Wanna Phyo M.Sc


Principal Engineer
Ground Anchor
Soil nailing

Shortcreting

*
Micro Pile
Pipe jacking Caisson construction

Geo-synthetic slope protection

Contractor Monthly payment review


and certification as Superintending
Officer S/O rep

*
Temp Strutting, monitoring
D-wall construction

Civil defense shelter TBM tunneling


Deep excavation/strutting

Ground improvement
TBM break through

*
Contiguous Bored Pile wall (CBP Bored piling

Jet Grouting

*
Sinking of Cassion Sand pumping

Vertical drain installation

*
S.I
Piezo

Inclinometer

*
De watering well Recharge well
*
*
1. Construction of 12 story Handy road commercial complex (2006)
2. Slope protection works for Singapore Ministry of Defence,
Housing development board (2007)
3. Public Utility Board sewer and water pipe project
(12.8 million) (2007)
4.Singapore MRT Circle line contract (4 station 6 tunnel)
(742 million)(2008)
5. Vehicular carriage way (fly over) and under pass tunnel
construction (130 million)(2009)
6. Singapore MRT downtown line C921 (1 station 2 tunnel)
(800 million)(2010)
7. Singapore MRT downtown line C918 (2 station 3 tunnel)
(670 million)(2011)
8. SP Power grid cable tunnel (36km tunnel and 18 shaft)
(2 Billion dollar)(2012 to date)
*

Promoted to Principal engineer

Honored by Allowed to present paper at Allowed to present paper at


SP magazine UGS2014 Singapore conference AGEC Myanmar conference