You are on page 1of 6

Grafik 4.2.

Daya Dukung Izin Pondasi Bore Pile Dari Data Sondir


Titik : S-9 KM. 158 + 700 (SBG) Ruas Jalan Onan Ganjang - Pakkat
Daya Dukung Izin Bore Pile (Qi) ton

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280
0

Bore Pile Dia. 40 cm

Bore Pile Dia. 45 cm

Bore Pile Dia. 50 cm

Bore Pile Dia. 55 cm

Bore Pile Dia. 60 cm

Bore Pile Dia. 65 cm

Bore Pile Dia. 70 cm


1
Bore Pile Dia. 75 cm

Bore Pile Dia. 80 cm

D
e
p
t
h

-4-
Tabel 4.2. Daya Dukung Izin Pondasi Bore Pile Dari Data Sondir

Titik : S-9 KM. 158 + 700 (SBG) Ruas Jalan Onan Ganjang - Pakkat

Keda D = 40 cm D = 45 cm D = 50 cm D = 55 cm D = 60 cm D = 65 cm D = 70 cm D = 75 cm D = 80 cm
laman CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi
(m)
(Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton)

0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.40 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.60 13.5 5.7 15.5 8.3 16.4 10.8 22.2 17.7 27.8 26.3 32.9 36.5 37.9 48.8 37.9 56.0 37.9 63.7
0.80 16.6 7.1 17.4 9.4 23.7 15.7 29.6 23.6 35.0 33.2 40.2 44.7 40.2 51.8 40.2 59.5 40.2 67.6
1.00 19.9 8.6 26.8 14.5 33.0 21.9 38.7 31.0 44.1 41.9 44.1 49.2 44.1 57.0 44.1 65.4 44.1 74.4
1.20 30.6 13.2 37.2 20.2 43.2 28.7 48.8 39.2 48.8 46.6 48.8 54.6 48.8 63.3 48.8 72.6 48.8 82.6
1.40 40.4 17.4 47.2 25.6 52.5 35.0 52.5 42.3 52.5 50.3 52.5 58.9 52.5 68.3 52.5 78.3 52.5 89.0
1.60 52.6 22.7 58.6 31.8 58.6 39.2 58.6 47.3 58.6 56.2 58.6 65.9 58.6 76.4 58.6 87.6 58.6 99.5
1.80 65.0 28.0 65.0 35.3 65.0 43.5 65.0 52.6 65.0 62.5 65.0 73.2 65.0 84.8 65.0 97.2 65.0 110.5
2.00 74.0 32.0 74.0 40.3 74.0 49.7 74.0 60.0 74.0 71.2 74.0 83.5 74.0 96.7 74.0 110.9 74.0 126.0
2.20 82.2 35.6 80.9 44.2 80.9 54.4 80.9 65.7 80.9 78.0 80.9 91.4 80.9 105.9 80.9 121.4 80.9 137.9
2.40 92.5 40.1 90.8 49.7 89.6 60.3 89.6 72.8 89.6 86.4 89.6 101.3 89.6 117.3 89.6 134.4 89.6 152.8
2.60 115.2 49.8 112.9 61.6 110.7 74.4 109.0 88.4 109.0 105.1 109.0 123.1 109.0 142.5 110.7 166.0 109.0 185.7
2.80 128.4 55.6 125.4 68.6 122.7 82.6 120.2 97.7 118.1 114.1 118.1 133.6 118.1 154.7 122.7 184.1 120.2 205.0
3.00 142.6 61.8 138.1 75.5 134.8 90.8 131.8 107.1 129.0 124.6 126.6 143.4 126.6 166.0 134.8 202.4 131.8 224.9
3.20 157.8 68.4 152.9 83.6 148.2 99.9 144.7 117.7 141.4 136.7 135.9 154.0 135.9 178.4 148.2 222.6 144.7 247.0

- 2+2 - Daya Dukung Izin Bore Pile


Grafik 4.1. Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir
Titik : S-9 KM. 158 + 700 (SBG) Ruas Jalan Onan Ganjang - Pakkat
Daya Dukung Izin Tiang (Qi) ton
0 20 40 60 80 100 120 140 160 180
0

Square 25 cm

Spun Pile Dia. 30 cm

Spun Pile Dia. 35 cm

Spun Pile Dia. 40 cm

1 Spun Pile Dia. 45 cm

Spun Pile Dia. 50 cm

Spun Pile Dia. 55 cm

Spun Pile Dia. 60 cm

D
e
p
t
h

-2-
Tabel 4.1. Daya Dukung Izin Pondasi Tiang Pancang Dari Data Sondir

Titik : S-9 KM. 158 + 700 (SBG) Ruas Jalan Onan Ganjang - Pakkat
Keda = 25 cm D = 30 cm D = 35 cm D = 40 cm D = 45 cm D = 50 cm D = 55 cm D = 60 cm
laman CR TSF CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi CR-r Qi
(m)
(Kg/Cm2)(Kg/Cm) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton) (Kg/Cm2) (ton)

