check steering system, transmission & repair, check pressure, proses check &
analysis, waiting mechanic UT, Steering brake problem, Indikasi : inner part
steering clutch & brake from UT's mechanic, remove engine to D85ESS -2 No.
1 BULLDOZER D85E SS 05 UB2 & Ub0 25-Mar-21 14:24 57Days14hours36Minutes tidak bisa maju mundur WS Baru Heli
06, lineboring & repair frame by KT, pekerjaan di cek oleh pak heli, remove
transmission for overhaul by ari h, masjito, agusman, johan, etc, waiting part
transmission, replace meta assy, replace bushing
4 BULLDOZER D85E SS 24 OK
5 BULLDOZER D85E SS 34 OK
MOTOR GREADER
1 02 OK
GD510
MOTOR GREADER
3 08 OK
GD510
1 VIBRO IR 110SD 06 UB1 12 May 2020 10:02 374Days18hours58Minutes pump problem evacuation unit to workshop (ok) WS Baru Supriyanta 1 0%
Waiting mechanic ac, hari ini di rencanakan pengecekkan ole mekanik vendor ac
1 EXCAVATOR ZX 850 02 UB0 28-Apr-21 14:20 23Days14hours40Minutes AC baru, waiting part ac from gajah mungkur, setelah lebaran ekspedisi baru jalan, part Loading Area Ari W
ac electrica sudah dtg, hari ini pasang oleh vendor ac gajah mungkur
check regulator (ok), travel unit to ws masih mencari & cek untuk kendala ini,
check sensor angle By azmee, adjust angle pump 1 & 2 , angle pump 2 masih
error, indikasi di regulator, tukar regulator pompa 2 dari ZX850H No. 02 ke 10,
hasilnya antara parameter 1 & 2 in & out sama dan stabil, efek miss track lh rh
(normal). Untuk engine masih drop, di coba manual connector di cabut, cek
Rpm rendah CZ ensor boom
2 EXCAVATOR ZX 850 10 UB2 02-Feb-21 10:05 108Days18hours55Minutes permasalahan di motor gas tetap engine drop, continue check compression in WS Baru Apin/Heli
raise broken
engine, check nozzle, check main pump, add oil hydraulic, check performance
main pump, test, telah di cek semuanya, engine nya bermasalah, indikasi di ring
piston by azmee, Aries hexindo, waiting part oring& ring piston, regulator part,
install ring piston, fan raditor sdh datang, tinggal shaft indent japan, canibal
hose radiator to ZX850H No. 02
3 EXCAVATOR SK200 15 OK
Check component fuel system, groundtest, masih muncul E11 tambah rpm
muncul E15 dan mesin tetap drop, check by mekanik UT, check pcv assy,
check supply pump assy, indikasi fuel pump abnormal, continue check
hose2 & recomendation fuel pump, waiting analysis from UT, waiting part
feed pump , etc , part recommendation from UT, process assembling part
like as fuel pump, etc by UT's mechanic cs mekanik LDA, test, masih low
4 EXCAVATOR PC400 16 UB2 & Ub0 10-Apr-21 08:40 41Days20hours20Minutes Low power power, check pressure common rail ternyata low di sensornya, waiting part WS Baru Masjito
sensor common rail ETA 2days, sensor sudah datang, continue for install to
unit, check performance unit & running test, ac problem, note : motor
blower ac, groundtest, low power tanpa ada error di display, indication
pressure hyd, ppm clinic by UT, groundtest for pressure hyd low (ok), many
leaking, temuan geram di strainer, moving to ws, flashing, switch sudah
datang, waiting strainer, pin bucket, etc,strainer sdh datang, replace strainer 57%
6
6 EXCAVATOR PC300 23 OK
check data, check part, Main pump dikirim ulang ke jakarta, part main pump
sudah tiba di ws, cek, assembling, running test, travel lh lambat, today check
shaft & pedal main pump by hexindo sensor & replace sensor, travel device by hexindo, cek mekanik
7 EXCAVA ZX 450 LC 25 UB0 & UB2 21-Apr-21 07:11 30Days21hours49Minutes WS Baru Apin/Heli
broken hexindo, groundtest, ac hot, hari ini insya tuhan perbaikkan gajah mungkur,
cek, , recom part & ordering part, untuk part travel device sudah dtg, hari ini
install
check cooler & repair, waiting part gasket oil cooler, sebagian part sudah
8 EXCAVATOR PC200 -8 26 UB2 & Ub0 28-Apr-21 10:25 23Days18hours35Minutes air radiator mix with oil WS Baru Ari W
tiba, assembling, check, waiting part switch, pin bucket, etc, replacehoe arm
EXCAVATOR ZX 470 LC
9 27 OK
- 5G
10 EXCAVATOR EC480DL 28 OK
EXCAVATOR ZX 350H -
11 29 OK
5G
12 EXCAVATOR EC480DL 30 OK
13 EXCAVATOR EC480DL 31 OK
14 EXCAVATOR ZX870LC 32 OK
Bongkar tire & wheel brake tire, replace seal AXL 3 RH, ETA tanggal 22
2 VOLVO ADT A35D 25 SBD 07-Apr-21 13:45 44Days15hours15Minutes Seal brake Axl 3 RH WS Baru Maulana
hari ini dikirim seal brake dari jakarta, ETA tgl 20 mei 2021 sampai jakarta
check & replace, add wet brake, remove wheel hub, cek apakah hanya seal
8 VOLVO ADT A35E 46 UB2 19-May-21 03:53 2Days1hours7Minutes hose brake leak wheel hub saja, brake shoe baret, gear plannet carrier, bearing, disc clutch WS Baru Maulana 3 83%
juga rusak
check & try for repair by bms, recomendation part, waiting part rocker arm
10 VOLVO ADT A35E 48 UB2 19-Apr-21 02:02 32Days2hours58Minutes npise in engine, camshaft crack WS Baru Maulana
injectior, egr, all, bushing, etc, eta part 23 mei 2021 come to m.e
ADT A 40 G OB.
