Professional Documents
Culture Documents
PROOF
Machine Assembly
1. Machine must be on a flat level surface.
2. Remove shipping stands (A).
A66508 —UN—12FEB10
FS41334,000039E 1912MAY101/34
TS229 —UN—23AUG88
on cinder blocks, hollow tiles, or props that
can crumble under a heavy load.
A—CCS Tanks
PROOF
A66943 —UN—21APR10
Continued on next page FS41334,000039E 1912MAY102/34
1 PN=5
051210
PROOF TEMPLATE OMSECTION
PROOF
5. Locate wheel hub with sensor ring (A), wheel hub (D),
wheel sensor and bracket (B), and cap screws and
lock nuts (C).
6. Install wheel hub with sensor ring (A) in righthand
side of center lift section while aligning hole in frame
with hole in hub shaft.
A66951 —UN—21APR10
7. Position sensor and bracket (B) over frame and install
cap screw (C) through bracket, frame, and hub shaft.
Install nut on cap screw and tighten securely.
8. Install wheel hub (D) in lefthand side of center lift
section.
RightHand Wheel Hub With Sensor Ring
9. Install cap screw (C) through frame and hub shaft.
Install nut on cap screw and tighten securely.
10. Remove wheel nuts from both hubs (A and D).
A66952 —UN—21APR10
FS41334,000039E 1912MAY103/34
A66993 —UN—29APR10
Specification
Wheel Nuts—Torque...................................................................176 N∙m
(130 lb.ft.)
A—Location
2 PN=6
051210
PROOF TEMPLATE OMSECTION
PROOF
13. Locate CCS rear mounting frame (A).
A—Mounting Frame
A66994 —UN—29APR10
FS41334,000039E 1912MAY105/34
A67011 —UN—03MAY10
Specification
Rear CCS Mounting
Frame Attaching Cap
Screws—Torque..........................................................................330 N∙m
PROOF
(245 lb.ft.)
A67012 —UN—03MAY10
3 PN=7
051210
PROOF TEMPLATE OMSECTION
PROOF
17. On both sides of CCS tank frame, loosen cap screws
(A) holding legs (B).
A67014 —UN—05MAY10
FS41334,000039E 1912MAY107/34
A67013 —UN—03MAY10
19. Lower machine until legs (B) slide inside end brackets
(C) while aligning front leg (D) with mounting bracket
(E).
A67040 —UN—05MAY10
A67025 —UN—03MAY10
4 PN=8
051210
PROOF TEMPLATE OMSECTION
PROOF
20. Align holes and loosely install cap screws and nuts
(C). Do not tighten cap screws and nuts (C) until told
to do so later in this procedure.
21. Ensure bracket (A) is installed and tighten cap screws
and nuts (B).
A67026 —UN—03MAY10
A—Bracket C—Cap Screw and Nut (2 used
B—Cap Screw and Nut (3 used per side)
per side)
FS41334,000039E 1912MAY109/34
A67041 —UN—05MAY10
of CCS tanks.
• Position washer over cap screw.
• Install nuts.
• Tighten cap screw and nut securely.
A—M16 x 60 mm Cap Screw (2 B—17 x 30 x 3 mm Washer, and
used) M16 Nut (2 used)
FS41334,000039E 1912MAY1010/34
PROOF
A67026 —UN—03MAY10
A—Bracket C—Cap Screw and Nut (2 used
B—Cap Screw and Nut (3 used per side)
per side)
5 PN=9
051210
PROOF TEMPLATE OMSECTION
PROOF
24. Locate CCS fan (A) and mounting bracket (B).
25. Remove cap screws and nuts (C) from mounting
bracket. Save hardware for reuse,
A67046 —UN—05MAY10
A67048 —UN—05MAY10
FS41334,000039E 1912MAY1012/34
26. Remove cap screws and nuts (A) from front leg of
CCS tank frame. Save hardware for reuse.
6 PN=10
051210
PROOF TEMPLATE OMSECTION
PROOF
27. Position mounting bracket (A) on righthand side of
front leg (C) on CCS tank frame.
28. Install previously removed cap screws and nuts (B).
Tighten cap screws and nuts.
A67049 —UN—05MAY10
B—Cap Screw and Nut (2 used)
FS41334,000039E 1912MAY1014/34
A67050 —UN—05MAY10
and nuts securely.
FS41334,000039E 1912MAY1015/34
to CCS tanks.
A67031 —UN—04MAY10
7 PN=11
051210
PROOF TEMPLATE OMSECTION
PROOF
32. Lower Refuge tank and loosely install U bolt (C)
around center tube and in rear hole of front leg (A).
33. Align rear holes in Refuge Plus frame with tabs (D)
on CCS tank frame.
34. Install and tighten cap screws and nuts (B).
A67033 —UN—04MAY10
35. Tighten U bolt lock nuts (C) securely.
A67032 —UN—04MAY10
A67057 —UN—05MAY10
PROOF
8 PN=12
051210
PROOF TEMPLATE OMSECTION
PROOF
36. Locate air duct (A) and install as follows:
• Install short end of air duct (A) on CCS tank air
plenum (B).
• T fitting on CCS fan (C).
• Long end on Refuge Plus tank plenum (D).
• Tighten all clamps securely.
A67034 —UN—05MAY10
• Secure air duct to side of Refuge Plus tank using
tie bands (E).
A67036 —UN—04MAY10
A67037 —UN—04MAY10
PROOF
9 PN=13
051210
PROOF TEMPLATE OMSECTION
PROOF
37. Locate hose (A) in bundle of parts and install as
follows:
• Connect end of hose (A) to fitting (C) on gauge (B).
• Route hose out of pinch points to lefthand CCS tank
plenum fitting (D).
