MAINTENANCE ORGANISATION
Rév.1
EXPOSITION
GEN 1/1
MAINTENANCE ORGANISATION
EXPOSITION
Any unauthorized reproduction and disclosure of the whole or any part of this
document by Air France constitutes a copyright infringement.
Société Air France 1993 – All rights reserved
APPROVAL Philippe Muzelle Maintenance Quality Assurance Manager Signed by : Philippe Muzelle - le
25/03/2005
General
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
0.0 1/5
GENERAL CONTENTS
PARTIE 0. GENERAL
0.1 INTRODUCTION
0.2 REVISION DETAILS
0.2.1 Revision record
0.2.2 Characteristic of revision 1
0.3 LIST OF EFFECTIVE PAGES
0.4 RECORD OF REVISIONS
0.5 LIST OF ADDRESSEES
PARTIE 1. ORGANISATION
General
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
0.0 2/5
1.11.1 MOE update
1.11.2 Revisions to related procedures
1.11.3 List of related procedures
1.11.4 List of cited procedures
General
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
0.0 3/5
2.12 Optional modification procedure
2.13 CURRENT Maintenance documentS AND Procedure FOR COMPLETION
2.13.1 Aircraft work
2.13.2 Equipment work
2.13.3 Engine work
2.14 INSPECTION and archiving of technical files
2.15 Rectification of defects FOUND during base maintenance
2.16 Release to service procedure
2.16.1 General case
2.16.2 Aircraft CRS
2.16.3 Works performed outside industrial centers
2.16.4 Equipment CRS
2.16.5 Engine CRS
2.16.6 Removal of serviceable parts
2.16.7 Components removed from crashed aircraft
2.17 Communication of Records TO the operator
2.17.1 Line Maintenance
2.17.2 Base maintenance
2.18 Reporting of defects to the authority / Operator / Manufacturer
2.18.1 Air France equipment:
2.18.2 Customer equipment
2.19 Return of defective components to store
2.19.1 Equipment
2.19.2 Engines
2.20 DISPATCH OF Defective components to outside contractors
2.21 Management of computerized work record systems
2.22 MONITORING of man-hour planning versus PROGRAMMED maintenance work
2.23 MONITORING of critical WORK
2.24 Specific maintenance procedures
2.25 PROCEDURES FOR THE DETECTION, RECTIFICATION AND PREVENTION OF
MAINTENANCE ERRORS
2.26 PROCEDURES FOR THE TRANSFER OF INSTRUCTIONS
2.26.1 Guarantee of work continuity
2.26.2 Continuity of the “production” function
2.26.3 Continuity of the “production control” function
2.26.4 Absence of supervisory or inspection personnel
2.27 Procedure for THE notification of maintenance data ERRORS and ambiguities
2.28 Maintenance planning procedure
2.28.1 Aircraft maintenance
2.28.2 Engine Maintenance
2.28.3 Equipment maintenance
General
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
0.0 4/5
3.1.2 Quality Assurance
3.1.3 Quality Control
3.2 AUDIT OF AIRCRAFT, ENGINES, AND EQUIPMENT BY THE QUALITY SYSTEM
3.2.1 Monitoring program
3.2.2 Survey program
3.3 PROCEDURES FOR THE MONITORING OF CORRECTIVE ACTION BY THE QUALITY
SYSTEM
3.3.1 General
3.3.2 CLASSIFICATION of nonconformities
3.4 QUALIFICATION AND TRAINING PROCEDURES FOR CERTIFYING STAFF AND CATEGORY
B1 AND B2 SUPPORT STAFF
3.4.1 Training
3.4.2 Qualification
3.4.3 Authorization
3.5 FILES OF CERTIFYING STAFF AND CATEGORY B1 AND B2 SUPPORT STAFF
3.5.1 File content
3.5.2 Authorization managers
3.5.3 Archiving
3.5.4 Communication to Authorities / access to files
3.6 QUALIFICATION OF MAINTENANCE QUALITY ASSURANCE AUDITORS
3.7 Qualification of INSPECTORS
3.7.1 Personnel with delegated inspection authority
3.7.2 Checker
3.8 Qualification of mechanics
3.9 MONITORING OF ONE-OFF AUTHORIZATION PROCEDURES RELATING TO AIRCRAFT OR
AIRCRAFT COMPONENT MAINTENANCE TASKS
3.9.1 Scope of application
3.9.2 Drafting of the one-off authorization request
3.10 MONITORING OF AUTHORIZATIONS FOR DEVIATION FROM THE ORGANISATION’S
PROCEDURES
3.11 Qualification procedure for specialIZED ACTIVITY such as non-destructive tests, welding,
etc.
3.12 MONITORING OF MANUFACTURER’S WORKING PARTIES AND OTHER MAINTENANCE
TEAMS
3.12.1 Manufacturer’s working parties
3.12.2 External personnel
3.13 Human factorS training procedureS
3.14 Assessment of personnel CAPABILITIES
General
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
0.0 5/5
PARTIE 5. APPENDICES
General
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
0.1 1/1
PARTIE 0. GENERAL
0.1 INTRODUCTION
The aim of this Maintenance Organisation Exposition (MOE) (French equivalent: Manuel de Spécifications de
l'Organisme d'Entretien (MOE)) is to enable the Official Services to authorize Air France to carry out, under its
responsibility, maintenance, repair and modification operations on aircraft and aircraft components.
The detailed content of this MOE provides basic information and instructions resulting directly from the application
of Regulation (EC) 2042/2003 - Part 145.
General
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.1
EXPOSITION
0.2 1/1
Rev. Subject
0 New Maintenance Organisation Exposition compliant with the requirements of Regulation (EC)
2042/2003 - Part 145.
1 Manchester activity deleted
Activity B767 and A310 transferred to Roissy / CDG
Line activity A330-300 integration
Line and base activity A340-200 integration
The major changes with respect to the last edition of MOE rev 0 are as follows:
- Manchester activity deleted
- Activity B767 and A310 transferred to Roissy / CDG
- The end transfer of equipment activity toward Villeneuve le roi
- Line activity A330-300 integration
- Line and base activity A340-200 integration
Revision details
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.1
EXPOSITION
0.3 1/1
Major Minor
0 SFACT/E EN Approval N 042813(September 10 2004) X 10 Sep 2004
1 DCS Approval N 05 006(March 21 2005) X 08 Feb 2005
Record of revisions
08 Feb 2005 Société Air France 1993 - All rights reserved
0 - General
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
0.5 1/1
GSAC SEVRES 1
GSAC ORY 1
AIRBUS 1
FAA.IFO.FRA 1
CAA CHINA 1
CASA KOREA 1
DCA BERMUDA 1
DCA MAURITIUS 1
DCAM QATAR 1
DGAC INDONESIA 1
DGCA INDIA 1
DNA ARGENTINA 1
DOA THAILAND 1
GCAA U.A. EMIRATES 1
JAPAN CAB 1
PCA SAUDI ARABIA 1
Every manager is to update the distribution list of this document for his activity.
Every addressee of this document is responsible for updating it.
