1. INTRODUCTION
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 4906
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 06 | June 2020 www.irjet.net p-ISSN: 2395-0072
Period of Removal of Formwork with the formwork, along these lines lessening the weight
on talented work when this is hard to come by. On leaving
Sr.No Description of structural member Time Period the manufacturing plant, all boards are plainly named to
guarantee that they are effectively identifiable on location
1. Walls, columns and vertical sides of 1 to 2 days and can be easily fitted together utilizing the formwork
beams regulation illustrations. MIVAN points utilizing present
day construction procedures and gear in the entirety of its
2. Slabs (props left under) 3 days projects.om leaving the MIVAN manufacturing plant all
boards' region obviously marked to guarantee that they
3. Beam soffits (props left under) 7 days
are effectively in difiedable on location and can be easily
fitted together utilizing the formwork balance
Removal of props to slabs
illustrations. All formwork creatures at corner and
4. (a) For slabs spanning upto 4.5 m 7 days
continues from that point.
The simplicity of Aluminum Formwork and the Day 2: -The second activity involves erection of the second
tedious idea of the get together process make it side of the vertical formwork and formwork for the floor.
conceivable to precisely program construction successions
Day 3: - Fixing reinforcement bars for floor slabs and
and along these lines process durations well ahead of time.
casting of walls and slabs.
Furthermore, this empowers the untalented work to work
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 4907
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 06 | June 2020 www.irjet.net p-ISSN: 2395-0072
Advantages:
Disadvantages:
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 4908
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 06 | June 2020 www.irjet.net p-ISSN: 2395-0072
Rate Analysis By Mivan Formwork Rate of mivan Formwork after 150 Repetitions = 90Rs/Sq.m
For 1 floor
Sr No Discription Of Item Quantity Unit 40
1 Shuttering Area Of One Floor 1053.62 SQ M 30
2 Number Of Floor 20
3 Total Shuttering Area 21072.4 SQ M
20
4 Price For The Shuttering 7400 PER 10
SQ M 0
5 B U A Of One Floor 578.49 SQ M
6 B U A Of All Floors 11569.8 SQ M
Slab Cycle ( Repetitions Cost of one
In days) (x10 times) set (x1000
Mivan Conventional INR)
The above-mentioned details used to calculate the
productivity of a specific Formwork System. The data for
the Conventional Formwork System, Mivan System and
Tunnel Form System is analyzed to figure out the
productivity of the Formwork system.
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 4909
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 06 | June 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 4910