You are on page 1of 7

DOCUMENT CODE CAN-WP-IMS-027 REV. # 02 REV.

DATE 20-07-2022 PAGE 1 of 7


PROCEDURE TITLE: ISOLATIONPROCEDURE OF
AMMONIUM NITRATE EVAPORATION CIRCUIT 17-
CAN PLANT
2307/08/09
DEPARTMENT: PRODUCTION
TITLE: ISOLATION PRODCEDURE OF AMMONIUM NITRATE EVAPORATION CIRCUIT 17-

2307/08/09

TYPE: NON-ROUTINE PROCEDURE WITH LOW RISK LEVEL-III.

TABLE OF CONTENTS

CHAPTER DESCRIPTION

1.0 Change Record

2.0 Scope

3.0 Purpose

4.0 Chemicals Involved

5.0 Hazards and Risks Involved

6.0 Process Prerequisites

7.0 Safe Operating Limits

8.0 Alarms and Trips

9.0 Actions against deviations

10.0 Process Description

11.0 Procedure & Responsibilities

12.0 Emergency Handling

13.0 Attachments and Records

14.0 Related Documents

15.0 Distribution Lists

ROUTE PREPARED BY REVIEWED BY APPROVED BY REFERENCE


Name Muhammad Umer Rana Jibran Zahoor Sohail Sharif
QMS: 7.5
Date 08-09-2022 09-09-2022 09-09-2022
HSE: 7.5
Dsig/Sign GTE CAN
DOCUMENT CODE CAN-WP-IMS-027 REV. # 02 REV. DATE 20-07-2022 PAGE 2 of 7
PROCEDURE TITLE: ISOLATIONPROCEDURE OF
AMMONIUM NITRATE EVAPORATION CIRCUIT 17-
CAN PLANT
2307/08/09
DEPARTMENT: PRODUCTION
1.0 CHANGE RECORD:

REV. PAGE CHAPTER SECTION


S.NO. DATE DESCRIPTION OF CHANGE
NO. NO. NO. NO.

1.1 00 21-09-17 1-06 1-11

1.2 01 22-11-18 1-07 1-11 Procedure Revision (P&ID attachment)

1.3 02 20-07-22 1-06 1-15 As per revision plan

1.4

1.5

ROUTE PREPARED BY REVIEWED BY APPROVED BY REFERENCE


Name Muhammad Umer Rana Jibran Zahoor Sohail Sharif
QMS: 7.5
Date 08-09-2022 09-09-2022 09-09-2022
HSE: 7.5
Dsig/Sign GTE CAN
DOCUMENT CODE CAN-WP-IMS-027 REV. # 02 REV. DATE 20-07-2022 PAGE 3 of 7
PROCEDURE TITLE: ISOLATIONPROCEDURE OF
AMMONIUM NITRATE EVAPORATION CIRCUIT 17-
CAN PLANT
2307/08/09
DEPARTMENT: PRODUCTION
2.0 SCOPE:
This document describes the steps to be taken regarding isolation and handover of ammonium nitrate
evaporation circuit 17-2307/08/09.

3.0 PURPOSE:
This procedure covered isolation steps for safe handover of ammonium nitrate evaporation circuit
17-2307/08/09 for maintenance purpose.

4.0 CHEMICALS INVOLVED:


4.1 Ammonium Nitrate

5.0 SAFETY PRECAUTION:


5.1 Ensure the compliance of mandatory PPE’s.
5.2 Use rubber gloves as per requirement and wear chemical resistant suit and face shield for
emergency handling.
5.3 Use full face ammonia gas mask.
5.4 Ensure that all relevant F-Keys are in placed at their designated location for their easy access.
5.5 Walkie talkie must be available with the field operator and inside control room for better
communication.
5.6 Barricade the area and restrict any unwanted movement of personnel.

6.0 HAZARDS AND RISKS INVOLVED:


SR# HAZARD RISKS REMEDIAL MEASURES
a. Prolonged skin contact may cause a) Wash the affected area with soap
some irritation and water. If irritation persists obtain
medical advice.
b. Eye contact may cause irritation
b) Flush with plenty of water at least
c. Ingestion in large quantities may
for 15 min. if it is necessary seek
Ammonium give rise to gastro intestinal
6.1 medical assistance.
Nitrate disorders
c) Do not induce vomiting. Give water
or milk to drink. Obtain medical
attention if more than small quantity
has been swallowed.