List of addressees
10 Sept 2004 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
1.0 1/1
PARTIE 1. ORGANISATION
Contents
10 Sept 2004 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE ORGANISATION
Rév.0
EXPOSITIONS
1.1 1/1
The Accountable Manager appointed by Air France affirms that this Maintenance Organisation Exposition (MOE),
and its associated Procedures, confirms compliance of Air France as an approved Part-145 organisation. He
guarantees that they will be complied with and also accepts that the above commitment does not exempt the Part-
145 approved Organisation from complying with new or amended regulations, published by the European Union,
when these regulations are inconsistent with existing Procedures.
It is understood that DGAC reserves the right to suspend, limit or withdraw Air France approval if it has proof that
procedures are not being complied with or that quality level is not being maintained.
The accountable manager also authorizes the competent services to carry out their monitoring mission within the
company.
P.H. GOURGEON
Accountable Manager and Executive General Manager
The Air France Industrial General Directorate operates a policy that gives priority to flight safety over any other
consideration such as commercial or economic.
Within the framework of the implementation of this policy within its organisation, the Air France Industrial General
Directorate undertakes that its personnel:
§ recognize that any maintenance operation must be performed with safety as the predominant concern ;
§ will comply with procedures, quality and safety standards and regulatory requirements;
§ will cooperate with the Maintenance Quality Assurance auditors;
§ will report any maintenance fault or incident to its hierarchy;
For this purpose, the Air France Industrial General Directorate:
§ operates a Human Factors awareness policy;
§ encourages feedback through the “Operational Safety – Experience Feedback” charter;
§ operates a methodic analysis of events and of feedback to determine the preventive and remedial
actions required;
§ makes available to personnel the documentation, tools, and resources necessary for the proper
execution of their tasks in compliance with quality and safety requirements.
ACCOUNTABLE MANAGER
DG.DD - Executive General Manager: Mr Pierre-Henri GOURGEON:
INDUSTRIAL GENERAL DIRECTORATE *
DG.BL - Deputy General Manager: Mr Alain BASSIL
MAINTENANCE QUALITY ASSURANCE DIVISION *
BL.MK - Manager: Mr Philippe MUZELLE
MAINTENANCE DIVISION*
BL.ME - Manager: Mr Philippe WALLET
AIRCRAFT INDUSTRIAL DIVISION*
BL.MA - Manager: Mr Jacques LUMBROSO
ENGINE DIVISION*
BL.MM - Manager: Mrs Martine SELEZNEFF
EQUIPMENT & SERVICE DIVISION*
BL.MS - Manager: Mr Bruno DELILE
PURCHASING DIVISION*
BL.AM - Manager: Mr Jean-Jacques MICHEL
HUMAN RESOURCE DIVISION
BL.DP - Manager: Mr Philippe POSTIC
In the event of an absence exceeding two weeks, each manager is to appoint a person to deputize for
him/her and inform other management personnel.
Management Personnel
10 Sept 2004 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
1.4 1/3
Chairman
General General
Other Directorates
Manager Inspection
At PTP, the Quality function is ensured by the Maintenance Department Manager PTP.KE, reporting to PTP.KK.
The Maintenance Quality Assurance Division is also supported by the Quality and Quality Control networks in
every entity.
Methods &
Surveillance Maintenance
Maintenance Monitoring Coordination
CoordinationMonitoring
Surveillance Surveillance
Industry Monitoring
Industrie
Regulations
BL.GQ BL.MR BL.CS BL.IQ
Coordination and Operation ISO Coordination
Follow- up Training
Aircraft Industrial Division
BL.GQ/CDG BL.VQ
Long Range Heavy maintenance – jumbo jet
Central Group C 135
BL.GQ/CDG BL.BQ
Medium Range Le Bourget Center
Aircraft Modification Product
Marketing & Sales
BL.GQ/CDG
BL.TQ
Supports & Statistics BL.TQ
Heavy maintenance - Commuterliner
Toulouse Industrial Center
BL.GQ/ORY
BL.WQ
Orly Support Activities
Moteurs (& NDT)
Engines
BL.EQ
Equipment & Services, Purchasing,
Engineering & Industrial Maintenance
• Maintenance Division-BL.ME
The mission of the Maintenance Manager is supported by the following organisation:
ME.UW - Long Range Maintenance Division:
ME.QB A330/A340
ME.QR B747
ME.NP B777
ME.UM - Medium Range Maintenance Division:
ME.QP B737
ME.QC A320
ME.CY A320/B737/B747 (ORY)
ME.CA - Method and Quality Division:
ME.GN Information and Documentation Systems
ME.GU Engineering/Airworthiness/Regulation coordination
ME.GY Cabin Accommodation and Aircraft Interior Fitting
ME.GR Maintenance Regulation/Risk Management/Safety/Security/Environment
ME.CQ Quality/Human Factors
ME.US - Maintenance Support Division:
ME.SM CDG Operation Support
ME.LK Line station maintenance:
ME.JK Customer Line station maintenance Unit at CDG (reporting to ME.LK)
ME.AM Logistics/Stores/Procurement (CDG and Orly)
ME.QG Industrial Support
ME.LI Subcontracting Unit
ME.GP - Human Resource Division:
ME.GF - Training
ME.GO - Operation Interface
ME.GC - Communication
ME.GI - Economization and Management
The managers of the above mentioned departments are responsible for implementing the remedial and preventive
actions requested by Maintenance Quality Assurance.
He is also to ensure implementation of the remedial and preventive actions requested by Maintenance Quality
Assurance.
The Engine Manager is supported by the following organisation in the execution of his tasks;
Support functions:
MM.WP - Human Resources
MM.WM - Customer development
MM.WI - Management Audit
MM.WY - Industrial Development
MM.WW - Quality Safety Environment
Each of the three entities below is focused on one type of product:
MM.WA - CDG Production
MM.WR - Orly Production
MM.WU - Engine Engineering
The Equipment & Service Manager’s task is supported by the following organisation:
- Support functions:
MS.EB- Methods & information systems
MS.EI - Management Audit
MS.EP- Human Resources
MS.EZ- Q.S.E – Industrial resources – Villeneuve project
- Each of the four entities below is focused on one type of product:
MS.SA - Aircraft logistic chain
MS.LO - Logistic operations
MS.EK - Industrial equipment operations
MS.EM - Stock product customers
§ Aircraft logistic chain (MS.SA)
MS.SA is responsible for logistic methods , the coordination of transverse logistic projects and the general
organisation of the logistic function of the Industrial General Directorate.
§ Logistic operations (MS.LO)
MS.LO is responsible for the coordination of logistic services (personnel, resources and industrial
strategy).
§ Industrial Equipment Operations (MS.EK)
MS.EK conducts the production and coherence of product lines (personnel, resources and industrial
strategy).
These product lines are responsible for the maintenance and repair of equipment families and aircraft
components:
- Pneumatics
- Electro-mechanics
- Hydraulics
- Avionics
§ Stock Product Customers (MS.EM)
ME.EM directs BL.MS strategy and development projects in respect of products, services and commercial
and industrial partnerships.
