cleaning and
Airframe & Aircraft Manufacture
Particle Chemical Magnetic
Engine or Service Bulletin
Inspection Particle Suspension and
from Aircraft
1 NDT UV Light
Manufacture
ASTM E 1417 or ASTM
E 1209 and ASTM E
Portable Liquid Penetrant
1210 or NDTM from
Penetrant Airframe & and Chemical Cleaning
Aircraft Manufacture
Inspection Engine and Chemical Developer
or Service Bulletin
and UV Light
from Aircraft
Manufacture
ASTM E 94 and NDTM
X ray Machine Equipment
from Aircraft
Radiography Airframe & and Radiography Film and
Manufacture or
Inspection Engine Chemical Developer and
Service Bulletin from
Chemical Fixer
Aircraft Manufacture
ASTM E 1934 and
Infra-Red NDTM from Aircraft Infrared Camera
Airframe &
Thermography Manufacture or Thermography and
Engine
Inspection Service Bulletin from Heater (Heating element)
Aircraft Manufacture
APPENDICES APPENDIX E
APPENDICES APPENDIX E
APPENDICES APPENDIX E
APPENDICES APPENDIX E
APPENDICES APPENDIX F
The Quality Assurance & Safety keeps a list of approved or accepted Contracted Organization by
DGCA (the authority of contracted organization) in computerized system. A hard copy is also
available on document no. DQ-005. The list includes the following information:
APPENDICES APPENDIX G
The Quality Assurance & Safety keeps a list of approved or accepted sub-contracted organization /
maintenance function by DGCA (the authority of contracted organization) in computerized system. A hard
copy is also available on document no. DQ-005, will be submitted annually to DGCA and if any revision
during the consecutive year Quality Assurance & Safety will notify to DGCA.
The list includes the following information:
a) The name of the company;
b) The types of the maintenance tasks subcontracted (scope of work);
c) The location.
The following Maintenance Functions may be contracted by PT Garuda Maintenance Facility Aero Asia Tbk
to outside sources:
1. Plating
2. Welding
3. NDT all methods
4. Coating
5. Thermal / Plasma Spray
6. Machining
7. Laboratory Testing
8. Heat Treatment
9. Grit Blasting
10. Balancing
11. Shoot Peening
12. Anodizing
13. Stripping
14. Other tasking
APPENDICES APPENDIX H
PT Garuda Maintenance Facility Aero Asia Tbk develops the forms as instructed in each Quality
Procedure (Section 2.8.3) and in this AMO Manual. Each form is exhibited in the Sharepoint PT
Garuda Maintenance Facility Aero Asia Tbk and is accessible to users as necessary for the execution
of the inspection and maintenance.
The user is responsible for designing the form to meet the recording requirements complete with
the guidance which will included into TFM (Technical Form Manual). When the user recommends a
form revision, the appropriate QP or AMO Manual Section (where the form authorized) is revised to
authorize the revision of the form. When a revision takes place the letter ''R'' following with a
revision sequence number (R1, R2, etc.) is added next to the form number.
The Quality Assurance & Safety prepares the current forms in full size and also its Technical Form
Manual (TFM), then distributes them to the users via the Sharepoint PT Garuda Maintenance Facility
Aero Asia Tbk. The Quality Assurance & Safety ensures that there is only one source for the users
retrieving the forms.
The user is responsible to print out and use the current forms found in the Sharepoint PT Garuda
Maintenance Facility Aero Asia Tbk as required in its TFM. Forms taken from any other source is not
allowed. Should a form be not found in the Sharepoint PT Garuda Maintenance Facility Aero Asia
Tbk ; the user must inform the Quality Assurance & Safety immediately and proceed as instructed.
A list of forms used is found in Section 5.1.2 of this manual and also in Sharepoint PT Garuda
Maintenance Facility Aero Asia Tbk The list includes: a) Form Number, b) Title, c) the QP number, or
the section of the AMO Manual or the Authority of A/C registration (or both), which authorized the
use of such form.
