Professional Documents
Culture Documents
Aircraft Extrusion
Co
2700 Hegan Lane,
Suite 168 Chico
CA95928
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer
QP08 Page: 2 of 11
MEASUREMENT, ANALYSIS, Issue Date: 4/2/2010
AND IMPROVEMENT Revision: B
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer
QP08 Page: 3 of 11
MEASUREMENT, ANALYSIS, Issue Date: 4/2/2010
AND IMPROVEMENT Revision: B
Table of Contents
Table of
Contents………………………………………………………………………..
Sec. 0.0
Amendment
Record…………………………………………………………………….. Sec.
0.1
Controlled Circulation
List……………………………………………………………... Sec. 0.2
Introduction………………………………………………………………………
……... Sec. 0.4
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer
Page: 1 of 2
Section 0.0
QP08 Issue Page: 4 of 11
Date: 4/2/2012
TABLE OF CONTENTS
MEASUREMENT, ANALYSIS, Issue Date: 4/2/2010
Revision: B
AND IMPROVEMENT Revision: B
Glossary…………………..
……………………………………………………………... Sec. 0.5
Organization Chart
………………………………………………………………... Appendix A
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer
QP08 Page: 5 of 11
MEASUREMENT, ANALYSIS, Issue Date: 4/2/2010
AND IMPROVEMENT Revision: B
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer
QP08 Page: 6 of 11
MEASUREMENT, ANALYSIS, Issue Date: 4/2/2010
AND IMPROVEMENT Revision: B
Production
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer
Management
Support
QP08 Page: 7 of 11
MEASUREMENT, ANALYSIS, Issue Date: 4/2/2010
AND IMPROVEMENT Revision: B
In-Process Inspection
Final Inspection
Receiving Inspection
Outsource Overview
Calibration
Shipping & Receiving (4.1, 7.4, 7.5, 8.3) 3
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer
QP08 Page: 8 of 11
MEASUREMENT, ANALYSIS, Issue Date: 4/2/2010
AND IMPROVEMENT Revision: B
Preventive Action
Quality Objectives / KPI
Any printed or saved version of this document is uncontrolled unless the word
“Controlled” in the footer appears in red and it is issued by the Industrial Engineer