Human resources
10 Sept 2004 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE
Rév.1
ORGANISATION EXPOSITION
1.8 1/19
1.8.2 Facilities
Air France facilities are located:
- In mainland France: at ORLY airport
at ROISSY/CDG airport
at LE BOURGET airport
at the VILLENEUVE LE ROI site
at TOULOUSE-BLAGNAC airport
- Overseas: at LE RAIZET airport at Pointe-à-Pitre
• IMPLEMENTATION AT CDG 2
• LE BOURGET FACILITIES
A3 Machine-tool shop
Structure workshop
Stripping center
Offices
A2 Flight control acceptance shop
FTR disassembly and acceptant shop
Office
A1 Management Offices + Workshop Technical
Office
Material flow storeroom
B2 Line station Maintenance
Offices
B3 ASTRE Department
Appendix Equipment Product Division
Office automation training
B4 North side
MA.PM, MA.BY, MA.BM Offices
MA.BA reproduction machine bays
Partie 145
Rez-de-chaussée
1er Etage
1.9.1 Aircraft
CATEGORY LIMITATION BASE LINE REMARKS
A1 B737 (- 200) X X
B737 (- 300/400/500) X X
B737 (- 600/700/800) X
B747 (- SP/200/300/400/ERF) X X
B767 (- 200/300) X X
B777 (- 200/300) X X
A310 (- 200/300) X X
A318 (- 100) X X
A319 (- 100) X X
A320 (- 100/200) X X
A321 (- 100/200) X X
A330 (- 200) X X
A330 (- 300) X
A340 (- 200/300/600) X X
DC8 (- 72) X X
Note 1: if “A” inspections are required at a line station, a specific request is to be addressed to the
Maintenance Quality Assurance division for examination with the GSAC.
Note 2: in some cases, the scale and duration of the activity included in the “A” inspection means that this
inspection has to be considered as a “C” inspection (“Base Maintenance”).
Scope of Work
08 Feb 2005 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
1.9 2/5
1.9.2 Engines
CATEGORY LIMITATION REMARKS
B1 GE CF6 series Repair/RG/QEC
CFMI CFM56 series Repair/RG/QEC
GE-90 series Repair/RG except TBP /QEC
Scope of Work
10 Sept 2005 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE
Rév.1
ORGANISATION EXPOSITION
1.9 4/5
§ Aircraft
ME.QR carries out light maintenance on B.747-100/200/300/400 and 400ERF.
ME.QP carries out light maintenance on B.737-200/300/400/500.
ME.NP carries out light maintenance on B.777-200/300.
ME.QB carries out light maintenance on A330-200 and A340-300/600.
ME.QC carries out light maintenance on A318, A319, A320 and A321.
ME.GY updates on board databases as part of cabin configuration management.
ME.JK (reporting to ME.LK) carries out line station maintenance for customers.
MA.BY (reporting to MA.BD) carries out light maintenance on B767-200/300, DC8-72 and A310-200/300 for
customers.
§ Equipment
MS.EV maintains aircraft instruments and electronic computers, especially using automated test rigs, and
maintains batteries and emergency exit controllers.
MS.EN fills oxygen bottles.
MS.EW coordinates subcontracting of landing gear and APUs.
MS.EX coordinates structural subcontracting
§ Engines
MM.WA, carries out maintenance on CF6, CFM56, GE-90 engines, QEC changes on all these engines and test
bed testing of CF6 and CFM56 engines (see procedure PAL-MI-0102-WD-006).
MM.WU manages engine returns (to customer).
§ Other activities
ME.SM (Operation Support) includes four units responsible respectively for:
- Structural maintenance (ME.QZ): design, execution and checking of structural repair quality (except for
DC8, where design is the responsibility of the Engineering Department in the MA.BA Division).
- Maintenance of wheels and tires (ME.QD): tire replacement, NDT, overhaul and dispatch for
retreading.
- Aircraft towing (ME.QJ): activity carried out in maintenance area, on the apron area and between the
apron and the maintenance area.
- Cabin equipment (ME.QO): cabin activities common to the various aircraft departments
ME.QG (Industrial Support) maintains ground equipment: maintenance of facilities, test resources and tools.
• Le Bourget
§ Aircraft
MA.BY (reporting to MA.BD) is responsible for aircraft light maintenance activity.
MA.BB (reporting to MA.BY) carries out light and heavy maintenance operations on DC8-72 aircraft.
§ Equipment / structure
MA.NE (reporting to MA.BD) is responsible for equipment and structural maintenance activity.
MA.BR (reporting to MA.NE) maintains thrust reversers and repairs engine pod components, flight controls and
composite material parts.
Scope of Work
08 Feb 2005 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE
Rév.1
ORGANISATION EXPOSITION
1.9 5/5
MA.BN (reporting to MA.NE) carries out metallic (sheet metal working) and composite (plasturgy) structural
repair, and machining (machine tools).
§ Other activities
MM.WT/LBG (reporting to MM.WR) conducts Non Destructive Testing.
MA.PM (reporting to BL.MA) manages special engineering projects.
MA.BO is responsible for the maintenance of ground equipment, facilities, test resources and tools for LBG.
• Villeneuve Le Roi
§ Equipment
The Industrial Equipment Operation entity – MS.EK – ensures:
- The maintenance of hydraulic, pneumatic, electrical, cabin and electromechanical equipment, aircraft
instruments and electronic equipment, radio equipment, structural subcontracting.
- Repairs (machining and galvanoplastics).
• Toulouse-Blagnac
§ Aircraft
MA.TM (reporting to MA.TD) carries out light and heavy maintenance of B737-200/300/400/500, A319, A320
and A321 aircraft, stripping and painting and miscellaneous aircraft modifications.
§ Other activities
The Non Destructive Test activity reports to the Quality Control Department – MA.TN.
Maintenance of ground equipment, test resources and tools is the responsibility of the MA.TZ department, which
is also responsible for the routine inspection of some tools.
MA.TO is responsible for managing facilities, buildings and safety.
• Pointe-à-Pitre industrial center
The Pointe-à-Pitre industrial center - PTP- KE - (functionally reporting to BL.ME) carries out:
- Line station maintenance on B747-200/300/400/400ERF, A319, A320 and A321
- Light maintenance on A319, A320 and A321 including up to “C” inspections.
Scope of Work
08 Feb 2005 Société Air France 1993 - All rights reserved
1- Organisation
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
1.10 1/1
Air France, through Maintenance Quality Assurance, notifies as soon as possible to the Authority any change
concerning:
The accountable manager, resulting in the submission of MOE declaration as in para 1.1 as soon as possible
The organisation name and locations, resulting in the submission of an EASA Form 2
Management personnel, resulting in the completion of an EASA Form 4 which is filed with Quality Assurance
and available to the authorities.
The organisation, activities, procedures, facilities and resources, as changes may affect the approval. If the
approval domain changes, this requires the submission of an EASA Form 2
Change of trade name resulting in the submission of an EASA Form 2.
Note: lists of authorized personnel (inspection and CRS) are not subject to any change notification to the authority.
However, they are permanently available in every affected organisation.
The list of CRS authorizing personnel is subject to notification to the authority following any changes to this
list (see procedures PG-MK-0306-MK-024 and PG-MK-0504-MK-008).
The Maintenance Quality Assurance Manager is responsible for keeping the MOE and related procedures updated.
