You are on page 1of 10

Weekly Planning Meeting

Sr.
Date Plant
#
1 NH3
2 NH3
3 Urea
4 Urea
5 Urea
6 UTW
7 UTW
15-04-19
8 UTW
9 Electrical
10 HNO3 Instt.
C&T
11 C&T
12 HNO3 ELECT
13 Inspection
1 NH3
2 Urea
3 UTW
4 Electrical
5 HNO3
6 HNO3
7 HNO3
8 HNO3
9 NH3
10 NH3
11 HNO3
12 LINE C
13 Electrical
14 Electrical
15 UTW
16
UTW/ELECTRICAL
1 UTW
2 UTW
3 NH3
NH3
4 NH3
5 NH3
22-05-2019 6 NH3
7 Urea
8 Urea
9 Nitric Acid
10 Nitric Acid
Instrumen
11 t
(Line C)
1 C&T
1 NH3
2 NH3
3 Urea
4 Urea
5 Urea
6 UTW
7 UTW
8 UTW
5/29/2019
9 HNO3
10 Line C
11 Electrical

12 Instrumen
t NH3
13 Instrumen
t NH3

1 UTW
2 UTW
3 UTW
4 UTW
5 Store

6 NH3
UTW

UREA
urea
NH3
UTW/Inst
HNO3
HNO3
HNO3
LINE C
6/12/2019

Store
NH3
NH3
NH3
NH3
NH3
NH3
NH3
Weekly Planning Meeting

Job Description

SCAF Req. at 101-J Lube Oil cooler


SCAF req. at 105-J Lube oil Cooler
SCAF Req. at TV-24 steam line
Crane Req. for footvalve cleaning of ladies park disposal pumps
Rescue person req. for entry in V-7
Removal of SCAF from Demin Tank, Sand filter #3 , Degasifier.
SCAF required for mothballing at HRSG # 1,2 and 3.
Rigger req. for fitting of GTG Exhaust Flange of GTG# 2.
Boom Truck req. for shifting of 121-J motor to Electrical workshop.
Rigger req. for UV-701 at Line B
Required scaffold support for ID fan rootor protection near planining
Load Testing of overhead req. at C & T
Scaff required for hanging light repair work
Insulation removal req. at NH3 Adsorber.
Rigger req. for Auxillary Boiler rigging job
Scaffolding required at Flash mixture ETP
Platfrom req. for light repairing GTG Area
Crane Req. for cable dressing at ETP
Scaffolding req. at cooling water valve CDM Line B
Scaffolding req. at Barometric condenser 2nd floor
SF reqd for 1152 & 1169 cable tray painting scaffolding painting
Rigger req. for 701 Actuator fitting at line b
SCAF required at Hydra step 101-F
SCAF req for HCV-102
SCAF req. for PM of Hoist Crane at Nitric Acid Plant
PM of overhead crane line C
SCAF Req. at 5 Ton crane at main workshop
SCAF required for cable dressing at PS2-2
main fire water line leakage at New cooling tower SF reqd
Scaffolding for GTG 1 - JB 10 FOR insulation covering
SCAF, Crane and rigger required for top shaft replacement of 11B Tubewell.
SCAF Req. at 2201 JSM Pump
SCAF Req. At 142 C
Scaffold required at 104 F
SCAF Req. 101 J and 105 J
SCAF req. for 103 J NRV
Rigging Req. for 104D PSV
SCAF req. at Urea Prilling tower outside Bucket room.
Crane req. for Mesh installation at Urea
SCAF Req. for removal of window Glasses
Readjustment of SCAF req. at 1164 pump suction valve

SCAF / Stand req. for calibration of level switches.

