Professional Documents
Culture Documents
20-30 days 31-80 days 90-100 days 101-150 days 151-160 days 161-210 days 211-260 days 261-285 days Above 285 days
Soil Application
TM
Fertigation
Urea 50 kg/acre Urea 50 kg/acre
(1 kg/day/acre) (1 kg/day/acre)
MOP/SOP 50 kg/acre MOP/SOP 50 kg/acre 25 kg/acre 25 kg/acre
(1 kg/day/acre) (1 kg/day/acre) (0.5 kg/day/acre) (1 kg/day/acre)
KRISTA MAP KRISTA MAP KRISTA K KRISTA K KRISTA SOP KRISTA SOP
Zintrac 700
700 (39.5%
(39.5% Zn)
Zn) Bortrac Stopit Rexolin® Combi II
TM ®
First foliar application at 45-50 days @ 1-1.5ml/litre water First foliar application at 45-50 days @ 1-1.5ml/litre water First foliar application at 45 days before harvest @ 5.0 ml/litre water First foliar application at 50-60 days @ 1-1.5 g/litre water
Second foliar application at 90-95 days @ 1-1.5ml/litre water Second foliar application at 90-95 days @ 1-1.5ml/litre water Second foliar application at 30 days before harvest @ 5.0 ml/litre water Second application by drip at 90-100 Days @ 0.75 kg to 1.0 kg/acre
Third foliar application at 15 days before harvest @ 5.0 ml/litre water
Disclaimer: The information contained herein is accurate to the best of Yara's knowledge and belief. Recommendations are based on Yara's experience and field trial results.