• Trim hose length as needed.
A67038 —UN—04MAY10
• Push hose on to fitting (D).
• Secure hose to existing hoses using tie bands (E).
A—250 ID X 0.375 OD (BLACK) D—Fitting
Hose E—Tie Bands
B—Gauge
C—Fitting
A67039 —UN—05MAY10
Continued on next page FS41334,000039E 1912MAY1019/34
PROOF
10 PN=14
051210
PROOF TEMPLATE OMSECTION
PROOF
D
E
C F I
B G
H J
A
E
P
N K
Q O
M L
P
A63657 —UN—05NOV08
A—Arm Extension F— Support K—Sensor P—Ball Joint (2 used)
B—Cap Screw (2 used) G—Snap Ring L— Screw (2 used) Q—Rod
C—Arm H—Oring (2 used) M—Ubolt
D—Oring I— Nut (2 used) N—Nut (2 used)
E—Nut (2 used) J— Bracket O—Nut
38. Assemble and install height sensor as follows: a. Assemble height sensor parts (A—N) using
exploded view as guide.
PROOF
FS41334,000039E 1912MAY1020/34
A—Switch Location
A63564 —UN—29OCT08
11 PN=15
051210
PROOF TEMPLATE OMSECTION
PROOF
NOTE: Use exploded view as guide when installing
height sensor on machine.
A63658 —UN—05NOV08
nuts (B).
e. Align arm extension (E) with bracket (F). Tighten
nuts (B) securely.
A63659 —UN—05NOV08
FS41334,000039E 1912MAY1022/34
12 PN=16
051210
PROOF TEMPLATE OMSECTION
PROOF
h. Attach rod (A) to arm and bracket using nuts (B).
i. Locate on center frame 3pin connector (C) labeled
Height Sensor.
j. Connect 3pin connector (C) to sensor as shown.
k. Retain harness to frame as needed using tie bands.
A63660 —UN—05NOV08
A—Rod C—3pin Connector
B—Nut (2 used)
PROOF
13 PN=17
051210
PROOF TEMPLATE OMSECTION
PROOF
39. Connect hydraulic hoses to CCS fan and flow control
valve:
• In location (A) on center frame hitch, locate one long
hydraulic hose (yellow tape), case drain hose and
return hose.
A67060 —UN—10MAY10
• Connect hydraulic hose marked with yellow tape (D)
to fitting on flow control valve.
• Connect hose (E) on flow control valve to CCS fan
hydraulic motor fitting (A).
• Connect case drain hose (B) to CCS fan hydraulic
motor.
• Connect hose (A) to fitting (B) on oil cooler.
• Connect return hose to fitting (C) on oil cooler. A—Location
A—Hose C—Fitting
A67061 —UN—10MAY10
B—Fitting
A67099 —UN—10MAY10
PROOF
A67132 —UN—12MAY10
14 PN=18
051210
PROOF TEMPLATE OMSECTION
PROOF
40. Locate on lefthand side of center frame, one wiring
harness breakout labeled S8 (A), second breakout
labeled Y3.
41. Route S8 harness breakout along lefthand side of
Refuge Plus tank and over agitator motor housing.
A67128 —UN—12MAY10
42. Connect S8 breakout harness (A) to purge switch
connector (B).
43. Route Y3 harness breakout (D) to lefthand side of
CCS fan.
44. Connect Y3 breakout harness (D) to purge switch
connector (C).
A67126 —UN—12MAY10
FS41334,000039E 1912MAY1026/34
A—Tie Bands
PROOF
15 PN=19
051210
PROOF TEMPLATE OMSECTION
PROOF
46. Locate in center of machine, two harness breakouts,
one breakout labeled M2 and P2 (A), second breakout
labeled M4 and P4.
47. Route harness breakout labeled M2 and P2 (A) over
CCS tank air plenum (D) to left side of lefthand CCS
tank.
A67100 —UN—11MAY10
48. Connect connector (A) to agitator motor (C) connector.
49. On agitator motor (C), remove nut from ground stud
(B) and install ground wire. Reinstall and tighten nut.
A67129 —UN—12MAY10
FS41334,000039E 1912MAY1028/34
A67103 —UN—12MAY10
52. On agitator motor (C), remove nut from ground stud
(B) and install ground wire. Reinstall and tighten nut.
16 PN=20
051210
PROOF TEMPLATE OMSECTION
PROOF
53. On Refuge Plus tank:
• Cut tie band (A) and route harness (B) along
righthand side of center frame.
• Locate on righthand side of center frame one
harness breakout (C) labeled Y3.
• Connect harness (B) from purge switch to harness
A67101 —UN—10MAY10
(C).
• Use tie bands to secure harness out of pinch points
and fold areas.
A67102 —UN—11MAY10
FS41334,000039E 1912MAY1030/34
A67107 —UN—11MAY10
Continued on next page FS41334,000039E 1912MAY1031/34
17 PN=21
051210
PROOF TEMPLATE OMSECTION
PROOF
55. Position warning light with clamp (A) on bracket (C)
and install cap screws (B).
A67108 —UN—10MAY10
RightHand Warning Light
A67109 —UN—10MAY10
FS41334,000039E 1912MAY1032/34
A67110 —UN—11MAY10
PROOF
18 PN=22
051210
PROOF TEMPLATE OMSECTION
PROOF
57. Install red amber lamps (B) in locations (A) on rear
of CCS tank frame.
58. Locate in center frame area, lamp wiring harness
A67111 —UN—11MAY10
A—Location B—Red Amber Lamp (2 used)
A67112 —UN—11MAY10
FS41334,000039E 1912MAY1034/34
PROOF
19 PN=23
051210