7.0m. HIGH SLOPE PROTECTION


(SEE DETAIL ON SHEET 8 OF 8)

(SEE DETAIL ON SHEET 8 OF 8)


7.0m. HIGH SLOPE PROTECTION
EL. 15.30

EL. 15.30
17 18 17
180 180
12mm∅ RSB SP. 15cm O.C. 12mm∅ RSB SP. 15cm O.C.
18
C D 15cm FILLET
12mm∅ LONG. BARS SP. 23cm O.C.
10000 10000 12mm∅ LONG. BARS SP. 23cm O.C.
180
12mm∅ RSB SP. 20cm O.C.
12mm∅ RSB SP. 20cm O.C.
120cm THK. PROPERLY LAID 80-100cm∅ BOULDERS
20
1000
12mm∅ RSB SP. 30cm O.C. 12mm∅ RSB SP. 30cm O.C.
12mm∅ RSB SP. 13cm O.C.
SECTION THRU 'F-F'
SCALE 1:50m
25 25
1.50m x 1.50m x 0.60m 1.50m x 1.50m x 0.60m
2400psi CONC. BLOCKS 2400psi CONC. BLOCKS
945 945
1.50m x 1.50m x 0.90m 2400psi CONC. BLOCKS
150 60
STANDARD L-SHAPED RETAINING WALL
(SEE DETAIL ON SHEET 8 OF 8) 150
7.00m STANDARD COUNTERFORT RET. WALL

7.00m STANDARD COUNTERFORT RET. WALL


B B
DETAIL OF CONCRETE BLOCKS
SCALE 1:50m

TOP BERM EL. 15.30


TOP BERM EL. 15.30

E
CONSTRUCTION
80 80
JOINTS 418
20
90
500 150
D/S APR. EL. 8.30 150
90
105
DETAIL OF CONCRETE BLOCKS
CONC. ROOFING OUTLINE 45
SECOND STAGE 135
CONCRETE
45 SCALE 1:50m
132.3
47.7
170

EL. 16.70
EL. 16.70

STANDARD L-SHAPED RETAINING WALL


50mm∅ G.I. PIPE RAILINGS (Welded) 265 (SEE DETAIL ON SHEET 7 OF 8)
310
6.50m STANDARD COUNTERFORT
50 F APPROVED
REV
TOP BERM EL. 15.30

RETAINING WALL 100 600 100 600 100 600 100 600 100 600 100 600 100 600 100 600 100 600 100 600 100 600 250 250 DATE NATURE OF REVISION BY CHECKED RECOM.
100 NO NIA
190
500
U/S APR. EL. 8.80 E 30 REPUBLIC OF THE PHILIPPINES
TRAINING WALL (SEE DETAIL 3 OF 8) 190 NATIONAL IRRIGATION ADMINISTRATION
15 REGION - 9 PAGADIAN CITY
170
F
PROVINCE OF ZAMBOANGA SIBUGAY
LOWER SIBUGUEY II RIS EXTENSION PROJECT
STANDARD L-SHAPED RETAINING WALL SIAY, ZAMBOANGA SIBUGAY
C
DIVERSION WORKS
(SEE DETAIL ON SHEET 7 OF 8)
FLOW D
6.50m. HIGH SLOPE PROTECTION
(SEE DETAIL ON SHEET 8 OF 8)

CANAL: STATION:

(SEE DETAIL ON SHEET 8 OF 8)


6.50m. HIGH SLOPE PROTECTION
DRAFTING DESIGN
8500
CADD : E.M.C CHECKED : MaTheT

EL. 15.30
EL. 15.30

REVIEWED : E.A.M
REVIEWED : MaTheT
SUBMITTED : CAS
2000 2000
RECOMMENDED :
GENERAL PLAN BENEDICTO ISAGANI O. PULIS, JR.
SCALE 1:200m PRINCIPAL ENGINEER C
RECOMMENDING APPROVAL :
JOEL C. ATAY
ACTING DIVISION MANAGER, EOD
APPROVED :
200 650 650 200 DIOSDADO A. ROSALES
REGIONAL IRRIGATION MANAGER