Professional Documents
Culture Documents
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.
BASE PLATE ID :- (B-1) Steel grade St.37 Refrences
Fy = 2.40 t/cm2 ECP
DESIGN CASE :- (D.L+L.L) case a Fu = 3.60 t/cm2
X
1)- APPLIED FORCES :-
N = 8.00 t
T = 0.00 t
Q = 2.00 t B
X
hWEB = 360.0 mm
tWEB = 8.0 mm
2
bFL.L = 170.0 mm
2
L
L
tFL.L = 12.7 mm L3
1
1
L
L
1
3)-DIM. OF BASE PLATE :-
2
2
L
L
L = 44.00 cm
B = 22.00 cm
5)-STRESSES ON R.C :-
fcu = 250 Kg/cm2
Wb = 8.26 Kg/cm2 < fbearing = 75.00 Kg/cm2 SAFE
t = 16 mm
ECG Project Name
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.
8)-DESIGN OF ANCHOR BOLTS :-
Φ = 20 mm
AΦ = 3.14 mm2
No of bolts = 1
2 ANCHOR Φ = 20 mm
Fb = 6.51 Kg/cm2
Length of Bolts = 80.00 cm
If the length of Bolts is too big so use a Bearing Washer Plate C
Lb = 50 cm
Twp = 0.000 t
C = 5 cm C = 2.5-3 d
fwp = 0.000 t/cm2
twp = 0.000 mm
twp = 8 mm