30.1.0 SCOPE
30.2.0 OBJECTIVE
30.2.3 To ensure that all the above are carried out professionally
and can further enhance the Group branding, leading to a
strong presence and reputation in the industry.
30.3.0 ABBREVIATIONS
30.4.0 POLICIES
30.4.1.2 All tangible assets and/or items bearing the corporate logo
and name must reflect Edaran’s corporate image
accurately. These include building façade, signages,
reception area, company stationery, corporate gifts and
other related material that carry the corporate logo.
30.4.4.1 All requests for the above must be channelled to CC, which
will then proceed to get the necessary approvals as
stipulated in the Limit of Authority (LOA), if a particular
request is deemed worthy.
30.4.4.2 The Edaran Group may, from time to time, make pledges to
different organisations depending on the causes they
champion. These must be approved by the relevant level of
authority as set out in the LOA.
Document STANDARD
OPERATING
PROCEDURE
Index
Edaran Digital Systems Berhad
Policies and Procedures Manual Version 1.0
BU identifies the need to procure items that fall under this BU/CC
category and consults with CC for accuracy and suitability
based on the reason and occasion for which they will be
used.
30.4.5.1.4 BU outlines specifications including target group, key Specifications from BU/CC/PCU
messages, estimated budget and CC, together with PCU, BU
will source for suppliers, quotations and samples.
30.4.5.1.5 BU, CC and PCU evaluate samples and quotations, bearing Quotations BU/CC/PCU
in mind the specifications outlined by BU.
30.4.5.2.2 CC, together with BU, fills in Function Checklist to Function checklist CC/BU
ascertain the necessary preparations to be made and a draft
programme is drawn up as an initial guide.
(Note: Golf events will require a separate Golf Checklist)
30.4.5.2.4 CC (and PCU) will source for quotations on the pertinent CC/PCU
items, usually venue, food & beverage, entertainment, gifts
etc.
30.4.5.2.7 CC and BU shall meet and agree on final details a day CC/BU
before the event, and a rehearsal/dry run shall be held if
necessary.
Document STANDARD
OPERATING
PROCEDURE
Index
Edaran Digital Systems Berhad
Policies and Procedures Manual Version 1.0
30.4.5.3.2 CC will issue a Note to Editor (NTE) to all print and NTE CC
electronic media three days before the event to invite
Editors to send their journalists and camera
crew/photographer to cover the event.
30.4.5.3.3 CC will resend the NTE as reminders a day before the NTE CC
event and call to check attendance.
(Note: Most editors do not assign journalists until late
afternoon but call anyway to build rapport with media
personnel.)
30.4.5.3.5 Any print coverage appearing within a week of the event Newspaper cuttings CC
will be monitored and forwarded to the MD and relevant (archives)
BU for information and future reference respectively.
Newspaper cuttings will be filed in CC archives.
Document STANDARD
OPERATING
PROCEDURE
Index
Edaran Digital Systems Berhad
Policies and Procedures Manual Version 1.0
30.4.5.4 On Archiving:
30.4.5.4.1 All events; business or social, formal or informal, must be Photographs CC/BU
recorded. CC will engage either an independent or internal (Archives)
photographer to record events which involve the Board of
Directors and/or Senior Management. For events held on a
smaller scale, the respective BU will be responsible for
taking the photographs or engaging the photographer.
30.4.5.6.2 CC, together with PCU, will source for suppliers, CC/PCU
quotations and samples.
30.4.5.6.3 BU, CC and PCU evaluate samples and quotations, bearing Quotations BU/CC/PCU
in mind the specifications outlined by BU.
30.4.5.6.5 Once decision is made, PCU will proceed to make the PCU
orders.
Document STANDARD
OPERATING
PROCEDURE
Index
Edaran Digital Systems Berhad
Policies and Procedures Manual Version 1.0
30.4.5.6.7 For items that are regularly used, it will be the respective BU/CC
BUs’ responsibility to update CC on any changes to
information on their unit including staff, products and
services.
30.4.5.7.2 Respective BUs must inform CC of the above in order for BU/CC
CC to make the necessary preparations in informing the
public via press releases.
30.4.5.7.3 Press Releases must be issued simultaneously with the Press release CC
announcements to KLSE.
30.4.5.7.4 CC will draft Press Releases and obtain MD’s approval Approval CC/MD
before issuing to the press.
Cash.
In kind - hampers, electrical goods, jerseys etc
advertisements for a souvenir booklet
sponsorship – of a whole event, of tables at a
special function, etc
Document STANDARD
OPERATING
PROCEDURE
Index
Edaran Digital Systems Berhad
Policies and Procedures Manual Version 1.0
30.4.5.8.2 Any BU receiving requests should forward them to CC, Contribution BU/CC
stating their recommendation and reasons for doing so. request
30.4.5.8.4 For requests which BU does not recommend, CC will Letter CC/CEO
proceed to draft a ‘regrets’ letter to be signed by the
relevant CEO or the addressee of the request letter.