You are on page 1of 5

TANK 01

TANK 06
TANK 04
TANK 02
C
D
A
B
TANK 05
TANK 03 F
D D
C NOTE:
ELECTRICAL THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
PIPELINE INLET SLUDGE THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
PIT
FROM TANK-04
OPENING SCHEDULE
VWS EGYPT
SCOPE
LOAD AREA 18,20
JV SCOPE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
111-PV-0001
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
18,47 ³
111-PV-0002 6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
18,47 UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
FGL 18,10
DRAINAGE PIT FOR
PORTABLE PUMP
750x750x600mm
FGL 18,10
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
PIPELINE OUTLET SLUDGE
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 1/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
PIPELINE INLET SLUDGE DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
FROM TANK-06 C [UNIT 111.D]
PLAN VIEW LEVEL+21.50
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-041( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
B ENGINEER ACTION:
TANK 01
TANK 06
TANK 04
TANK 02
C
B A

D
D D TANK 05
TANK 03 F
C
ELECTRICAL
PIPELINE INLET SLUDGE
PIT NOTE:
FROM TANK-04 THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
LOAD AREA 18,20
VWS EGYPT
SCOPE
JV SCOPE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
111-PV-0001
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
18,47 ³
111-PV-0002
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
18,47 REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
FGL 18,10
DRAINAGE PIT FOR EPC CONTRACTOR: SUB-CONTRACTOR:
PORTABLE PUMP
750x750x600mm
FGL 18,10
PIPELINE OUTLET SLUDGE
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
PIPELINE INLET SLUDGE CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 2/5
NUMBER:
FROM TANK-06 C DRAWING TITLE:

ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
PLAN VIEW LEVEL+20.00
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-042 ( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
B
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION:
111-TP-0001
NOTE:
THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
VWS EGYPT
SCOPE
LIST OF RESERVATIONS
JV SCOPE
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
³
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 3/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
SECTIONS A-A & B-B
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-043( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION:
NOTE:
THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
³
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
DOCUMENT TYPE:
DETAILED DESIGN DRAWING- MECHANICAL
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 4/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
VIEWS C & D
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-044( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION:
111-TP-0001
NOTE:
THIS DRAWING DO NOT INCLUDE ANY OPENING FOR POWER AND CONTROL CABLES
THEIR FOR SUCHES OPENINGS SHOULD BE DEFINED BY AQUALIUM / ORASCOM
OPENING SCHEDULE
LIST OF RESERVATIONS
LIST OF TRAPS
LIST OF ELECTRICAL RESERVATIONS
Main Equipment Schedule
ITEM Code DESCRIPTION Characteristics
³
111-TP-0001
6 29/01/2020 GKE JNA FOR_APPROVAL NHA
5 09/10/2019 GKE JNA FOR_APPROVAL NHA
4 02/07/2019 GKE JNA FOR_APPROVAL NHA
3 GKE JNA FOR APPROVAL
REV. DATE BY CHECK DESCRIPTION APPROVED
UPGRADE AND RAISING CAPACITY OF
ABU RAWASH WASTEWATER TREATMENT PLANT
EMPLOYER: CONSULTANT:
EPC CONTRACTOR: SUB-CONTRACTOR:
DOCUMENT TYPE:
SHOP DRAWING- MECHANICAL
CONTRACTOR CODE
ORQ DD -- -- -- -- SHEETS: 5/5
NUMBER:
ORIGINATOR DOC. TYPE LOCATION SUB-LOCATION DWG NO. REV. SCALE: 1:50
DRAWING TITLE:
NEW PRIMARY SLUDGE PUMPING STATION-04&6
[UNIT 111.D]
SECTIONS E-E & F-F
SUBCONTRACTOR REFERENCE NO.: DWG-04.11-ME-045 ( r.6)
REFERENCE SPECIFICATION(S): CONSULTANT CODE:
FOR CONTRACTOR:
NAME: SIGNATURE: DATE: 12/03/2019
ENGINEER ACTION: