YOUR REF.: Abu Rawash water treatment plant 1.6 m3/day: Expansion Joints
OUR REF.: PALC0006790 REV 3
TECHNICAL OFFER
Dear Sirs,
Following your request for quotation for the a/m reference, please find attached our best
offer with the below listed conditions:
1. Material description
Quoted material is in accordance with your RFQ (see attached list of material) with the
following conditions:
- Material description:
This offer is based on the current quantities provided for quotation. This affects what it is
considered manufacturing material, based on the minimum mill quantity.
In case of variation of quantities, criteria for manufacturing / stock may change and therefore our
quotation. In that case, we reserve to adjust our prices.
Page 1 of 4
CUÑADO, S.A. • Calle Camino del Olivar, 2 (esquina calle México) • 28806 Alcalá de Henares • MADRID • SPAIN • Telf.: +34 91 8 87 87 00 • Fax: +34 91 887 87 64 • www.grupocunado.com
In case stock material is needed, this will be provided according the applicable standard with no
further specs. Any additional test can be performed, if it is requested, upon stock holder
availability or lab retest. In this case, this will be invoiced separately at price cost.
3. Documental requirements
All items will be delivered with Mill's test certificate according to EN 10204 3.1.
All results to be included inside the 3.1 MTC or as separate test report, at manufacturer
option.
It will not be supplied native formats. Only PDF.
In case of requirement in the PO to submit technical documents for revision and approval, a
document list will be submitted by Cuñado including all technical documents considered to be
submitted for approval: inspection and test plan (ITP), welding procedures (where applicable),….
Once approved, those technical documents will be submitted between 4-8 weeks after approved
list. They will be reviewed one time only, being necessary to receive all client comments at the
same time after revision 0.
It has been considered a standard timing reply of 2 working weeks maximum after each submission.
Any variation of that it allow us to adjust our delivery date.
It will not be included procedures from standard operations during manufacturing process
regularized by applicable ASTM or ASME codes.
In case of KOM, documentation will be submitted once has been carried out and the
documental list has been approved by the client.
If PIM is required, it will be notified and kept once required critical documentation for revision
were approved (as for example ITP, welding procedures, drawings…). Manufacturing planning will
be confirmed once carried out.
Manufacturing process will not start up to receive all required documents as approved.
Final Dossier Report will be supplied at the end of the Project in accordance with the approved
index and instructions confirmed during KOM (if not at supplier option, later changes will not be
accepted). It could be supplied by supplement or aggrupation of supplements as supplier options.
As far this kind of projects issues several take-offs with many sub-suppliers involved, there is no
chance to supply one FDR per shipment.
In any case, one copy of MTCs (EN 10204 3.1) will travel along the goods and other copy will
be delivered directly to your designed person by email once the inspector released the goods.
It will be managed and included in the final dossier only one authorization document type, to
be determined, as for example Inspection Release Certificate (IRC) or Release Note (RN) or Shipping
Authorization (SA).
Page 2 of 4
CUÑADO, S.A. • Calle Camino del Olivar, 2 (esquina calle México) • 28806 Alcalá de Henares • MADRID • SPAIN • Telf.: +34 91 8 87 87 00 • Fax: +34 91 887 87 64 • www.grupocunado.com
4. Inspection
Neither tests nor inspections have been considered. If required, to be quoted separately.
Inspection activities will be done in accordance with the applicable / approved Inspection
Activity Plan.
All third party fees resulting from inspections are to your account. Client to inform us of
Inscrita en el Registro Mercantil de Madrid, Tomo 9.735, 8.430 de la Sección 3ª, Folio 51, Hoja 74.444, Inscripción 1ª - N.I.F. A-79187423
intended date of inspection in order to ensure that any inspection carried out on our behalf may
coincide with the client visit.
It is considered Cuñado standard format for Notification of inspection. Timing will be agreed
between parties during the Pre Inspection Meeting or Kick-Off Meeting upon Buyer, Inspector and
mill availability.
Our delivery time has been confirmed not considering any inspection points with influence on
the manufacturing progress. If anyone is required it would be considered as monitoring or confirmed
deliveries times would have to be adjust.
