You are on page 1of 1

the Month

them.
BL6. The
of
namethis of the
represented
Navigate from in
increment
workbook
Enter Project forin
is
Project
the
B7 cell
through
paging Lead
block
through in
BL7
the
A
above
to About
Scrolling
information
cell B3.
hear Enter
each
the
the data
worksheet.
Increment
starting is cell
in is in
the Project
date cellas
content.
defined and
The 2cell
Continue
cell
B9 F4.
through
Startautodate
are
first
pages letter
navigating
Months
G9. a in
atfor of
time
the
cell
each
and F3
calculated.
day
can orbe allow
of the
down
dates
Sample
the
Do
week column
in
sample
not row
data
modify
for the 5is
Enter
configured
A
are
in to Company
hear
displayed
cells B9 in
formula
these
date
Name
the above
settingsto
cells.
inincell find
for
further
starting
through
the smallest
Today's
that
B2.
the
instructions.
I4 through
Enter
date
outlined
starts
A
bar. value
legend
date
heading,
control
in
Topographic Survey
G33.cells
cell
is Red
in cell inI7
is
BL4.
Milestone
from
(hex
and the
#AD3815)
continuesGantt
cells
To
Do jump
I2
not
Description,through
modify
Data
from table.
AC2. today's
through
forward cell
or Group 1
these
select
Project
date incells.
arow
Start
BL7.
backward
They
Category are in5
auto
from
Date:
through
All
the label
project
timeline,the is in Project Start Date: 2/19/2020
updated
the
cell
entiredrop-down
D3.
timeline datebased
enter
on
list,the aproject
assignvalue
column
charting
of 0 or tois the
higher auto
start
someone
end date
of
generated theto in Scrolling Increment: 0
in
cellcell
the
A
F3.F4.
item,
project
based
value onofenter
the
0
February March April
the progress,
schedule.
category, start 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
takesdate
start you to
date and and
the beginning
number
number of
of
of
daysthe chart.
days forenteredthe in
task to start
the Milestones Milestone Description Category Assigned To Progress Start No. Days W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T
charting.
table.
The next
instruction is in
cell A34.

All Members 100% 4/3/2021 2


Planning

Buffer
All Members 0% 4/10/2021 8
Field Day
All Members 0% 4/17/2021 1
As-built Survey
Data and Contour All Members 0% 4/18/2021 3
Generation
Revisions and All Members 4/21/2021 3
Consultations
Lab Report All Members 0% 4/11/2021 13
Generation

This row marks


the end of the
Gantt
milestone
data. DO NOT
enter anything
in this row.
To
Thisadd more
is an empty row
items, insert
new rows
above this one.

Page 1 of 1

You might also like