You are on page 1of 5

1

398
443

GRADE LEVEL: Grade 7/8


SUBJECT: Electrical Installation Maintenance
NOMINAL HOURS: 40 HOURS
COMPONENT: INDUSTRIAL ARTS

QUARTER CONTENT STANDARDS PERFORMANCE STANDARDS MOST ESSENTIAL LEARNING DURATION K-12 CG Code
COMPETENCIES

The learner demonstrates The learner independently LO 1. Prepare electrical materials and TLE_IAEI7/8UT-
an understanding of the prepares appropriate electrical tools for the task 1 week 0a-1
concepts in the preparing materials and tools using the 1.1 Prepare a list of electrical tools and
electrical materials and different forms in electrical materials for a specific job
tools using the different installation and maintenance
forms in electrical based on industry standards.
installation and
maintenance.

LO 2. Request appropriate electrical TLE_IAEI7/8UT-


supplies materials and tools applicable to 0a-2
a specific job
1.1 Use the appropriate form in
requesting for electrical tools,
444

supplies and materials for a specific


job

The learner demonstrates The learner independently LO 1. Select electrical measuring tools 2 weeks TLE_IAEI7/8MC-
an understanding of the performs accurate measurements and instruments 0c-1
concepts and underlying and calculation based on given 1.1 Identify object or component to be
principles in performing tasks. measured
measurements and 1.2 Choose test instruments to be used
calculations. for specific tasks
LO 2. Carry out measurements and TLE_IAEI7/8MC-
calculations 0d-2
1.1 Use appropriate measuring devices
for specific tasks
1.2 Compute for required data
LO 1. Analyze signs, electrical symbols 1 week TLE_IAEI7/8ID-
and data 0e-1
1.1 Read and interpret electrical signs,
symbols and data
1.2 Analyze electrical components and
materials based on electrical signs,
symbols and data

LO 2. Interpret technical drawings and


plans
2.1 Read blueprints of electrical plans,
diagrams and circuits
2.2 Identify necessary tools, materials and
equipment according to blueprints of TLE_IAEI7/8ID-
electrical plans, diagrams and circuits 0e-2

LO 1. Check condition of tools and 2 weeks TLE_IAEI7/8MT-


equipment 0f-1
1.1 Label functional and non-functional
tools and equipment
LO 2. Perform basic maintenance TLE_IAEI7/8MT-
1.1 Clean and lubricate tools 0f-2
445

1.2 Observe periodic preventive and


maintenance of electrical tools and
equipment
1.2.1 Sharpening
1.2.2 Oiling
1.2.3 Insulating

LO1. Identify hazards and risks 1 week TLE_IAEI7/8OS-


1.1 List down hazards and risks in the 0h-1
workplace

LO2. Control hazards and risks TLE_IAEI7/8OS-


3.4. Determine effects of hazards and risks 0i-2
3.5. Evaluate hazards and risks
3.6. Follow procedure for controlling
hazards and risks in the workplace

You might also like