Sr # BoQ # Description Qty. Price Unit Amount

Termite Control: Providing and Carrying out Termite proofing of


approval chemical as per manufacturer Specification in bottom and
sides of trenches and underfloor etc. The work will be done by a
1 3 specialist sub-contractor who will required to give a seven years 461.50 13 P.cft Rs 5,999.50
warranty acceptable to the Engineer for this work will be deemed to
cover all works under this items complete in all respects as per
drawings. Technical Provisions and or as directed by the Engineer.

PCC in foundation: Providing and laying PCC (1:4:8) cement


concrete using graded crush aggregate 1" and down guage,
2 6 approved lawrencepur sand, incl levelling, compacting and curing , 115.38 171 P.cft Rs 19,729.98
in foundations etc. complete in all respects as per
drawings.Technical Provisions and or as directed by the Engineer.

Water Proofing: Providing and applying 2 coats of Hot Bitumen


SIB 10/20 @ 20 lbs per 100 Sft each coat incl primer coat and two
3 11 layers of polythene sheet 500 guage under Bed of basement raft, 461.50 31 P.sft Rs 14,306.50
arround UG Tank, complete in all respects as per drawings,
Technical Provisions and or as directed by the Engineer.

Brick Masonry in super structure: P/L first class solid burnt bricks
masonry set in cement mortor 1:6 in strainght or curved walls 9''
and above thickness at any height /level i/c the cost of 3/8'' dia
4 12 (2feet long steel tie bars at every 6th course of brick masonry at 619.28 234 P.cft Rs 144,911.52
joints with RCC columns /walls , drilling, scaffolding, raking out
joints and curing etc complete in all respects as per drawing
technical provisions and or as directed by the Engineer.

Reinforced Cement Concrete: Providing and laying reinforced


cement concrete cast-in-situ using ordinary portland cement having
4000 psi cylinder strenght using screened graded crushed aggregate
3/4'' and down guage (as per mix design) approved Lawrencepur
5 14 517.50 332 P.cft Rs 171,810.00
sand in Raft, Foundations / Footings of Columns, walls Minaret etc
incl vibrating using Formwork and its removal (but excl the cost of
steel reinforcement), complete in all respects as per drawings,
Technical Provisions and or as directed by the Engineer.

Same as Item No. 15 but Reinforced cement concrete 4000 psi in


6 21 8,476.84 425 P.cft Rs 3,602,657.00
Waffle/Ribbed Beams and Slabs as per drawing.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
7 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 43.29 105,695.00 M.Ton Rs 4,575,959.33
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Total Rs 8,535,373.83

5.83% above as per Agreement. Rs 497,765.93

Total-I Rs 9,033,139.76
Contractor's Rep Quantity Surveyor Resident Engineer
ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY
(WORKS DIVISION-II)

Subject:- Construction Upgradation of Mosque at Pak Secretariet , Islamabad


4th Running Bill
Period 01-06-18 to 26-06-18

Sr # BoQ # Description Qty. Price Unit Amount

Providing and laying reinforced cement concrete using ordinary


portland cement cast in-situ having 4000 psi cylinder strength using
screened, graded crushed aggregate 3/4'' and down guage (as per
mix design), approved Lawrencepur Sand, in Beams , Lintels,
ordinary Slab, Shelves, Projections, Stairs, Shades
1 15 10,423.15 379 P.cft Rs 3,950,373.85
Parapets/Paradies etc. at any height/level using Marine Play Wood
Shuttering /Formwork and its removal, vibrating, compacting
curing etc. (but excluding the cost of steel reinforcement), complete
in all respects as per drawings, Technical provisons and as directed
by the Engineer

Same as above but reinforced cement concrete 4000 psi in Retaning


2 16 445.38 389 P.cft Rs 173,252.82
Walls as per drawing.

Same as above but reinforced cement concrete 4000 psi in Columns


3 17 7,155.22 394 P.cft Rs 2,819,156.68
as per drawing.

Same as above but Reinforced cement concrete 4000 psi in Minaret


4 20 637.50 436 P.cft Rs 277,950.00
as per drawing.

