Sr. No.

Following Drawings to be submitted along with Offer


COMPLIANCE ON THE TECHNICAL SPECIFICATION
1
(G.T.P. AS PER ABOVE FORMAT)
2 MANUFACTURING QUALITY PLAN (MQP)
TYPE TEST REPORT OF AVAILABLE / EXISTING SIMILAR TYPE / CONSTRUCTION, SIMILAR OR HIGHER
3
RATING OF THE TRANSFORMER (NOT BE OLDER THAN 5 YEARS)
Sr. No. Following Drawings to be submitted post award of contract

1 GA OF TRANSFORMER

2 BOM & MAKE LIST

3 RATING & DIAGRAM PLATE

4 HV CABLE BOX

5 LV CABLE BOX

6 GA OF MARSHALLING BOX

7 MARSHALLING BOX WIRING DIAGRAM PLATE

8 FOUNDATION PLAN

9 HV BUSHING DRAWING

10 LV BUSHING DRAWING

11 EARTH SHIELD BUSHING DRAWING

12 INSTALLATION and O&M MANUAL

13 TRANSFORMER COOLING CALCULATION

14 FACTORY ACCEPTANCE TEST (FAT) PROCEDURE