Professional Documents
Culture Documents
Contents
1 Purpose ...................................................................................................................................................................... 2
2 Scopes........................................................................................................................................................................... 2
3.1 RACI Chart .............................................................................................................................................. 2
3.2 Key........................................................................................................................................................... 2
4 Reference document .................................................................................................................................................. 2
5 Revision Histories ...................................................................................................................................................... 2
6 Abbreviations ............................................................................................................................................................. 2
7 Organization Chart: .................................................................................................................................................... 3
8 PCC VISION .............................................................................................................................................................. 4
9 PCC MISSION ........................................................................................................................................................... 4 x.
10 PCC IMS .................................................................................................................................................................... 5
10.1 PCC IMS Mapping: ............................................................................................................................. 5
............................................................................................................................................................................ 5
10.2 PCC IMS Overview: ............................................................................................................................ 6
10.3 Human Resources: ............................................................................................................................... 6
10.4 Engineering: ......................................................................................................................................... 7
10.5 Production: ........................................................................................................................................... 7
10.5.1 Operations: ...................................................................................................................................................... 7
10.5.2 Traceability & Recall: ...................................................................................................................................... 7
10.5.3 Maintenance: ................................................................................................................................................... 7
10.5.4 Preservation: ................................................................................................................................................... 8
10.6 Quality: ................................................................................................................................................. 8
10.6.1 Continual Improvement: .................................................................................................................................. 8
10.6.2 Audit & Review: ............................................................................................................................................... 8
10.6.3 Document Control: .......................................................................................................................................... 8
10.6.4 CAPA: ............................................................................................................................................................. 8
10.6.5 Testing: ........................................................................................................................................................... 8
10.7 Management: ........................................................................................................................................ 9
10.7.1 Risk Management: .......................................................................................................................................... 9
10.7.2 Environment Management: ............................................................................................................................. 9
10.7.3 Management of Change: ................................................................................................................................ 9
10.7.4 Supplier / Customer Management: ................................................................................................................. 9
10.7.5 Safety Management: ..................................................................................................................................... 10
11 Annex: ................................................................................................................................................................. 11
SOP-00
1 Purpose
This Procedure is Created as an introduction to PCC IMS, Presenting an overview of PCC Operations, processes and
Controls.
Describing PCC organizational Hierarchy, Mission, Vision and objectives, while mapping the road to achieve all of them
through PCC IMS, complying with Applicable Customer and Legal requirements, and ISO certification requirements “ISO
9001:2015, ISO 14001:2015 and ISO 4500”
2 Scopes
This SOP is applicable and supplemental to all PCC procedures, Process and facilities.
R&D Engineering D QD
3.2 Key
• Responsible: Doing The Task
• Accountable: Owning The Task
• Consulted: Assisting Informed: Keeping Aware
4 Reference document
SOP-00
5 Revision Histories
6 Abbreviations
Abbreviation Full form
PCC Power Container Corp
IMS Integrated Management System
QMS Quality Management System
ISO 9001 Standards for Management System
ISO 45001 Standards for Health and safety system
ISO 14001 Standards for Environmental system
SOP Standard Operating Procedures
WI Work Instructions
GM General Manager
HR Human Resources
CS Customer Service
DO Director of Operations
QD Quality Department
QM Quality Manager
QC Quality Control
QA Quality Assurance
ED Engineering Department
BOV Bag on Valve
PDCA Plan Do Check Act
CTQ Critical to Quality
FMEA Failure Mode Effect Analysis
RM Risk Management
CAPA Corrective Action Preventive Action
PA Power Pouch
PP Power Assembly
SOP-00
7 Organization Chart:
8 PCC VISION
PCC Aim to be the lead BOV and its accessories supplier of choice, providing reliable BOV and Accessories for wide
range of applications resolving several issues that industry faced with common Aerosol and regular BoV.
9 PCC MISSION
PCC Mission is divided to 2 main points:
1- BOV
A. Designing and developing a reliable BOV that is accepted in wide range of applications
B. Industrializing The processes of BoV Production to be ready for mass production
C. Insuring Quality of products, through Qualifying processes and setting product standards
2- Accessories
A. Design and develop Universal Accessories able to work with any kind of BoV.
B. Industrializing The processes of Accessories Production to be ready for mass production C. Insuring
Quality of products, through Qualifying processes and setting product standards
10 PCC IMS
10.1 PCC IMS Mapping:
SOP-00
10.4 Engineering:
SOP-00
Research : this involves exploring new concepts or materials for products as well as making incremental improvements
to existing products. Research engineers also try to find the next big thing that will give their organisation the edge in the
market, by introducing ideas for an improved product or innovating a new, advanced process. Engineering department is
also responsible for validating the newlly designed moulds, product, process and machines.
Design : Engineers design products with consideration of what the customer wants and the specialist processes needed
to manufacture them. Increasingly designers must consider the ‘whole life’ of the product and review how the product will
be disposed of at the end of its life.
Follow Design Control SOP :
Development : The development process involves taking a product design or prototype and making it into a
manufacturable product. Development engineers consider the scale of production (volume), availability of materials (and
their cost), production safety, lead times, quality and overall cost.
10.5 Production:
10.5.1 Operations:
Production planning : The first decisions facing operations managers come at the planning stage. At this stage,
managers decide where, when, and how production will occur. They determine site locations and obtain the necessary
resources.
Production control : At this stage, the decision-making process focuses on controlling quality and costs, scheduling,
and the actual day-to-day operations of running a factory or service facility.
Improving production and operations : The final stage of operations management focuses on developing more
efficient methods of producing the firm’s goods or services.
10.5.3 Maintenance:
Whenever the new equipment installed, shall be incorporated in the preventive maintenance plan as a supplement to the
original preventive maintenance plan.
Preventive maintenance shall be carried out as per the scheduled date. Preventive maintenance checklists shall be
prepared based on our experience, maintenance manuals and manufacturers recommendations for every for every
equipment.
Each checklist shall be approved.
Ensure the main switch of the machine is turned OFF, the fuses have been removed whenever available and utilities are
isolated whenever required. Tag UNDER MAINTENANCE label to the equipment.
Take necessary work permit from the concerned department whenever required.
In case if the repeated breakdowns observed during operation, corrective actions should be planned during preventive
maintenance.
After completing the preventive maintenance, take machine trial and remove UNDER MAINTENANCE label.
If the machine status is not acceptable take appropriate corrective action.
10.5.4 Preservation:
10.6 Quality:
SOP-00
Record
Write/ Effective/ Archive
Review Approval Execution Review/
Create Available Record
Approval
10.6.4 CAPA:
Corrective action and preventive action are improvements to our processes taken to eliminate causes of non-
conformities or other undesirable situations. It focuses on the systematic investigation of the root causes of non-
conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive
action).
.
10.6.5 Testing:
The main purposes of In-Process Quality Control checks (IPQC) are to monitor control and improve effectively the whole
applied operations at the every stage of the finished products. In-Process control includes inspection of raw material,
equipment, environment, process, testing with respect to specification, packing and so on. Testing procedure includes
testing of incoming material, in process inspection, Equipment test calibration, Compatibility testing.
SOP-00
10.7 Management:
An often overlooked but very important function of supplier management involves understanding cultural norms and
differences for better buyer-supplier relationships. I can’t stress how important this is, because understanding how other
cultures conduct business and understanding their values will produce trust.
Without good supplier management practices you lose-out on opportunities to cut costs and save money. Dedicated
supplier management practices have a lot of benefits and should be considered for optimizing your supply chain.
11 Annex:
SOP-00