S.No. Activity Unit Scope Start Date Prev. Today Cumm. Balance Percentage MANPOWER DETAILS Remarks
Work completion
15.1 Pre-Hydro test of Crossing section Nos 8 6 0 6 2.00 75.00% 4 TRACTOR TRAILORS 0
15.2 Post-Hydro test of Crossing section Nos 3 2 0 2 1.00 66.67% 5 DIESEL GENERATORS 0
16.1 Open Cut crossing Nos 11 11 0 11 0.00 100.00% 6 AIR COMPRESSORS: 300-600 CFM 0
SAND BLASTING UNITS WITH
16.2 Open Cut crossing + C.C pipe Nos 10 3/20/2021 10 0 10 0.00 100.00% 7
COMPRESSOR 300 CFM
0
Open Cut crossing + C.C pipe
16.3 (Major Waterways) Nos 0 0 0 0 0.00 8 HDD EQUIPMENT 0
16.4 Open Cut+ Casing Nos 2 2 0 2 0.00 100.00% 9 WELDING M/C 0
HDD + Casing : ROAD
16.5 Nos 5 4/29/2021 1 0 1 4.00 20.00% 10 WATER TANKERS 0
( CH 02,10,11,27,30 )
HDD + Casing : RAILWAYS
16.6 (CH : 3.9, 28 ) Nos 2 1 0 1 1.00 50.00% 11 DE-WATERING PUMP 0
16.7 HDD (without casing) Nos 1 3/8/2021 1 0 1 0.00 100.00% 12 EXTERNAL CLAMP 0
16.8 Crossing Restoration 31 0 0 0 31.00 0.00% QC
C CP Works 1 HOLIDAY DETECTORS 0
17.1 Soil Resistivity Survey RMT 33000.00 33000.00 0.000 33000.00 0.00 100.00% CIVIL/ SURVEY
17.2 TLP Installation Nos 56 56 0 56 0.00 100.00% 1 PLATE COMPACTOR 0
17.3 Pin Brazing Nos 56 27 0 27 29.00 48.21% 2 VIBRATE M/C 0
Zn Anode Installation
17.4 (Type-A,B,C,D) (Each location 2 Nos 16 9 0 9 7.00 56.25% 3 CONCRETE MIXER 0
Nos. of Zn Anode)
Mg Anode Installation
17.5 (Type-A+1,B+1,C+1,D+1, H ) Nos 30 10 0 10 20.00 33.33% 4 CUBE TESTING SET (6Nos. Mould) 0
17.6 Insulation Joints (Type- E) Nos 7 0 0 0 7.00 0.00% 5 Road Roller 0
17.7 Polarization Coupon Nos 3 12 0 12 -9.00 400.00% 0
6 Total Station
( Type A+ PC)
D Final Cleanup & Restoration 7 Theodolite 0
18.1 Mainline Restoration RMT 33000.00 0.00 0.00 0.00 33000.00 0.00%
18.2.1 RoU Boundray Marker Nos 132 0 0 0 132.00 0.00%
18.2.2 Warning Marker Nos 87 0 0 0 87.00 0.00%
18.2.3 Direction Marker Nos 184 0 0 0 184.00 0.00%
18.2.4 Kilometer Marker Nos 32 0 0 0 32.00 0.00%
18.2.5 Total Marker Installation Nos 435 0 0 0 435.00 0.00%
E Mainline Hydrotesting
19.1 Cleaning, Gauging & Pigging RMT 33000.00 0 0 0 33000.00 0.00%
19.2 Mainline Hydro Testing RMT 33000.00 0 0 0 33000.00 0.00%
19.3 De-watering & Swabbing RMT 33000.00 0 0 0 33000.00 0.00%
F Pre-Commissioning
20.1 Drying RMT 33000.00 0 0 0 33000.00 0.00%
20.2 N2 Purging RMT 33000.00 0 0 0 33000.00 0.00%
G Isolation Valve
21.1 Isolation Valve Installation Nos. 10.00 0 0 0 10.00 0.00%
H Valve Chamber
22.1 Valve Chamber Construction Nos. 10.00 0 0 0 10.00 0.00%
I Commissioning
21.0 Gas In Activity RMT 33000.00 0 0 0 33000.00 0.00%
J DRS
21.1 DRS Installation Nos. 3.00 0 0 0 3.00 0.00%
K CNG
22.1 CNG Station Installation Nos. 1.00 0 0 0 1.00 0.00%
Today's Hindrances
1.0 Total main line Pipes Received at RMT 30000.0 12/27/2020 30000.00 0.0 30000.00 0.00 100.00%
site(12"NB x 6.4mmThk) A Engineer & Staff
Total RT Accepted Nos 2500.0 1/2/2021 1350 0 1350 1150.00 54.00% 1 BackHoe Loader (JCB) Operator 0
