Professional Documents
Culture Documents
Specifications ................................................................................................................. 1
Precautions during operation ........................................................................................ 2
Transportation posture, dimensions and weights of main components .................. 3
List of parts sent individually ........................................................................................ 7
Tightening torque ........................................................................................................... 18
M-1. Adjustment of work equipment speed ................................................................ 21
SPECIFICATIONS
SPECIFICATIONS
Machine model PC300LC-7
Machine weight kg 35,600
3
Bucket capacity SAE heaped (CECE heaped) m 0.69 (0.60)
Engine model – SA6D114E-2
Engine output kW{HP}/rpm 180{242}/1,900
Min. ground clearance mm 498
Travel speed (Lo/Mid/Hi) km/h (MPH) 3.2/4.5/5.5(2/2.8/3.4)
Swing speed rpm 9.5
1
2
TRANSPORTATION POSTURE, DIMENSIONS AND WEIGHTS OF MAIN COMPONENTS
Machine body
3
TRANSPORTATION POSTURE, DIMENSIONS AND WEIGHTS OF MAIN COMPONENTS
Boom assembly
Boom cylinder
Arm assembly
4
TRANSPORTATION POSTURE, DIMENSIONS AND WEIGHTS OF MAIN COMPONENTS
Bucket assembly
0.6 m3 Bucket
Overall width: 930 mm
Weight: 627 kg
Counterweight
5
LIST OF PARTS SENT INDIVIDUALLY
7
BOOM (1/2)
Connect
8
BOOM (2/2)
9
List of parts sent individually (Boom)
10
Arm & Bucket
Connect
12
List of parts sent individually (Arm and bucket)
13
COUNTERWEIGHT
14
COUNTERWEIGHT
15
COUNTERWEIGHT MOUNTING
Counterweight
Revolving Frame
16
COUNTERWEIGHT MOUNTING
17
18
19
20
M-1. ADJUSTMENT OF WORK EQUIPMENT SPEED
Adjust dimension A of the slow return valve according to the following table and set each standard
value within the given range (Since the values marked with fl are not used for this model, they do not
need to be adjusted).
A
( The more dimension A and the value of the scale are increased,
the more the speed is increased. )
Item Standard value Dimension A (mm)
fl Boom RAISE 4.0 ± 0.4 SEC —
Boom LOWER 5.5 ± 0.6 SEC 7.5
Arm IN 4.5 ± 0.5 SEC 12.5
fl Arm OUT 3.5 ± 0.4 SEC —
Bucket CURL 3.5 ± 0.4 SEC 7
Bucket DUMP 4.0 ± 0.4 SEC 9.5
21