JSA DATE: 05/01/2007 JSA NO./ REVISION: N/A (Greenfield work area)
SUPERVISOR/ JSA LEADER: Majeed / Mohammad Aslam SCRIBE: Masood Memon
PARTICIPANTS: Tahair Basheer, Hanif, Shahid Jamal
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs: None Applicable
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1- Co-ordinate access with all work groups in work area
2- Review work area for safe entry and exit
3- Plan the job sequence
4- Scaffold erection – note a separate JSA covers this work
5- Mobilization of materials and workers to work area
6- Erection of cable ladder
7- Disassembly of scaffold – note a separate JSA covers this work
8- Demobilization from work area
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans.
Standard PPE,S
First aid kit must be present at the area
Supervisor and HSE personnel are the first response in case of emergency
All personnel working at height must complete “Safe working at height training”
Work area to be barrier taped to remove risk of workers walking under workers working above.
All work to be completed during daylight hours. “No work at night”
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: N/A JOB TITLE: Installation of cable ladder on T beam supports
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Co-ordinate access with all work Poor Communication Talk to each work disciple supervisor in work area
groups in work area
Plant Layout Drawings for cable ladder installation
highlighted
Plant Layout Drawings for work area laydown
2 Review work area for safe entry and Equipment / Worker interface Talk to each work disciple supervisor in work area
exit
Poor housekeeping from previous workers Talk to each work disciple supervisor in work area
Incorrect Installation of structural T beams Gain approval from Structural I/C - DEW
IF IN DOUBT ASK
QA/QC to be completed