00 | 26-Feb-20| AD RM ISSUED FOR APPROVAL Ww
Rev] Date ‘Author _| Checked Description of Revision Approved
| Upgrade and Raising Capacity of Abu Rawash Wastewater Treatment Plant Project
sorrsutalitice
Tehnical
Review
[Employer
ed ‘consuLtniG ENGINEERS
[JV Contractor: ppro| Subgontragtol
onasqualia [eve ei Sew
4
[Type of Document: vm
TECHNICAL
Z|
eee lorals P|1 0 4/0 0/6 0.0 4] 0 O|srects : s-roves
[esses Jose testy | me menes |e Sea
[Document Tite:
MECHANICAL PARTICULAR TECHNICAL SPECIFICATIONS FOR CLARIFIED WATER
PUMPING STATION TO BIOLOGICAL TREATMENT (UNIT - 104). Drainage pumps
[Subcontractor Reference:
Reference Specification(s) —
|For Contractor: |
INeme: Eng. Magdy Salama Sign Dete: 26 Feb 2020]
ENGINEER ACTION:UPGRADE AND RatsiNe Capacrry
OF Any RawasWastEwarER
‘TeEaTMENTPLANT
onasqualia = S-\eww
| TREATMENT (UNIT - 104). Drainage pumps
1. General Characteristics
Type
BALL CHECK VALVE
‘Nominal diameter
DNI50
2. Construction
Body
Ductile Cast Iron GGG40
Ball Ductile Cast Iron with NBR Tiner_ GGG 70 «|
Bonnet ‘Ductile Cast ron GGG “is ay _5¢
Bol/autwasher Stainless steel_3VS
Gasket NBR
3. Working Conditions
Maximum working pressure:
Standards
+ Face-to-face dimension according to EN 558
= Standard flange drilling to EN1092-2 (ISO 7005-2), PN 10
= BS EW i67eF
Finish
= according to manufacturer standard :epoxy coated or equal
50[UrGR DE. AND RAISING Caraerry
OF Anu RawasuWastewarer
"TREATMENTPLANT.
orasqualia
SPW
SERVICE: CLARIFIED WATER PUMPING STATION TO BIOLOGICAL
TREATMENT (UNIT- 104). Drainage pumps
6. Valves List
Trem | Type of valve | Quy Nerina Location Fluid Material
Ductile Cast
1 | BallCheck | | sq | clarifiedwater pumping | v0 water Iron
valve station Body
Head Office
Tehnicat
Review
[A] Approved
(fE]Anproved 2s noted|