Transformer Testing
Using DV Power Devices
Maid Dzambic, Application Engineer
2 | © 2016 DV Power All Rights Reserved.
DV Power Devices – Transformer Group
RMO-TW series
winding resistance measurement The most advanced on the market
TWA40D
RMO-TD series
+ connection of all 8 (or 6) bushings at once
+ tap changer analysis (DVtest)
+ OLTC synchronization measurement
+ OLTC motor current measurement
+ simultaneous three-phase measurement
+ demagnetization process
+ fast measurement
RMO-TT series
+ temperature measurement channels
How is it performed?
• Injecting DC current, measuring voltage drop,
calculating resistance R = U / I
• Should be done for all phases and every tap position
• Compared to reference measurement, across phases
Higher current => better saturation => lower L => shorter time
How is it performed?
• Measuring winding resistance during transformer cooling
• Measuring ambient temperature, top and bottom oil layer
temperature
• Extrapolating resistance curve
• Alternate direction
• Lower the magnitude
• Bring flux to 0
36/47
• Max. current • 10 A DC • 20 A DC • 30 A DC • 50 A DC
RMO-TD series
• RMO25TD
• RMO40TD
• RMO60TD
RMO-TD series
O00TD RMO60TT RMO40TD
RMO25TD RMO60TD
• Max. current • 25 A DC • 40 A DC • 60 A DC
RMO-TT series
• RMO40TT
• RMO60TT
• RMO100TT
RMO-TT series
RMO60TT RMO60TT
RMO40TT RMO100TT
• Max. current • 40 A DC • 60 A DC • 100 A DC
• Temperature channels • 3 • 3 • 6
• Three-phase instrument
• One-time connection of all 6-8 bushingss
• All 6 resistances measured in one test
• Max. 25 A per phase in step by step test
• Max. 40 A, 13 A per phase in OLTC
synchronization test
A, B, C, N connectors
One- time cable setup
TRT33 series
+ test voltage 1 V Most advanced
(instrument transformers testing) TRT63 series
+ 250 V test voltage
How is it performed?
• Voltage ratio between primary and
secondary windings is measured for
each transformer leg, applying voltage
at HV side and measuring on LV side
• Phase by phase with single-phase
voltage
• All phases at once with true three-
phase
How is it performed?
• Excitation current is transformer primary no load current, or
magnetizing current (with open secondary) tested at reduced
voltage
• Results are compared to values obtained under same test voltage
values
• Results should follow specific pattern based on transformer
construction type
How is it performed?
• Comparing sine waves of AC voltage(s) on HV side and AC voltage(s)
induced on LV side
How is it performed?
• Using proprietary algorithm & software solution loaded in TRT
• Completely automatic
How is it performed?
• By comparing excitation currents before and after
demagnetization
TRT
TWA
• 3 years warranty