ROUTE PREPARED BY REVIEWED BY APPROVED BY REFERENCE


Name Muhammad Umer Rana Jibran Zahoor Sohail Sharif
QMS: 7.5
Date 08-09-2022 09-09-2022 09-09-2022
HSE: 7.5
Dsig/Sign GTE CAN
DOCUMENT CODE CAN-WP-IMS-027 REV. # 02 REV. DATE 20-07-2022 PAGE 4 of 7
PROCEDURE TITLE: ISOLATIONPROCEDURE OF
AMMONIUM NITRATE EVAPORATION CIRCUIT 17-
CAN PLANT
2307/08/09
DEPARTMENT: PRODUCTION

7.0 PREREQUISITE:
7.1 Inform UM CAN and Coordination engineer in event of heavy AN leakage or spillage.
7.2 Ensure the availability of fire water and fresh water supply.
7.3 Ensure full face gas masks and SCABA are in good health for immediate use in case of emergency.
7.4 The hose pipe should be certified and properly clamped.
7.5 Monitor the wind direction intermittently with reference to NAST.

8.0 SAFE OPERATING LIMITS:


NA
9.0 ALARMS & TRIPS:
NA

10.0 ACTIONS AGAINST DEVIATIONS:


NA

11.0 PROCESS DESCRIPTION:


NA
12.0 PROCEDURE AND RESPONSIBILITIES:
12.1 ISOLATION STEPS FOR HANDOVER OF AN EVAPORATION CIRCUIT 17-2307/08/09
SR.# ACTION RESPONSIBILITY
Stop the feeding of ammonium nitrate to 3rd stage of AN Evaporation
12.1.1 Concerned field operator
17-2309 by switching off 17-1108/88 at ground floor.
Shut down AN pumps 17-1109/89 and 17-1110/90 of 2 nd and 3rd stage
12.1.2 Concerned field operator
from local switches if possible, otherwise rack them out from MCC-100.
Stop AN pump 17-1198 (AN supply to NP plant) and inform NP shift SIC/ Concerned Area
12.1.3
engineer. Operator
Open the air bleed valve PIC 17-215 from control room to break the
12.1.4 CN Boardman
vacuum of circuit.
Shut down 17-1309 agitator from local switches if possible, otherwise
12.1.5 Concerned field operator
rack it out from MCC 100F.
Close the SM steam valve TIC 17-112 of 1st stage evaporators 17-
12.1.6 CN Boardman
2105/25 from control room.
12.1.7 Close the battery limit block valve of SM (steam) and CM (condensate) Concerned field operator

ROUTE PREPARED BY REVIEWED BY APPROVED BY REFERENCE


Name Muhammad Umer Rana Jibran Zahoor Sohail Sharif
QMS: 7.5
Date 08-09-2022 09-09-2022 09-09-2022
HSE: 7.5
Dsig/Sign GTE CAN
DOCUMENT CODE CAN-WP-IMS-027 REV. # 02 REV. DATE 20-07-2022 PAGE 5 of 7
PROCEDURE TITLE: ISOLATIONPROCEDURE OF
AMMONIUM NITRATE EVAPORATION CIRCUIT 17-
CAN PLANT
2307/08/09
DEPARTMENT: PRODUCTION
at 106F.
12.1.8 Close the SL block valve of 2nd stage evaporators 17-2106/26 at 110F. Concerned field operator
12.1.9 Close the CL block valve of 2nd stage evaporators 17-2106/26 at 106-F. Concerned field operator
Stop steam supply to ejectors 17-2601/02/03 of surface condenser 17-
12.1.10 Concerned field operator
2108 at 116F.
AN in AN Evaporation circuit has high concentration (79-90 %) it will Concerned Field
12.1.11
solidify immediately so apply water for dilution. Operator / ERT Members
Shut down CN-Reactor- A/B 17-2201/21 & VBF - A/C/D after consuming
12.1.12 Concerned field operator
slurry tank level as per SOP CAN-WP-IMS-012.
Drain the all stages 17-2307/08/09 of AN Evaporation circuit from
12.1.13 Concerned field operator
106F/103F to 17-2009 AN storage tank, if possible.
12.1.14 Open sufficient water in CN drain channel to prevent NEQS excursion. Concerned field operator
12.2 BLINDING STEPS FOR ENTRY AN EVAPORATION CIRCUIT 17-2307/08/09
Insert blind on discharge line of 17-1108/88 at 106F as marked in P&ID SIC/ Concerned field
12.2.1
# D 13968-0 and update blind list. (Blind-1) operator
Insert blind at upstream flange of 17-338 flow head of AN line from 17-
SIC / Concerned field
12.2.2 2307 AN separator to 15-2002 AN storage tank at 106F as marked in
operator
P&ID # D 13968-0 and update blind list. (Blind-2)
Insert blind on circulation line of AN evaporation circuit from 1 st stage
SIC / Concerned field
12.2.3 AN separator 17-2307 to 17-2009 AN storage tank at 106F as marked in
operator
P&ID# D 13968-0. (Blind-3)
Insert blind on drain line of AN evaporation circuit to 17-2009 AN tank SIC / Concerned field
12.2.4
at 106F as marked in P&ID # D 13968-0. (Blind-4) operator
Handover vessel for maintenance purpose after flushing with SIC / Concerned field
12.2.5
demineralized water. operator