8.0 UT of Weld Joint Nos 150 0 150 2 Excavator/Breaker Operator 0
9.0 Weld Joint CUT OUT Nos 7 0 7 3 Hydra Operator 0
10.0 Production Test of Weld joint Nos 0 0 0
11.0 Field Joint Coating Nos 2500.0 1/7/2021 1102 0 1102 1398.00 44.08% MACHINDERY DETAILS
12.0 Trenching RMT 30000.0 1/15/2021 15569.00 230 15799.00 14201.00 52.66% A Equipment CH 56 59 41
13.0 Pipe Lowering RMT 30000.0 1/17/2021 14799.58 121.39 14920.97 15079.03 49.74% 1 BackHoe Loader (JCB) 0 CH 56 57
14.0 Backfilling RMT 30000.0 1/20/2021 11417.00 150.00 11567.00 18433.00 38.56% 2 EXCAVATOR/ ROCK BREAKER/ Pocklane 0 CH 56 57
B Crossings 3 HYDRA- 14 TON 0
15.1 Pre-Hydro test of Crossing section Nos 5.0 1 0 1 4.00 20.00% 4 TRACTOR TRAILORS 1
15.2 Post-Hydro test of Crossing section Nos 2.0 0 0 0 2.00 0.00% 5 DIESEL GENERATORS 1
16.1 Open Cut crossing Nos 8.0 0 0 0 8.00 0.00% 6 AIR COMPRESSORS: 300-600 CFM 0
SAND BLASTING UNITS WITH
16.2 Open Cut crossing + C.C pipe Nos 19.0 0 0 0 19.00 0.00% 7
COMPRESSOR 300 CFM
0
16.3 Open
Cut crossing + C.C pipe
(Major Waterways) Nos 1.0 0 0 0 1.00 8 HDD EQUIPMENT 0
16.4 Open Cut+ Casing Nos 0.0 0 0 0 0.00 #DIV/0! 9 WELDING M/C 2
16.5 HDD
+ Casing : ROAD
( CH 33,33,34) Nos 3.0 0 0 0 3.00 0.00% 10 WATER TANKERS 0
16.6 HDD + Casing : RAILWAYS Nos 1.0 0 0 0 1.00 0.00% 11 DE-WATERING PUMP 0
(CH : 35 )
16.7 HDD (without casing) Nos 0.0 0 0 0 0.00 #DIV/0! 12 EXTERNAL CLAMP 0
16.8 Crossing Restoration 32.0 0 0 0 32.00 0.00% QC
C CP Works 1 HOLIDAY DETECTORS 0
17.1 Soil Resistivity Survey RMT 30000.0 30000.0 0.000 30000.00 0.00 100.00% CIVIL/ SURVEY
17.2 TLP Installation Nos 40.0 10 1 11 29.00 27.50% 1 PLATE COMPACTOR 0
17.3 Pin Brazing Nos 40.0 0 2 2 38.00 5.00% 2 VIBRATE M/C 0
Zn Anode Installation
17.4 (Type-A,B,C,D) (Each location 2 Nos 16.0 0 0 0 16.00 0.00% 3 CONCRETE MIXER 0 CH 39
Nos. of Zn Anode)
17.5 Mg
Anode Installation
Nos 19.0 0 1 1 18.00 5.26% 4 CUBE TESTING SET (6Nos. Mould) 0 CH 39
(Type-A+1,B+1,C+1,D+1, H )
17.6 Insulation Joints (Type- E) Nos 2.0 0 0 0 2.00 0.00% 5 Road Roller 0
17.7 Polarization
Coupon
Nos 3.0 0 0 0 3.00 0.00% 6 Total Station 0
( Type A+ PC)
D Final Cleanup & Restoration 7 Theodolite 0
18.1 Mainline Restoration RMT 30000.0 0.00 0.00 0.00 30000.00 0.00%
18.2.1 RoU Boundray Marker Nos 120.0 0 0 0 120.00 0.00%
18.2.2 Warning Marker Nos 105.0 0 0 0 105.00 0.00%
18.2.3 Direction Marker Nos 258.0 0 0 0 258.00 0.00%
18.2.4 Kilometer Marker Nos 30.0 0 0 0 30.00 0.00%
18.2.5 Total Marker Installation Nos 513.0 0 0 0 513.00 0.00%
E Mainline Hydrotesting
19.1 Cleaning, Gauging & Pigging RMT 30000.0 0 0 0 30000.00 0.00%
19.2 Mainline Hydro Testing RMT 30000.0 0 0 0 30000.00 0.00%
19.3 De-watering & Swabbing RMT 30000.0 0 0 0 30000.00 0.00%
F Pre-Commissioning
20.1 Drying RMT 30000.0 0 0 0 30000.00 0.00%
20.2 N2 Purging RMT 30000.0 0 0 0 30000.00 0.00%
G Isolation Valve
21.1 Isolation Valve Installation Nos. 7.0 0 0 0 7.00 0.00%
H Valve Chamber
