KABUPATEN SERANG
PROPINSI BANTEN
Volume
URAIAN Dari Dari Dana Satuan Katagori Harga Satuan Jumlah Jumlah Dana Desa
Total Biaya Rp. Swadaya Rp. Rp.
Swadaya Desa
I. BAHAN
1.1 Beton Readymix K250 367.20 0.00 367.20 M3 I-b 900,000.00 0.00 330,480,000.00
1.2 Papan Bekesting 3.00 0.00 3.00 M3 I-a 3,000,000.00 0.00 9,000,000.00
1.3 Paku 5-10 cm 15.00 0.00 15.00 Kg I-b 13,500.00 0.00 202,500.00
1.4 Minyak Bekesting 5.00 0.00 5.00 Ltr I-b 16,500.00 0.00 82,500.00
1.5 Sirtu 86.40 0.00 86.40 M3 I-a 250,000.00 0.00 21,600,000.00
1.6 Plastik cor 2,581.20 0.00 2,581.20 M2 I-b 2,500.00 0.00 6,453,000.00
1.7 Batu Scroup/3/4 46.44 0.00 46.44 M3 I-a 200,000.00 0.00 9,288,000.00
1.8 Besi 10 mm 192.60 0.00 192.60 Kg I-b 15,000.00 0.00 2,889,000.00
Sub Total 1) 0.00 379,995,000.00
II. ALAT
2.1 Ember 5.00 0.00 5.00 Bh II-a 11,000.00 0.00 55,000.00
2.2 Benang 5.00 0.00 5.00 Pak II-a 15,000.00 0.00 75,000.00
2.3 Cangkul 1.00 0.00 1.00 Bh II-a 73,500.00 0.00 73,500.00
2.4 Papan Proyek 1.00 0.00 1.00 Bh II-a 150,000.00 0.00 150,000.00
2.5 Prasasti Marmer 1.00 0.00 1.00 Bh II-a 350,000.00 0.00 350,000.00
2.6 Uji Kualitas 1.00 0.00 1.00 Ls II-b 3,000,000.00 0.00 3,000,000.00
2.7 Uji Coring ( Min 10 Titik ) 1.00 0.00 1.00 Ls II-b 3,900,000.00 0.00 3,900,000.00
2.8 Mobilisasi Alat Coring 1.00 0.00 1.00 Ls II-b 500,000.00 500,000.00
0.15
4
1 VOLUME BETON
Panjang : L1 : 2.50 m
Lebar : B : 4.00 m
Tebal : t : 0.15 m
V 1 (1 block) = L1 x B x t x 1 = 1.5 m3
V total = V1 x n = 360 m3
2 VOLUME BEKESTING
Luas : pb x tb = 145 m2
3 x pakai, V = 48.45 m2
3 SIRTU
Lapisan perata
t = 0.03 m
V= Lxt xB = 72 m3
P0
50 2.00 25.00 0.05 2.50
P1
100 2.50 25.00 0.10 6.25
P2
150 2.50 25.00 0.05 3.13
P3
200 2.50 10.00 0.10 2.50
P4
250 2.50 10.00 0.01 0.25
P5
300 2.50 10.00 0.05 1.25
P6
350 -
P7
400 -
450
P9
500 2.50 15.00 0.15 5.63
P10
550 2.50 15.00 0.15 5.63
P11
600 2.50 15.00 0.15 5.63
P12
650 -
P13
700 -
P14
750 -
P15
800 2.50 15.00 0.15 5.63
950 -
1000 - - - -
b = kesimpulan lebar kerusakan hasil pengamatan oleh Kasi Pembangunan dan TPK
l = kesimpulan panjang kerusakan hasil pengamatan oleh Kasi Pembangunan dan TPK
t = kesimpulan kedalaman dari kerusakan hasil pengamatan Kasi Pembangunan dan TPK
(…………………………..) (……………………………….)
