Sr # SECTION Job dscription

1 VBFs Both isolation valves of 17-315 & 322 are hard to operate
2 VBFs Both isolation valves of 17-315 & 322 hand wheel to be rectified
3 VBFs Both isolation valves of 17-408 are hard to operate
4 VBFs Both suction and discharge valves of 15-1192 are passing problem
5 VBFs Both suction and discharge valves of 17-1105 & 1185 are hard to operate
6 VBFs VBF A slurry block valve handle is to be fixed
7 VBFs SL valve at 110 floor replacement required
8 VBFs Collar washing lines of VBF A C D replace (nozzle shape formation required)
9 VBFs Collar washing valve of VBF D replacement reuired due to passing
10 VBFs By pass valve of 17-1105/85 discharge line to 17-17-2006 is hard to operate
11 VBFs Slope required of VBF A & C after doctor knife
12 VBFs Welding fabrication job at 17-1216 is still pending
13 VBFs 17-1216 drum rollar packing replacement required
14 VBFs VBF C flushing nozzle vale replacement required (Floor Washing)
15 VBFs Damage hand railing to be rectified near slurry valves
16 VBFs Fishtail line replacement at VBF A job is remaining
17 VBFs VBF A fishtail slope formation requred
18 VBFs Tapping point fabrication job PG replacement at 17-1022
19 VBFs Scaffolding arrangement for PG job at 17-1022
20 VBFs VBF A C D hood panes job
21 VBFs Welding job for Tapping point at fresh water line 116 Floor
22 VBFs 17-1216 motir fan cover to be rectified
23 VBFs Damaged bellows replacement of VBF A C D seperators is pending
24 VBFs Provide ON OFF switch of tango lights at 116 floor
25 VBFs 17-1216 IN OUT switch replacement required
26 VBFs Replacement of P.A system speaker at 116 floor
27 VBFs Relocate ON OFF switch of 17-1201
28 VBFs Replacement of instrument air valve at VBF C panel
29 VBFs Suction side valves of all vacuum pumps are hard to operate
30 VBFs PM of all vacuum pumps required
31 VBFs Grating Required to replace to wooden platform
32 P/T Overhauling of prilling bucket distance piece and ring required.
33 P/T Lime cyclones bottom spool flange dori packing and flange snot fitted.
34 P/T Insulation at Mixing tank bottom required.
35 P/T Insulation at F.F.E,s A+B bottom at sump required.
36 P/T Instrumentation at Air Heater A+B and bubler A+B required.
37 P/T SM Header at 161F Insulation required.
38 P/T Lime Motors 15-1211/71/72and star wheel 15-1218 PM job required.
39 D/P 15-1002 blower V-belts and V guard provision required.
40 D/P 15-1003 blower V guard fitting pending.
41 D/P Scrapper fitting job I/P
42 D/P 15-1203 overhauling pending.
43 D/P Dissolving Tank 15-2003 drain valve fitting job pending.
44 D/P Coating drum 15-1301 outlet chute crack welding required.
45 D/P 15-1004 discharge duct inspection window and manway fitting pending.
46 D/P SOP bin 15-2010 at 129F vent line blocked.
47 D/P SL steam circuit of 15-2007 A/B some flanges leakage.
48 D/P Steam Trap of 15-1002 battery passing issue.
49 D/P Insulation damage of water bath pit for drum heating.
50 D/P Oil Amine flowmeter instrument connection &P.G &T.G installation pending.
51 D/P 135F houskeeping required insulation material present.
52 D/P 15-1205/71 elevator ON/OFF switch at 129F faulty.
53 D/P 15-1222 elevator ON/OFF switch at 129F faulty

54 D/N 15-303 auto valve one bolt missing at116F


55 D/N AN Line drain valve not fitted at 110F.
56 D/N 15-1103 discharge valve actuator not installed at 100F
57 D/N Drain Valve of 15-2002 tank not fitted.
58 D/N 15-1101 pump installation job I/P.
59 D/N Pressure guage at 15-2601 ejector is required.
60 D/N Replace demin water block valve of 15-502.
61 D/N Welding required at flange of 15-2104 at height (colony side) DPT required
62 D/N Replace steam trap of 15-2103.
63 D/N Purge at pt-207 is not available.
64 D/N Provide NRV at minimum flow line of acid pumps.

65 CNR NRV tightening required 4 nutbolts missing


66 CNR Ladder welding required above sample point
67 CNR FCV 17-108 fitting instruments connection required at bottom.
68 CNR T.G required at at 106F /110F inlet outlet lines.
69 CNR NRV 17-2221 nutbolts no blindes at 113F
70 CNR End blind required near 17-357.
71 CNR 17-357 autovalve instrument connection arefitted.
72 CNR 17-351/317/618/353/619/316/317/318 instruments connection required

74 LIME 17-1205-72 sproket, alignment pending.


75 LIME CN Burner instrumentation pendings.
76 LIME 15-1202 and 1217 connection done but rotation not verified.
77 LIME 17-9807/71 plant air pipe for plumber block required
78 LIME 17-9807/71 V belts V guard provision pending.
79 LIME 15-1018 V belts and V guard providing required.
80 LIME CAN Scrubber inlet line piece fitting required.
81 LIME CAN Scrubber discharge line deblocking required.
82 LIME CAN scrubber inspection gate rectification required.
83 LIME 17-9807&15-1018 discharge line washing required.
84 LIME 17-2015 boxup pending.
85 LIME 17-2014 Lime Bin Boxup Pending.
86 LIME CN Cyclons insulation required.
87 LIME CN CAN Burners N.G line blind removal required.
Responsibility
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN Column1
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
Civil
FM CAN
Electrical
FM CAN
Electrical
Electrical
Admin
Electrical
FM CAN
FM CAN
FM CAN
CIVIL
FM CAN
FM CAN
FM CAN
FM CAN
Instrument
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
Instrument
Craft
Electrical
Electrical

FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
Instrument
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN

FM CAN
FM CAN
Instrument
Instrument
FM CAN
FM CAN
Instrument
Instrument

Instruments
Instruments
Electrical
FM CAN
FM CAN
FM CAN
FM CAN
Operation
FM CAN
Operation
FM CAN
FM CAN
Craft
FM CAN