5. Marking
Material will be marked in accordance with standard information required in the applicable
manufacturing standard. Any additional marking to be analyzed and subject of extra cost.
Details of any additional marking must be given to our project team as maximum 15 days after
the order awarding, as this is automated process in mill. Any delay in submitting this information
could generate extra marking costs to be back charged to client.
6. Surface protection
We cannot be responsible of any surface imperfections that should be highlighted after shot
blasting. No relevant extra cost for grinding eventual superficial imperfections could be back
charged us if “material to be shot blasted” was not specified in PO.
Any damage on coating once arriving at job site would not be under Cuñado responsibility
unless transport is part of Cuñado’s scope of work or the damage is clearly and irrefutably
attributable to the supplier.
7. Packing
8. Storage
Once material is finished, inspected and released, we can only grant 15 days storage free of
charge, due to lack of space in our yards. If not, this can jeopardize other running orders.
Page 3 of 4
CUÑADO, S.A. • Calle Camino del Olivar, 2 (esquina calle México) • 28806 Alcalá de Henares • MADRID • SPAIN • Telf.: +34 91 8 87 87 00 • Fax: +34 91 887 87 64 • www.grupocunado.com
9. Contacts
Please consider additionally our General Terms and Conditions of Sale/Delivery (visit
www.grupocunado.com or to be sent by mail upon request).
Should you have any further related question to this offer or our Company, we will be at your
full disposal at your first request. Please contact us for any clarification, information or comment.
Yours sincerely,
Cuñado, S.A.
Page 4 of 4
CUÑADO, S.A. • Calle Camino del Olivar, 2 (esquina calle México) • 28806 Alcalá de Henares • MADRID • SPAIN • Telf.: +34 91 8 87 87 00 • Fax: +34 91 887 87 64 • www.grupocunado.com
Nr. 200-9011-2
INSPECTION TEST PLAN (PPI) REV. 00 Manufacturer Ref. SHEET 1 OF 1
CUSTOMER: PROJECT : AXIAL AND LATERAL METALLIC EXPANSION JOINTS PURCHASE ORDER:
PARTS
ASSEMBLY
CENTRALES TERMICAS
THERMAL POWER GENERATION
2014/68/UE
RESUMEN DE LA LISTA DE REFERENCIAS GENERAL POR SECTORES
GENERAL REFERENCE LIST BRIEFING BY SECTORS
CENTRALES NUCLEARES
NUCLEAR PLANTS
2014/68/UE
RESUMEN DE LA LISTA DE REFERENCIAS GENERAL POR SECTORES
GENERAL REFERENCE LIST BRIEFING BY SECTORS
CENTRALES HIDRAULICAS
HYDRO POWER
C.H. BAUSEN
C.H. ESTANY GENTO
C.H. GUALBA
C.H. HUGARTE-BALLONTI
C.H. MONTENARTRO
C.H. REVERSIBLE DE MORALETS
C.H. PEÑA DE BESO – RIO MANSA
C.H. LEWTOMEREIA – MICHANIKIS
2014/68/UE
RESUMEN DE LA LISTA DE REFERENCIAS GENERAL POR SECTORES
GENERAL REFERENCE LIST BRIEFING BY SECTORS
PROYECTOS DE COGENERACION
COGENERATION PROJECTS
2014/68/UE
RESUMEN DE LA LISTA DE REFERENCIAS GENERAL POR SECTORES
GENERAL REFERENCE LIST BRIEFING BY SECTORS
OBRA CIVIL
CIVIL PROJECTS
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2017 Rediseño sala de calderas District Heating + FEDA DISTRICT HEATING, Soldeu El Tarter Andorra
compensadores.
TERMOSOL 1 y 2, Plantas Termosolares de Nextera,
2017 Rediseño tuberías tanques sales + cambio textiles España
Extremadura
a metálicos.
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
38 Compensadores metálicos
DN800 a DN2000. 42 Carretes,
2016 desmontaje DN100 a DN1000. 256 Planta tratamiento aguas residuales. Colombia
C-Flex-0 DN100 a DN500.