Reference TITLE
PG-MK-0308-MK-001 DGI monitoring by Maintenance Quality Assurance
PG-MK-0304-MK-002 Exceptional authorizations
PG-MK-0405-MK-004 Application of Airworthiness Directives
PG-MK-0309-MK-006 Archiving rules for maintenance-related documents
PG-MK-0304-MK-007 Structural repairs
PG-MK-0504-MK-008 Certificate of release to service of aircraft components
PG-MK-0404-MK-010 Sampling
PG-MK-0304-MK-011 Approval of repair procedures for non-structural parts
PG-MK-0304-MK-011 Acceptance and delivery conditions of aircraft equipment
PG-MK-0404-MK-013 Maintenance actions out of bases
PG-MK-0802-MK-014 Authorization and monitoring of suppliers
PG-MK-0102-MK-023 Regulatory capability list
PG-MK-0306-MK-024 Certificate of release to service of aircraft
PG-MK-0308-MK-025 Monitoring programs and reports
PG-MK-0305-MK-027 Inspection by reiteration
PG-MK-0102-MK-028 Air France and customer work files
PG-MK-0304-MK-029 Parts and products to be rejected for technical reasons
PG-MK-0205-MK-030 Use of external manpower
PG-MK-0304-MK-032 Information on Part 145 technical event
PG-MK-0205-MK-034 Monitoring of HABIL authorizations
PG-MK-0203-MK-036 Authorization, training, continuation training of auditors
PG-MK-0304-MK-048 Definition and management of technical inspection marks …
PG-MK-0307-MK-051 Manufacturing of replacement parts
PG-MK-0102-MK-052 Regulatory evolution sheet
PG-MK-0102-GU-004 Technical documentation processing
PG-MK-0404-GU-001 Use of CRM (ATL - ACL)
PG-MK-0405-GU-005 Implementation of ADs (airworthiness information)
PG-MK-0701-JO-001 Confirmation of measurement resources
PG-MK-0203-WT-001 Non Destructive Testing training and certification
PG-MK-0101-WT-002 NDT Specs listing
Reference TITLE
PG-M-0402-CI-001 Management of man-hour planning
PG-M-0401-GU-035 Maintenance or installation/removal of identical components on a single aircraft
PG-M-0102-GU-013 Procedures for notification of maintenance data errors and ambiguities
PG-M-0102-GU-014 Task handover procedure
Reference TITLE
Contents
10 Sept 2004 Société Air France 1993 - All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.1 1/1
Suppliers of goods and services are selected by the Purchasing division. Approval (type of supplier, domain and
duration) for suppliers of aircraft equipment and services is undertaken in accordance with procedure PG-MK-
0802-MK-014. A supplier’s approval gives access to his code in the supply-chain management system
(ASTRE), which is an essential pre -requisite for order placement.
Approval is monitored in a database (STEF) managed by the Maintenance Quality Assurance division.
Approval is awarded subject to various criteria: sales domain, criticality of products or service provided with respect
to safety and Air France activity, supplier’s commitment to meet DGI quality requirements, past performance for a
renewal, existence of a quality system certified (by an independent body) as compatible with the DGI system or the
possibility of being able to take account of the supplier’s operations under the DGI’s quality system, etc.
For subcontracted activities that are subject to a production or maintenance approval, suppliers are to hold the
corresponding approval covering the field. If approval is not held in the case of maintenance activities, the
subcontractor is to operate under the DGI quality system.
In certain situations, the authorization decision is subject to a satisfactory audit result.
Supplier performance is monitored by the Purchasing division, depending on criticality, in accordance with
procedure PG-M-0802-AM-030.
• General rules
Storage areas are closed and maintained at the highest possible standards of cleanliness.
These areas are separated from production or maintenance workshops, to prevent serviceable equipment or
accessories from mixing with those to be repaired. They are used only for storage.
Aviation-specific materials and equipment are separated from those assigned to other uses.
Storage conditions take account of any special storage recommendations from each manufacturer and
requirements defined in current regulations.
Access to storage areas is reserved for authorized personnel.
Equipment is stored, stowed and arranged on shelves and racks; it is identified, and fully protected against
dust, moisture, light, shocks and falls. Account is taken, where appropriate, of its location to prevent
damage to any equipment to be maintained in an airworthy condition caused by stacking, or permanent
distortion due to spending lengthy periods on excessively small or insubstantial surfaces.
“Serviceable” or “unserviceable” items are stowed on independent, identified, separated shelves.
Non-recoverable items are clearly identified with a red label and locked in a separated room or an appropriate
cabinet. The procedure for non-recoverable items is defined in Procedure PG-MK-0304-MK-029.
In some cases, because of local conditions, storerooms are climate-controlled and maintained at a constant
temperature and humidity level.
Such areas are also equipped with appropriate fire protection.
The management of self-service dispensers for expendable items (hardware and routine parts) installed in
hangars or workshops is the sole responsibility of the distributing stores that ensure batch traceability
for these items.
To ensure permanent traceability and identification of consumable items, distribution is only authorized by
the distributing stores and this means that they cannot be held by maintenance personnel.
• Identification of storage mode
§ Repairable equipment
These items are identified so that their “Serviceable” condition and specia l characteristics is clearly shown
(overhaul date, etc...).
Their storage entails, as required, the use of special resources (appropriate containers, climate-controlled
space, etc...).
Storage, labeling, and supply of aircraft components and material to aircraft maintenance teams
10 Sept 2004 Société Air France 1993 – All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.3 2/4
§ Consumable items
These items are stowed in accordance with their special storage conditions (see “Special rules” below). Any
time-limited equipment is stored in such a way as to ensure that the item whose storage date is the oldest
date is used first.
Any out-of-date equipment is discarded.
It is strictly forbidden to store “unserviceable” and “serviceable” items in the same shelf.
• Special rules
§ Flammable materials
Segregation requirements are applied to flammable materials such as volatile ingredients (separate room
away from the storeroom).
§ Raw materials
Raw materials for aircraft application are stored separately from those intended for non-aircraft use.
§ Ingredients
Ingredients are stored in a room apart from other stores or workshops in accordance with rigorous safety and
fire protection standards. Some ingredients are to be stored at a temperature recommended by the
manufacturer.
§ Elastomeric materials
In addition to the requirements laid down in the general storage rules, these materials are to be stored in a
room protected against heat, light, and with a satisfactory humidity level. Elastomeric materials, sealants,
etc., are to be stored separately from materials emitting carbon dioxide (CO2 bottles, carbonated products).
Every product mentioned above shall be identified by its SMI Number and by its batch Number, as
appropriate. Every manager identifies any equipment before shipment to a warehouse or a workshop.
§
§ Time-limited equipment
Expendable items are subject to physical inspection; items that can be overhauled are subject to a computer
check.
(see MOE - Paragraph - “equipment storage limits”)
Some materials or expendable products (sealants, greases and paints) have a use-by date defined by the
product manufacturer. Every time-limited item shall be identified by its use-by date
The manufacturer can enter the date on the label in various forms: usually this entry is carried out by the
manufacturer, but if this information is not provided by the manufacturer, the storekeeper is responsible for
adding an AF label stating the use-by date.
