Cost Comparison
Reinforced Earth Retaining Walls & Abutments ~ Pile Abutments & RCC Retaining Walls
9/11/2019
Reinforced Earth
RCC Abutments &
Abutments & Walls Savings (RE ~ RCC Ramps)
Retaining Walls Cost
Cost
Sr.No.
(PKR) (PKR) (PKR) %
501 Aggregate Base Course Under Beam Seat CM 123.20 1,708.25 210,456.40
Concrete Leveling Pad for Reinforced Earth Wall, Concrete
401 a1(ii) Class A1 CM 94.5 11,392.19 1,076,789.80
CALCULATION
No. Length Width Height Quantity TOTAL Material
ITEM REF. DESIGNATION
u m m m QUANTITY
Assumptions:
1 Width of Ramp 13 m
2 Clear Height 5m
3 Length of Ramp 240 m
4 Wall start at Min (PGL-NSL) 0.3 m
5 Ramps in flyover 2 Nos
Construction of Flyover at Bara Ring Road Intersection (Pishtakhara Chowk), Peshawar
Freypak Pvt. Ltd. Supply Rates
Reinforced Earth Retaining Walls & Bridge Abutments
Rate Amount
Item No. Description Unit Quantity
(Rs.) (Rs.)
Supply of Moulds (on loan) ,Soil Reinforcement Strips, C-
Connections, Dowel rods, EPDM pads Sealing
Foam,Geotextile, The internal design of Reinforced Earth
PS-2
structures, Construction Drawings, Method Statement and
Technical Assistance for proper execution.
CALCULATION
No. Length Width Height Quantity TOTAL Material
ITEM No. DESCRIPTION
u m m m QUANTITY
1 Structural Excavation
H = 3.00m 4 57.70 3.40 2.575 2,020.65
H = 4.00m 4 33.92 4.15 2.575 1,449.91
H = 5.00m 4 33.92 5.15 2.575 1,799.29
H = 5.50m 4 19.36 5.40 2.575 1,076.80
H = 6.00m 4 16.96 5.65 2.575 987.05
H = 6.50m 4 16.96 5.90 2.575 1,030.66
H = 7.00m 4 16.96 6.40 2.575 1,118.00
H = 7.50m 4 16.96 6.65 2.575 1,161.68
H = 8.00m 4 9.51 6.90 2.575 675.88
H = 8.50m 4 7.60 7.40 2.575 579.27
H = 9.00m 0 0.00 7.90 2.575 0.00
H = 9.50m 0 0.00 8.15 2.575 0.00
H = 10.00m 0 0.00 8.40 2.575 0.00
11,899 m³ Common Soil
2 Select Fill Under Foundations
H = 3.00m 4 57.70 3.40 1.500 1,177.08
H = 4.00m 4 33.92 4.15 1.500 844.61
H = 5.00m 4 33.92 5.15 1.500 1,048.13
H = 5.50m 4 19.36 5.40 1.500 627.26
H = 6.00m 4 16.96 5.65 1.500 574.98
H = 6.50m 4 16.96 5.90 1.500 600.38
H = 7.00m 4 16.96 6.40 1.500 651.26
H = 7.50m 4 16.96 6.65 1.500 676.70
H = 8.00m 4 9.51 6.90 1.500 393.71
H = 8.50m 4 7.60 7.40 1.500 337.44
H = 9.00m 0 0.00 7.90 1.500 0.00
H = 9.50m 0 0.00 8.15 1.500 0.00
H = 10.00m 0 0.00 8.40 1.500 0.00
Outside Wall
H = 3.00m 4 57.70 0.95 1.075 235.70
H = 4.00m 4 33.92 1.20 1.075 175.03
H = 5.00m 4 33.92 1.50 1.075 218.78
H = 5.50m 4 25.86 1.90 1.075 211.28
H = 6.00m 4 16.96 2.10 1.075 153.16
H = 6.50m 4 16.96 2.20 1.075 160.44
H = 7.00m 4 16.96 2.30 1.075 167.73
H = 7.50m 4 16.96 2.40 1.075 175.03
H = 8.00m 4 9.51 2.50 1.075 102.23
H = 8.50m 4 7.60 2.70 1.075 88.24
H = 9.00m 0 0.00 2.75 1.075 0.00
H = 9.50m 0 0.00 2.90 1.075 0.00
H = 10.00m 0 0.00 3.10 1.075 0.00
8,619 m³ Granular Fill
3 Granular Fill Over Foundations
Inside Wall
H = 3.00m 4 57.70 1.70 2.70 1,059.37
H = 4.00m 4 33.92 2.10 3.70 1,054.23
H = 5.00m 4 33.92 2.75 4.70 1,753.66
H = 5.50m 4 19.36 2.55 5.15 1,016.98
H = 6.00m 4 16.96 2.35 5.65 900.80
H = 6.50m 4 16.96 2.65 6.10 1,096.63
H = 7.00m 4 16.96 3.05 6.60 1,365.62
H = 7.50m 4 16.96 3.20 7.05 1,530.47
H = 8.00m 4 9.51 3.25 7.55 933.41
H = 8.50m 4 7.60 3.45 8.00 839.04
H = 9.00m 0 0.00 3.90 8.50 0.00
H = 9.50m 0 0.00 3.90 8.90 0.00
H = 10.00m 0 0.00 3.95 9.40 0.00
5 Lean Concrete
H = 3.00m 4 57.70 2.40 0.075 41.54
H = 4.00m 4 33.92 3.15 0.075 32.05
H = 5.00m 4 33.92 4.15 0.075 42.23
H = 5.50m 4 25.86 4.40 0.075 34.14
Page 7
A3
A3 Concrete for piles 12 30.00 1.13 488.33 488 m³