JOB TITLE / AIM: Installation of cable ladder on T beam supports at Flare Line

JSA DATE: 05/01/2007 JSA NO./ REVISION: N/A (Greenfield work area)
SUPERVISOR/ JSA LEADER: Majeed / Mohammad Aslam SCRIBE: Masood Memon
PARTICIPANTS: Tahair Basheer, Hanif, Shahid Jamal
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs: None Applicable
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1- Co-ordinate access with all work groups in work area
2- Review work area for safe entry and exit
3- Plan the job sequence
4- Scaffold erection – note a separate JSA covers this work
5- Mobilization of materials and workers to work area
6- Erection of cable ladder
7- Disassembly of scaffold – note a separate JSA covers this work
8- Demobilization from work area

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans.
 Standard PPE,S
 First aid kit must be present at the area
 Supervisor and HSE personnel are the first response in case of emergency
 All personnel working at height must complete “Safe working at height training”
 Work area to be barrier taped to remove risk of workers walking under workers working above.
 All work to be completed during daylight hours. “No work at night”
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: N/A JOB TITLE: Installation of cable ladder on T beam supports
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Co-ordinate access with all work Poor Communication Talk to each work disciple supervisor in work area
groups in work area
Plant Layout Drawings for cable ladder installation
highlighted
Plant Layout Drawings for work area laydown

Plant Layout Drawings for scaffold requirements

2 Review work area for safe entry and Equipment / Worker interface Talk to each work disciple supervisor in work area
exit
Poor housekeeping from previous workers Talk to each work disciple supervisor in work area

Clean up work area before starting job

Incorrect Installation of structural T beams Gain approval from Structural I/C - DEW

Visually check before starting job

3 Plan the job sequence Poor Communication Toolbox meeting everyday


JSA No: N/A JOB TITLE: Installation of cable ladder on T beam supports
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
JSA to be discussed and understood by all workers
on job
Construction drawings must be understood before
starting work
Falling behind of Schedule Communicate need for extra resources early

Monitor and communicate to supervisor any delays


early
4 Scaffold erection – note a separate 2 different work group in same work area Toolbox meeting everyday with both work groups
JSA covers this work
JSA to be discussed and understood by all workers
on job
Scaffold requires are clearly understood before
starting work. Layout drawings of scaffold
requirements to be understood.
Barrier tape of work area so none can be struck by
falling object.
5 Mobilisation of materials and Poor Communication Toolbox meeting everyday
workers to work area
Construction drawings must be understood before
starting work
6 Erection of cable ladder Working at heights All workers to have completed “Safe working at
heights training” before starting on the job
Is the scaffold safe to work on “Green Tag”

Wear correct PPE – full body fall arrest harness

Barrier tape work area below

Falling object If working at height barrier tape work area below


JSA No: N/A JOB TITLE: Installation of cable ladder on T beam supports
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Wear correct PPE – Safety boots, Hard Hat

Trip hazards Housekeeping to be done all the time

Electrical leads to be dressed above ground and


identified with tape
Review work area before starting work

Poor workmanship Construction drawings must be understood before


starting work
Supervisors to review work at all times

IF IN DOUBT ASK

Unsafe tools All electrical tools to be tagged with correct colour


for month
Visually inspect tools before starting the work

Only tools from stores to be used on work site

Sharp edges Wear correct PPE – Overalls, gloves

File down any sharp edges if possible

Use protective edging materials and clearly


identify
(Drilling Machine hilti) Hand injury, dust, eye Ensure workers are complying with the min. PPE
injury with splinters req. Safety shoes, helmet, safety glass, dust mask
Double face shield must be worn while performing
the job
Loose clothing Ensure that no lose clothing like handkerchief is
worn Brims in case of that is worn
JSA No: N/A JOB TITLE: Installation of cable ladder on T beam supports
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Uneven surface/Tripping hazards Ensure that workers accessing the right pedestrian
and watch their steps.
Tools not inspected/damage All tools must be inspected and tagged
Ensure that the righ bit is used and secured by
means of lock.
SIMOPS Other workers/contractors working on the area will
be inform and advised to stop if necessary
Fire No smoking policy shall be implemented

7 Disassembly of scaffold – note a Fire extinguisher shall be made available at the


separate JSA covers this work area and ensure that workers are aware of how to
use the fire extinguisher in case of fire.
Unauthorized crossing from construction area All workers will be inform that no trespassing in
to operation area the operation area
Barrier tape of work area so none can be struck by
falling object.
8 Demobilization from work area Poor Housekeeping Housekeeping to be at all times

Poor Workmanship Supervisors to review work at all times

QA/QC to be completed