Life limits for all time-limited equipment are entered into a centralized data processing system (FITS). The
Materials and Processes Department (ME.UX) is responsible for updating this computer file.
Storage times are those recommended by the manufacturer or amended by ME.UX in agreement with the
manufacturer in accordance with procedure PG-M-0401-GU-002.
As a minimum, a monthly check is carried out in every distribution store or workshop so that life-expired
products may be removed.
Storage, labeling, and supply of aircraft components and material to aircraft maintenance teams
10 Sept 2004 Société Air France 1993 – All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.3 3/4
Life-expired products are stored in a quarantine zone by storekeepers; these products are then sent to MA.JO
or ME.QG (responsible for waste treatment or disposal) and they determine the most appropriate method of
destruction.
The rule is to issue the oldest products first (first in / first out).
Under no circumstances can a life-expired product be issued by the storeroom.
Users are also to check the use-by date before use, and are only to use unexpired products.
Storage, labeling, and supply of aircraft components and material to aircraft maintenance teams
10 Sept 2004 Société Air France 1993 – All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.3 4/4
Storage, labeling, and supply of aircraft components and material to aircraft maintenance teams
10 Sept 2004 Société Air France 1993 – All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.4 1/1
These tools and instruments are subject to an acceptance process as defined below, under the control of the technical
manager:
§ Pre-acceptance by the technical manager at the supplier’s facility.
§ Supplier takes responsibility for items not approved.
§ Delivery.
§ Pre-acceptance on Air France site by the technical manager.
§ Suppliers take responsibility for items not approved.
§ Final acceptance approved by the technical manager.
These acceptance and monitoring procedures apply to all measuring devices as defined in procedure PG-MK-0701-
JO-001 whether the tools or instruments are:
§ Bought new
§ Maintained
§ Modified
§ Checked or calibrated
§ Loaned or rented
The tools and instruments concerned are managed by a single organisation responsible for each function: technical,
logistic or purchasing:
The technical manager is responsible for:
§ approval of standard tools
§ definition of tool box content
§ consideration of metrology requirements
§ consideration of work regulation requirements
§ user information
§ relationships with suppliers
The logistic manager is responsible for:
§ marking of tools
§ centralization of supplies
§ making up tool boxes and additional tool sets
§ administrative monitoring of acceptance compliance
The purchasing manager is responsible for:
§ management of suppliers
§ management of contracts (prices and deadlines)
§ treatment of nonconformities with suppliers
2.5.1 General
All equipment used to carry out checks (weights, voltages, pressures, temperatures, electrical measurements,
dimensional measurements, etc…) is subject to periodical inspection to guarantee its accuracy. There is an
exception for instruments used for ambiguity resolution during troubleshooting procedure (without accurate
measurement reading), and identified with a self-adhesive label stating: “NOT SUBJECT TO CONFIRMATION
OF MEASURING DEVICES”.
The only tools and measuring instruments to be considered are those available for users; equipment belonging to Air
France or manufacturers, but placed under the responsibility of Air France.
All information related to measuring instruments and tools subject to calibration is developed in Procedure PG-
MK-0701-JO-001.
2.5.2 Responsibilities
The MA.JO Department is responsible for defining the policy for tools and instruments used by Air France.
It therefore controls the choice of resources to be used, the organisation of technical monitoring of measuring
instruments and tools subject to calibration, the definition of verification standards and the grant of possible
exemptions. This Department is guarantor for the validity of procedures and is the point of contact with the BMM
(National Metrology Office).
The user unit is responsible for the monitoring of measuring instruments and tools subject to confirmation that it is
holder, for their correct use (observance of calibration limits) and their sending to verification before the due date.
2.5.7 Archiving
Verification and calibration test certificates and the documents used to manage tools and measuring instruments are
archived in accordance with annex 4 of procedure PG-MK-0701-JO-001 by the user workshop or laboratory
depending on the type of document.
Maintenance instructions and method of ensuring compliance with aircraft and component
manufacturers’ instructions including updating and availability to personnel
10 Sept 2004 Société Air France 1993 - All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.8 2/2
• Modification documentation
Service Bulletins (SB) provide modification instructions and priorities or recommendations for special
maintenance actions. In case of urgent or priority action, an “Alert Service Bulletin” is issued and is
given priority treatment by the relevant department.
• Miscellaneous documents
- Process Standards / Manufacturer Standards (DPS, BAC, PMS,...)
- Engineering / Manufacturing Drawings (Aperture Cards,...).
- Service Letters (AOT, SIL, MEMORANDUM, TELEX,...) including information about problems met in
operation, manufacturer’s research activities, etc...
• Documentation management
The acceptance and distribution of documentation is carried out by the Documentation Department (ME UG).
This Department accepts all regularly issued external documents, except for documentation related to
line station maintenance of customer aircraft which, depending on the contract, is directly managed by
the Line station maintenance Division (ME.LK, ME.JK,).
The “Ariane” computerized system enables the list and the last revision to be known for all documents issued
by ME.UG.
This Department ensures the reproduction and distribution of documents. The user is responsible for
amending the documentation (see Procedure PG- MK- 0102- GU- 004).
Maintenance instructions and method of ensuring compliance with aircraft and component
manufacturers’ instructions including updating and availability to personnel
10 Sept 2004 Société Air France 1993 - All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.9 1/1
Repair procedure
10 Sept 2004 Société Air France 1993 - All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.10 1/2
• Customer Aircraft
All requests for deferred works are to be transmitted to the customer for approval in accordance with the regulations
defined by its own Authority.
• Routine work
After completion of work, the operator enters his name and signs the appropriate document.
When some operations require a check, once the check is complete, the authorized person adds his stamp or
name, and signature, in the appropriate box.
• Additional work (special work, statutory work)
After completion of this work and, where applicable, any checks required, the appropriate documents are
signed as for routine work.
• Routine replacement
After completion of equipme nt removal / installation (for routine replacement, modification or repair), the
Aircraft Production Department:
- completes the label from the installed equipment and attaches it to the removed equipment before sending
it off.
- completes the inspection file.
• Inspection file (Air France aircraft)
For Light Maintenance operations, the inspection file is issued from the SIGMA system (Information and
Management System of Aeronautical Maintenance).
Note: When a “Transit” type inspection is carried out, a “manual” file is compiled based on the ATL and the
SIGMA history report (work initiation on Supplementary Work Sheet).
For major inspections, the inspection file forms are identical to those used for customer aircraft (see
procedure PG-MK-0102-MK-028).
Upon completion of the inspection, the last supervisor, who is the CRS signatory, collects all the inspection
file documents, checks that they have been duly signed and that deferred work has been validated.
The monitoring function checks inspection files by samp ling.
The inspection file is transferred to the Technical/Control Support Department for review and re-
parameterizing of deferred work, as well as for the document check.
The inspection file is then transmitted to the relevant departments for updating of the data in the computerized
initiation system and all the monitoring data.
• Customer Aircraft Inspection Report
Upon completion of the inspection, the last supervisor, who is the CRS signatory, collects all the inspection
file documents, checks that they have been duly signed and that deferred work has been validated and
accepted by the customer.
The inspection file is transferred to the Technical/Control Support Department for document check.
