INSTALLATION OF AC UPS
PMC
Doc No .
PROJECT : CONSTRUCTION OF RAIL FED DEPOT AT SOP/NAYARA/PEMS/EE/INSTL/IR-19A
VILLAGE SWAIPURA/CHOTILA,DIST-PALI, RAJASTHAN Rev.0.0
TAG No. Falcon 1k 2X15KVA TYPE & SIZE Three Phase ups
Acceptable
2 BATTERY SET Remarks
(Yes / No / NA)
a Batteries and racks installation Yes
Specific gravity NA
d
Number plates of cells and
Yes
e connection links
General cleaning & tightness of
Yes
f all cables connection
REMARKS :
SIGN :
NAME :
DATE :
Owner CONTRACTOR
INPUT 415V AC, 3Φn, Hz.50 BYPASS 240V AC, 1Φn, Hz.50
1 BUSBAR TIGHTNESS
60 NM
Torque Value :
YES
Busbar Tightness checked with standard Torque Value for all joints
On completion of all cable glanding confirm spare entries are sealed : YES Sealed
UPS parellel operation and by pass operation sequences are tested satisfactorily Yes
Switching from normal operation/battery operation/maintenance bypass test completed satisfactorily : Yes
REMARKS :
SIGN :
NAME :
DATE :
Owner CONTRACTOR
1 BUSBAR TIGHTNESS
Torque Value :
Busbar Tightness checked with standard Torque Value for all joints
Phase to Phase
Phase to earth
Positive to earth
Negative to earth
AC input voltage :
DC output voltage :
Battery voltage :
UPS parellel operation and by pass operation sequences are tested satisfactorily :
REMARKS :
SIGN :
NAME :
DATE :
Owner CONTRACTOR
INSTALLATION OF AC UPS
PMC
Doc No .
PROJECT : CONSTRUCTION OF RAIL FED DEPOT AT SOP/NAYARA/PEMS/EE/INSTL/IR-19A
VILLAGE SWAIPURA/CHOTILA,DIST-PALI, RAJASTHAN Rev.0.0
TAG No. Falcon 1k 2X40KVA TYPE & SIZE Three Phase ups
Acceptable
2 BATTERY SET Remarks
(Yes / No / NA)
a Batteries and racks installation Yes
Specific gravity NA
d
Number plates of cells and
Yes
e connection links
General cleaning & tightness of
Yes
f all cables connection
REMARKS :
SIGN :
NAME :
DATE :
Owner CONTRACTOR
INPUT 415V AC, 3Φn, Hz.50 BYPASS 240V AC, 1Φn, Hz.50
1 BUSBAR TIGHTNESS
60 NM
Torque Value :
YES
Busbar Tightness checked with standard Torque Value for all joints
On completion of all cable glanding confirm spare entries are sealed : YES Sealed
UPS parellel operation and by pass operation sequences are tested satisfactorily Yes
Switching from normal operation/battery operation/maintenance bypass test completed satisfactorily : Yes
REMARKS :
SIGN :
NAME :
DATE :
Plant Name Err:504
FORM No.
AC/DC UPS AND BATTERIES System No Err:504
B15 Subsystem No Err:504
TCM ID CODE : 3435-LZ-PQ-06-05001 POLYOLEFINS UNITS,PRODUCT HANDLING AND MARINE WORKS
BROUGE ID CODE : 06-SY-478-05001 BOROUGE 2 PROJECT,RUWAIS,UAE Report No 001
Rev Q3
TAG No.
Falcon 1k 2X15KVA TYPE & SIZE Three Phase ups
REFERENCE DOCUMENTS:
TPI/
B15.1A INSTALLATION CHECKS OF UPS CHARGER/ BATTERY CHARGER/RECTIFIER TICB TCM
COMPANY
BUSBAR TIGHTNESS
Torque Value : Err:504
Busbar Tightness checked with standard Torque Value for Yes / No / NA
all joints
SIGNATURE VVVVVV
Page 1 of 2
Plant Name Err:504
FORM No.
AC/DC UPS AND BATTERIES System No Err:504
B15 Subsystem No Err:504
REFERENCE DOCUMENTS:
REMARKS :
SIGNATURE