You are on page 1of 11

KEYPLAN

NOTES :

AMMONIUM NITRATE PROJECT


75000 MTPY AMMONIUM NITRATE
KALTIM AMONIUM NITRAT 60000 MTPY NITRIC ACID

A3 SITE OFFICE WIKA & SEDIN


FOUNDATION PLAN & SECTION

PT. WIJAYA KARYA (PERSERO) Tbk.

PRE CHK APP CHK APP 1:150


REV. DATE DESCRIPTION KONSORSIUM WIKA - SEDIN XXX-XXX-XXX-XXX 1OF4 0
CONTRACTOR PT. KAN
NOTES :

AMMONIUM NITRATE PROJECT


75000 MTPY AMMONIUM NITRATE
KALTIM AMONIUM NITRAT 60000 MTPY NITRIC ACID

A3 SITE OFFICE WIKA & SEDIN


DETAIL

PT. WIJAYA KARYA (PERSERO) Tbk.

PRE CHK APP CHK APP 1:25


REV. DATE DESCRIPTION KONSORSIUM WIKA - SEDIN XXX-XXX-XXX-XXX 2OF4 0
CONTRACTOR PT. KAN
KEYPLAN

NOTES :

AMMONIUM NITRATE PROJECT


75000 MTPY AMMONIUM NITRATE
KALTIM AMONIUM NITRAT 60000 MTPY NITRIC ACID

A3 SITE OFFICE WIKA & SEDIN


PLUMBING PLAN

PT. WIJAYA KARYA (PERSERO) Tbk.

PRE CHK APP CHK APP 1:150


REV. DATE DESCRIPTION KONSORSIUM WIKA - SEDIN XXX-XXX-XXX-XXX 3OF4 0
CONTRACTOR PT. KAN
KEYPLAN

SP

SP

SP

SP
SP

SP

CERAMIC FLOOR CERAMIC FLOOR


200X200mm 200X200mm

NOTES :

AMMONIUM NITRATE PROJECT


75000 MTPY AMMONIUM NITRATE
KALTIM AMONIUM NITRAT 60000 MTPY NITRIC ACID

A3 SITE OFFICE WIKA & SEDIN


FLOOR PLAN

PT. WIJAYA KARYA (PERSERO) Tbk.

PRE CHK APP CHK APP 1:150


REV. DATE DESCRIPTION KONSORSIUM WIKA - SEDIN XXX-XXX-XXX-XXX 4OF4 0
CONTRACTOR PT. KAN
KEYPLAN

NOTES :

AMMONIUM NITRATE PROJECT


75000 MTPY AMMONIUM NITRATE
KALTIM AMONIUM NITRAT 60000 MTPY NITRIC ACID

A3 SITE OFFICE OWNER


FOUNDATION PLAN, SECTION & DETAIL

PT. WIJAYA KARYA (PERSERO) Tbk.

PRE CHK APP CHK APP 1:150


REV. DATE DESCRIPTION KONSORSIUM WIKA - SEDIN XXX-XXX-XXX-XXX 1OF3 0
CONTRACTOR PT. KAN
KEYPLAN

NOTES :

AMMONIUM NITRATE PROJECT


75000 MTPY AMMONIUM NITRATE
KALTIM AMONIUM NITRAT 60000 MTPY NITRIC ACID

A3 SITE OFFICE OWNER


PLUMBING PLAN

PT. WIJAYA KARYA (PERSERO) Tbk.

PRE CHK APP CHK APP 1:25


REV. DATE DESCRIPTION KONSORSIUM WIKA - SEDIN XXX-XXX-XXX-XXX 2OF3 0
CONTRACTOR PT. KAN
KEYPLAN

PAVING BLOCK

SP

CERAMIC FLOOR
600X600mm

CERAMIC FLOOR
600X600mm

CERAMIC FLOOR
600X600mm
SP CERAMIC FLOOR
CERAMIC FLOOR 600X600mm
600X600mm

PAVING BLOCK

CERAMIC FLOOR
200X200mm

NOTES :

AMMONIUM NITRATE PROJECT


75000 MTPY AMMONIUM NITRATE
KALTIM AMONIUM NITRAT 60000 MTPY NITRIC ACID

A3 SITE OFFICE OWNER


FLOOR PLAN

PT. WIJAYA KARYA (PERSERO) Tbk.

PRE CHK APP CHK APP 1:100


REV. DATE DESCRIPTION KONSORSIUM WIKA - SEDIN XXX-XXX-XXX-XXX 3OF3 0
CONTRACTOR PT. KAN
MATERIAL TAKE OFF

MTO SITE OFFICE WIKA-SEDIN KONSORSIUM WIKA – SEDIN

NO. DESCRIPTION QTY UNIT Remarks


SITE OFFICE WIKA SEDIN MODULAR 15.72 x 10.48 m
1 Excavation, 20 cm 1.09 m3
2 Polyetheline Sheet for Concrete, above compacted soil 4.56 m2
3 Base Concrete, thickness 30 cm 1.37 m3
4 Formwork, polywood 12.28 m2
5 T errace and Canopy Work 13.70 m2 scope to be clarified
MATERIAL TAKE OFF

MTO SITE OFFICE WIKA-SEDIN KONSORSIUM WIKA – SEDIN

NO. DESCRIPTION QTY UNIT Remarks


SITE OFFICE WIKA SEDIN PREFAB BUILDING 21 x 15.7 m
termasuk shelter, tempat makan, ping
1 Slab Foundation
pong area
Compacted Soil Fill, thickness 200mm 74.68 m3
Polyethylene Sheet for Concrete, thickness 0.25mm 115.73 m2
Concrete slab 26.61 m3
Wiremesh M8-150, 1 layer 88.51 m2
Formwork 80.46 m2
Redbrick 18.15 m2
2 Floor Ceramic Work anti skid 20x20cm (for toilet) - including sand & mortar 38.50 m2
3 Floor Ceramic Work (for inside office) - including sand & mortar 291.21 m2 ceramic 60x60 cm
termasuk shelter rokok, tempat makan,
4 Floor Ceramic Work (for shelter) - including sand & mortar 64.50 m2 ping pong area, 60x60 cm
5 Paving Block/ Conblock 95.00 m2
6 Concrete for Stair 0.63 m3
7 Lean Concrete for Smoking Shelter Floor, thickness 5 cm 0.89 m3
8 Drainage
Excavation Drainage 11.45 m3
Soil Backfill 4.01 m3
Soil Disposal 7.44 m3
Lean Concrete for: base (5cm), wall mortar (3cm), drainage cover (5cm) ,
K-125 4.76 m3
Red brick, 1/4 bata 69.96 m2
9 Built in Furniture
Kitchen Sink 1.00 set
Pantry T able 1.00 set
Faucet (keran) 14.00 Ea
Sink (wastafel) 5.00 set
Urinoir 3.00 Ea
Water Closet - Seat In 3.00 Ea
Water Closet - Squatting Pan 4.00 Ea
10 Fresh Water Installation
Potable water pipe, PVC 1" pipe ( estimation) 138.00 m see dwg for detail
Water tank (torrent) 2000L with tower 3 meters height 2.00 set
11 Waste Water Installation
Waste water pipe, PVC 4" pipe ( estimation) 57.20 m see dwg for detail
Bio-Septictank 2.00 set cap 50 & 40 people, see dwg for detail
MATERIAL TAKE OFF

MTO SITE OFFICE KAN & MUSHOLA KONSORSIUM WIKA – SEDIN

rev 1

NO. DESCRIPTION QTY UNIT Remarks


SITE OFFICE KAN PREFAB 16.5 x 12 m
1 Slab Foundation
Compacted Soil Fill, thickness 200mm 37.76 m3
Polyethylene Sheet for Concrete, thickness 0.25mm 99.81 m2
Concrete slab 14.26 m3
Wiremesh M8-150, 1 layer 48.51 m2
Formwork 44.10 m2
Redbrick 7.54 m2
2 Floor Ceramic Work anti skid 20x20cm (for toilet) - including sand & mortar 9.20 m2
3 Floor Ceramic Work (for inside office) - including sand & mortar 188.80 m2 ceramic 60x60 cm
4 Paving Block/ Conblock 55.30 m2
5 Concrete for Stair 0.27 m3
6 Drainage
Excavation Drainage 5.64 m3
Soil Backfill 1.97 m3
Soil Disposal 3.66 m3
Lean Concrete Base (5cm), wall mortar (3cm), drainage cover (5cm) K-125 2.40 m3
Red brick, 1/4 bata 34.45 m2
7 Built in Furniture
Kitchen Sink 1.00 set
Pantry T able 1.00 set
Faucet (keran) 3.00 Ea
Water Closet - Seat In 3.00 Ea
8 Fresh Water Installation
Potable water pipe, PVC 1" pipe ( estimation) 37.44 m see dwg for detail
9 Waste Water Installation
Waste water pipe, PVC 4" pipe ( estimation) 18.80 m see dwg for detail
cap 50 people combine with mushola, see
Bio-Septictank 1.00 set dwg for detail
MATERIAL TAKE OFF

MTO SITE OFFICE KAN & MUSHOLA KONSORSIUM WIKA – SEDIN

rev 1

NO. DESCRIPTION QTY UNIT Remarks


MUSHOLA 16 x 18.5 m
1 Foundation & Sloof
Soil Excavation 6.72 m3
Soil Backfill 2.35 m3
Soil Disposal 4.37 m3
Concrete 12.64 m3
Lean Concrete 1.22 m3
Formwork 172.12 m2
Rebar 1580.45 kg
2 Gypsum Partision Work (GRC board) 256.00 m2
3 Gypsum Partision Frame Work 1.00 LS
4 Floor Ceramic Work anti skid 20x20cm (for toilet) - including sand & mortar 23.20 m2
5 Wall Ceramic Work anti skid 20x25cm (for toilet) - including sand & mortar 43.50 m2
6 Floor Ceramic Work (for inside mushola) - including sand & mortar 106.00 m2

7 Floor Ceramic Work (for terrace) - including sand & mortar 87.35 m2
8 Roofing Work (Light T russ Steel Work with Zincalum sheet thk=1.5mm) 152.00 m2
9 Roofing Work (Canopy Light T russ with Zincalum sheet thk=1.5mm) 140.80 m2
10 Plafon (polywood + gypsum list) 125.50 m2
11 Painting Work 1.00 LS
12 Paving Block/ Conblock 20.20 m2
13 Door
D4 (single door PVC) 4.00 Ea
D5 (sliding door/ folding door) 1.00 Ea
14 Window
W1 (double window) 4.00 Ea
BV (single glass bi-frame for toilet) 2.00 Ea
15 Drainage
Excavation Drainage 3.78 m3
Soil Backfill 1.32 m3
Soil Disposal 2.46 m3
Lean Concrete Base (5cm), wall mortar (3cm), drainage cover (5cm) K-125 1.64 m3
Red brick, 1/4 bata 23.10 m2
16 Built in Furniture
Kitchen Sink 2.00 set
Portable Curtain inside Mushola 1.00 set
Faucet (keran) 13.00 Ea
Sink (wastafel) 2.00 Ea
Water Closet - Seat In 2.00 Ea
17 Fresh Water Installation
Potable water pipe, PVC 1" pipe ( estimation) 54.00 m see dwg for detail
18 Waste Water Installation
Waste water pipe, PVC 4" pipe ( estimation) 40.00 m see dwg for detail
19 Landscaping 22.00 m2