22.1 Valve Chamber Construction Nos. 7.0 0 0 0 7.00 0.00%
I Commissioning
21.0 Gas In Activity RMT 16000.0 0 0 0 16000.00 0.00%
J DRS
21.1 DRS Installation Nos. 2.0 0 0 0 2.00 0.00%
K CNG
22.1 CNG Station Installation Nos. 3.0 0 0 0 3.00 0.00%
Today's Hindrances
1
Issues & Concerns by TPPL
1
2.0 Route Survey RMT 16000.0 16000.0 0.0 16000.00 0.00 100.00% 1 RCM Rajendra Pandey 1
3.0 Clearing & Grading RMT 16000.0 12/23/2020 16070.00 0.0 16070.00 -70.00 100.44% 2 Site In charge 1
4.0 Pipeline Stringing RMT 16000.0 12/28/2020 16010.16 0.00 16010.16 -10.16 100.06% 3 Civil Engineer 1
5.0 Pipe Bend 4 QA/ QC Enginner 1
5.1 Pipe Bend(3D) Nos 40.0 0 0 0 40.00 0.00% 5 Surveyor 0
5.2 Cold Bend Nos 5.0 3/6/2021 0 0 0 5.00 0.00% 6 Safety Engineer/officer 1
6 Mainline joint Welding Nos 1133.0 12/28/2020 912 0 912 221.00 80.49% B Sites Workmen
6.1 Tie -In joint Welding Nos 200.0 1/21/2021 265 4 269 -69.00 134.50% 1 Mechanical Foreman 1 CH 69 75
Total Nos of joint Welding Nos 1333.0 12/28/2020 1177 4 1181 152.00 88.60% 2 Mechanical Supervisor 5
6.2
Total Mainline Welding Length RMT 16000.0 12/28/2020 15766.78 0.00 15766.78 233.22 98.54% 3 Civil Supervisor 0
NDT 4 Welder 8
Radiography Taken Nos 1333.0 12/29/2020 1171 0 1171 162.00 87.85% 5 Fitter 4
Radiography Film Review Nos 1333.0 1/2/2021 1171 0 1171 162.00 87.85% 6 Grinder 4
Radiography Joint Accepted Nos 1/2/2021 1161 0 1161 7 Rigger 10
Joint Repair Nos 30 0 30 8 Sand Blaster 2
Repair Percentage % 2.56% #DIV/0! 2.56% 9 Insulator 2
7.0 RT Repair Taken Nos 5 0 5 10 Electrician 0
Repair RT Accepted Nos 5 0 5 11 Helper 12
Retake/ Reshoot/ Others Nos 4 0 4 12 Watchman 0
RT/RS/others Taken Nos 0 0 0 13 Civil Labour 0
RT/RS/Accepted Nos 0 0 0 C Driver & Operators
Total RT Accepted Nos 1333.0 1/2/2021 1163 0 1163 170.00 87.25% 1 BackHoe Loader (JCB) Operator 3
8.0 UT of Weld Joint Nos 28 0 28 2 Excavator/Breaker Operator 0
9.0 Weld Joint CUT OUT Nos 0 0 0 3 Hydra Operator 2
10.0 Production Test of Weld joint Nos 0 0 0
11.0 Field Joint Coating Nos 1333.0 1/7/2021 1076 0 1076 257.00 80.72% MACHINDERY DETAILS
12.0 Trenching RMT 16000.0 1/15/2021 12720.00 0.00 12720.00 3280.00 79.50% A Equipment
13.0 Pipe Lowering RMT 16000.0 1/17/2021 12260.44 258.40 12518.84 3481.16 78.24% 1 BackHoe Loader (JCB) 3 CH 75 69
14.0 Backfilling RMT 16000.0 1/20/2021 11540.70 0.00 11540.70 4459.30 72.13% 2 EXCAVATOR/ ROCK BREAKER/ Pocklane 0
B Crossings 3 HYDRA- 14 TON 2
15.1 Pre-Hydro test of Crossing section Nos 2.0 1 0 1 1.00 50.00% 4 TRACTOR TRAILORS 1
15.2 Post-Hydro test of Crossing section Nos 1.0 0 0 0 1.00 0.00% 5 DIESEL GENERATORS 1
16.1 Open Cut crossing Nos 7.0 0 0 0 7.00 0.00% 6 AIR COMPRESSORS: 300-600 CFM 0
SAND BLASTING UNITS WITH
16.2 Open Cut crossing + C.C pipe Nos 7.0 0 0 0 7.00 0.00% 7
COMPRESSOR 300 CFM
0
Open Cut crossing + C.C pipe
16.3 Nos 1.0 0 0 0 1.00 8 HDD EQUIPMENT 0
(Major Waterways)
16.4 Open Cut+ Casing Nos 0.0 0 0 0 0.00 #DIV/0! 9 WELDING M/C 2