PROGRAM PEMBANGUNAN PEMBERDAYAAN MASYARAKAT DESA
KABUPATEN SERANG
PROPINSI BANTEN
Harga
Satuan di Ongkos Harga di
No Jenis Material Satuan Keterangan
toko / Angkut Lokasi
sumber
BAHAN
1 Semen 50 kg Zak 69000 69,000
2 Spleet m3 267000 267,000
3 Pasir Beton m3 241000 241,000
4 Pasir Urug m3 160000 160,000
5 Batu Belah m3 250000 250,000
6 Tripleks lbr 55000 55,000
7 Papan Begesting (kelas IV) m3 3000000 3,000,000
8 Kayu Kelas IV m3 3000000 3,000,000
9 Minyak Begesting ltr 16500 16,500
10 Plastik (Alas Cor) m 2500 2,500
11 paku kg 13500 13,500
12 Sirtu m3 250000 250,000
13 Beton Ready Mix K250 m3 900000 900,000
14 Cat Lapangan Kg 57000 57,000
15 Buis Beton D-40 Bh 125000 125,000
16 Besi Beton D-10 Bh 98000 98,000
17 Besi Beton D-6 Bh 65000 65,000
18 Kawat Beton Bh 23000 23,000
19 Besi 10 mm Kg 15000 15,000
20 Dolken btg 26000 26,000
21 Batu Scroup m3 200000 200,000
ALAT -
1 Cangkul bh 75000 75,000
2 Sekop bh 55000 55,000
3 Ember bh 11000 11,000
4 Selang water pass m 2000 2,000
5 Sendok semen bh 15000 15,000
6 Benang pak 48000 48,000
7 Sewa Molen hari 300000 300,000
8 Prasasti bh 350000 350,000
9 Papan Proyek bh 150000 150,000
10 Kuas 3" bh 10000 10,000
11 Sewa Mobil Dramtruck hari 700000 700,000
PEKERJA -
1 Pekerja HOK 130000 130,000 18,571
2 Tukang HOK 150000 150,000 21,429
3 Mandor HOK 150000 150,000 21,429
PROGRAM PEMBANGUNAN PEMBERDAYAAN MASYARAKAT DESA
KABUPATEN SERANG
PROPINSI BANTEN
918,000.0000
130,000.00
37,500.00
15,000.0000
1,100,500.0000
135,000.00
4,050.00
67,600.00
39,000.00
245,650.00
PROGRAM PEMBANGUNAN PEMBERDAYAAN MASYARAKAT DESA
KABUPATEN SERANG
PROPINSI BANTEN
Dana Desa
Dana Desa
TA. 2016
Propinsi : Banten
Kabupaten : Serang
Kecamatan : Ciruas
Talaga
Jenis Prasarana
Rabat Beton
Lokasi
Kp Kolelet
JUDUL GAMBAR
Dibuat oleh :
Kasi Pembangunan/TPK
Diperiksa Oleh :
Kasi Perencanaan
(………………………………)
Diketahui Oleh
Kepala Desa
Dana Desa
DOKUMENTASI FOTO PERENCANAAN DANA DESA (P3MD) T. A 2020
KABUPATEN :
Serang
KECAMATAN :
Mancak
DESA :
Bale Kencana
KONDISI : 0 %
KEGIATAN :
LOKASI :
P0
KABUPATEN :
Serang
KECAMATAN :
Mancak
DESA :
Bale Kencana
KONDISI : 0 %
KEGIATAN :
LOKASI :
P3
KABUPATEN :
Serang
KECAMATAN :
Mancak
DESA :
Bale Kencana
KONDISI : 0 %
KEGIATAN :
LOKASI :
P11
REKAPITULASI KEBUTUHAN BAHAN, ALAT D
Kabupaten : Serang
Kecamatan :
Desa : ........................
BATU SCROPP
BATU SIRTU
BEKESTING
BEKESTING
MINYAK
PAKU
KAYU
Pekerjaan
I PEKERJAAN GALIAN
II PEKERJAAN PEMERATAAN BADAN JALAN 46.44
III PEKERJAAN PEMERATAAN SIRTU 86.40
IV PEKERJAAN BEKESTING 3.00 4.85 14.54
V PEKERJAAN PLASTIK COR
VI PEKERJAAN READYMIX
Mandor ( OH )
Pekerja Galian
Pekerja ( OH )
Tukang ( OH )
PLASTIK COR
Besi 10 mm
READYMIX
( OH ) 19.35
18.00 1.80
192.60 25.19 12.60 1.26
2,581.20
367.20 360.00 90.00 36.00
2 Pekerjaan Readymix
Pekerja 360.00 OH 360.00 OH
Tukang 90.00 OH 90.00 OH
Mandor 36.00 Oh 36.00 OH
Keterangan