Table of Contents
1 Introduction..................................................... 2
1.1 Scope......................................................... 2
1.2 Intended Users.......................................... 2
1.4 Disclaimer.................................................. 2
1.5 Conflicts..................................................... 2
2 References..................................................... 2
3 General........................................................... 3
1 Introduction
1.1 Scope
1.4 Disclaimer
The use of this Best Practice does not relieve the engineer from his
responsibility or duty to confirm and verify the accuracy of any information
presented herein. This Best practice is shall not be considered as replacement
for any Mandatory Saudi Aramco Engineering Requirements.
1.5 Conflicts
In the event of a conflict between this Best Practice and other Mandatory Saudi
Aramco Engineering Requirements, the Mandatory Saudi Aramco Engineering
Requirement shall govern.
2 References
The latest edition of the following applicable codes, standards, specifications, and
references in effect on the date of contract offer should be used, except as otherwise
specified.
Page 2 of 4
Document Responsibility: Process Control Standards Committee SABP-Z-002
Issue Date: 13 August 2015
Next Planned Update: TBD Functional Specifications for Process Control Systems
3 General
Project specifications for Process Control Systems (PCS) should separate functional
requirements from the actual Scope of Work for the project. This allows general
functional/technical requirements to be re-used from project-to-project. Sample generic
functional requirements documents are contained in Table 1. They should be used as a
‘go-by’ for developing the project-specific functional specifications.
Link Title
SABP-Z-002A Project Specification for PCS Scope of Work
SABP-Z-002B Functional Specification for Process Control Systems (PCS) and Integration
SABP-Z-002C Functional Specification for Distributed Control Systems (DCS)
SABP-Z-002D Functional Specification for Emergency Shutdown Systems (ESD)
SABP-Z-002E Functional Specification for Compressor Control Systems (CCS)
Functional Specification for Data Acquisition and Historization Systems
SABP-Z-002F
(DAHS)
SABP-Z-002G Functional Specification for Alarm Management Systems (ALMS)
SABP-Z-002H Functional Specification for System Design Document (SDD)
SABP-Z-002I Functional Specification for Maintenance Training System (MTS)
SABP-Z-002J Functional Specification for Operator Training Simulator (OTS)
Functional Specification for Supervisory Control and Data Acquisition
SABP-Z-002K
Systems (SCADA)
SABP-Z-002L Functional Specification for Remote Terminal Unit (RTU)
Page 3 of 4
Document Responsibility: Process Control Standards Committee SABP-Z-002
Issue Date: 13 August 2015
Next Planned Update: TBD Functional Specifications for Process Control Systems
Link Title
SABP-Z-002M Functional Specification for Leak Detection Systems (LDS)
SABP-Z-002N Functional Specification for Terminal Management Systems (TMS)
SABP-Z-002S Functional Specification for Production Operation Management (POM)
SABP-Z-002T Functional Specification for Maintenance Operation Management (MnOM)
SABP-Z-002U Functional Specification for Quality Operation Management (MnOM)
SABP-Z-002V Functional Specification for Inventory Operation Management (IOM)
Revision Summary
17 November 2007 New.
11 January 2009 Editorial: revised list of appendices to include new FSD for Leak Detection Systems.
24 October 2009 Editorial: revised list of appendices to include new FSD for Terminal Management
Systems.
9 March 2010 Editorial: Added 4 new FSD documents.
24 November 2012 Editorial: Corrected definition of OTS as Operator Training Simulator.
14 December 2014 Editorial: Revised process updates in appendices A, B, C, D, E, H.
13 August 2015 Editorial: Converted appendices to Table 1 and fixed hyperlinks.
Page 4 of 4