task_code status_code wbs_id actv_code_item_id

Activity ID Activity Status WBS Code Item


TP-8009F.PHASE-2A.1.1 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.1.2 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.1.3 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.1.4 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.1.5 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.1.6 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.1.7 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.1.8 Not Started TP-8009F.PHASE-2A.1
TP-8009F.PHASE-2A.2.1.1 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.2 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.3 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.4 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.5 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.6 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.7 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.8 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.9 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.10 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.11 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.12 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.1.13 TP-8009F.PHASE-2A.2.1
TP-8009F.PHASE-2A.2.2.1 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.2 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.3 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.4 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.5 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.6 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.7 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.8 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.9 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.10 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.11 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.12 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.13 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.14 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.15 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.16 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.17 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.2.18 TP-8009F.PHASE-2A.2.2
TP-8009F.PHASE-2A.2.3.1 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.2 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.3 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.4 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.5 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.6 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.7 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.8 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.9 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.10 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.11 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.12 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.13 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.14 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.15 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.3.16 TP-8009F.PHASE-2A.2.3
TP-8009F.PHASE-2A.2.4.1 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.2 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.3 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.4 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.5 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.6 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.7 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.8 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.9 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.10 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.4.11 TP-8009F.PHASE-2A.2.4
TP-8009F.PHASE-2A.2.5.1 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.2 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.3 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.4 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.5 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.6 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.7 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.8 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.9 TP-8009F.PHASE-2A.2.5
TP-8009F.PHASE-2A.2.5.10 TP-8009F.PHASE-2A.2.5

TP-8009F.PHASE-2A.3.1
TP-8009F.PHASE-2A.3.1.1 TP-8009F.PHASE-2A.3.1
TP-8009F.PHASE-2A.3.1.2 TP-8009F.PHASE-2A.3.1
TP-8009F.PHASE-2A.3.1.3 TP-8009F.PHASE-2A.3.1
TP-8009F.PHASE-2A.3.1.4 TP-8009F.PHASE-2A.3.1
TP-8009F.PHASE-2A.3.1.5 TP-8009F.PHASE-2A.3.1
TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.1 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.2 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.3 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.4 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.5 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.6 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.7 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.8 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.9 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.10 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.2.11 TP-8009F.PHASE-2A.3.2
TP-8009F.PHASE-2A.3.3
TP-8009F.PHASE-2A.3.3.1 TP-8009F.PHASE-2A.3.3
TP-8009F.PHASE-2A.3.3.2 TP-8009F.PHASE-2A.3.3
TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.1 TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.2 TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.3 TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.4 TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.5 TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.6 TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.7 TP-8009F.PHASE-2A.3.4
TP-8009F.PHASE-2A.3.4.8 TP-8009F.PHASE-2A.3.4

TP-8009F.PHASE-2A.3.5.1 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.2 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.3 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.4 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.5 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.6 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.7 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.8 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.9 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.10 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.11 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.12 TP-8009F.PHASE-2A.3.5
TP-8009F.PHASE-2A.3.5.13 TP-8009F.PHASE-2A.3.5

TP-8009F.PHASE-2A.3.7.1 TP-8009F.PHASE-2A.3.7
TP-8009F.PHASE-2A.3.7.2 TP-8009F.PHASE-2A.3.7
TP-8009F.PHASE-2A.3.7.3 TP-8009F.PHASE-2A.3.7
TP-8009F.PHASE-2A.3.7.4 TP-8009F.PHASE-2A.3.7
TP-8009F.PHASE-2A.3.7.5 TP-8009F.PHASE-2A.3.7
TP-8009F.PHASE-2A.3.7.6 TP-8009F.PHASE-2A.3.7

TP-8009F.PHASE-2A.3.6.1 TP-8009F.PHASE-2A.3.6
TP-8009F.PHASE-2A.3.6.2 TP-8009F.PHASE-2A.3.6
TP-8009F.PHASE-2A.3.6.3 TP-8009F.PHASE-2A.3.6

TP-8009F.PHASE-2A.3.8.1 TP-8009F.PHASE-2A.3.8
task_name start_date
Activity Name (*)Start
Review of SOC Design 13-05-2021 08:00
Construction Execution plan 13-05-2021 08:00
project execution procedure 13-05-2021 08:00
SOC approval 13-05-2021 08:00
HVAC calculation 13-05-2021 08:00
SOC approval 13-05-2021 08:00
preparation of bill of material 13-05-2021 08:00
SOC approval 13-05-2021 08:00
provision of samples,literature and other applicables documents
SOC approval
Reinforcement
backfill material
constrction Material (CHB WALL)
Sevage system
sanitary material and equipment
kitchen equipment and accessories
roofing material
roof drain system material
plumbing and fixtures
joint sealing material
wall and floor finishing material
preparation of material requisitions
SOC approval
preparation of technical bid tabulation
SOC approval
preparation of purchase order
SOC approval
false floor
suspendedceiling
ceramic tiles
windowsand doors
steel ladders
wash room equipment and material
launch room equipment and material
store and photocopy room equipment and material
locker room equipment and material
training room equipment and material
supervisor room equipment and material
office rooms equipment and material
preparation of material requisitions
SOC approval
preparation of technical bid tabulation
SOC approval
preparation of purchase order
SOC approval
main distribution panel MDP-1
distribution panel DP-1
Lghting panel LP-1
Dry type transformer
power cables
recepticles lighting fixtures andswitches
conduuits andcable glands
junction boxes
grounding material
miscelleneous consumable electrical material
preparation of material requisitions
SOC approval
preparation of technical bid tabulation
SOC approval
preparation of purchase order
SOC approval
Fiber optic cables
telephone and computer network cables and accessories
fire alarm system devices
fire alarm control panel
multipair signal cable
preparation of material requisitions
SOC approval
preparation of technical bid tabulation
SOC approval
preparation of purchase order
SOC approval
central air conditioning units
air conditioning split units
air conditioning ducts
air conditioning accessories (diffuser,grill,damper,fans etc..)
CONSTRUCTION
MOBILIZATION
setting out of foundation structure for building
relocation of existing sewer line and electrical cables
excavation of soil to neccassry depth asper project drawings
backfilling and leveling of area
prefabrication and installation of reinforcement
concrete work
formwork and installation of binding concrete
formwork and installation of foundation footing
installation of underground condit and plumbing inside the building
formwork and installation of foundation beams
formwork and installation of slab on grade
cutting of concrete slab
formwork and installation of building columns
formwork and installation of roof beams
formwork and installation of roof slab c/w parapet
cutting of concrete slab
walkway around the building
Masonry works
layingdown of blocks for the external walls
layingdown of blocks for the internal walls
craft work
roof installation
plastering work (internal and external)
installation roof drainage system
installation of windows
installation of doors
water distribution sevage works including sanitary installation
ceramic wokk
interior and exterior painting
Electrical work
lighting system installation
cable installtion for lighting
internal lighting fixtures installation wiring
electrical equipment installation
LV distribution panles installation
LV distribution panles wiring
lighting panel installation
LV 480-208/120V trasformer installation and wiring
Cable installtion and wiring for HVAC system
Eartihing system installation
trenching for earthing system installation
earting rod installation
external underground eatihing system installation
earting system connection to installed equipment
Communication
installation of telephone and computer network cables and accessories
inside the building
installation of fiber optic cables new handholes and CJB
installation of Telephone cables new handholes and TDB
Fire alarm system devices installation and wiring
fire alarm control panel installation
multipair cable installation
Mechanical work
HVACsystem installation
suspended ceiling installation
falsefloor installation
other works
building cleaning and installation of furniture and other equipment and
material as per the contract
MECHANICAL COMPLETION-PHASE 2A
end_date resource_list delete_record_flag
(*)Finish (*)Resources Delete This Row
19-05-2021 16:00
19-05-2021 16:00
19-05-2021 16:00
19-05-2021 16:00
19-05-2021 16:00
19-05-2021 16:00
19-05-2021 16:00
19-05-2021 16:00
user_data
UserSettings Do Not Edit
DateFormat=dd/MM/yyyy
CurrencyFormat=US Dollar