AREVA T&D Site test record RELAY TEST Doc. Ref.

MCRI01- O/C STARTER RELAY


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Designation
Panel No. Serial No.
Make Model No.
Dwg & Sh No. Aux. Voltage
Flag Type No. of Contacts

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM DESCRIPTION CHECKED
1 Inspect for any physical damage or defects.
2 Verify connections as per approved drawings.
3 Check that serial no. of relay matching with serial no. of case.
4 Relay CT shorting function checked.
5 Test switch checked for correct function.

3. ELECTRICAL TESTS:
3.1 PICK UP / DROP OUT TEST:

Phase Phase - A Phase - C E/F E/F Element


setting setting
current current
(A) Pickup (A) Drop out (A) Pickup (A) Drop out (A) (A) Pickup (A) Drop out (A)

2 1

4 2

6 3

8 4

10 5

12 6

Note: Limits & Tolerances:


Operating value: +/-10% of setting.
The maximum resetting value of O/C element is not less than 98% of Operating value.

Test performed by Test witnessed by Date of test


AREVA T&D
Name MUSTAFA HAJI

Signature
Customer Contract
Location #
Project
Contractor
AREVA T&D Site test record RELAY TEST Doc. Ref.

MCRI01- O/C STARTER RELAY


3.2 TIMIG TEST:
Phase Injected Operating time in Injected Operatin
msec E/F setting Limits for
setting current current g time in
current (A) P/F & E/F
current (A) 4xsetting (A) Phase A Phase C 4xsetting (A) msec
4ms at 4
times
setting

3.3 RELAY DC BURDEN AT RATED VOLTAGE:


Burden at rated voltage Limits (W)
Rated voltage
Relay Terminal Current (mA) Quiescent
(V) Operated (W) 48/54V 110/125V
(W)

0.05 3.5

3.4. FINAL SETTING TESTS:


3.4.1 PICK UP / DROP OUT TEST:

Phase Phase - A Phase - C E/F E/F Element


setting setting
current current
(A) Pickup (A) Drop out (A) Pickup (A) Drop out (A) (A) Pickup (A) Drop out (A)

3.4.2 TIMIG TEST:


Phase Injected Operating time in Injected Operatin
msec E/F setting Limits for
setting current current g time in
current (A) P/F & E/F
current (A) 4xsetting (A) Phase A Phase C 4xsetting (A) msec
4ms at 4
times
setting

4. FUNCTIONAL TEST:

Item Description Checked

1 All output contacts resistance measured.

Test performed by Test witnessed by Date of test


AREVA T&D
Name MUSTAFA HAJI

Signature