Casing Top Ground level Cut Off Level Rock Touch Founding Level Total Boar Total Boar Total Boar Depth Total Casing Cage Length Total Qty Poured
Sl.No Pile No Casting date Level (C.T.L) (G.L) (C.O.T) Level (R.T.L) (F.L) Depth From Depth In From GL (mt) Length (mt) (mt) (m3)
G.L In Soil (mt) Rock (mt)
1 A-45 1-Jan-14 (+) 4.212 (+) 3.742 (-) 3.062 (-) 13.088 (-) 14.288 16.830 1.200 18.030 15.090 18.700 21
2 A-43 4-Jan-14 (+) 3.853 (+) 3.747 (-) 3.062 (-) 13.947 (-) 15.147 17.694 1.200 18.894 16.610 19.690 22
3 A-35 5-Jan-14 (+) 4.522 (+) 3.792 (-) 3.062 (-) 17.678 (-) 18.878 21.470 1.200 22.670 15.110 23.300 26
4 A-41 6-Jan-14 (+) 4.602 (+) 3.792 (-) 3.062 (-) 13.998 (-) 15.198 17.790 1.200 18.990 16.610 19.590 22
5 A-39 7-Jan-14 (+) 4.482 (+) 4.482 (-) 3.062 (-) 13.258 (-) 14.458 17.740 1.200 18.940 15.110 18.795 22
6 B-46 11-Jan-14 (+) 4.622 (+) 4.102 (-) 3.062 (-) 13.183 (-) 14.383 17.285 1.200 18.485 14.600 18.905 22
7 B-42 13-Jan-14 (+) 4.722 (+) 4.002 (-) 3.062 (-) 13.078 (-) 14.278 17.08 1.200 18.280 14.580 18.620 21
8 C-47 14-Jan-14 (+) 4.502 (+) 4.127 (-) 3.062 (-) 13.918 (-) 15.118 18.045 1.200 19.245 17.270 19.460 22
9 A-33 14-Jan-14 (+) 4.192 (+) 3.792 (-) 3.062 (-) 14.908 (-) 16.108 18.700 1.200 19.900 16.380 20.450 23
10 A-44 17-Jan-14 (+) 4.412 (+) 3.717 (-) 3.062 (-) 12.988 (-) 14.188 16.705 1.200 17.905 14.655 18.530 21
11 A-40 22-Jan-14 (+) 4.062 (+) 3.767 (-) 3.062 (-) 13.278 (-) 14.478 17.045 1.200 18.245 13.950 21
12 D-46 (+) (+) (-) 3.062 (-) (-) 1.2 0 1.200 1.200 15.910
13 A-46 17.1.14 (+) 4.557 (+) 3.822 (-) 3.062 (-) 12.403 (-) 13.603 16.225 1.200 17.425 15.760 17.945 22
14 A-42 18.1.14 (+) 4.447 (+) 3.712 (-) 3.062 (-) 14.293 (-) 15.493 18.005 1.200 19.205 17.980 19.835 22
15 C-48 18.1.14 (+) 4.747 (+) 4.127 (-) 3.062 (-) 13.918 (-) 15.118 18.045 1.200 19.245 17.050 20.095 22.5
16 B-47 24.1.14 (+) 4.447 (+) 4.102 (-) 3.062 (-) 13.183 (-) 14.383 17.285 1.200 18.485 16.430 21.5
17 B-41 22.1.14 (+) 4.392 (+) 3.952 (-) 3.062 (-) 13.028 (-) 14.228 16.98 1.200 18.180 15.210 20.5
18 B-43 24.1.14 (+) 4.717 (+) 3.937 (-) 3.062 (-) 12.883 (-) 14.083 16.82 1.200 18.020 16.430 20.5
19 C-46 24.1.14 (+) 4.667 (+) 3.962 (-) 3.062 (-) 13.253 (-) 14.453 17.215 1.200 18.415 15.840
20 (+) (+) (-) 3.062 (-) (-) 1.200 0.000 1.200 1.200 15.840
21 (+) (+) (-) 3.062 (-) (-) 1.200 0.000 1.200 1.200 15.840
22 1.200 0.000 1.200 1.200
23 1.200 0.000 1.200 1.200
24 1.200 0.000 1.200 1.200
25 1.200 0.000 1.200 1.200
26 1.200 0.000 1.200 1.200
27 1.200 0.000 1.200 1.200
28 1.200 0.000 1.200 1.200
29
30
31
32
282.924 303.324 268.305 351.5
Total No's of pile in Completed
Row Row Till Date
Remaining Piles
A 48 10 38
B 48 5 43
C 48 3 45
D 48 48
B D
Sl.No Pile No Casting date Casing Top Ground level Cut Off Level Rock Touch Founding Level
Level (C.T.L) (G.L) (C.O.T) Level (R.T.L) (F.L)
1 A-45 1-Jan-14 (+) 4.212 (+) 3.742 (-) 3.062 (-) 13.088 (-)
2 A-43 4-Jan-14 (+) 3.853 (+) 3.747 (-) 3.062 (-) 13.947 (-)
3 A-35 5-Jan-14 (+) 4.522 (+) 3.792 (-) 3.062 (-) 17.678 (-)
4 A-41 6-Jan-14 (+) 4.602 (+) 3.792 (-) 3.062 (-) 13.998 (-)
5 A-39 7-Jan-14 (+) 4.482 (+) 4.482 (-) 3.062 (-) 13.258 (-)
6 B-46 11-Jan-14 (+) 4.622 (+) 4.102 (-) 3.062 (-) 13.183 (-)
7 B-42 13-Jan-14 (+) 4.722 (+) 4.002 (-) 3.062 (-) 13.078 (-)
8 C-47 14-Jan-14 (+) 4.502 (+) 4.127 (-) 3.062 (-) 13.918 (-)
9 A-33 14-Jan-14 (+) 4.192 (+) 3.792 (-) 3.062 (-) 14.908 (-)
10 A-44 17-Jan-14 (+) 4.412 (+) 3.717 (-) 3.062 (-) 12.988 (-)
11 A-40 22-Jan-14 (+) 4.062 (+) 3.767 (-) 3.062 (-) 13.278 (-)
12 A-46 17-Jan-14 (+) 4.557 (+) 3.822 (-) 3.062 (-) 12.403 (-)
13 A-42 18-Jan-14 (+) 4.447 (+) 3.712 (-) 3.062 (-) 14.293 (-)
14 C-48 18-Jan-14 (+) 4.747 (+) 4.127 (-) 3.062 (-) 13.918 (-)
15 B-47 24-Jan-14 (+) 4.447 (+) 4.102 (-) 3.062 (-) 13.183 (-)
16 B-41 22-Jan-14 (+) 4.392 (+) 3.952 (-) 3.062 (-) 13.028 (-)
17 B-43 24-Jan-14 (+) 4.717 (+) 3.937 (-) 3.062 (-) 12.883 (-)
18 C-46 24-Jan-14 (+) 4.667 (+) 3.962 (-) 3.062 (-) 13.253 (-)
19 B-35 27-Jan-14 (+) 4.732 (+) 3.932 (-) 3.062 (-) 12.828 (-)
20 B-37 27-Jan-14 (+) 4.927 (+) 3.947 (-) 3.062 (-) 13.133 (-)
21 D-30 31-Jan-14 (+) 4.397 (+) 3.772 (-) 3.062 (-) 17.3 (-)
22 D-28 1-Feb-14 (+) 4.562 (+) 3.777 (-) 3.062 (-) 17.3 (-)
23 B-28 2-Feb-14 (+) 3.937 (+) 3.557 (-) 3.062 (-) 16.863 (-)
24 A-28 3-Feb-14 (+) 4.187 (+) 3.617 (-) 3.062 (-) 17.073 (-)
25 B-27 3-Feb-14 (+) 4.147 (+) 3.607 (-) 3.062 (-) 17.153 (-)
26 A-37 4-Feb-14 (+) 3.842 (+) 3.797 (-) 3.062 (-) 12.138 (-)
27 A-31 5-Feb-14 (+) 4.227 (+) 3.747 (-) 3.062 (-) 16.913 (-)
28 C-29 7-Feb-14 (+) 3.992 (+) (-) 3.062 (-) 18.488 (-)
29 B-25 7-Feb-14 (+) 3.962 (+) 3.632 (-) 3.062 (-) 19.338 (-)
30 C-25 7-Feb-14 (+) 4.157 (+) 3.627 (-) 3.062 (-) 18.743 (-)
31 A-38 10-Feb-14 (+) 4.337 (+) (-) 3.062 (-) 12.763 (-)
32 A-36 10-Feb-14 (+) 4.187 (+) 3.737 (-) 3.062 (-) 15.093 (-)
33 B-34 10-Feb-14 (+) 4.647 (+) 3.897 (-) 3.062 (-) 11.993
34 (+) (+) (-) (-) (-)
35 (+) (+) (-) (-) (-)
36 (+) (+) (-) (-) (-)
37 (+) (+) (-) (-) (-)
38 (+) (+) (-) (-) (-)
A 48 10 38
B 48 7 41
C 48 3 45
D 48 48
Remaining Piles
38
41
45
48
172
Total Qty. of
Cage Weight Cage Length Total Qty Poured Remark
( mt )
(mt) (m3)
4.055 18.700 21
19.690 22
5.139 23.300 26
4.370 19.590 22
4.076 18.795 22
4.090 18.905 22
4.050 18.620 21
4.221 19.460 22
4.411 20.450 23
4.024 18.530 21
4.075 18.820 21
3.909 17.945 22
4.281 19.835 22
4.327 20.095 22.5
4.175 19.265 21.5
4.031 18.570 20.5
3.991 18.425 20.5
4.071 18.795 21.5
20.5
21
71.296 435
KAMAR INFRASTRUCTURE PVT. LTD
NEW MANGLORE PORT TRUST
24.88
12.44
188.8
KAMAR INFRASTRUCTURE PVT. LTD
NEW MANGLORE PORT TRUST
1. 0.100
1
2 Main Bar 2 10mm 5 34 0.25 1.230 41.820 0.617 2 51.60588
0
0
. 0.550
3 Main Bar 3 10mm 1 34 0.25 0.630 21.420 0.617 2 26.43228
0
0
KIPL DBM
40