The inspection file is sent to the customer; a copy of the inspection file is kept by the appropriate workshop
(see Procedure PG-MK-0102-MK-028).
- The collection of all information related to work carried out on this equipment and ensures technical monitoring of
the equipment.
- Certification that all the work has been completed in accordance with the documents related to this equipment.
- Retention of evidence and authentication.
Every operation which is defined is certified by the operator identified by name and signature or trigram and
signature (see procedure PG-MK-0304-MK-048).
Equipment being highly varied, the repair shops created specific documents for some equipment (electronic
equipment, survival equipment, wheels, etc…) as individual monitoring forms for which the repair shop is
responsible, and which are supplements to the equipment file.
For Air France and related customers, maintenance actions carried out in workshop (repairs, modifications,
components replaced as appropriate, AD, etc…) related to their release to service are coded and entered into the
ASTRE system from the equipment file. This system provides a detailed technical history for each item of
equipment and enables reliability studies to be carried out.
In addition, after application of an AD, the equipment file is transmitted within the REE organisation to the
Department responsible for recording and monitoring airworthiness requirements.
Requests for acceptance of workshop non-compliances (non-observance of an instruction or tolerance included in
manufacturer’s documentation) are recorded on the “INDUSTRIAL EXCEPTIONAL AUTHORIZATION” form
by the repair shop and submitted to the designated Department in accordance with procedure PG-MK-0304-MK-
002.
The equipment file (definition and content of work file, inspection procedures, list of documents sent to the
customer and/or kept by the repair shop) is subject to Procedure PG-MK-0102-MK-028.
Actions resulting from defects recorded on the ATL or ACL and those found during inspection are entered on the
ATL/ACL and/or inspection file.
The work is carried out in accordance with the reference documentation. The operator appends name and signature
on the operating document, mentioning the location, date and time, as also references and revision indexes of used
documents.
When the work must be inspected, when this is complete the authorized person appends stamp or name facing the
corresponding operation, as well as his signature.
When detected defects require work in the workshop, an ASTRE type label for equipment that can be overhauled or
a PURS label for repairable equipment is attached to the component to be repaired. After return from workshops
and installation of the component on the aircraft, initiation and execution documents are completed as detailed
above.
When a team of specialists detached from a workshop is to operate on an aircraft, an Execution Order (OE) is
prepared. The OE is only an accounting document; the operator is to certify completion of the works requested on
the initiation and execution document.
§ A copy of most recent entries in the customer aircraft logbook with responses to aircrew comments, a
description of the work carried out and the CRS specifying the type of inspection carried out.
§ The airworthiness document in the case of component replacement
Air France may need to subcontract some work for the following reasons:
Temporary overloading of workshops (capacity subcontracting)
Absence of specific resources to carry out part of the work (skill subcontracting)
Absence of resources specific to Air France in a given location (case of line technical assistance
subcontracted to another maintenance organisation)
Cost and timescale gains,
Observance of bilateral agreements within the Air France Group or outside,
Reliability improvement during the standard guarantee period.
For all subcontracting, a work order or a contract is to be prepared to specify procedures and/or sharing of
responsibility. In all cases, the work order shall specify:
Work to be carried out.
Applicable reference documents.
These subcontractors are selected and authorized and are on the lists of subcontractors, issued from the STEF
data base.
The computerized work record systems meet the following minimum requirements:
• Backup
A full backup of databases is carried out once a week, as also a daily incremental backup (backup of changed data
since the last backup)
In addition, every updating is saved in real time.
• Storage location of saved data
Every backup is copied and every copy is stored in a different computer room inside every computer site.
The daily backup is stored outside the site.
• Data archiving
Work record data is kept for at least two years following completion
• System safety
Only authorized personnel have access to the systems during modific ation. These personnel obtain access using a
personal identifier and a password.
• Standby system
In case of system failure, manual processing is carried out. A system update is then carried out as soon as the
computer is operating.
Specific maintenance procedures such as engine ground run, aircraft pressurization, and aircraft jacking procedures,
etc., are subject to technical instructions developed in accordance with paragraph 2.8.
In the specific case of jet engine start-up and ground run, special clearance is required (PFIX authorization).
§ The qualification rules for the relevant personnel are defined in the Training Manuals.
§ This authorization is computer-processed and stored in HABIL. This authorization is valid only when the
authorization sheet is signed by the authorized person and the chief inspector.
Systems for the detection and rectification of maintenance errors such as inspection reports, surveys,
analysis of technical events via GET, classified incidents, monitoring of Maintenance Quality Assurance
via AMQ, are supplemented by an analysis system addressing the human factors aspects of maintenance
events.
This system, derived from MEDA methodology (Maintenance Error Decision Aid), is based on the
following:
The “Operational safety – Experience feedback” charter of Air France, which aims to encourage
spontaneous feedback of information.
Analysis methodology derived from MEDA, called FAIRI (Identified Incident or Risk Analysis
Sheet), enabling determination, through feedback analysis, of event contributory factors and the
identification of appropriate remedial actions.
Data base enabling recording of the FAIRI sheets and analysis of the events in accordance with their
typology, identification of recurrences and precursors and initiation of the required preventive actions.
This system is supplied from on-site coordinators, training initiatives and the raising of human factor awareness
adapted to the various populations within the Industrial Directorate.
The whole system is therefore used to activate several feedback loops, providing information through quality
“newsflashes” in a range of media, team meetings for problem solving through the monitoring of actions derived
from FAIRI, and for prevention through the incorporation of REX FH (Human Factor Experience Feedback) in
continuation training and type qualifications
Periodical reports are prepared for Management and incorporated in management section reviews.
• Activity planning
§ Air France fleet aircraft
The Program / Scheduling Department of the Maintenance Division (ME GR), in cooperation with the relevant
maintenance organisations, is responsible for pla nning and scheduling aircraft downtimes for maintenance
operations, repairs, modifications and major work.
For aircraft based at ORLY, except B747 aircraft, these functions are assured by the ME YC Department in close
cooperation with ME GR.
Criteria sele cted for the downtime planning are as follows:
- Deadlines for next inspections determined from approved maintenance manuals
- Operating forecasts for aircraft in terms of cycles and flight hours, or calendar time limits.
- Operational requirements
In parallel to the assimilation of quantity and type availability of the resources needed for carrying out the work, the
personnel responsible for planning this work and organizing work teams benefit from an awareness of human
factors that enables them to take account of human performance aspects in the decisions for which they are
responsible. On the basis of allocated limits and time slots, a program is developed, taking into account the
requirements of the Production Departments. When prepared, the downtime program is distributed to the relevant
departments as an inspection schedule.
§ Customer aircraft
Downtimes are scheduled in accordance with customers’ requests, depending on hangar and production resource
availability.
• Work preparation / initiation
§ Preparation
All maintenance inspections at “weekly” or longer than “weekly” frequency, performed at Main Base as well as
major work are subject to an inspection file compiled by the Preparation Departments involved before the aircraft
inspection starts.
For the types of inspection with a level shorter than “weekly” level, an inspection file may be prepared as required.
For each inspection requiring an inspection file, the preparation phase covers:
- Routine work (application of maintenance manuals),
- Additional work:
- Routine replacements
- ADs to be applied
- Removal not scheduled (incident, engine monitoring, result from wing scheduled inspection, AD, etc...)
