DAILY BREAKDWON CONDITION MONITORING

Periode : Saturday, March 06, 2021 Time 04:00:00

BD Start Estimasi RFU


NO Type Unit Code Unit Status Delay Time Trouble Description Activities Location PIC Tot BD AU
Date Time Date Time

BULLDOZER Populasi : 5 unit

1 BULLDOZER D85E SS 05 OK

tap , check, clean, analysis, repair, bongkar cyl head, injection pump part
2 BULLDOZER D85E SS 06 UB2 24-Feb-21 13:30 10Days14hours30Minutes engine oil mix with water (seal oil, gasket, oring, bushing, lever swivel) & cyl head kit (sleeve, gasket WS Baru Masjito
cyl head)

1 80%
3 BULLDOZER CAT D 7 G 21 OK

4 BULLDOZER D85E SS 24 OK

5 BULLDOZER D85E SS 32 OK

MOTOR GREADER Populasi : 2 unit

MOTOR GREADER
1 02 OK
GD510
0 100%
MOTOR GREADER
2 03 OK
GD510

VIBRO Populasi : 1 unit

1 VIBRO IR 110SD 06 UB1 12 May 2020 10:02 298Days17hours58Minutes pump problem evacuation unit to workshop (ok) WS Baru Supriyanta 1 0%

EXCAVATOR Populasi : 13 unit

Bongkar cylinder head & piston, di cek pistonnya mengalami retak kecil,
dalam proses analisa, pelepasan piston, waiting part ring piston, bongkar
injeksi, bawa ke palembang untuk di perbaiki, cek & perbaikkan, tgl
22/2/21 tiba kembali di ws injeksi yang sudah selesai di cek & repair,
part ring piston dll sdh ada, proses replace & install ring piston, linear &
1 EXCAVATOR ZX 850 02 UB2 & UB0 02-Feb-21 07:44 32Days20hours16Minutes Keluar Asap Putih Loading Area Apin/Heli
piston, replace gasket cyl head, replace bracket injec pump, replace
injection pump & nozzle repair , replace packing head, gasket joint bolt,
adjust valve, replace unit oil pressure & clamp,replace center joint part
like as seal oil, oring, seal dust, bushing, add oil hyd, gasket part hari
selasa baru datang, check leaking

check regulator (ok), travel unit to ws masih mencari & cek untuk kendala
ini, check sensor angle By azmee, adjust angle pump 1 & 2 , angle pump 2
masih error, indikasi di regulator, tukar regulator pompa 2 dari ZX850H No.
02 ke 10, hasilnya antara parameter 1 & 2 in & out sama dan stabil, efek
Rpm rendah CZ ensor boom miss track lh rh (normal). Untuk engine masih drop, di coba manual
2 EXCAVATOR ZX 850 10 UB2 02-Feb-21 10:05 32Days17hours55Minutes WS Baru Apin/Heli
raise broken connector di cabut, cek permasalahan di motor gas tetap engine drop,
continue check compression in engine, check nozzle, check main pump, add
oil hydraulic, check performance main pump, test, telah di cek semuanya,
engine nya bermasalah, indikasi di ring piston by azmee, Aries hexindo,
waiting part oring& ring piston, regulator part

3 EXCAVATOR SK200 15 OK

travel to ws, process welding, waiting part plat for doubling bucket,
4 EXCAVATOR PC400 16 UB0 02-Mar-21 08:00 4Days20hours0Minutes bucket problem WS Baru Heli 08/03/2021 17:00
estimate part plate come friday 05/04/21, doubling bucket by akbar
EXCAVATOR EC460
5 20 OK
BLC
62%
6 EXCAVATOR PC300 23 OK 5

Cek hydraulic sistem,cylinder arm rusak, Part baru dibawa tgl 3/1/21 untuk repair cyl arm di
sentosa, waiting information from hexindo for reseal hyd, reseal hyd pump, part sudah dtg untuk
reseal control valve, motor swing, fan pump regulator (install part reseal & part cyl arm), waiting
cordination for mainpump etc, lifting control valve & swing motor, disassembly swing motor &
Swing lambat, shaft aus, control valve to reseal, check main pump & oil cooler, main pump dibawa ke ws hexindo untuk
di cek, proses cek main pump, pembongkaran swing motor LH RH & fan pump, pelepasan swing
banyak geram, main pump motor lh rh, dibawa ke ws hexindo, pengecekkkan lanjutan, pembersihan komponen & install
problem, condensor ac leak, etc, ulang control valve, bongkar cylinder boom, check part ke ws hexindo, motor travel, pump , etc,
main pump broken, rencana process check & list part & list price for action reseal hydr systeM, Rod cylinder sudah datang dr
GTI, check rod cyl, check the new qou main pump & cooler from hexindo, lepas tangki hidrolik
7 EXCAVA ZX 450 LC 25 UB0 26-Dec-20 22:29 70Days5hours31Minutes mau reseal hyd component, fan & pasang cyl arm dari global, replace control valve, clean all hyd piping by erwan & farid
WS Baru Apin
pump, motor travel, main pump hexindo, install oil cyl pipe arm, install selenoid block, signal control valve, install center joint or
problem, waiting part gear main swing motor, enter joint sudah terpasang + hose, continue reseal swing motor & install swing
motor, reseal travel motor in hexindo's ws by erwan & farid hexindo, hyd pump sudah siap, oil
pump yang kemarin datang dari cooler sudah siap, proses persiapan travel motor, install oil cooler, hyd pump/mainpump, motor
sentosa tidak cocok travel by erwan & fairul hexindo, Repair kit sit for bucket, install coupling, Job hari ini : Pasang
kopling, pasang main pump, nyambung pipa suction (Welder LDA), Pasang Cover, replace kit
seal, job today tgl 5/3/21 : Pasang Hose Main Pump dan Fan Pump, Pasang Filter2 Hidrolik, Isi
Oli Hidrolik, Pasang Cover2, install adapter, hose, hydraulic filter, add oil finaldrive by erwan &
farul hexindo

8 EXCAVATOR PC200 -8 26 OK

EXCAVATOR ZX 470 LC
9 27 OK
- 5G

bucket problem, seal bucket &


10 EXCAVATOR EC480DL 28 UB0 05-Mar-21 07:50 1Days20hours10Minutes replace lip seal, sealing kit,etc, doubling bucket WS Baru Helli
arm

EXCAVATOR ZX 350H -
11 29 OK
5G

12 EXCAVATOR EC480DL 30 OK

13 EXCAVATOR EC480DL 31 OK

ADT Populasi : 14 unit


ADT A 35 D/E
Engine in cannibal to ADT-41,
1 VOLVO ADT A35D 24 UB1 01-Jul-19 07:00 614Days21hours0Minutes waiting part & mechanic WS Baru -
etc

2 VOLVO ADT A35D 25 OK

3 VOLVO ADT A35D 41 UB0 05-Mar-21 22:34 1Days5hours26Minutes exhaust broken check & welding WS Baru Maulana 06/03/2021 17:00

4 VOLVO ADT A35D 42 UB2 22-Feb-21 09:05 12Days18hours55Minutes seal brake rh problem waiting part WS Baru Maulana

sambil menunggu tranmisi yang mau di exchange lagi di overhaul, action


backlog schedule in hitch component, process making stand & remove
hitch component by denta & iwan BMS, hitch sudah terlepas, perapian,
check part, making tool, proses pengukuran bushing, install hitch part by
denta & iwan bms, replace bearing front & rear, bushing 2pc, wearing
trasnsmission problem, banyak
2pc, radial seal 2pc, seal 2pc ,oring 3pc, replace & install hitch part by
5 VOLVO ADT A35E 43 SB0 08-Feb-21 11:08 26Days16hours52Minutes geram, hitch problem, waiting WS Baru Maulana
iwan & denta bms, lanjut install hitch by kahar dkk, completed,
part o/h tm
assembling transmission part by BMS, small propeller shaft canibal to
a35e no. 48, penurunan transmission tgl 01.3.21, process install
exchange transmission, completed, calibration, running test (OK),
continue install companion flange, propeller shaft , etc, groundtest by
BMS

general service & action


5 64%
6 VOLVO ADT A35E 44 SB0 04-Mar-21 07:50 2Days20hours10Minutes backlog : rep;ace seal general service (ok), replace seal differential, replace nut WS Baru Maulana 06/03/2021 17:00
differential

7 VOLVO ADT A35E 45 OK


8 VOLVO ADT A35E 46 OK

9 VOLVO ADT A35E 47 OK

10 VOLVO ADT A35E 48 TB0 05-Mar-21 20:01 1Days7hours59Minutes tire no 1 RH broken Replace Tire no 1 RH WS Baru Besnat 06-Mar-21 17:00

ADT A 40 G OB.

1 VOLVO ADT A40G 49 OK

2 VOLVO ADT A40G 50 OK

3 VOLVO ADT A40G 51 OK

4 VOLVO ADT A40G 52 OK

5 VOLVO ADT A40G 53 OK

OB Populasi : 3 unit

SCANIA. P 360 -
NISSAN CWE OB

DT NISSAN CWE 370 1 67%


1 39 TB0 05-Mar-21 16:40 1Days7hours59Minutes tire no 1 RH flat Replace Tire no 1 RH Loading Area Besnat 06/03/2021 17:00
QUESTER UD

2 DT SCANIA P. 360 40 OK

3 DT SCANIA P. 360 41 OK

Hauling Populasi : 13 unit

DT NISSAN CWB / CWE HAULING

1 DT NISSAN CWB 520 19 UB1 02-Jun-20 15:00 277Days13hours0Minutes Transmission problem turun transmisi, repair transmission component WS Baru Jauhari delete soon

2 DT NISSAN CWB 520 20 OK

ENGINE NOTHING, TRANMSISSION NOTHING, SHAFT PTO NOTHING,


PROPELLER SHAFT TO GARDAN NOTHING, PROPELLER SHAFT FROM
BANYAK PART SUDAH TIDAK TRANMISSION TO GARDAN NOTHING, HYD DUMP PUMP NOTHING, AKI
3 DT NISSAN CWB 520 21 - 15-Nov-19 15:00 477Days13hours0Minutes ADA NOTHING, HANDLE GIGI UP TO DOWN NOTHING, ACCELERATOR NOTHING,
WS Baru delete soon
SEALING DUMP NOTHING, MATAHARI NOTHING, FLYWHEEL NOTHING,
PRODO NOTHING, BOOSTER COUPLING NOTHING

dinamo cas canibal to DT 20,


4 DT NISSAN CWB 520 22 UB2 08-Aug-20 15:00 210Days13hours0Minutes shaft PTO canibal to DT 20, WS Baru
booster canibal to DT 20

DT NISSAN CWB 520 (


5 33 OK
Tangki Siram )

6 DT NISSAN CWB 520 34 OK 0 100%

7 DT NISSAN CWB 520 35 OK

8 DT NISSAN CWB 520 36 OK

DT NISSAN CWE 370


9 37 OK
QUESTER UD
DT NISSAN CWE 370
10 38 OK
QUESTER UD

11 DT HINO JD 260 42 OK

12 DT HINO JD 260 43 OK

13 DT HINO JD 260 44 OK

14 DT HINO JD 500 45 OK

15 DT HINO JD 500 46 OK

16 DT HINO JD 500 47 OK

SARANA PENUNJANG OPERASIONAL

MOBIL LV ( LIGHT VEHICLE )

BD Start
NO NAMA UNIT NOMOR POLISI NO UNIT Delay Time Trouble Description Activity Location PIC STATUS REMARKS
Date Time

1 HILUX DOBEL KABIN B 9031 NBA LV 001 JULIARDI OK

AHMAD
2 HILUX DOBEL KABIN B 9038 NBA LV 002 OK
SYAFII

3 TRITON DOBEL KABIN BE 9492 JM LV 003 AFUI OK

ADJI
4 STRADA DOBEL KABIN BE 8694 DE LV 004 OK
ALAMSYAH

5 TRITON DOBEL KABIN B 9533 NBA LV-005 SUYANTO OK

6 TRITON DOBEL KABIN B 9540 NBA LV 006 KUNTONO OK

SUHARNO
7 TRITON DOBEL KABIN B 9417 IC LV 007 DAN ENDI OK
MUSAROM

TEAM
8 HILINE PICK UP BE 9952 DF LV 008 OK
MEKANIK

TOYOTA DYNA
9 BE 9094 E - LOGISTIK OK
(TANGKI BBM SOLAR)

TEAM
10 TOYOTA TRUCK B 9134 NDB OK
MEKANIK

TEAM
11 STRADA MEGA KABIN BG 9176 LR - OK
MEKANIK

ARDI (PT.
12 BUS KARYAWAN B 7266 CAA MA-001 OK
ARYA