7 C-Flex-2 DN700 y DN2000.
41 Juntas de expansión tipo Lens
2016 de alto espesor para IBN POM SINA Arabia Saudí
intercambiadores.
Compensadores equilibrados con
2015 codo DN1000 más soportes carga Proyecto BESTER Welling-Borough Inglaterra
variable.
14 Juntas de expansión de presión
equilibrada de caucho, 60 Juntas
2015 IBN POM SINA Arabia Saudí
de expansión atirantadas y 14
Juntas metálicas
26 Juntas de Expansión metálicas
2015 UTE RESSANO (Gas Engine Power Plant) Mozambique
Universales DN950
Compensadores de todo tipo y
2015 Proyecto CYNAR Sevilla España
Tubería metálica Flexible
Juntas de Expansión metálicas
2015 SUEZ Thermal Power Plant Egipto
Universales DN1800
Compensadores universales DRAGADOS COBRA INITEC JV – GREAT ISLAND combined cycle gas
2015 Irlanda
metálicos para calderas turbine
Juntas de Expansión de caucho C-
2014 Proyectos KEMYA y PETROKEMYA (Jubail) Arabia Saudí
Flex-2 y textiles varias
Juntas de Expansión de caucho
2014 C-Flex-2 gigantes DN1200 y ABENER ENERGÍA - STALOWA Power Plant Polonia
equilibradas, con codo.
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
Compensadores.
2013 Tuberías escape, soportes para Proyecto LUKOIL Rusia
Turbinas DN800 y DN600
Compensadores cardan DN150,
2013 DN250 PN25 Proyecto ZINC NACIONAL México
PN100 para líneas Turbina
Tuberías, compensadores y
2013 soportes carga variable para Proyecto AMBIMED Portugal
escape Turbina DN250
Compensadores de todo tipo más
2013 KEMIRA TARRAGONA Nueva planta Química España
de 120 unidades
Compensadores de todo tipo y
2013 Proyecto CYNAR Almería España
Tubería metálica Flexible
Compensadores equilibrados para
2013 Agua Marina – Superdúplex Planta Desaladora de Barka Omán
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
Trinidad
1998 Juntas de Expansión Metálicas LURGI – Trinidad Methanol Complex
&Tobago
Juntas de expansión Universales
ABB – BABCOCK & WILCOX ESP. Ya He Kou Power Plant in Henan
1996 equilibradas con codo hasta China
Province
tamaño DN1200 (48”)
1996 Juntas de Expansión Metálicas BABCOCK & WILCOX – Wuhan Mill &Steel Plant Blast Furnace China
Suministro juntas de expansión
en elastómero varios diámetros
1995 incluyendo 8 juntas C-FLEX-2T ENDESA - Central Térmica Litoral de Almería “Carboneras” (Almería) España
DN2200 (88”) y 2 juntas DN1800
(72)” bombeos y conducciones.
Suministro de juntas de
1994 expansión en elastómero UNELCO - Central Térmica de San Bartolomé (Gran Canaria) España
incluyendo 20 juntas C-FLEX-2T
2014/68/UE
MORE THAN 50 GREAT REFERENCES FOR OUR MORE THAN 39 YEARS OF HISTORY (1979 – 2018)
MÁS DE 50 REFERENCIAS DESTACADAS TRAS NUESTROS MÁS DE 39 AÑOS DE HISTORIA (1979 – 2018)
1993 20 juntas elastómero C-FLEX-2T UNELCO - Central Térmica de La Granadilla (Tenerife) España
DN1000 (40”)
1992 Juntas de Expansión Metálicas INTECSA – Tianjin Polypropylene (PP) Process Plant China
Juntas de Expansión Metálicas INTECSA – Dushanzi Polypropylene (PP) Process Plant in Xinjian Uyghur China
1991
Reg
We could continue browsing our History but what is most important to us, is to build the future together with our customers.
Podríamos continuar navegando por nuestra historia pero, ahora, lo más importante para nosotros es construir un futuro junto
con nuestros clientes.
2014/68/UE