Number of hours and cycles since last installation on aircraft, since last off-aircraft servicing, since build, etc....
- the ability to enter set restrictions (hours remaining) or maintenance events (ADs, modifications) which may apply
to any lifed equipment.
The modular work files are prepared in accordance with the engine file; they change depending on the results of
preliminary inspections.
The work files are passed to workshop planning offices for action.
Life-limited parts are identified during the preliminary inspection in accordance with the data approved by the
customer. All information (life remaining, scrap items, etc...) concerning these parts are included in the work file
(see procedure PG-MK-0102-MK-028).
• Work recording
For the work defined above, the workshop confirms work completion in the engine modular files (PROSPER
labels, operation orders, workshop data sheets) etc... and enters data in PROSPER. Every operation defined in
the file is signed off by the operator identified by name, stamp and signature.
Note: For some subcontracted engines, the “PROSPER” computer system is replaced by information
monitoring provided by MM.WW.
The engine file (definition and content of work file, inspection procedures, list of documents sent to the
customer and/or retained by the workshop) is subject to Procedure PG-MK-0102-MK-028.
2.28.3 Equipment maintenance
• Work planning
§ Air France equipment and that of customers having access to the pool
Equipment maintenance planning requires knowledge of the history, availability and status of each equipment item
within Air France, as well as access to statistical data for reliability studies, inventory management etc...
This is achieved using the ASTRE equipment management computer system, which, for each monitored item of
equipment, offers:
- information on:
- its status: on aircraft, in workshop or in store,
- number of hours and cycles and (calendar) aging since last installation on aircraft, since manufacture,
since last maintenance action, etc.
- any storage limit,
- the option of entering any operating limits defined by the maintenance policy or resulting from a modification
decision or an AD, which may affect the equipment,
- comparisons between these operating limits and flight hour and/or cycle and/or calendar status for the initiation of
removals and returns to workshop,
- data output for the calculation of removal rates and failure rates, downtimes, etc....
For customers having access to the pool, contracts define the task breakdown between Air France and the customer.
Customer equipment (not pooled)
Except when covered by contracts or special agreements, it is not Air France but the customer that is
responsible for planning engine maintenance.
• Initiation of work
§ Air France equipment and customer equipment, having access to the pool.
(see procedure PG-MK-0102-MK-028)
Equipment maintenance activity is divided into four categories:
Category 1 – Scheduled work directly related to the approved maintenance policy,
(Type of action to be carried out in workshop in accordance with that defined in CMM, OHM...)
Maintenance planning procedure
10 Sept 2004 Société Air France 1993 - All rights reserved
2- Maintenance
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
2.28 5/5
Category 2 – Work resulting from a malfunction occurring during operation or detected during overhaul or
preliminary inspection,
Category 4 – Application of an AD
Each Aircraft Maintenance Department determines activity under categories 1, 3 and 4 for the equipment for which
it is responsible and ME.NO initiates category 1 work in ASTRE.
The Engineering Department of REE enters category 3 and 4 maintenance activity in ASTRE.
The Production Departments defines category 2 activities in cooperation with the Engineering or Control
Departments, as appropriate and initiates this directly through the equipment file.
Work under categories 1, 3 and 4 is instigated by the Scheduling / Initiation Department to the designated repair
shop (or subcontractor) in order to maintain equipment operational availability and airworthiness (operating limits,
ADs, modifications, etc....).
The ASTRE system automatically generates notifications for the removal for monitored equipment and its return to
the repair shop.
For customers having access to the pool, the initiation fucntion is defined in the contract.
§ Equipment (not pooled)
Work in categories 1, 3 and 4 is initiated as a function of customer requirements.
Category 2 work is initia ted in accordance with the preceding paragraph, following advice from the customer if
required.
Any life-limited components are identified during the preliminary inspection in accordance with data approved by
the customer. All information (life remaining, scrap items, etc.) relating to these components is contained in the
work file (see procedure PG-MK-0102-MK-028).
Contents
10 Sept 2004 Société Air France 1993 - All rights reserved
3 - Quality
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
3.1 1/3
The audit plan thus defined is presented in advance to the managers of audited Divisions, so that the time
schedule can be determined and the individuals to be consulted can be identified.
• Conduct
The audit process involves:
Collection of information from the audited managers or from the individuals consulted,
Identification and analysis of deviations.
• Audit report drafting
Each audit generates a report. The audit report identifies the subjects checked and states any deviations
identified. Prior to release, the preliminary conclusions are read by and discussed with the audited
managers. During this phase, the auditor and audited managers jointly determine recommended remedial
actions required and the associated timescale.
• Audit report release
Audit reports are transmitted to the managers of the audited divisions, with a copy to the headquarters of
the Quality Assurance Department.
• Monitoring
Each remedial action requested is specifically monitored by Maintenance Quality Assurance; this enables
achievement of the deadline to be checked. A specific IT tool is available to support the implementation
of the monitoring program and the monitoring and measurement of results (AMQ: Quality improvement).
• Archiving
Audit reports are archived for at least two years after the completion of all associated remedial actions.
• Investigations
Each investigation generates a report and may, like audits, result in requests for remedial action.
• Surveys
Activity-specific surveys are carried out during the monitoring program. These generate “Quality Reports” that may
result in remedial actions.
• Implementation
The QUALITY CONTROL function is involved:
- When direct control is required by the work documents
- When the controllers consider that an action should be taken
- During any surveys.
Actions associated with the control function result in the application of inspection stamps and signatures, or names
and signatures, on the equipment and/or associated documents.
An individual performing a maintenance task cannot carry out the associated control function required by the work
documents, except in cases explicitly specified in paragraph 2.23.
• Inspection marks/stamps
Procedure “PG-MK-0304-MK-048” specifies the design and management of technical and qualified operator
inspection marks/stamps.
3.3.1 GENERAL
Each remedial action requested is specifically monitored by Maintenance Quality Assurance; this enables
achievement of the deadline to be checked. The remedial action is only closed when the auditor considers the action
as satisfactory and fully implemented. The AMQ (Quality improvement) IT system supports the implementation of
the monitoring program and the monitoring and measurement of results.
Every year the Accountable Manager organizes an accident prevention/flight safety meeting; attendance includes
the Industrial General Manager and the Maintenance Quality Assurance Manager.
A Maintenance Quality Assurance monitoring report is also submitted every four months to the Industrial General
Manager during the Management Review.
Major:
§ any non-compliance with current regulations that may impact on maintenance standards and/or the
airworthiness of the aircraft or aircraft component.
APPLICABILITY: defined by the auditor after negotiation with the audited entity(*).
Minor:
§ any nonconformity not classified as major but requiring a correction.
APPLICABILITY: defined by the auditor after negotiation with the audited entity(*).
(*) This applicability shall not exceed 90 days. Exceptionally, this may be exceeded under specific conditions
(financial, workload, etc.) or in case of difficulties in application; the audited entity is then to re-negotiate the
applicability with the auditor.
3.4.2 Qualification
CRS personnel and B1 and B2 support personnel are qualif ied in accordance with procedures PG-MK-0306-MK-
024 (aircraft activity) and PG-MK-0504-MK-008 (equipment and engine activities).