NOTE: The list of forms in section 5.1.2 of this manual and in Sharepoint PT Garuda Maintenance
Facility Aero Asia Tbk does not indicate the revision number of the form (such as R1, R2, etc)
in order to avoid unnecessary revisions of the AMO Manual. Only the appropriate QP or AMO
Manual Section (for PT Garuda Maintenance Facility Aero Asia Tbk forms) shows the current
revision number
The Quality Assurance & Safety is responsible to assign a number to each quality related form using
the numbering system below:
GMF/Q-001, where:
GMF = PT Garuda Maintenance Facility Tbk
Q = Quality (the form initiated by the QA) or,
B = (initiated by base maintenance) or
Revision: 02 Date: 18 January 2021 Page: 1 of 10
AMO MANUAL
APPENDICES APPENDIX H
1.2. Control and Use of Forms Given by the Authority of Aircraft Registration
Forms issued by the Authority of A/C registration for the purpose of releasing A/C and A/C
components to service, reporting suspected unapproved parts, for malfunction and defect reports,
etc., are listed in section 5.1.2 of this manual and in Sharepoint PT Garuda Maintenance Facility Aero
Asia Tbk and are prepared in full size, controlled and retrieved with the same manner as the PT
Garuda Maintenance Facility Aero Asia Tbk forms. The number of these forms is usually the number
given by the Authority of A/C registration except the A/C release to service forms which have PT
Garuda Maintenance Facility Aero Asia Tbk number.
Instructions to use such forms may be given by this manual directly and may not be in any
associated QP. When a QP does not give instructions to complete such form, the instructions are
found in the appropriate section of this manual. See also section 5.1.2 (''Authorized by'' column).
1.3. Forms Required by the Customer - Customer Design & Use Forms
When a customer requires the use of his own forms, then these forms may be used provided that:
The forms will be used and all the blocks of the form will be filled as instructed by the appropriate
QP, which authorized the use of such form or the appropriate section of this manual. Unfilled blocks
are not allowed. If an entry is not necessary or not applicable, the user will enter ''N/A'' to indicate
that the requirements of the specific block is not necessary or not applicable for the specific
operation or process. The same will apply for maintenance support computerized forms - which a
print-out is not necessary.
APPENDICES APPENDIX H
All inspection and maintenance forms including PT Garuda Maintenance Facility Aero Asia Tbk
serviceable tags and airworthiness approval tags from in house and vendors associated with the
specific contracted maintenance and also customer or Authority design forms will be part of the
maintenance records and will be kept under the specific work order as required by section 2.14 of
this manual.
All forms used to support the contracted maintenance which are not part of the work order
maintenance records, will be kept as general support records. Example: calibration records, audit
records, etc.
2. List of Forms
Form
No. Title Auth. By
Number
1 DGCA 21-18 Authorized Release Certificate (template) DGCA
2 DGCA 21-35 Suspected Unapproved Parts Notification DGCA
3 DGCA 43-337 RTS after embodiment of alteration or major repair DGCA
4 GMF Q-001 Aircraft Maintenance Work Order QP209-05
5 GMF Q-001A Non Routine Work Order QP209-05
6 GMF Q-002 Maintenance Job Card QP209-05
7 GMF Q-003 Maintenance Discrepancy QP209-05
8 GMF Q-004 Preliminary Inspection Report (Aircraft) QP209-05
9 GMF Q-005 Preliminary Inspection Report QP209-05
10 GMF Q-006A Altimeter Test 81 Insp-DGAC QP209-13
11 GMF Q-007A Transponder Test - DGAC QP209-13
12 GMF Q-008 Material Receiving Tag QP202-01
13 GMF Q-434 Component Holding Tag QP209-05
14 GMF Q-434 Repairable Tag QP209-05
15 GMF Q-434 Serviceable Tag QP209-05
16 GMF Q-013 Condemned Tag QP209-05
17 GMF Q-014 Material Receiving Label QP202-01
18 GMF Q-015 Material Inspection or Test Request QP202-01
19 GMF Q-016 Receiving Inspection Record QP202-01
20 GMF Q-017 Material Return Notice QP202-01
21 GMF Q-018 Material Receiving Inspection Report QP202-01
22 GMF Q-019 Calibration Sticker QP205-01
23 GMF Q-020 Removal Tag QP209-05
24 GMF Q-021 Calibration Record Card QP205-01
25 GMF Q-024 Strip Report QP209-13
26 GMF Q-026 ELMO Planning Data Sheet QP209-13
27 GMF Q-027 Sales Order (Computer Generated Form) QP404-01
Revision: 02 Date: 18 January 2021 Page: 3 of 10
AMO MANUAL
APPENDICES APPENDIX H
APPENDICES APPENDIX H
APPENDICES APPENDIX H
APPENDICES APPENDIX H
APPENDICES APPENDIX H
APPENDICES APPENDIX H
APPENDICES APPENDIX H