Professional Documents
Culture Documents
Sr.
Date Plant
#
1 NH3
2 NH3
3 Urea
4 Urea
5 Urea
6 UTW
7 UTW
15-04-19
8 UTW
9 Electrical
10 HNO3 Instt.
C&T
11 C&T
12 HNO3 ELECT
13 Inspection
1 NH3
2 Urea
3 UTW
4 Electrical
5 HNO3
6 HNO3
7 HNO3
8 HNO3
9 NH3
10 NH3
11 HNO3
12 LINE C
13 Electrical
14 Electrical
15 UTW
16
UTW/ELECTRICAL
1 UTW
2 UTW
3 NH3
NH3
4 NH3
5 NH3
22-05-2019 6 NH3
7 Urea
8 Urea
9 Nitric Acid
10 Nitric Acid
Instrumen
11 t
(Line C)
1 C&T
1 NH3
2 NH3
3 Urea
4 Urea
5 Urea
6 UTW
7 UTW
8 UTW
5/29/2019
9 HNO3
10 Line C
11 Electrical
12 Instrumen
t NH3
13 Instrumen
t NH3
1 UTW
2 UTW
3 UTW
4 UTW
5 Store
6 NH3
UTW
UREA
urea
NH3
UTW/Inst
HNO3
HNO3
HNO3
LINE C
6/12/2019
Store
NH3
NH3
NH3
NH3
NH3
NH3
NH3
Weekly Planning Meeting
Job Description
13 ton crane with rigger required for 2001 JA compressor head remove work
Scaf Req. at 101 J PA
Manitowoc Crane req. at 104F and 1106
Scaf Req. at E-7
Crane and rigger req. for boster ejector
Rigger req.for V-7
SCAF / Stand req at NCT for Cl2 Dosing line PSV.
SCAF Req. at Cation # Demin area
SCAF Req. HP Steam export valve .for gland replacement
SCAF Adjustment req. at PSV Outlet at Cooler Condenser
Support req. for air heater and cooler condenser
SCAF , Crane and rigging support req, for panel replacement at Chemical house
Un Plan Work
Scaffold required for re root of exhaust flange and psv slincer line at GTG2
13 ton crane with rigger required for GTG 1 psv line re root work
To provide scaffold +rigging support+Crane+ liftruck for M/I / GTG 2
Erect scaffold at 2001 JA compressor.
Required 13 ton crane with rigger for co2 plant vaporizer unload work
Provide scaffold from 107 J for insulation removal work.
Required scaffold valve near utw control room
Provide 13 ton crane cradle with rigger for replacement of marketing pena flex
Required 13 ton crane for 142 C cap refitting job
Provide 30 ton crane for replacement of wind socks at NAST ammonia tank
Scaffold required at LCV-27 for cable tray installation
Required 30 ton crane sapphire tank 2 for psv and steam line fitting job
Required crane / rigging support from TRC -103 control valve remove
Required scaffold from HRSG2 for damper by pass valve work
Scaffold required from tail gas for insulation.
Scaffold required from HNO3 PM of over head crane.
Scaffold required from rotating arm for cabel tray
Scaffold required from bleacher line C
WO1564508 1 Yes
WO1645517 1 COMP
WO1647611 1 Yes COMP
WO1647613 2 COMP
WO1636525 1 Yes
WO1647617 2
WO1636588 3 COMP
WO1647619 1 Yes
1 Yes
WO1647622 2 Yes
1 Yes COMP
COMP
WO1647623
1
WO1647624 Yes COMP
2
Yes
WO1656517 I/P
WO1656519 COMP
WO1522465 I/P
COMP
WO1659559 COMP
WO1664515 COMP
WO1659508
WO1659504 I/P
WO1659506 I/P
WO1659520
WO1659524
WO1659528
WO1659538 COMP
WO1659542
WO1659559
COMP
WO1660501
WO1660502
WO1660504
WO1660511
WO1660514 COMP
WO1660503 COMP
1 Separator manhole& PG (Line-B) insulation required. (Nitric Acid)
2 Insulation required on 1623 Turbo (Line-B).(Nitric Acid)
3 Insulation req. Near KS isolating valve Urea Plant
4 Insulation req. L-2 Holder Urea plant
Insulation req. Outlet hot brine headers crystallizer line A,B,C and D at
5 121and 114Floor (NP Plant)