Certifying staff shall meet the following criteria:
- Appropriate knowledge of the equipment concerned and applicable procedures within the organisation and/or
Division.
- Knowledge of languages used within the Maintenance Organisation, including the usual aeronautical vocabulary,
enabling them to:
Read and understand the instructions and technical manuals used
Complete in writing all maintenance documents, in an understandable manner
Read and understand Air France procedures
Communicate orally at a level that enables the avoidance of any misunderstanding within the scope of their
authorization; the level of understanding should be compatible with the field of activity (AF or customer,
station or main base) and the type of authorization
3.4.3 Authorization
• Award and renewal of authorizations
CRS personnel and category B1 and B2 support staff are authorized by “CRS Managers”, by delegation from the
Maintenance Quality Assurance Manager, in compliance with procedure PG-MK-0205-MK-034.
Prior to any award or renewal of an authorization for issuing CRS, the “CRS Managers” assess the competence of
the applicants for carrying out the desired authorization activity. This assessment, specific to each authorization
proposal, covers primarily background experience, CRS authorizations held, if any, training programs attended and
the ability to perform the tasks included in this new authorization. Also, on renewal of an authorization, the “CRS
Manager” should check the recent experience of the authorized personnel (6-month/2-year rule), as well as the
attendance at in-service training. See PG-MK-0306-MK-024 and PG-MK-0504-MK-008
§ For aircraft activities: (see procedure PG-MK-0306-MK-024).
Various types of CRS authorizations are granted depending on the qualification level and experience of the
applicants:
- for light maintenance activities, CRS is signed off by type A and type B certifying personnel, and
- for heavy maintenance, by type C certifying personnel, supported by personnel with a qualification level
equivalent to categories B1 and B2 (whether or not they are cleared to issue CRS), personnel specialized in
“aircraft structure” activities and personnel specialized in “aircraft cabin” activities.
Personnel authorized to issue CRS hold:
- either an aircraft maintenance license JAR 66 or Part 66,
- or grandfather rights in accordance with procedure PG-MK-0306-MK-024.
§ For workshop activities: (see procedure PG-MK-0504-MK-008).
Personnel authorized to issue CRS are selected from amongst operatives with a qualification level matching the
selected authorization activities.
Qualification and training procedures for certifying staff and category B1 and B2 support staff
10 Sept 2004 Société Air France 1993 - All rights reserved
3 - Quality
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
3.4 2/2
Qualification and training procedures for certifying staff and category B1 and B2 support staff
10 Sept 2004 Société Air France 1993 - All rights reserved
3 - Quality
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
3.5 1/1
3.5.3 Archiving
The HABIL system cannot be used to store details of previous authorizations. This record can however be traced by
archiving the individual hard copy authorization cards (see PG-MK-0309-MK-006).
However, if the card format allows this, old authorizations can be retained on the card. In this case, the term
“RENEWAL” (or an abbreviation) shall be entered on the new authorization.
Files of personnel authorized to sign CRS and category B1 and B2 support personnel
10 Sept 2004 Société Air France 1993 - All rights reserved
3 - Quality
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
3.6 1/1
3.7.2 Checker
In certain industrial organisations, scrutiny operations – basically checks for condition and dimensional checks on
parts - leading to a certificate of conformity with a specification or a work document - are carried out by
“Production” agents, who may perform this type of task on a part-time basis.
These agents are called “Checkers”
They undergo training appropriate to the tasks they are assigned.
They are authorized and registered in accordance with the procedure described in the previous paragraph.
They are provided with a personal control mark/stamp that differs from the stamp of agents with delegated
inspection authority.
Qualification of inspectors
10 Sept 2004 Société Air France 1993 - All rights reserved
3 - Quality
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
3.8 1/1
Qualification of mechanics
10 Sept 2004 Société Air France 1993 - All rights reserved
3 - Quality
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
3.9 1/1
Qualification procedure for specialized activity such as non-destructive tests, welding, etc.
10 Sept 2004 Société Air France 1993 - All rights reserved
3 - Quality
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
3.12 1/1
Each post is described in a “Job description”. The job description defines the task and the capabilities required.
Personnel capabilities are permanently assessed by line management and are subject to an annual report that follows
annual interviews. These interviews are formalized in the Annual Assessment Forms.
Maintenance records are retained by the workshop in accordance with procedure PG-MK-0309-MK-006. In all
cases, they are to be retained for at least 2 years after the date of release to service.
PARTIE 5. APPENDICES
Appendices
10 Sept 2004 Société Air France 1993 - All rights reserved
5 - Appendices
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
5.1 1/1
Facsimiles of documents used during maintenance operations are included in the procedures associated with the
MOE.
Sample documents
10 Sept 2004 Société Air France 1993 - All rights reserved
5 - Appendices
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
5.2 1/1
5.2 LIST OF SUB-CONTRACT ORS (IN ACCORDANCE W ITH 145.A.75 (B) AND
145.A.70(A)16)
List of sub-contractors
10 Sept 2004 Société Air France 1993 - All rights reserved
5 - Appendices
MAINTENANCE ORGANISATION
Rév.0
EXPOSITION
5.3 1/1
The ME.LK Division provides line station maintenance at the line station airports contained in a list transmitted to
the management of this division (Ref.: GQLIST01) and regularly updated in accordance with IATA seasons. This
list is available to authorities on request.
6.0 1/1
6.1 Management of aircraft components, tools, instruments, etc. for line station maintenance
6.2 Line station maintenance procedures for servicing / refueling / de-icing, etc.
6.3 Monitoring of defects and recurring defects by line station maintenance
6.4 Line station maintenance procedure for completing the equipment report
6.5 Line station maintenance procedure for pooled or leased parts
6.6 Line station maintenance procedure for returning faulty parts removed from aircraft
6.7 Monitoring of critical work during line station maintenance
Contents
10 Sept 2004 Société Air France 1993 - All rights reserved
6- Line Station
MAINTENANCE ORGANISATION Maintenance
EXPOSITION Rév.0
6.1 1/1
Management of aircraft components, tools, instruments, etc. for line station maintenance
10 Sept 2004 Société Air France 1993 - All rights reserved
6- Line Station
MAINTENANCE ORGANISATION Maintenance
EXPOSITION Rév.0
6.2 1/1
Line servicing is performed in accordance with the procedures of Part 2 of this MOE.
Line station maintenance procedures that fall outside Part 145 coverage (refueling, de-icing, water replenishment,
etc.) follow the procedures in Air France’s General Operations Manual (GEN OPS).
Line station maintenance procedures for servicing / refueling / de- icing, etc.
10 Sept 2004 Société Air France 1993 - All rights reserved
6- Line Station
MAINTENANCE ORGANISATION Maintenance
EXPOSITION Rév.0
6.3 1/1
6.4 1/1
6.5 1/1
6.6 1/1
Line station maintenance procedure for returning faulty parts removed from aircraft
10 Sept 2004 Société Air France 1993 - All rights reserved
6- Line Station
MAINTENANCE ORGANISATION Maintenance
EXPOSITION Rév.0
6.7 1/1