HDD + Casing : ROAD
16.5 ( CH 74,76,78,78) Nos 4.0 1 0 1 3.00 25.00% 10 WATER TANKERS 0
16.6 HDD + Casing : RAILWAYS Nos 1.0 0 0 0 1.00 0.00% 11 DE-WATERING PUMP 0
(CH : 78 )
16.7 HDD (without casing) Nos 0.0 0 0 0 0.00 #DIV/0! 12 EXTERNAL CLAMP 1
16.8 Crossing Restoration 20.0 0 0 0 20.00 0.00% QC
C CP Works 1 HOLIDAY DETECTORS 0
17.1 Soil Resistivity Survey RMT 16000.0 16000.0 0.000 16000.00 0.00 100.00% CIVIL/ SURVEY
17.2 TLP Installation Nos 26.0 17 0 17 9.00 65.38% 1 PLATE COMPACTOR 0 CH 66
17.3 Pin Brazing Nos 26.0 2 0 2 24.00 7.69% 2 VIBRATE M/C 0
Zn Anode Installation
17.4 (Type-A,B,C,D) (Each location 2 Nos 5.0 0 0 0 5.00 0.00% 3 CONCRETE MIXER 0
Nos. of Zn Anode)
17.5 Mg Anode Installation Nos 17.0 0 0 0 17.00 0.00% 4 CUBE TESTING SET (6Nos. Mould) 0
(Type-A+1,B+1,C+1,D+1, H )
17.6 Insulation Joints (Type- E) Nos 2.0 0 0 0 2.00 0.00% 5 Road Roller 0
Today's Hindrances
1 0.0
Issues & Concerns by TPPL
2.0 Route Survey RMT 5800.0 5800.0 0.0 5800.00 0.00 100.00% 1 RCM Rajendra Pandey 1
3.0 Clearing & Grading RMT 5800.0 700.00 200.0 900.00 4900.00 15.52% 2 Site In charge 1
4.0 Pipeline Stringing RMT 5800.0 652.00 192.00 844.00 4956.00 14.55% 3 Civil Engineer 1
5.0 Pipe Bend 4 QA/ QC Enginner 1
5.1 Pipe Bend(3D) Nos 40.0 0 0 0 40.00 0.00% 5 Surveyor 0
5.2 Cold Bend Nos 5.0 0 0 0 5.00 0.00% 6 Safety Engineer/officer 1
6 Mainline joint Welding Nos 483.0 51 12 63 420.00 13.04% B Sites Workmen CH 00 SL
6.1 Tie -In joint Welding Nos 0.0 0 0 0 0.00 #DIV/0! 1 Mechanical Foreman 1
Total Nos of joint Welding Nos 483.0 51 12 63 420.00 13.04% 2 Mechanical Supervisor 2
6.2
Total Mainline Welding Length RMT 5800.0 652.00 192.00 844.00 4956.00 14.55% 3 Civil Supervisor 0
NDT 4 Welder 4
Radiography Taken Nos 483.0 29 29 454.00 6.00% 5 Fitter 2
Radiography Film Review Nos 483.0 29 0 29 454.00 6.00% 6 Grinder 2
Radiography Joint Accepted Nos 28 0 28 7 Rigger 4
Joint Repair Nos 1 0 1 8 Sand Blaster 2
Repair Percentage % 3.45% #DIV/0! 3.45% 9 Insulator 2
7.0 RT Repair Taken Nos 0 0 0 10 Electrician 0
Repair RT Accepted Nos 0 0 0 11 Helper 4
Retake/ Reshoot/ Others Nos 0 0 0 12 Watchman 0
RT/RS/others Taken Nos 0 0 0 13 Civil Labour 0
RT/RS/Accepted Nos 0 0 0 C Driver & Operators
Total RT Accepted Nos 483.0 28 0 28 455.00 5.80% 1 BackHoe Loader (JCB) Operator 3
8.0 UT of Weld Joint Nos 1 0 1 2 Excavator/Breaker Operator 0
9.0 Weld Joint CUT OUT Nos 0 0 0 3 Hydra Operator 2
10.0 Production Test of Weld joint Nos 0 0 0
11.0 Field Joint Coating Nos 483.0 0 28 28 455.00 5.80% MACHINDERY DETAILS CH 00 SL
12.0 Trenching RMT 5800.0 0.00 0.00 0.00 5800.00 0.00% A Equipment
13.0 Pipe Lowering RMT 5800.0 0.00 0.00 0.00 5800.00 0.00% 1 BackHoe Loader (JCB) 3
14.0 Backfilling RMT 5800.0 0.00 0.00 0.00 5800.00 0.00% 2 EXCAVATOR/ ROCK BREAKER/ Pocklane 0
B Crossings 3 HYDRA- 14 TON 2
15.1 Pre-Hydro test of Crossing section Nos 0.0 0 0 0 0.00 #DIV/0! 4 TRACTOR TRAILORS 1
