E.O
E.O E.O Prepare
no of pile Total Cut-off Enlarge permanent
type of pile cap total no boring tremie RC pile
per pile concrete Total pile head bases casing bored Remarks
pile cap nos of piles penertration bored pile cap Column enlarge thru rock pipe head
cap C.O.L length for concrete depth
depth depth depth stump bases
1 no of length
pile
m m m m m m m m 10% m no no no m
400 mm Diameter vertical Test piles
P5 1 3 3 23.3 69.9 2.00 0.00 0.00 0.075 21.375 64.13 6.99 64.13 3
TOTAL 3 69.9 64.13 6.99 64.13 3