You are on page 1of 1

L

OF RAIL GAUGE

OF RAIL GAUGE
M

425

845
CL

CL

H
ØD

16
RAIL GAUGE 1676 HV SIDE JACK CENTER 800 JACK CENTER 800
= =
= =
+3
1743-0 +3
1743 -0
JACK CENTER 1500 JACK CENTER 1500
Sq A

2xØ30 4xØ18 DETAIL OF FOUNDATION BOLT


SIZE D A M L H
FOR ITEM 2 M24 70 120 M24 75 260
1385 1385

230
160
5 5 FOR ITEM 3, 4 & 5 M16 40 80 M16 55 120

POSITION OF 4-SETS
TABLE FOR FOUNDATION BOLTS

35
FOUNDATION BOLTS M16 SQ.250
FOR LV CABLE BOX
LV SIDE
1200

= = SQ.350 BOLT SIZE QTY. NO. OF COMPONENT LOAD ON EACH


S.NO. DESCRIPTION
M-TAP FOUNDATION PLATE SIZE FOUNDATION (kg)
2175 2175 130
ITEM 3 1 JACK PADS -- -- 4 400 x 400 72000
2 ROLLER LOCKING M24 8 4 250 x 130 7000
5 5 POSITION OF 4-SETS FOUNDATION
BOLTS M24 FOR ROLLER LOCKING
ITEM 2 3 PROP FIXING M16 8 2 350 x 350 15000
4 RADIATOR SUPPORT M16 8 4 100 X 230 3000
A 160
2 2xM16
5 LV CABLE BOX SUPPORT M16 8 4 100 X 230 1000
2
400
1510

100
1 1
162.5

POSITION OF 2-SETS FOUNDATION


871.5

BOLTS M16 FOR PROP FIXING 180


600

230
OF RAIL GAUGE

CL OF RAIL GAUGE
ITEM 4 & 5
1743

3 3
WITH DRAWL DIRECTION
600

POSITION OF 4-Nos. JACK-PAD


871.5

NOTE :-
1. FOR OUTLINE GENERAL ARRANGEMENT REFER DRG.NO. 1 CD01 0469.
271.5
CL

1 1
400

2. GROUTING OF FOUNDATION BOLTS SHALL BE DONE ONLY AFTER ERECTING THE EQUIPMENT IN POSITION,
GAP AS SHOWN IN DETAIL OF FOUNDATION BOLT SHALL BE LEFT FOR THIS PURPOSE.
2 2
128.5

3. ALL FOUNDATION BOLTS ARE HOT DIP GALVANIZED AND THESE ITEMS ARE IN THE SCOPE OF TTDI.
871.5 871.5 4. TRANSFORMER IS DESIGNED FOR ROLLER MOUNTED & ALSO CAN MOUNT ON PLINTH BY ADJUSTING ROLLER
A HEIGHT.
1743 5. ONLY JACKING PADS SHALL BE USED FOR LIFTING TRANSFORMER FROM BOTTOM SIDE.
3300

400 1300 1300 400 6. DIMENSIONS WITHOUT TOLERANCE WILL BE MAINTAINED AS PER TABLE.
7. GROUTING OF FOUNDATION BOLTS ARE NOT IN TTDI SCOPE.
8. LEVEL OF ALL FOUNDATION BOLTS SHOULD BE KEPT IN LINE WITH RAIL LEVEL.
9. ALL ABOVE POSITIONS & AREAS SHOWN ARE TRANSFORMER FOOT PRINTS ONLY, FOUNDATION SIZE SHALL
JACK FOUNDATION
BE DECIDED BY CONTRACTOR BASED ON LOADING DETAILS PROVIDED.
400
POSITION OF 4-SETS HV SIDE 271.5 128.5
10. ALL MATERIALS AND MAKES SHALL BE AS PER SPEC & NTPC QA APPROVED.
11. MATERIALS, FITTINGS AND ITEMS SHOWN / NOT SHOWN TO BE AS PER CONTRACT.
FOUNDATION BOLTS M16
ANGLE -75x75 (MIN.)

12. DRAWING IS INLINE WITH ALL RELATED DRAWINGS & DOCUMENTS


FOR RADIATOR SUPPORT 75 80
13. LOAD ON EACH FOUNDATION BASE IS GIVEN ON HIGHER SIDE FOR FOUNDATION PURPOSE ONLY.
75

4 4 4 4
TOLERANCES:
1580 1240 450 1580 I. UPTO 315 mm ±2
II. ABOVE 315 TO 1000 mm ±3
III. ABOVE 1000 TO 2000 mm ±4
IV. ABOVE 2000 TO 4000 mm ±6
1743
V. ABOVE 4000 TO 8000 mm ±8
VI. ABOVE 8000 TO 12000 mm ±10 NTPC LIMITED VIKRAM SOLAR LIMITED
DETAIL B VII. ABOVE 12000 mm ±12 (A GOVERNMENT OF INDIA ENTERPRISE) THE OBEROI CORPORATE TOWER,BUILDING NO.-11, 4TH FLOOR, DLF CYBER CITY,
GURUGRAM, HARYANA, INDIA

PACKAGE ID :- 5732 PROJECT CODE : - CG0051


ANGLE -75x75 (MIN.)
PROJECT NAME : - 56MW Kawas Solar PV Projects in Gujarat CLIENT NAME :- NTPC LIMITED
80 3 09.03.21 WITHDRAWAL DIRECTION UPDATED AS COMMENTED, SECTION VIEW A-A ADDED. GYG CHS MY
2 10.02.21 COMMENTS UPDATED AS PER CRS SHEET. GYG CHS MY PACKAGE NAME : - KAWSPV PROJECT NAME : - 56 MW Kawas Solar PV Projects in Gujarat
1 01.02.21 COMMENTS UPDATED AS PER CRS SHEET. GYG CHS MY
DRAWING NO :- 5732-040-001-PVE-N-002 DRAWING NO :- VSL-CG0051-GTP-S03-014

DIVISION TITLE :-
FOUNDATION ARRANGEMENT REV NO 03
CHS 15.12.20
400 B EHV POWER
(63 MVA, 220/33 KV-3 PHASE POWER TRANSFORMER) SCALE : - NTS
GYG 29.12.20
TRANSFORMER
SECTION A-A (UNIT 9) TOSHIBA TRANSMISSION & DISTRIBUTION SYSTEMS (INDIA) PRIVATE LIMITED. CHS 30.30.20
DRAWN
NAME SIGN. DATE DO NOT SCALE THIS THIS DRAWING IS THE PROPERTY OF VSL IT
DRAWING IF IN IS SUPPLIED IN CONFIDENCE AND MAY NOT BE
SIZE :- A2
PROJECTION :-
DETAIL OF FOUNDATION FOR JACK PAD NTS
MY 30.12.20 DOUBT PLS ASK. COPIED WITHOUT WRITTEN PERMISSION
FOUNDATION ARRANGEMENT 90601A CHECKED SHEET NO : - 1 OF 1
2 CD02 0444 REVIEWED APPROVAL INFORMATION RECORD CONSTRUCTION
(63 MVA, 220/33 KV-3 PHASE POWER TRANSFORMER) SUBMITTED FOR
1 OF 1 3 APPROVED