13.0 EMERGENCY HANDLING:


13.1 Consult grave emergency handling procedure of ammonium nitrate circuit CAN-WP-IMS-018.

14.0 RELATED DOCUMENTS:


14.1 Emergency Management Plan (SAF-WP-IMS-003).
14.2 Grave emergency procedure for explosion in AN circuit (CAN-WP-IMS-018).
14.3 Shutdown procedure of CN Plant (CAN-WP-IMS-012).
14.4 Blinds marked P&ID# D-13968
14.5 MSDS of ammonium nitrate
15.0 RECORDS:

ROUTE PREPARED BY REVIEWED BY APPROVED BY REFERENCE


Name Muhammad Umer Rana Jibran Zahoor Sohail Sharif
QMS: 7.5
Date 08-09-2022 09-09-2022 09-09-2022
HSE: 7.5
Dsig/Sign GTE CAN
DOCUMENT CODE CAN-WP-IMS-027 REV. # 02 REV. DATE 20-07-2022 PAGE 6 of 7
PROCEDURE TITLE: ISOLATIONPROCEDURE OF
AMMONIUM NITRATE EVAPORATION CIRCUIT 17-
CAN PLANT
2307/08/09
DEPARTMENT: PRODUCTION
15.1 Shift Engineer’s Logbook
15.2 Blind list record
15.3 Log books of relevant section.

16.0 DISTRIBUTION LIST:


16.1 Original : Unit Manager
16.2 Copy # 1 : Control Room
16.3 Copy # 2 : HSE
16.4 Copy # 4 : Coordination Engineer

SR# ACTION / STEP RESPONSIBILITY YES NO NA

REQUIREMENTS: Cotton gloves/ Industrial gloves and F type key.


DESCRIPTION
Are all stages 17-2307/08/09 of AN Evaporation circuit have been
1. drained to 17-2009 tank from 103-F/106-F?
Is steam supply to ejectors 17-2601/02/03 of surface condenser 17-
2.
2108 closed?
3. Is FIC-17-337 manually closed from CAN CCR?
4. Is PIC-17-215 air bleed valve manually open from CAN CCR?
Is the vacuum of the circuit break and pressure of circuit has become
5.
zero?
Is main battery limit block valve of SM (steam) and CM (condensate)
6.
closed at 106-F?
7. Is SL block valve of 2nd stage evaporators 17-2106/26 closed at 110F?
8. Is CL block valve of 2nd stage evaporators 17-2106/26 closed at 106-F?
Is TIC 17-112 SM steam supply valve to 17-2105/25 manually closed
9.
from CAN CCR?
Are A pumps 17-1109/89 and 17-1110/90 of 2 nd and 3rd stage racked
10.
out and tagged?
BLINDING STEPS OF AN EVAPORATION CIRCUIT 17-2307/08/09
11. Is A discharge line of 17-1108/88 at 106F blinded? * (1)
Is blind inserted at upstream flange of 17-338 flow head of A line
12.
from 17-2307 A separator to 15-2002 AN storage tank at 106F? (2)
Is circulation line of AN evaporation circuit from 1 st stage AN
13.
separator 17-2307 to 17-2009 AN storage tank at 106F blinded? *(3)
Is the drain line of AN evaporation circuit to 17-2009 AN tank at 106F
14.
blinded? * (4)

ROUTE PREPARED BY REVIEWED BY APPROVED BY REFERENCE


Name Muhammad Umer Rana Jibran Zahoor Sohail Sharif
QMS: 7.5
Date 08-09-2022 09-09-2022 09-09-2022
HSE: 7.5
Dsig/Sign GTE CAN
DOCUMENT CODE CAN-WP-IMS-027 REV. # 02 REV. DATE 20-07-2022 PAGE 7 of 7
PROCEDURE TITLE: ISOLATIONPROCEDURE OF
AMMONIUM NITRATE EVAPORATION CIRCUIT 17-
CAN PLANT
2307/08/09
DEPARTMENT: PRODUCTION
Marked P&ID: D-13968-0

4 3

ROUTE PREPARED BY REVIEWED BY APPROVED BY REFERENCE


Name Muhammad Umer Rana Jibran Zahoor Sohail Sharif
QMS: 7.5
Date 08-09-2022 09-09-2022 09-09-2022
HSE: 7.5
Dsig/Sign GTE CAN