1 VBFs Both isolation valves of 17-315 & 322 are hard to operate
2 VBFs Both isolation valves of 17-315 & 322 hand wheel to be rectified
3 VBFs Both isolation valves of 17-408 are hard to operate
4 VBFs Both suction and discharge valves of 15-1192 are passing problem
5 VBFs Both suction and discharge valves of 17-1105 & 1185 are hard to operate
6 VBFs VBF A slurry block valve handle is to be fixed
7 VBFs SL valve at 110 floor replacement required
8 VBFs Collar washing lines of VBF A C D replace (nozzle shape formation required)
9 VBFs Collar washing valve of VBF D replacement reuired due to passing
10 VBFs By pass valve of 17-1105/85 discharge line to 17-17-2006 is hard to operate
11 VBFs Slope required of VBF A & C after doctor knife
12 VBFs Welding fabrication job at 17-1216 is still pending
13 VBFs 17-1216 drum rollar packing replacement required
14 VBFs VBF C flushing nozzle vale replacement required (Floor Washing)
15 VBFs Damage hand railing to be rectified near slurry valves
16 VBFs Fishtail line replacement at VBF A job is remaining
17 VBFs VBF A fishtail slope formation requred
18 VBFs Tapping point fabrication job PG replacement at 17-1022
19 VBFs Scaffolding arrangement for PG job at 17-1022
20 VBFs VBF A C D hood panes job
21 VBFs Welding job for Tapping point at fresh water line 116 Floor
22 VBFs 17-1216 motir fan cover to be rectified
23 VBFs Damaged bellows replacement of VBF A C D seperators is pending
24 VBFs Provide ON OFF switch of tango lights at 116 floor
25 VBFs 17-1216 IN OUT switch replacement required
26 VBFs Replacement of P.A system speaker at 116 floor
27 VBFs Relocate ON OFF switch of 17-1201
28 VBFs Replacement of instrument air valve at VBF C panel
29 VBFs Suction side valves of all vacuum pumps are hard to operate
30 VBFs PM of all vacuum pumps required
31 VBFs Grating Required to replace to wooden platform
32 P/T Overhauling of prilling bucket distance piece and ring required.
33 P/T Lime cyclones bottom spool flange dori packing and flange snot fitted.
34 P/T Insulation at Mixing tank bottom required.
35 P/T Insulation at F.F.E,s A+B bottom at sump required.
36 P/T Instrumentation at Air Heater A+B and bubler A+B required.
37 P/T SM Header at 161F Insulation required.
38 P/T Lime Motors 15-1211/71/72and star wheel 15-1218 PM job required.
39 D/P 15-1002 blower V-belts and V guard provision required.
40 D/P 15-1003 blower V guard fitting pending.
41 D/P Scrapper fitting job I/P
42 D/P 15-1203 overhauling pending.
43 D/P Dissolving Tank 15-2003 drain valve fitting job pending.
44 D/P Coating drum 15-1301 outlet chute crack welding required.
45 D/P 15-1004 discharge duct inspection window and manway fitting pending.
46 D/P SOP bin 15-2010 at 129F vent line blocked.
47 D/P SL steam circuit of 15-2007 A/B some flanges leakage.
48 D/P Steam Trap of 15-1002 battery passing issue.
49 D/P Insulation damage of water bath pit for drum heating.
50 D/P Oil Amine flowmeter instrument connection &P.G &T.G installation pending.
51 D/P 135F houskeeping required insulation material present.
52 D/P 15-1205/71 elevator ON/OFF switch at 129F faulty.
53 D/P 15-1222 elevator ON/OFF switch at 129F faulty
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
Instrument
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
FM CAN
Instrument
Instrument
FM CAN
FM CAN
Instrument
Instrument
Instruments
Instruments
Electrical
FM CAN
FM CAN
FM CAN
FM CAN
Operation
FM CAN
Operation
FM CAN
FM CAN
Craft
FM CAN