0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.2 2 2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.4 1 4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.6 5 10 7.3 1.6 8.8 2.2 10.3 3.4 13.5 5.8 15.5 8.4 16.4 10.9 22.2 17.8 27.8 26.4
0.8 4 16 9.3 2.2 10.9 2.8 14.5 4.9 16.6 7.2 17.4 9.5 23.7 15.9 29.6 23.8 35.0 33.4
1.0 10 24 13.2 3.1 17.1 4.4 19.2 6.6 19.9 8.8 26.8 14.8 33.0 22.2 38.7 31.3 44.1 42.3
1.2 18 34 20.3 4.8 22.5 5.9 23.1 8.1 30.6 13.6 37.2 20.6 43.2 29.2 48.8 39.7 48.8 47.1
1.4 11 44 24.5 5.9 24.8 6.6 33.2 11.5 40.4 17.9 47.2 26.2 52.5 35.6 52.5 43.0 52.5 51.0
1.6 27 54 29.9 7.2 38.4 10.0 46.1 15.9 52.6 23.3 58.6 32.5 58.6 40.0 58.6 48.2 58.6 57.2
1.8 34 64 45.9 10.8 52.9 13.6 58.9 20.2 65.0 28.8 65.0 36.2 65.0 44.5 65.0 53.6 65.0 63.6
2.0 67 82 65.4 15.2 70.7 18.1 75.2 25.8 74.0 33.0 74.0 41.5 74.0 50.9 74.0 61.3 74.0 72.7
2.2 58 96 81.1 18.7 85.8 22.0 84.0 29.0 82.2 36.8 80.9 45.5 80.9 55.9 80.9 67.3 80.9 79.8
2.4 43 110 98.6 22.7 95.7 24.6 94.1 32.5 92.5 41.4 90.8 51.2 89.6 62.0 89.6 74.6 89.6 88.4
2.6 157 126 125.2 28.5 121.4 30.9 117.6 40.4 115.2 51.3 112.9 63.3 110.7 76.3 109.0 90.6 109.0 107.4
2.8 172 148 142.5 32.6 137.1 35.0 132.7 45.7 128.4 57.4 125.4 70.6 122.7 84.9 120.2 100.2 118.1 116.8
3.0 184 164 157.7 36.0 153.0 39.1 147.3 50.8 142.6 63.8 138.1 77.8 134.8 93.3 131.8 109.9 129.0 127.6
3.2 201 184 176.2 40.3 168.4 43.1 163.5 56.4 157.8 70.6 152.9 86.2 148.2 102.7 144.7 120.8 141.4 140.1

- 4+0 - Daya Dukung Izin Tiang Pancang


SONDERING TEST
PT. Arangsibu Raya Consultant
(DUTCH CONE
PENETRATION TEST)
Test No : S-9 Capasity : 2.50 ton
Date : 24 Oktober 2020 Sondering Master : Irwansyah
GWL : - m Checked By : Ir. Janner Napitupulu
Coordinate UTM (m) : N = 0448157 ; E = 0237093 ; Z = -6.70 m
Cone Total Skin Skin Total Skin Local Skin Friction
Depth Resistant Resistant Friction Friction Friction Friction Ratio
(CR) (TR) (SF) x 20/10 (TSF) (LSF) (FR)
(m) Kg/Cm2 Kg/Cm2 Kg/Cm2 Kg/Cm Kg/Cm Kg/Cm %

0.00 0 0 0 0 0 0.00 0.00


0.20 2 3 1 2 2 0.10 5.00
0.40 1 2 1 2 4 0.10 10.00
0.60 5 8 3 6 10 0.30 6.00
0.80 4 7 3 6 16 0.30 7.50
1.00 10 14 4 8 24 0.40 4.00
1.20 18 23 5 10 34 0.50 2.78
1.40 11 16 5 10 44 0.50 4.55
1.60 27 32 5 10 54 0.50 1.85
1.80 34 39 5 10 64 0.50 1.47
2.00 67 76 9 18 82 0.90 1.34
2.20 58 65 7 14 96 0.70 1.21
2.40 43 50 7 14 110 0.70 1.63
2.60 157 165 8 16 126 0.80 0.51
2.80 172 183 11 22 148 1.10 0.64
3.00 184 192 8 16 164 0.80 0.43
3.20 201 211 10 20 184 1.00 0.50
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
6.20
6.40
6.60
Project : Location : Page :
KM. 158 + 700 (SBG)
Ruas Jalan
Perencanaan Teknis Paket 4 Onan Ganjang - Pakkat 2

Kab. Humbang Hasundutan


PT. Arangsibu Raya Consultant GRAPHIC SONDERING TEST

Test No. : S-9 Capasity : 2.50 ton


Date : 24 Oktober 2020 Sondering Master : Irwansyah
GWL : - m Checked By : Ir. Janner Napitupulu
Coordinate UTM (m) : N = 0448157 ; E = 0237093 ; Z = -6.70 m
FR 0 2 4 6 8 10 12 14 16 18 20 22 24 26
CR 0 20 40 60 80 100 120 140 160 180 200 220 240 260
0

CR (Kg/Cm2)
TSF (Kg/Cm)
LSF (Kg/Cm)
FR (%)
Column R
1
Depth (m)

5
TSF 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600
LSF 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6

Project : Location : Page :


KM. 158 + 700 (SBG)
Ruas Jalan
Perencanaan Teknis Paket 4 Onan Ganjang - Pakkat 1

Kab. Humbang Hasundutan

You might also like