13 ton crane with rigger required for 2001 JA compressor head remove work
Scaf Req. at 101 J PA
Manitowoc Crane req. at 104F and 1106
Scaf Req. at E-7
Crane and rigger req. for boster ejector
Rigger req.for V-7
SCAF / Stand req at NCT for Cl2 Dosing line PSV.
SCAF Req. at Cation # Demin area
SCAF Req. HP Steam export valve .for gland replacement
SCAF Adjustment req. at PSV Outlet at Cooler Condenser
Support req. for air heater and cooler condenser
SCAF , Crane and rigging support req, for panel replacement at Chemical house

SCAF At LT-107 for Cable arrangement

SCAF Req. for PM of PG ( PI166)

Un Plan Work
Scaffold required for re root of exhaust flange and psv slincer line at GTG2
13 ton crane with rigger required for GTG 1 psv line re root work
To provide scaffold +rigging support+Crane+ liftruck for M/I / GTG 2
Erect scaffold at 2001 JA compressor.
Required 13 ton crane with rigger for co2 plant vaporizer unload work
Provide scaffold from 107 J for insulation removal work.
Required scaffold valve near utw control room
Provide 13 ton crane cradle with rigger for replacement of marketing pena flex
Required 13 ton crane for 142 C cap refitting job
Provide 30 ton crane for replacement of wind socks at NAST ammonia tank
Scaffold required at LCV-27 for cable tray installation
Required 30 ton crane sapphire tank 2 for psv and steam line fitting job
Required crane / rigging support from TRC -103 control valve remove
Required scaffold from HRSG2 for damper by pass valve work
Scaffold required from tail gas for insulation.
Scaffold required from HNO3 PM of over head crane.
Scaffold required from rotating arm for cabel tray
Scaffold required from bleacher line C

NH3 PSV for drain hole


Required 13 ton crane with rigger for co2 plant vaporizer unload work
Scaffold required from 101 JPA.
Scaffold required for RV-S-1 at 104 D ammonia plant for drain hole.
Scaffold required at RV-LS-A header for drain hole ammonia plant.
Required scaffold at RV-146-CS for drain hole at ammonia plant.
Required scaffold from RV-MS-15 drain hole at ammonia plant.
Required scaffold from RV-1203 nast ammonia for drain hole.
Scaffold required at RV-111-CT for drain hole ammonia plant.
Job Type Required
Work Order # Priority Remarks (IF ANY)
Scaf
WO1636585 1 Yes COMP
WO1636586 2 Yes COMP
WO1643596 2 Yes
WO1636587 1 COMP
WO1636588 1 Yes COMP
WO1636589 1 Yes COMP
WO1637503 2 Yes COMP
WO1636590 1 COMP
WO1636591 1 COMP
2 COMP
WO1643611 2
WO1636592 2 COMP
WO1637502 COMP
Insulation
WO1636523 2
WO1632518 2 Yes COMP
WO1632507 1 Yes
WO1632511 1
WO1632513 2 Yes
WO1636529 2 Yes
WO1598472 3
WO1636594 3 COMP
WO1637501 3 COMP
WO1643591 2
2 COMP
WO1643592 2
3 COMP
WO1643593 3
WO1643594 2 COMP
WO1643595 3
WO1585444 1 Yes COMP
WO1643527 2 Yes COMP
WO1643532 1 Yes COMP
WO1643545 Yes COMP
WO1636586 2 Yes COMP
WO1643546 1 Yes COMP
WO1643548 1 Yes I/P
WO1643553 1 Yes COMP
WO1643549 1 COMP
WO1643556 1 Yes I/P
WO1643551 2 Yes COMP

WO1564508 1 Yes

WO1645517 1 COMP
WO1647611 1 Yes COMP
WO1647613 2 COMP
WO1636525 1 Yes
WO1647617 2
WO1636588 3 COMP
WO1647619 1 Yes
1 Yes
WO1647622 2 Yes
1 Yes COMP
COMP
WO1647623
1
WO1647624 Yes COMP
2
Yes

WO1656517 I/P
WO1656519 COMP
WO1522465 I/P
COMP
WO1659559 COMP

WO1664515 COMP
WO1659508
WO1659504 I/P
WO1659506 I/P
WO1659520
WO1659524
WO1659528
WO1659538 COMP
WO1659542

WO1659559
COMP
WO1660501
WO1660502
WO1660504
WO1660511
WO1660514 COMP
WO1660503 COMP
1 Separator manhole& PG (Line-B) insulation required. (Nitric Acid)
2 Insulation required on 1623 Turbo (Line-B).(Nitric Acid)
3 Insulation req. Near KS isolating valve Urea Plant
4 Insulation req. L-2 Holder Urea plant
Insulation req. Outlet hot brine headers  crystallizer line A,B,C and D at
5 121and 114Floor (NP Plant)

You might also like