You are on page 1of 2

CALIFICACION Y CERTIFICACIÓN DE PERSONAL EN PND

QUALIFICATION AND CERTIFICATION OF NDT PERSONNEL

FECHA REVISIÓN
DATE May 15, 2016 REVIEW 0
NOMBRE
NAME Luis Felipe Hernández Tejeda / Level I in RT
FECHA DE INGRESO
ENTRY DATE Junio, 2014
FECHA INICIO PND
NDT START DATE Julio, 2014
NIVEL ACADEMICO
ACADEMIC LEVEL

NIVEL ACADEMICO ESCUELA GRADO PERIODO


ACADEMIC LEVEL SCHOOL DEGREE PERIOD
ESCUELA PRIMARIA
Yes Yes 1995 - 2001
JUNIOR HIGH SCHOOL
ESCUELA SECUNDARIA
Yes Yes 2001 - 2004
HIGH SCHOOL
PROFESIONAL
------ ------ -------
PROFESSIONAL
OTRO TELEBACHILLERATO
Yes Yes 2005 - 2008
OTHER

ENTRENAMIENTO EN PND
NDT TRAINNING

METODO NIVEL COMPAÑÍA DURACION PERIODO


METHOD LEVEL COMPANY DURATION PERIOD
LIQUIDOS PENETRANTES I
PENETRANT TESTING II
PARTICULAS MAGNÉTICAS I
MAGNETIC TESTING II
INSPECCIÓN VISUAL I
VISUAL TESTING II
RADIOGRAFÍA IND. I Capac. y PND de México 48 Hours 12 – 17 October 2015
RADIOGRAPHIC TESTING II
ULTRASONIDO IND. I
ULTRASONIC TESTING II

COMENTARIOS
COMMENTS The training was received in time as established by the written practice SNT-TC-1A.

The obtained results were as follows:

NIVEL EXAMEN GENERAL EXAMEN ESPECIFICO EXAMEN PRÁCTICO PROMEDIO FINAL


LEVEL GENERAL EXAM SPECIFIC EXAM PRACTIC EXAM FINAL AVG.

I 83.0% 73.0% 95.0% 84.0%

Eng. Jorge L. Anzo Abarca Bonifacio Alanís Toledo

DIRECTOR GENERAL NIVEL III ASNT REG. 63586


GENERAL DIRECTOR LEVEL III ASNT REG.63586

ANEXO H1: CALIFICACIÓN Y CERTIFICACIÓN PERSONAL PND REV. 00 PÁGINA 1 DE 2


CALIFICACIÓN Y CERTIFICACIÓN DE PERSONAL EN PND
QUALIFICATION AND CERTIFICATION OF NDT PERSONNEL

NOMBRE:
NAME Luis Felipe Hernández Tejeda / Level I in RT

EXPERIENCIA EN PND
NDT EXPERIENCE

METODO: NIVEL COMPAÑÍA MESES PERIODO


METHOD LEVEL COMPANY MONTHS PERIOD
LIQUIDOS PENETRANTES I
PENETRANT TESTING II
PARTÍCULAS MAGNÉTICAS I
MAGNETIC TESTING II
INSPECCIÓN VISUAL I
VISUAL TESTING II
RADIOGRAFÍA INDUSTRIAL I NOVO CONTROL S.A. de C.V 22 July 20014-March 2016
RADIOGRAPHIC TESTING II
ULTRASONIDO INDUSTRIAL I
ULTRASONIC TESTING II

COMENTARIOS:
COMMENTS On July 16th, 2014 Mr. Luis Felipe Hernandez began to work in Novo Control as an RT Level I

From that date until today he has perform as RT Level I.

EXAMENES DE LA VISTA
VISION EXAMINATIONS

AGUDEZA VISUAL CERCANA CUMPLIÓ: NATURAL CORREGIDO


NEAR VISION ACUITY: MEETS: YES NATURAL YES CORRECTED
DIFERENCIACIÓN DE CONTRASTE-COLOR CUMPLIÓ: NO CUMPLIÓ:
COLOR CONTRAST DIFFERENTATION MEETS: DOES NOT MEETS:
TONOS DE GRIS CUMPLIÓ: NO CUMPLIÓ:
SHADES OF GRAY MEETS: YES DOES NOT MEETS:

CERTIFICACIÓN Y RECERTIFICACIÓN DE PERSONAL EN PND


CERTIFICATION AND RECERTIFICATION OF NDT PERSONNEL

METODO: NIVEL FECHA DE CERTIFICACION FECHA DE RECERTIFICACION VALIDEZ


METHOD LEVEL CERTIFICATION DATE RECERTIFICATION DATE VALIDITY
LIQUIDOS PENETRANTES I
PENETRANT TESTING II
PARTÍCULAS MAGNÉTICAS I
MAGNETIC TESTING II
INSPECCIÓN VISUAL I
VISUAL TESTING II
RADIOGRAFÍA INDUSTRIAL I April 15, 2016 April 15, 2021 5 Years
RADIOGRAPHIC TESTING II
ULTRASONIDO INDUSTRIAL I
ULTRASONIC TESTING II

POR HABER CUMPLIDO CON LOS REQUERIMIENTOS DE ESCOLARIDAD, ENTRENAMIENTO, EXPERIENCIA Y EXAMEN
VISUAL; COMO TAMBIEN PASAR EL EXAMEN TEÓRICO-PRÁCTICO, BASADO EN LA PRÁCTICA ESCRITA PARA LA
CALIFICACIÓN Y CERTIFICACÓN EN PND No. NC-CP-01 REV 7 DE NOVO CONTROL, S.A. DE C.V.
FOR HAVING COMPLIED WITH THE REQUERIMENTS OF SCHOOLING, TRAINING, EXPERIENCE AND VISION EXAMINATIONS; AS
WELL PASSING THE PRACTICAL - THEORETICAL EXAMINATION, BASED ON THE WRITTEN PRACTICE FOR THE QUALIFICATION
AND CERTIFICATION IN NDT No. NC-CP-01 REV. 7 OF NOVO CONTROL, S.A. DE C.V.

Eng. Jorge L. Anzo Abarca Bonifacio Alanís Toledo


DIRECTOR GENERAL NIVEL III ASNT REG. 63586
GENERAL DIRECTOR LEVEL III ASNT REG.63586

ANEXO H1: CALIFICACIÓN Y CERTIFICACIÓN PERSONAL PND REV. 00 PÁGINA 2 DE 2

You might also like