CHECKLIST FOR FORMWORK

Site
Location
Date
Drawing Reference No.
Refer to the Approved Work Method Statement for Shuttering and relevant
drawings
S.No. Description YES NO NA
Are all the safety norms being covered
1
as
Checkper HSEM process?
for shuttering scheme for
2 Level of slab/beam/column/shear
availability and arrangement
3 wall/concrete walls from proper
Are all thelevel
reference plates/plywood cleaned and
4
polished properly
Application of Mould releasing agent on
5
the
Check surface of shuttering
for Suitability, Stability, Safety &
6
rigidity of assembled
Vertical Members-Columns,shearforms
A
walls,starters
Check alignment etc.
of all vertical members
1
at floor level with
Check plumb for vertical respectmembers(min.
to grid lines
2
2 sides)right angle and diagnols of the
Check
3
vertical
Check for member
alignmentfromwith
the respect
top to
4
adjacent
Check forvertical
adequate members
support as per
5
shuttering design
6 Check for adequacy of cover block
B Slabs
Check & theBeams
alignments,level and diagnols
1 of beam bottom & beam sides with
Check
respectthe verticality
to the verticalofmembers
beam sides and
2
confirm slab dimensions
3 Check for
Check the vertical
line andsupports/cross
level of slab
4 supports/horizontal supports as per
Check
shutteringfor horizontal
scheme bracing in case of
5
single/douible
Ensure lockingbracing
of vertical support
6
system
Check for sealing of members
with vertical gaps, joints, holes
7
and tie rods
C Deshuttering:
Check for deshuttering time after
1
concreting
Check as per specification
the condition of Shuttering
3
assembly
Are repairs required? (If so send to
4
shuttering
Clean, oil and yard)
stack shuttering material
5
for future use?
6 Clean the area after deshuttering
Signature:Site Engineer
Observations:
Whether the above points checked and in order?
Corrective actions proposed, if any: