Professional Documents
Culture Documents
BY COPPER
fcx.com
POWERED
Outline
BY COPPER
2
POWERED
Safety Talk
BY COPPER
• Foot print
1,200mL x 600mW x 500mH
• Block cave mining
• Advanced undercutting
• Production start up at 2000
• Decreasing production
target on 2021
4
POWERED
• Reserve 78.8 Mt
(@ 0.57% Cu, 0.71 g/t Au)
• Payable metal:
Cu: 1.9B lbs
Au: 3.1M oz
• Designed peak production:
80,000 tpd.
• Adjusted peak production:
50,000 tpd.
5
POWERED
6
POWERED
7
POWERED
Mine Section
BY COPPER
8
POWERED
Mine Section
BY COPPER
9
POWERED
10
POWERED
11
POWERED
12
POWERED
13
POWERED
14
POWERED
Rock formation
(Aquifer)
15
POWERED
Wet Muck
BY COPPER
17
POWERED
Drawpoint Classification
BY COPPER
18
POWERED
Drawpoint Classification
BY COPPER
19
POWERED
Drawpoint Classification
BY COPPER
20
POWERED
Class A Drawpoints
BY COPPER
A1 A2 A3
Coarse dry Coarse moist Coarse wet
21
POWERED
Class B Drawpoints
BY COPPER
B1 B2 B3
Mix dry Mix moist Mix wet
22
POWERED
Class C Drawpoints
BY COPPER
C1 C2 C3
Fine dry Fine moist Fine wet
23
POWERED
24
POWERED
25
POWERED
26
POWERED
27
POWERED
28
POWERED
29
POWERED
30
POWERED
Hierarchy of Controls
BY COPPER
Opportunities
BY COPPER
Remote Chute
BY COPPER
Controlled Activities
BY COPPER
POWERED
BY COPPER
End of
Slides
50