15.2 Post-Hydro test of Crossing section Nos 0.0 0 H #VALUE! #VALUE! #VALUE! 5 DIESEL GENERATORS 1
16.1 Open Cut crossing Nos 0.0 0 0 0 0.00 #DIV/0! 6 AIR COMPRESSORS: 300-600 CFM 0
SAND BLASTING UNITS WITH
16.2 Open Cut crossing + C.C pipe Nos 0.0 0 0 0 0.00 #DIV/0! 7
COMPRESSOR 300 CFM
0
Open Cut crossing + C.C pipe
16.3 Nos 0.0 0 0 0 0.00 8 HDD EQUIPMENT 0
(Major Waterways)
16.4 Open Cut+ Casing Nos 0.0 0 0 0 0.00 #DIV/0! 9 WELDING M/C 2
HDD + Casing : ROAD
16.5 ( CH 74,76,78,78) Nos 0.0 0 0 0 0.00 #DIV/0! 10 WATER TANKERS 0
Today's Hindrances
1 0.0
Issues & Concerns by TPPL
S.No. Activity Unit Scope Start Date Prev. Today Cumm. Balance Percentage MANPOWER DETAILS Remarks
Work completion
1.0 Total main line Pipes Received at RMT 84800.00 12/27/2020 84800.0 0.0 84800.0 0.00 100.00%
site(12"NB x 6.4mmThk) A Engineer & Staff
14.0 Backfilling RMT 84800.00 1/20/2021 54793.7 175.0 54968.7 29831.30 64.82% 2 EXCAVATOR/ ROCK BREAKER/ Pocklane 0
15.1 Pre-Hydro test of Crossing section Nos 15.00 8.0 0.0 8.0 7.00 53.33% 4 TRACTOR TRAILORS 2
15.2 Post-Hydro test of Crossing section Nos 6.00 2.0 #VALUE! #VALUE! #VALUE! #VALUE! 5 DIESEL GENERATORS 2
16.1 Open Cut crossing Nos 26.00 11.0 0.0 11.0 15.00 42.31% 6 AIR COMPRESSORS: 300-600 CFM 0
SAND BLASTING UNITS WITH
16.2 Open Cut crossing + C.C pipe Nos 36.00 3/20/2021 10.0 0.0 10.0 26.00 27.78% 7
COMPRESSOR 300 CFM
0
16.3 Open Cut crossing + C.C pipe Nos 2.00 0.0 0.0 0.0 2.00 8 HDD EQUIPMENT 0
(Major Waterways)
16.4 Open Cut+ Casing Nos 2.00 2.0 0.0 2.0 0.00 100.00% 9 WELDING M/C 4
HDD + Casing : ROAD
16.5 ( CH 02,10,11,27,30, Nos 12.00 4/29/2021 2.0 0.0 2.0 10.00 16.67% 10 WATER TANKERS 0
33,33,34,74,76,78,78 )
16.6 HDD + Casing : RAILWAYS Nos 4.00 1.0 0.0 1.0 3.00 25.00% 11 DE-WATERING PUMP 0
(CH : 3.9, 28,35,78 )
16.7 HDD (without casing) Nos 1.00 3/8/2021 1.0 0.0 1.0 0.00 100.00% 12 EXTERNAL CLAMP 1
16.8 Crossing Restoration Nos 83.00 0.0 0.0 0.0 83.00 0.00% QC
C CP Works 1 HOLIDAY DETECTORS 0
17.1 Soil Resistivity Survey RMT 84800.00 84800.0 0.0 84800.0 0.00 100.00% CIVIL/ SURVEY
17.2 TLP Installation Nos 122.00 83.0 1.0 84.0 38.00 68.85% 1 PLATE COMPACTOR 0
17.3 Pin Brazing Nos 122.00 29.0 2.0 31.0 91.00 25.41% 2 VIBRATE M/C 0
Zn Anode Installation
17.4 (Type-A,B,C,D) (Each location 2 Nos 37.00 9.0 0.0 9.0 28.00 24.32% 3 CONCRETE MIXER 0
Nos. of Zn Anode)
Mg Anode Installation
17.5 Nos 66.00 10.0 1.0 11.0 55.00 16.67% 4 CUBE TESTING SET (6Nos. Mould) 0
(Type-A+1,B+1,C+1,D+1, H )
17.6 Insulation Joints (Type- E) Nos 11.00 0.0 0.0 0.0 11.00 0.00% 5 Road Roller 0
17.7 Polarization Coupon Nos 8.00 12.0 0.0 12.0 -4.00 150.00% 6 Total Station 0
( Type A+PC)
D Final Cleanup & Restoration 7 Theodolite 0
18.1 Mainline Restoration RMT 84800.00 0.0 0.0 0.0 84800.00 0.00% OVERALL
18.2.1 RoU Boundray Marker Nos 316.00 0.0 0.0 0.0 316.00 0.00% Equipment
18.2.2 Warning Marker Nos 264.00 0.0 0.0 0.0 264.00 0.00% PIPE TRAILORS 0
