You are on page 1of 1

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

-- -- -- -- - .. --
1 _ _. . . . . . . __ _ _ _ ._ __ , __ _, . . . . __ _ _ _ . __ _. . . _ __ _ _ _ . __ _. . . . . . . __ _ _ _ ._ __ , __ _, . . . . __ _ _ _ . __ _. . . _ __ _ _ _ . __ _. . . . . __ _ _ _ ._ __ , __ _, . . . . __ _ _ _ . __ _. . . _ __ _ _ _ . __ _. . . . . __ _ _ _ ._ __ , __ _, . . . . __ _ _ _ . __ _. . . _ __ _ _ _ . __ _. . . . . __ _ _ _ ._ __ , __ _, . . . . __ _ _ _ . __ _. . . _ __ _ _ _ . __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

30- -- TRUE NORTH


--
As per title of this package (Security Defense), the design in this package should
-- -- THIS DRAWING AND TH E INFORMA TION IT CON TAINS ARE THE SOLE PROPERTY OF
COM PANY IT SHALL NO T BE REPRODUCED OR LEN T ~THO UT THE AGREEMEN T OF THE
OWNER.

covered the previous package (outside fencing) in term of security. Assuming the P28 X

intruder has successfully passed the outside fence, the design in this Security BRICK WALL
29- Defense work package must be able to block the intruder or at least make it more P27 (BY OTHER)
difficult to infiltrate further or make the smuggling effort easy to monitor by Plant / X

28-
I security.
® I
28
I Sub-base finishing I
top-surface $ EL,+2 5
OUT DOOR
27- IP
P21
27
GATE AND LOGO WALL (BY OTHER)
5% SLOPE
26- 26
I
26.7
25- I 25
I, I, I I, I, I I, I, I I, I, I
KEYPLA N _ _ _ _ _ _4--24
~
SHORT T- WALL @ 20M l---------.....;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;...
24- (2 GROUP)
~-------------------
NOTES:
1. ALL DIME NSIONS, COORDINATES AN D ELEVATIONS AR E IN METERS
23- 23
UNLESS NOTED OTHERWISE (U NO)
I 2. FOR T-WALL DETAILS REFER TO DWG NO.
I' I' I I' I' I I' I' I BK91 - 1312- INF-829-CIV-DRD-000 1.
I -· _,- --- - - -- (S ~
22- 3. FOR WALKWAY, ASPHALT, SUB-BASE AREAS AN D CONCRETE 22
/,,~////

9c-'o~\\ SLOWDOWN BLOCK REFER TO DWG. NO.


/ BK91 - 1312- INF-829-CIV- DSE-0002.
!
/ 0 4. TH IS DRAWIN G IS DEVELO PED BASED ON CO MPANY FEED STU DY
21- n 21
(INCLU DING SPECIFI CATION & DRAWINGS) WITH TOPOGRAP HICAL
/ SURVEY REPORT RECEIVED FROM SUBCONTRACTOR. REFER BELOW
/ "REFERENCES SECTION" FOR DOCUMENTS NUMBERS.
/

20- - - ------- ----------- -------------- --- ------- - - __ 5. CONTRACTOR SHALL FILL ANY GAP BETWEEN T- WALLS IN TH E 20
I
/

I ,<,_ 1,1,1 I , I, I IP
Add: Elevation +0.00 TURNING LOCATIO NS BY BRICK WITH MORTAR.
correspond to MSL of
I Al-Faw station, formerly I
19- known As FAO 1979 LEGENDS: 19
height GT GUARD TOWER
,_
, _-
'
FWT FRES H WATER TANK
18- ' -= 18
FON FO UNDATIO N
R RADIUS
17- I I EL ELEVATION 17

I $ EL. +2.6 EL.+2.6 5 ~ 2. 2.7 3.6 I


OUT DOOR 0 SUBBASE AREA
16 - ,_ [J I' I I ' 0
' - EL. '<'---t----1------ r--- 16
', -=
- P04 BRICK WALL\ it------, ~
0 '11'1 SLOPE DIRECTION
5% SLOPE 5% SLG'E (BY OTHER) $ OUT
EL.+ 2.5
DOOR 14)(15
--

15- SECURITY FENCE


- -- -- -- -- - N
- OD- =\-
- -
- I - - X - X - SECURITY FENCE (BY OTHER)
15

t=-
N

I I D=- === =~ =-- =o I


X
- ,- NEW
- 1'

14- 14
I I -
-= _ I_ I T- WALL (H = 1M)
,I -
=i=
X
-
13- E T-WALL (H =3M) 13
rP05 I - - _ ,_
1
X I
5% SLOPE DIRECTION
- I-

-- -- -- - - ----- - - -- -- - -x----- .. - -- --
12- i,/QJ-- - -lrr'Im'1,-------,lrr
'Irr
'1-----,ITT
'ITT
' I - - --E9,:) - I -
-
I
1- 12
- I - DRAWING LIMIT

WORK ORDER NO: NA


11 - MAIN ENTRANCE LAYOUT - - - - - - - - - + - - - - - - - - - - - - - - - - - - - + - 11
(SCALE 1 250) CONTRACT NO: BLK9/IRQ-SF-CO N- 0258
REFE RENC E DRAWINGS & DOCUMEN TS
10 - DRAWING NO DRAWING TI TLE 10
COORDINATES TAB LE COORDINATES TAB LE BU ILDING AND STRUCTURES LIST BK91-1312-INF- 829- CIV-ESL- 0001 PLOT PLAN AND PROFILE OF MAIN ENTRANCE AREA
POINT NO, EASTING NORTHI NG EASTING NORTHING POINT NO. EASTI NG NORTHI NG EASTING NO RTHING NO. DESCR IPTION STRUCTU RAL STYLE QTY. Approval Code
 Remarks BK91-1 101-INF-B29-CIV-PLT-0005 EMERGENCY ENTRANCE & CONS TRUCllON ENTRANCE LAYOU T (FEED)

9-
P1 100.75 150.25 778505.792 34 191 79.076 P2 1 149.00 111.90 778467.452 3419227,854 Here BK91- 1312-INF-829 - CIV- ORD-0001 SHORT AND LONG T-WALLS DETAILS
1 CHECK ROOM PR EFABRICATED MODULAR 1 9
P2 96.73 152.50 778508.068 3419175.073 P22 152.24 129.1 1 778484.668 3419230.588
150.25 2 OFFICE CARAVAN 1 Code 1 Approved BK91-1312- INF-B29-CIV- DSE-0001 WALK WAY, SUB BASE, ASPHALT ROAD AND CONCRE1E SLOWDOWN BLOCK SECTION AND DETAILS
BK91-1101-GEN-999-CIV-SPC-0001 SPECIFICATION FOR CONCRETE WORKS
P3 100.00 144.00 778 499.562 3419178.351 P23 151.50 778505.810 3419229.8 43
BK91 - 11 01- GEN - 999- CIV- SPC- 001 SPECIFICATION FOR EXCAVATION, BACKFILL AND CDMPACTIDN
8- P4 100.00 100.00 778455.559 3419178.371 P24 155,50 152.50 778508 064 3419233.845 3 DORM ITORY CARAVAN 1 8
778522.3 10 3419233.845
With Minor Comments: Revise and
PS 87.00 92.00 778447.571 3419165.342 P25 155.50 166.75 4 ACCESS CONTROL GATE TURNSTILE DOOR 2 Code 2 Resubmit, Works may proceed
P6 87.00 64.00 7784 19.566 3419165.342 P26 118.30 135.95 77849 1.462 3419 19 6.487 5 CHECK SHELTER STEEL 1
7- With Major Comments: Revise and 7
P7 135.00 88.00 778443.567 34 19213.339 P27 161.00 100.00 778455.565 3419239.329
6 ARM BARRIER (MBCSN) STEEL 4
Code 3

PB 129.00 49. 00 778449.534 3419207.359 P28 161.00 144,00 778499.562 3419239.357 Resubmit, Works may NOT Proceed
7 SHORTT- WALL (H=1M) CONCRETE 52
6 - pg 120.00 106.00 77846 1.561 341921 1.353 P29 156.00 134.00 778524.550 3419 184.350 pp 6
P1 0 126.00 112.25 77846 1.561 3419204.346 P30 180.00 158.70 778548.450 3419209.000
8 T- WALL (3M) - 65
Code 4 Reference and information only.
P11 118.80 122.40 778467.809 3419204.346 P3 1 180.00 176.40 778548.450 3419226. 700 9 CONCRETE SLOWDOWN BLOCK CONCRETE 3 A 04-M AY-21 YA ISSUED FOR APPROVAL

5- P12 130.00 115.25 778470 .799 3419208.341 P32 160.00 172.00 778528.570 3419222.330 10 BR ICK WALL - - Christian Berry/ Senior 2021/05/15 ISSUE DATE PREP'D DESCR IPTION 5
Civil/Structural Engineer
P13 118.80 122.40 778477.962 3419197.139 11 DROP OFF AND CAR CHECK AREA - - EPC FOR SECURITY DEFENCE
118.30 127.90 778483.450 3419196.648 12 VIS ITOR PARKING -
Kuwait . Energy AND CHECKPOINTS FOR BLOCK9
P1 4 SUB BASE
4- Approval Authority Signature Date KU WAI T ENERGY COMPANY KSCC PHASE-1 PROJECTS 4
P1 5 111.40 123.30 778478.855 3419189.798 13 INTERNAL PARK ING ASPHALT -

P1 6 108 .50 107.00 778462.554 3419 186.840 These comments do not relieve the Contractor/ Vendor and/ or their
14 SEPTIC TANK CONCRETE 1
3- P17 125.00 137.00 778492.556 3419203.342 Sub‐contractors of their responsibilities to meet the requirements of 3
15 SANITARY SEWAGE SUMP CONC RETE 1
P18 135.00 153 .00 778508.555 3419213.127 the Contract. BIM PRO ENGIN EER ING OFFICE

16 PVC WATER TANK PVC 1


P1 9 135.00 11 0.00 778465.556 3419213.340
2- 2
P20 144.00 96.00 77845 1.565 3419222.354 MAIN ENTRANCE AREAGENERAL ARRANGMENT
1- 0.0 2.5 5 10 15 20 25 DRAWN BY DA TE SCALE SHEET NO. PROJECT STAGE
METERS YA 04- MAY- 21 1:250 1 OF 1 DETAILED DES IG N
SCALE 1 : 250 DRAWING NO. ISSUE NO,
BK9 1-1312-I NF- 829 - CIV - DGA - 0002 A 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BK91- 1312-IN F-829-CIV-DGA-0002 _A UPD.dwg, 07-May-2021 @ 2: 12pm , hp

You might also like