OB Populasi : 3 unit
SCANIA. P 360 -
NISSAN CWE OB
2 DT SCANIA P. 360 40 OK
3 DT SCANIA P. 360 41 OK
1 DT NISSAN CWB 520 19 UB1 02-Jun-20 15:00 353Days14hours0Minutes Transmission problem turun transmisi, repair transmission component WS Baru Jauhari delete soon
2 DT NISSAN CWB 520 20 OK
replace seal oil cranshaft, completed, tinggal groundtest, groundtest, masih leaking,
process check, analysis & repair again, waiting seal cranshaft, remove engine,
replace engine yang sudah di assembling & o/h punya DT 19 ke unit DT 35,
completed, waiting terompet, part sdh tiba, install to tm, continue install
transmission to unit, completed, running test, waiting part bolt transmission, infonya
7 DT NISSAN CWB 520 35 UB2 07-Apr-21 16:50 44Days12hours10Minutes seal oil cranshaft problem WS Baru Agus S
hari ini tiba bautnya, cek baut, install, baut yang datang salah ukuran, Baut tm sudah
sampai ukuran 17", check & install to tm, completed, add oil tm, charge battery,
running test dari jam 09-11.00 by jauhari, ready to groundtest, valve angin canibal to
DT-20, replace valve angin, groundtest by opt, waterpump leak, repair, ac hot, insya
tuhan hari ini di cek dan repair tim gajah mungkur, ordering part ac 2 85%
12 DT HINO JD 260 43 OK
13 DT HINO JD 260 44 OK
14 DT HINO JD 500 45 OK
15 DT HINO JD 500 46 OK
16 DT HINO JD 500 47 OK
SARANA PENUNJANG OPERASIONAL
BD Start
NO NAMA UNIT NOMOR POLISI NO UNIT Delay Time Trouble Description Activity Location PIC STATUS REMARKS
Date Time
ADJI
4 STRADA DOBEL KABIN BE 8694 DE LV 004 OK
ALAMSYAH
AJI
6 TRITON DOBEL KABIN B 9540 NBA LV 006 ALAMSYAH/ OK
plant
SUHARNO
7 TRITON DOBEL KABIN B 9417 IC LV 007 DAN ENDI OK
MUSAROM
TEAM
8 HILINE PICK UP BE 9952 DF LV 008 OK
MEKANIK
TOYOTA DYNA
9 BE 9094 E - LOGISTIK OK
(TANGKI BBM SOLAR)
TEAM
10 TOYOTA TRUCK B 9134 NDB OK
MEKANIK
TEAM
11 STRADA MEGA KABIN BG 9176 LR - OK
MEKANIK
PRODUCTIO
12 BUS KARYAWAN B 7222 CAA LV 012 OK
N
baut roda di tire no 1 slek, seal, lock, nut, ban lepas, unit tidak bisa di
moving, replace brake shoe, bolt, lock brake shoe, seal, etc, ternyata bolt
brake shoe kependekkan, hari ini mau di cari lokal muara enim, tidak jadi PRODUCTIO
13 BUS KARYAWAN B 7009 CGA LV 013 WS Baru BD UB2
cari baut, pakai yang lama, install, completed, running test, brake hot, N
schedule : adjust brake & running test again, bolt brake shoe tidak bisa
dipakai karena kependekkan dan sudah di cari m.e - t.e tidak ada