You are on page 1of 1

CONCRETE LENGTH

E.O
E.O E.O Prepare
no of pile Total Cut-off Enlarge permanent
type of pile cap total no boring tremie RC pile
per pile concrete Total pile head bases casing bored Remarks
pile cap nos of piles penertration bored pile cap Column enlarge thru rock pipe head
cap C.O.L length for concrete depth
depth depth depth stump bases
1 no of length
pile
m m m m m m m m 10% m no no no m
400 mm Diameter vertical Test piles
P5 1 3 3 23.3 69.9 2.00 0.00 0.00 0.075 21.375 64.13 6.99 64.13 3
TOTAL 3 69.9 64.13 6.99 64.13 3

400 mm Diameter Raking Piles


P2A 44 2 88 21 1848.00 0.90 0.00 0.00 0.075 20.18 1775.40 184.80 1775.40 88
TOTAL 88 1848.00 1775.40 184.80 1775.40 88

400 mm Diameter Working Piles


P2 44 2 88 21 1848.00 0.90 0.00 0.00 0.075 20.18 1775.40 184.80 1775.40 88
P3 31 3 93 24.6 2287.80 1.50 0.00 0.00 0.075 23.18 2155.28 228.78 2155.28 93
P5 13 5 65 23.3 1514.50 2.00 0.00 0.00 0.075 21.38 1389.38 151.45 1389.38 65
P5 1 2 2 23.3 46.60 2.00 0.00 0.00 0.075 21.38 42.75 4.66 42.75 2
TOTAL 248 5696.90 5362.80 569.69 5362.80 248

600mm Diameter Working Piles


P8 2 8 16 32.3 516.80 2.00 0.00 0.00 0.075 30.38 5405.55 51.68 5405.55 16 16 516.80
TOTAL 16 516.80 5405.55 51.68 5405.55 16 16.00 516.80

800mm Diameter Working Piles


P4 5 4 20 29.1 582.00 2.00 0.00 0.00 0.075 27.18 543.50 58.20 543.50 20
P6 1 6 6 20.6 123.60 1.50 0.50 0.80 0.075 19.48 116.85 12.36 116.85 6 6
TOTAL 26 705.60 660.35 70.56 660.35 26.00 6

P8 ADE CUT-OFF SBB ADE PERMANENT CASING