Check Sheet For Testing and Commissioning of
Check Sheet For Testing and Commissioning of
Check Sheet For Testing and Commissioning of
SUBCONTRACTOR:
Checked
ITEM POINTS TO BE CHECKED by REMARKS
1 VISUAL CHECKS
a. Check installation of all cameras, switches,
monitors for proper support and connection.
b. Check all cables for proper installation.
2 FUNCTIONAL CHECKS
a. Put the system into operation as per
manufacturer’s recommendations.
b. Check performance of the system for its
configuration.
c. Tabulate observations.
THE ABOVE POINTS HAVE BEEN CHECKED AND FOUND TO COMPLY WITH
CONTRACT SPECIFICATIONS.