18.2.3 Direction Marker Nos 561.00 0.0 0.0 0.0 561.00 0.00% PIPE BENDING M/C 1
18.2.4 Kilometer Marker Nos 78.00 0.0 0.0 0.0 78.00 0.00% THRUST BORING M/C 0
18.2.5 Total Marker Installation Nos 1219.00 0.0 0.0 0.0 1219.00 0.00% FILLING PUMP 100 Cu.m /min. 1
E Mainline Hydrotesting HIGH PRESSURE TEST PUMP 0
19.1 Cleaning, Gauging & Pigging RMT 84800.00 0.0 0.0 0.0 84800.00 0.00% DOZING PUMP 0
19.2 Mainline Hydro Testing RMT 84800.00 0.0 0.0 0.0 84800.00 0.00% BEVELING M/C 0
19.3 De-watering & Swabbing RMT 84800.00 0.0 0.0 0.0 84800.00 0.00% QC
F Pre-Commissioning DARK ROOM & ASSOCIATED FACILITIES
1
20.1 Drying RMT 84800.00 0.0 0.0 0.0 84800.00 0.00% RADIOGRAPHY: EXT & INT UNITS 1
20.2 N2 Purging RMT 84800.00 0.0 0.0 0.0 84800.00 0.00% UT M/C 1
G Isolation Valve PIPELINE LOCATORS 1
21.1 Isolation Valve Installation Nos. 31.00 0.0 0.0 0.0 31.00 0.00% HYDRO TESTING EQUIP. 0
H Valve Chamber 0.0 Electrical
22.1 Valve Chamber Construction Nos. 31.00 0.0 0.0 0.0 31.00 0.00% Megger: 1000 Volts 1
I Commissioning Multi Meter 1
21.0 Gas In Activity RMT 84800.00 0.0 0.0 0.0 84800.00 0.00% CLIP-ON Meter 2
J DRS
21.1 DRS Installation Nos. 6.00 0.0 0.0 0.0 6.00 0.00%
K CNG
22.1 CNG Station Installation Nos. 6.00 0.0 0.0 0.0 6.00 0.00%
Hindrances
1 0.0
Issues & Concerns by TPPL
B Sites Workmen
1 Fabricator - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 NDT Crew - 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 UT Technician - 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 Trailor Driver - 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SPREAD-1 ( 0-32)
1 RCM G. TRIPATHI 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 Site In charge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Civil Engineer 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 QA/ QC Enginner 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 Surveyor 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 Safety Engineer/officer 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
B Sites Workmen
1 Mechanical Foreman 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 Mechanical Supervisor 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 Civil Supervisor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Welder 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 Fitter 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 Grinder 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7 Rigger 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
8 Sand Blaster 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Insulator 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10 Electrician 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11 Helper 132 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
13 Civil Labour 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Excavator/Breaker Operator 9 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1
3 Hydra Operator 9 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1