Steel Reinforcement: Providing, fabricating and laying steel


reinforcement bars incl the cost of straightning, cutting, bending,
binding, wastge, rolling margin and such overlaps as not shown
over the drawings, chairs etc. placing in position on cement
5 24 concrete or M.S Chairs of #4 bars etc. and 18 SWG annealed steel 43.29 105,695.00 M.Ton Rs 4,575,536.55
wire in all kinds of RCC work complete in all respect as per
Drawings, Technical Provisions , approved bar bending schedule
and or as directed by the Engineer. Deformed Bars Grade-60 (6000
PSI)

Total Rs 11,796,269.90

5.83% above as per Agreement. Rs 688,017.44

Total-I Rs 12,484,287.34

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.4 Duration 01-05-18 to 31-05-18

A 0.510 i
Labour Un Skilled

Applicable
Weightage Basic Rates Current Rate Adjustment
Period Data Days Remarks
(C factor) Rs. /Day Rs./ Day (Pn)
for Rates

From To (28 Days Prior) a b c d


1/May/2018 31/May/2018 3/May/2018 31 0.160 700 825 0.18857
31 B 0.18857 ii
Cement Bags

Applicable
Weightage Basic Rates Current Rate Adjustment
Period Data Days Remarks
(C factor) Rs. /Day Rs./ Day (Pn)
for Rates

From To (28 Days Prior) a b c d

1/May/2018 31/May/2018 3/May/2018 31 0.080 550.00 535.00 0.07782

31 C 0.07782 iii
Reinforcement Steel Billets

Applicable
Weightage Basic Rates Current Rate Adjustment
Period Data Days Remarks
(C factor) Rs. /Day Rs./ Day (Pn)
for Rates

From To (28 Days Prior) a b c d


1/May/2018 31/May/2018 3/May/2018 31 0.200 68,500 83,500 0.24380
31 D 0.24380 iv
Diesel (High Speed Diesel)

Applicable
Weightage Basic Rates Current Rate Adjustment
Period Data Days Remarks
(C factor) Rs. /Day Rs./ Day (Pn)
for Rates

From To (28 Days Prior) a b c d


1/May/2018 31/May/2018 3/May/2018 31 0.050 80.48 98.76 0.06136
31 E 0.06136 v

Total Adjustment (A+B+C+D+E)= 1.08154

Net Adjustment (Increased) Pn= 0.08154

%age= 8.1542

Net Amount of Work Done,Rs= 9,033,140

TOTAL Price Adjustment,Rs= 736,581

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
700 825
550 535
68500 83500
80.48 98.76

1.08

1.000

#VALUE! 3016424
CAPITAL DEVELOPMENT AUTHORITY ISLAMABAD
(WORKS DIVISION-II)

Construction/ Upgradation of Mosque at Pak Secretariet , Islamabad


Employer Contractor
Capital Development M/S Zarif Khan Hussainzai
Authority & Brothers

IPC No.4 Duration 01-06-18 to26-06-18

A 0.510
Labour Un Skilled

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jun/2018 26/Jun/2018 29/May/2018 26 0.160 700 825 0.18857
26 B 0.18857
Cement Bags

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d

1/Jun/2018 26/Jun/2018 29/May/2018 26 0.080 550.00 535.00 0.07782

26 C 0.07782
Reinforcement Steel Billets

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jun/2018 26/Jun/2018 29/May/2018 26 0.200 68,500 83,500 0.24380
26 D 0.24380
Diesel (High Speed Diesel)

Applicable Data Weightage Basic Rates Current Rate Adjustment


Period Days
for Rates (C factor) Rs. /Day Rs./ Day (Pn)

From To (28 Days Prior) a b c d


1/Jun/2018 26/Jun/2018 29/May/2018 26 0.050 80.48 98.76 0.06136
26 E 0.06136

Total Adjustment (A+B+C+D+E)= 1.08154

Net Adjustment (Increased) Pn= 0.08154

%age= 8.1542

Net Amount of Work Done,Rs= 12,484,287

TOTAL Price Adjustment,Rs= 1,017,995

Contractor's Rep Quantity Surveyor Resident Engineer


ZKHB PEPAC (Pvt) Ltd. PEPAC (Pvt) Ltd.
Contractor
M/S Zarif Khan Hussainzai
& Brothers

Remarks

ii

Remarks
700 825
550 535
68500 83500
iii 80.48 98.76

Remarks

1.08

iv

Remarks
1.000

#VALUE! 3016424

1,754,576

3251405.61

1,754,576
1742911.69

Resident Engineer
PAC (Pvt) Ltd.