INTRODUCTION
PROS:
Typically,
Ksu = 2.5 to 3.0
Kbu = 200 to 400 (clay to sand)
G&P Geotechnics Sdn Bhd
GEOTECHNICAL CAPACITY OF PILES
Reduction in
shaft
resistance!!!
GRANITE FORMATION
Case Histories
• Boulders encountered
- Some piles installed after preboring
Granite Formation
Boulders
exposed after
preboring
3200
3000
2800
2600
2400
2200
2000
1800
1600
1400
1200
1000
800
600
400
200
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PILE TOP SETTLEMENT (mm)
G&P Geotechnics Sdn Bhd
Static Load Tests
Site B
130
0.5m to 10.7m
120
10.7m to 20.9m
110
100
90
80
70 fsu = 5 x SPT-N (in kPa)
60
50
- conservative!!!
40
30
20
10
Site C
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
DISPLACEMENT (mm)
9000
8500
8000 600mm Spun Pile, Pile length = 21.4m
(Nearest borehole, BH-20)
7500
7000
6500 End-bearing not fully
6000
5500 mobilised
5000
4500
4000
3500
Stiff end bearing
3000 response observed –
2500
2000
end-bearing mobilized
1500 with small toe
1000
500
displacement
0
0 1 2 3 4 5 6 7 8 9 10
DISPLACEMENT (mm)
250
150
fsu = 5 x SPT-N (in kPa)
125
- conservative!!!
100
75
50
25
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
DISPLACEMENT (mm)
G&P Geotechnics Sdn Bhd
MOBILISED END-BEARING RESISTANCE (kN/m2) Mobilised (Base) Resistance
8000
7500
7000
6500
6000
5500 End-bearing not fully
5000
mobilised
4500
4000
3500
Stiff end bearing
3000
2500 response observed –
2000 end-bearing mobilized
1500
with small toe
1000
500
displacement
0
0 1 2 3 4 5 6 7 8 9 10
DISPLACEMENT (mm)
250
0.82m to 6.53m
225 6.53m to 17.43m
17.43m to 26.43m
200 26.43m to 31.43m
31.43m to 33.93m
175
150
125
100
LIMESTONE FORMATION
Static Load Tests
3*WL
500mm diameter
spun pile
1*WL
- conservative!!!
ALLUVIAL DEPOSITS
Static Load Tests
3*WL
500mm diameter
spun pile
23mm
11mm 44mm
- conservative!!!
METASEDIMENTARY
FORMATION
Nusajaya
PROPOSED 4 BLOCKS OF 12 & 24 – STOREY RESIDENTIAL
APARTMENTS (488 UNITS) AT PHASE C1B, EAST LEDANG,
JOHOR
Traders Hotel
CS1 – Driven Piles
2*WL
1*WL
600mm diameter
15mm
spun pile
5.5mm
Pile working load =
3,000kN
1*WL
400mm x 400mm RC
square pile
8.5mm 20mm
Pile working load =
2,000kN
1*WL
450mm x 450mm RC
square pile
12mm
Pile working load =
2,500kN
8000
7500
7000
6500
6000
5500
5000
4500
4000
3500
3000
2500
2000
1500
1000
500
0
0 1 2 3 4 5 6 7 8 9 10
DISPLACEMENT (mm)