SPREAD- 2 (32-62)
1 RCM GC Tripathi 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 Site In charge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Civil Engineer 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 QA/ QC Enginner 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 Surveyor 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 Safety Engineer/officer 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
B Sites Workmen
1 Mechanical Foreman 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Mechanical Supervisor 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 Civil Supervisor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Welder 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 Fitter 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 Grinder 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
7 Rigger 88 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
8 Sand Blaster 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Insulator 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10 Electrician 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11 Helper 132 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
12 Watchman 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13 Civil Labour 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Excavator/Breaker Operator 22 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2
3 Hydra Operator 55 1 1 1 1 1 1 1 1 1 1 1 4 4 4 4 4 4 4 4 4 4 4
SPREAD- 3 (63-86)
2 Site In charge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Civil Engineer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 QA/ QC Enginner 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 Surveyor 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 Safety Engineer/officer 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
B Sites Workmen
1 Mechanical Foreman 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 Civil Supervisor 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Welder 176 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
5 Fitter 88 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
6 Grinder 88 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
7 Rigger 220 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
8 Sand Blaster 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
9 Insulator 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 Electrician 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11 Helper 264 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
12 Watchman 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13 Civil Labour 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Excavator/Breaker Operator 44 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 Hydra Operator 62 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4
Remarks:
SUBMITTED BY TPPL VERIFIED BY CEIL
SIGNATURE: SIGNATURE: